Loading...
213334�. z -� '213334 'PUBLISHED COUNCIL FILE N0_________________________ By----------- -- -- --------- FINAL ORDERS ,,C11 File No. 213334 FINAL ORDER 4LzernatteP o�.9 ^)proving 1VIISS;s'• � �iJj,a'1Fl;T,'.:ic :1.;1?Y 1'�haY � 4 , In the Matter of Improving MISSISSIPPI STREET from Minnehaha Avenue to York Avenue by grading, paving, curbing; by constructing and reconstructing sidewalk, by reconstructing the intersecting alley, street, and driveway returns; by reconstructing existing bridge surfaces; by constructing storm water drainage facilities; by constructing sewer, water, and gas service con- nections; and by doing all other work which is necessary and incidental to complete said improvement under Preliminary Order -------- R11503 ----------------------- approved --------- Mar_ ch__. 5_}__ l9 .63---------------------- - - - - -- IntermediaryOrder ---------------------------------------------- - - - - -- approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council, having heard all persons; objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement t be made b the said City is. -- south end of ridge over the Northern 1)6ptff1ci. wetly at Improving MISSISSIPPI STREET from Minnehaha Avenue -t?/York Avenue by �. grading, paving, curbing; by constructing and reconstructing sidewalk, by reconstructing the intersecting alley, street, and driveway returns; by reconstructing existing bridge surfaces; by constructing storm water drainage facilities; by constructing sewer, water, and gas service con- nections; and by doing all other work which is necessary and incidental to complete said improvement and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement in accordance therewith. Adopted by the Council__ File 16011 JUN 18 1963 Approved------------------------------------------ - - - - -- Councilman Dalglish Councilman Holland Councilman Loss , Councilman Mortinsorl Councilman Peterson Councilman Rosen Mayor Vavoulis &62 3M 22 City Clerk. 4 ---------------- ----- 10 �l Q --------- - - --I, Mayor. s ELTOR A.,DEHN, Vatiaion Engineer J. WILLIAM DONOVAN Assistant Valuation Engineer FOREST W. CROWLEY, Valuation Technician CITY OF SAINT PAUL BUREAU OF VALUATIONS 286 City Hall Saint Paul 2, Minnesota g Mrs. Agnes O'Connell, City Clerk City of Saint Paul Attention: Mr. Harold Riordan Dear Harold: CApital 4 -4612 May 22, 1963 Pursuant to our recent conversation I hereby request that the final order in connection with the improving of Mississippi Street from approximately Minnehaha Avenue to York Avenue be amended on the day of the hearing to read as follows: "Mississippi Street from Minnehaha Avenue to south end of bridge over the Northern Pacific Railway at York Avenue ". All other portions of this order are apparently correct and should stand as previously stated. I have also included herewith a copy of the preliminary esti- mate as received from the Department of Public Works and showing therein underlined in red the correct limits of this improvement. For ;your information, the first hearing on the final order is scheduled for June 185 1963. Very truly ours, J. William Donovan Asst Valuation Engineer JWD:lf Encl. c a �v O April 9, 1963 Honorable James J. Dalglish Ca=LUsi=or of Finance Rom 113, City Hall Rot. MISSISSIPPI STREET - Minnshaha Ave. to south and of bridge over N.P.RR. at York Dear Sir t I transmit berewith a parellnbairy estimate of cost for improving 1,,ISSISSIPPI STMT from Minnehaha Avenue to south and of bridge over Northern Pacific Railway a Iork Avenue y gra Ing, paving curbing, by constructing and reoonstruR Mi vidowalkl by reaonatruoting the intersecting alley, street, and driveway returns; by reconstructing existing bridge surfaces; by aonatructing star& caster drainage facilities; by oonstructiog sewer, Water and gas servios connections; and by doing all other work vUch is necessary and incidental to oomplete said Improvements under Preliminary Order C.F. 21150$ approved March 5, 1963. It is B ested that the above . limits of this proposed construction be na the �`ina er. Estimated Construction Costs = X82,971800 Engineering and Inspeotian, 12% = 91,956.52 Watbor Department Charges - Department of Finances Charges 10.00 Total Estimated Cost = $92,937.52 Estimated Property Assessments = 5 City's Share of Cost (M.S.A. Funds) _ ,000.52 Estimated property share of cost is bused an making the following assessment rates per front foot: Paving 1,092 feet • $10.00 nsr foot = $10,920.00 Curbing 1,094 feet g $2.50 per foot r 21735.00 Sidewalk 5,470 sq.ft. @ $0.60 per sq.ft. $16.9937.00 _Driveways will be assessed at the rate of $6000 per square yard. 6• Sever servioe connections, where necessary at X200.00. ti OFFICE OF THE COMMISSIONER OF PUBLIC WORKS Z!28% 28% REPORT TO COMMISSIONER OF FINANCE April S. 1 %� To the Commissioner of Finance of the City of Saint Paul: The Commissioner of Public Works, having had under consideration the pre- liminary order of the Council, known as Council File No, 211508 approved March 5, 19 63 relative to Improving Mississippi Street from Minnehaha Avenue to York Avenue by grading, paving, curbing; by constructing and reconstructing sidewalk, by reconstructing the intersecting alley, street and driveway returns; by reconstructing existing bridge surfaces; by constructing storm water drainage facilities; by constructing sewer, water, and gas service connections; and by doing all other work which is necessary and incidental to complete said improvement and having investigated the matters and things referred to therein, hereby reports: 1. The estimated cost thereof is 92.937.52 2. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 3. Initiated by the Commissioner of Public Works g 4. Improvement is asked for upon petition Commissioner of Public Works s�' i, ��•� ��� ■ ■ n tI 0 ENE . AVERY GEORGE M. SHEPARD fL CITY Q ;� " SAINT =P� J ENGINEER STREET AND HIGHWAY `�•� w ' ENGINEERING COORDINATOR i�' lull, h.K ny #'kl ofyMinn�e�sgota = �; ;' M s , e 3 �o TESTEg '+� ��` �'• "';� � "1'` J'O' _ •+ J p ^ g 9 I RINTENDE�I�F SANITATION • �"'° _ `' V DEPART I'; 1�A BLT. -G _ ' O_ RK_F- = ::� y$ Cbrt Ho so ■�,}]�• _~p.. .7►. S • '{ � " M4. •+ iii � f�".�' L�7 FJ {f•N e� D +\ ILTO,N RQSSN� ZI � .M . t...,.. W1bMAM,P. BEHREN$ -. - 4I '� _ - - -- - J �.:y.... _ .._.• ae'P�,a- � • -- -DeP� Eo�'eY�~ s i 1 � i ? � ! I � 1 � � I E 1 - - 224 ' April 9, 1963 Honorable James J. Dalglish Commissioner of Finance Room 113, City Hall Re: MISSISSIPPI STREET - Minnehaha Ave. to south end of bridge over N.P.RR. at York Dear Sir: I transmit herewith a preliminary estimate of cost for improving MISSISSIPPI STREET from Minnehaha Avenue to south end of bridge over Northern Pacific Railway at York Avenue by grading, paving curbing, by constructing and reconstructing sidewalk, by reconstructing the intersecting alley, street, and driveway returns; by reconstructing existing bridge surfaces; by constructing storm water drainage facilities; by constructing sewer, water and gas service connections; and by doing all other work which is necessary and incidental to complete said improvement, under Preliminary Order C.F. 211508 approved March 5, 1963. It is suggested that the above limits of this proposed construction be used in the Final Order. Estimated Construction Costs = $82,971.00 Engineering and Inspection, 12% = 9,956.52 Water Department Charges - Department of Finances Charges = 10.00 Total Estimated Cost = $92,937.52 Estimated Property Assessments = 16,93��.00 City's Share of Cost (M.S.A. Funds) _ $76,000.52 , following Estimated property share of cost is based on making the assessment rates per front foot: Paving 1,092 feet @ $10.00 per foot = $10,920.00 Curbing 1,09/. feet @ $2.50 per foot = 2,735.00 ® Sidewalk 5,470 sq.ft. @ $0.60 per sq.ft. = 282.00 - CA, � 1� ..�oM -f��� GOwecu-d�j. a Mv $16,937-00 , wa-ys be assessed at the rate of $6.00 per square yard.h �� �`' " Sewer service connections, where necessary at $200.00. `l • r• i Preliminary Estimate Page 2 Water service connections as per following schedule (West Side) (East Side) 3/4" - $179.00 3/4" - $229.00 1" - $185.00 1" - 0235.00 411 - $235.00 1 -I-" - $285.00 Water service connections 2" and larger will be estimated by the Water Department. Yours very truly, Claude Thompson Design Engineer CT /gs Approved: Eugefie V. Avery, Chief gineer Approved: Milton Rosen, Commissioner of Public Works � f 9�< J, Y 4L4&'1 V. 4tl WT fWW-! rr I y LL �r613�cl FIA IT 771 21WI: TIT R7 NO 14, e ' J, Y 4L4&'1 V. 4tl WT fWW-! rr I y LL �r613�cl FIA a2'.a -60 1 - O� " lk I w. i4E 7N Ir V-9014 y y 0) e ' a2'.a -60 1 - O� " lk I w. i4E 7N Ir V-9014 y y