Loading...
213448ORIGINAL TO CITY CLERK �` i �+ 63 2? 3448 - • CITY OF ST PAUL PUBLISHED COUNCIL t1 r PRESENTED RY COMMISSIONI FILE U. OFFICE OF THE CITY CLERK �tosen F'lle No. 213448 — By Milton UNCIL RESOLUTION — GENERAL FORM _'Resolved, That, nmendation of the Commissioner ee' ublic Works, and Chief Enginee, DATE ached randm adc tion is hereunto ache tPart yehereof (, RESOLVED, that, pursuant to the recommendation -b-f the Commissioner of Public Works, and Chief Engineer, which recommen- dation is hereunto attached and made a part hereof by reference, Sidewalk Contract No. 63 -M -279, District No. 4, may be and hereby is amended to include in its Special Provisions, in that paragraph entitled "Integral Curb - Sidewalk," the following: The contractor shall repair the gutter with Class A concrete in all cases, specifically including but not limited to, those areas wherein the gutter to be repaired was previously formed or constructed of paving block or brick, the same to be constructed with rate of $0.22 per lineal foot, and RESOLVED, further, that this amendment of contract shall be effective upon the filing of and acceptance of said amendment by the affected contractor or contractors, said acceptance to be in `a form acceptable to the Corporation Counsel. COUNCILMEN Yeas Nays Dalglish Rolland Loss Mortinson Rosen Mr. President, Vavoulis 10M 8-82 0 Adopted by the Council 19— XON 19 , 19— Approved ►r Mayor M • GEORGE M~ S EPAfM - C IT Y .w1 STREET AND HIGHWAY ENGINEERING COORDINATOR DEPAR 234 � o ;F:,; S A- I N TP%`UL� = e ilk inns it d Wl ' #AI fAMinnesota `- `' ■"-" i p r q o ..t ^�rgd�al 1 -Y =0�.1� P,IrnVUBL"IC•:WORKS__ _.Hale& Court a House 2)", I LT ON R O§) N� ell min L� g9 �` ENE V. AVERY EF ENGINEER �s LTESTE RW� ERINTENDENT OF SANITATION II It NL -LIAM P. BEHRENS— 7I MI �'if D.Pu+ Commissioner' Mr. Donald L. Lais Corporation Counsel B U I L D I N G Attention: Mr. Robert Faricy Dear Mr. Lais: June 14, 1963 !`fiqlp coo, �1V 1 � 19 �9 63 y Reference is made to Contract No. 63 -M -279, the contract to do all sidewalk work approved under final orders by the City of St. Paul in )District No. 4. (This is a local improvement contract granted to Pederson Broth - ers, Cement Contractors, Inc. countersigned by the Comptroller on April) 24, 1963. In previous years when work of this type was done in the downtown area, repairs of the gutter along the curb line was done by the City forces of the Public Works Department. Pecause of the extensiveness of the 1963 program, it is the thinking of the Engineering Division of the Public Works Department that this repair of gutters should be incorporated as part of the contract and then assessed back to the property owners. This office has negotitated with Pederson Brothers, Cement Con- tractors, Inc. and a verbal agreement of $.22 per lineal foot has been reached for said repair to the gutter. As we are in the midst of the construction season, it is request- ed that your office expedite this matter as soon as possible by taking the necessary steps through Council action and amend said Contract 63- M -279 to include this new item to be paid for at the rate of $.22 per lineal foot. Mr. Donald L. Lais June 14, 1963 Thank you for your cooperation in this matter and all other matters in the past; and if any further information is needed, do not hesitate to call me. GB/j d cc: Comr. M. Rosen Mr. E. V. Avery Mr. H. Thomas Approved: v• Eugene V. Avery Chief Engineer Milton Rosen Commissioner of Public Works Yours truly, Greeckett Lo Improvement Engineer