2142641 _
Council ,File No .................
By- •------ •- .................
Council Flle No. 214284 --
-In the matter of the assessment of
benefits, costs and expenses for im-
proving WHITE BEAR, AVENUE from
East Third Street to Hudson Road
(T. H. No. 12) by regrading, curbing;
and paving with a" one course concrete
pavement; by grading and pavin
street, alley and driveway returns; by
grading and sodding boulevard areas
where new curb is constructed; by con-
structing drainage facilities; by re-
constructing s'_? ,w4 lks, curbs and pave -
ments en �'> tingg, s.rer;Y. where
nry in tti_.i „$:gryii '1vi''f, ,14
rx:;nt; t'•,, fr, It--'isvtiidb Ltxr. .s ?ttz1L`;SJ
E- .4vt�'��''R7� 31.ii' 3`2 f ^tit�'t�i
CITY OF}tr AUL
Resolution Ratifying Assessment
214264
PVBLl's % ) F"I"G'/-,
In the matter of the assessment'of benefits, costs and expenses for
improving WHITE BEAR AVENUE from East Third Street to Hudson Road (T.H. No. 12) by
regrading, curbing and paving with 8" one course concrete pavement; by grading and
paving street, alley and driveway returns; by grading and sodding boulevard areas where
new curb is constructed- by constructing drainage facilities; by reconstructing sidewalks,
curbs and pavements on intersecting streets where not in conformity with said improve-
ment; by constructing sewer, water and gas service connections from.street mains to
property lines where necessary and by doing all other work necessary and incidental
to complete the said improvement.
under Preliminary Order....- ..2ooi67 ...... Intermediary Order ...... 2DL761 ........ Final Order .... 20225.4. ........ .
approved .......... 14 fly -4 .... ...................19..61..
A public hearing having been had upon the assessment for the above improvement, and said assessment
having been further considered by the Council, and having been considered finally satisfactory, be it therefore
RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same
is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation.
BE IT FURTHER RESOLVED, That the said assessment be and it is hereby determined to be payable
in .............. � ........ equal installments.
Adopted by the council ..................... AUG 1963 .................... - 19.........
_L/.I:: ..... ��1=- �• - = -L�
AUG 71963 City Clerk.
Approved........... - .......... ......................... 19........
__ - .........._ ----- ........ _............................ .......... Mayor.
Form B. 18
File A 5197 ACM79
Councilman
Councilman ;
Councilman
Councilmen
Councilman
Councilman n
Mayor (�
. _ V
CITY OF ST. PAUL
OFFICE OF THE COMMISSIONER OF FINANCE
-?7213800 Ave- 61
Report, of Completion of Assessment
July 9 , 1963
In the matter of the assessment of benefits, costs and expenses for
improving WHITE BEAR AVENUE from East Third Street to Hudson Road (T.H. No. 12) by
regrading, curbing and paving with 8" one course concrete pavement; by grading and
paving street, alley and driveway returns; by grading and sodding boulevard areas where
new curb is constructed; by constructing drainage facilities; by reconstructing sidewalks,
curbs and pavements on intersecting streets where not in conformity with said improve-
ment; by constructing sewer, water and gas service connections from street mains to
property lines where necessary and by doing all other work necessary and incidental
to complete the said improvement.
under Preliminary Order , 200167 , approved T)PCembpr 22i 1960
Intermediary Order 201761 approved A rr i 1 ?5 1961
Final Order 202254 approved May 23, 1961
To the Council of the City of St: Paul:
The Commissioner of Finance hereby reports to the Council the following as a statement of the ex-
penditures necessarily incurred for and in connection with the making of the above improvement, viz:
Cost of construction . ............................... $ 78i 635.61
Engineering ....... ............................... $ 60 -Li 6. 18
Inspection fees........ 6 ...........................$ 10529.04
Postal cards ......... ..............................$ 4.95
Publications ....... ...............................
Court costs for'' confirmation ........................ $ 4.9�
Total expenditures............
$ 86, 14o. 23__
Charge to County Aid - $66,204.34 -Net Assessment $20,135.89
Said Commissioner further 'reports that he has assessed and levied the total amount as above ascer-
tained, to-wit: the sum of $ 86.,340-23 upon each and every lot, part or parcel of land deemed
benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; 'that the said assessment has been completed, and that hereto attached,
identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as
completed by him, and which is herewith submitted to the Council for such action thereon as may be
considered proper. ; 0, ZQZ—z
2M 12-62 8 Commis ' er of Finance.
1 � -
. _ V
CITY OF ST. PAUL
OFFICE OF THE COMMISSIONER OF FINANCE
-?7213800 Ave- 61
Report, of Completion of Assessment
July 9 , 1963
In the matter of the assessment of benefits, costs and expenses for
improving WHITE BEAR AVENUE from East Third Street to Hudson Road (T.H. No. 12) by
regrading, curbing and paving with 8" one course concrete pavement; by grading and
paving street, alley and driveway returns; by grading and sodding boulevard areas where
new curb is constructed; by constructing drainage facilities; by reconstructing sidewalks,
curbs and pavements on intersecting streets where not in conformity with said improve-
ment; by constructing sewer, water and gas service connections from street mains to
property lines where necessary and by doing all other work necessary and incidental
to complete the said improvement.
under Preliminary Order , 200167 , approved T)PCembpr 22i 1960
Intermediary Order 201761 approved A rr i 1 ?5 1961
Final Order 202254 approved May 23, 1961
To the Council of the City of St: Paul:
The Commissioner of Finance hereby reports to the Council the following as a statement of the ex-
penditures necessarily incurred for and in connection with the making of the above improvement, viz:
Cost of construction . ............................... $ 78i 635.61
Engineering ....... ............................... $ 60 -Li 6. 18
Inspection fees........ 6 ...........................$ 10529.04
Postal cards ......... ..............................$ 4.95
Publications ....... ...............................
Court costs for'' confirmation ........................ $ 4.9�
Total expenditures............
$ 86, 14o. 23__
Charge to County Aid - $66,204.34 -Net Assessment $20,135.89
Said Commissioner further 'reports that he has assessed and levied the total amount as above ascer-
tained, to-wit: the sum of $ 86.,340-23 upon each and every lot, part or parcel of land deemed
benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; 'that the said assessment has been completed, and that hereto attached,
identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as
completed by him, and which is herewith submitted to the Council for such action thereon as may be
considered proper. ; 0, ZQZ—z
2M 12-62 8 Commis ' er of Finance.