Loading...
214410Council File No. 2144111— v �' In the matter of the assessment_ of ✓ 1'°neHts, costs and expenses for im- _� ' •ovingg WHITE BEAR AVENUE from `ijington Avenue to h;rpenteur Ave - Council File No----------- ------- -- ---------- --- -- by widening the paved roadbed on sides, by regrading and paving �q8 ! 9videned areas with new concrete 2L: % nd asphaltic,, concrete surfacing• ecfacir.^ wit,h� - rhaltic concrete By---------------------------------- 13 di -X�a •----- •-- •------ - - - - -- - r s .. v CITY OF ST. PAUL Resolution Ratifying Assessment In the matter of the assessment of benefits, costs and expenses for improving WHITE BEAR AVENUE from Arlington Avenue to Larpenteur Avenue by widening the paved roadbed on both sides, by regrading and paving the widened areas with new concrete base and asphaltic concrete surfacing; by resurfacing with asphaltic concre,e the existing paving where necessary; by constructing new curb, driveways and paving approaches where necessary; by constructing sewer, water and gas service connections where necessary; by reconstructing drainage facilities; by reconstructing sidewalks, curbing and paving on intersecting streets where not in conformity with said improve- ment and by doing all other work necessary and incidental to complete said improve- ment under Preliminary Order ...... 49046........ Intermediary Order ...... - .20081L..... Final Order- ._2011fi4... ....... . approved........ March-- 14- .................. 19.... 61 A public hearing having been had upon the assessment for the above improvement, and said assessment having been further considered by the Council, and having been considered finally satisfactory, be it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation. BE IT FURTHER RZSOLVED, That the said assessment be and it is hereby determined to be payable in .............. - J - --- - - - -- -equal installments. AUG 21 1963 Adoptedby the Council- ................................................. --- .................... - 19......... AUG 21 1963 Approved.............. -- ------------------------------------ 19........ Form B. B. 18 File #151+0 Councilman Councilman Councilman Councilman Councilman Councilman Mayor ........�..1...L - -_. `.- ...._.. _ ., City Clerk. --------- ------ - - - - -- - -- - - - - -- - - - - - -- - -••- -------------- , Mayor. 9- A.. . 2.4036 CITY OF ST. PAUL OFFICE OF THE COMMISSIONER OF FINANCE Report of Completion of Assessment July 23 19 63 In the matter of the assessment of benefits, costs and expenses for improving WHITE BEAR AVENUE from Arlington Avenue to Larpenteur Avenue by widening the paved roadbed on both sides, by regrading and paving the widened areas with new concrete base and asphaltic concrete surfacing; by resurfacing with asphaltic concrete the existing paving where necessary; by constructing new curb, driveways and paving &Dproaches where necessary; by constructing sewer, water and gas service connections where necessary; by reconstructing drainage facilities; by reconstructing sidewalks, curbing and paving on intersecting streets where not in conformity with said improve- ment and by doing all other work necessary and incidental to complete said improve- ment under Preliminary Order 199046 approved SPptemrer 22, 1960 Intermediary Order 200811 approved FPrrnary 14, 1960 Final Order 201164 , approved Marrh 14i 1A61 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports to the Council the following as a statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction . ............................... $ 64,52.7() Engineering ........ ..............................$ 5,169.08 Inspection fees ...... ..............................$ I 2 P7 Postal cards ......... ..............................$ 7 -95 Publications ........................................ $ 79.50- - Court costs for confirmation ........................ $ 7.95-_ Total expenditures........... ...........$ 70.,909.45 County aid - $47,283.21 - Net Assessment $23,6.26.24 Said Commissioner further reports that he has assessed and levied the total amount as above ascer- tained, to-wit: the sum of $ 701,909- 45 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. 2M 12 -b2 8 4 Ca issioner of Finance.