Loading...
214406} Council File No----------------------------------- ,By ,e ............. ......................................... Resolution In the matter of the assessment of Council File No. 214400 — In the matter of the assessment of( benefits, costs and expenses for fading [>� Arundel' -'St. from Minnehaha "Ave. to %/J the north line of L_ of 19, Block 3, ° Neurer's 'Addition; Englewood Ave. from Arundel, St. to Western Ave. and Cumberland St. from Englewood Ave. t6 the south line of the Great Northern Railroad right -of -way, under Pre- liminary Order 196273, Intermediary, Omer 196845, Fin '-1 .Qr; er 197560, ap- Jun,e14, 31). riBLLSIMD CITY OF ST. PAUL " J, Ratifying Assessment benefits, costs and expenses for grading Arundel St. from Minnehaha Ave. to the north line of Lot 19, Block 3, Neurer's Addition; Englewood Ave. from Arundel St. to Western Ave. and Cumberland St. from Englewood Ave. to the south line of the Great Northern Railroad Right =of -way, under Preliminary Order ..... 19- 6273.......... Intermediary Order ..... 1.9.6845......... Final Order ........1.97.56II..... approved .......... _ ....... , Iuue..14 ............ 19 ... f1Q. A public hearing having been had upon the assessment for the above improvement, and said assessment having been further considered by the Council, and having been considered finally satisfactory, be it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation. BE IT FURTHER •RESOLVED, That the said assessment be and it is hereby determined to be payable in ............. .... equal installments. 1196 Adopted by the - Council----------- --p!uG 2. ________.____ ... _._ ........... _ ----- 19......... CiC%ity Clerk. p,UG 21 196 Approved.-.-_..__--- ------------------------------------ 19 -------- ... ..__....... •• -• .... - ................................................ , Mayor. Form B. B. 18 File #14842 Councilman Councilman Councilman Councilman Councilman Councilman Mayor 3 � " CITY OF ST. PAUL 0-1 �� ®� OFFICE OF THE COMMISSIONER OF FINANCE ,. Report of Completion of Assessment .T „7 y 16 63— In the matter of the assessment of benefits,costs and expenses grading and surfacing with bituminous material the East North and South alley in Block 3, Joseph R. WeM,de's 2nd Addition, from Orange Ave. to Hyacinth Ave., also constructing a sewer in the alley from 130 ft. North of Orange Ave. to the exist- ing sewer in Orange Ave. for under Preliminary Order 195609 approved January 28, 1960 Intermediary Order 196680 approved April 12, 1960 Final Order 197041 , approved July 19, 1960 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports to the Council the following as a statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction . ............................... $ 3,387.20 Engineering ........ ..............................$ 337.00 Inspection fees ...... ..............................$ 34.00 Postal cards ......... ..............................$ 2.85 Collection costs 47.50 Publications ........ ..............................$ 28.50- Court costs for confirmation ........................ $ 2.85 Total expenditures .............................$ 3,839.90 Said Commissioner further reports that he has assessed and levied the total amount as above ascer- tained, to -wit: the sum of $ - 839.90 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. 2M 12 -62 Commis ' er of Finance. g s T CITY OF ST. PAUL OFFICE OF THE COMMISSIONER OF FINANCE �7� Report of Completion of Assessment In the matter of the assessment of benefits, costs and expenses July 16 19 63 for grading Arundel St. from Minnehaha Ave. to the north line of Lot 19, Block 3, Neurer's Addition; Englewood Ave. from Arundel St. to Western Ave. and Cumberland St, from Englewood Ave. to the south line of the Great Northern Railroad right -of -way under Preliminary Order 196273 approved Marrh 155, 1960 Intermediary Order 196845 approved April 26, 1960 Final Order 197560 approved June 14, 1960 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports to the Council the .following as a statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction . ............................... $ 12, 455.00 Engineering ........ ..............................$ 1- 25l.3-4 -- Inspection fees ...... ..............................$ 74.07 Postal cards ......... ..............................$ 4.05 Publications ........ ..............................$ 40,�O Collection costs 67.50 Court costs for confirmation ........................$ 4.05 Total expenditures .............................$ 13,896.47 Said Commissioner further reports that he has assessed and levied the total amount as above ascer- tained, to -wit: the sum of $ 11,1996-47 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. Aa0z' 2M 12 -62 8 Corn sioner of Finance.