96-56t ° '`i r; s
� F��� �;'�� i
��� ..�,i��.�i's
RESOLUTION
„93NT PAUL, M!I
Presented By.
Referred To:
Council Fife # �
Greensheet# 31121
GSJ
Committee: Date
i
z 1rVHEREAS, the Capital Allocation Policy F-11 requires an annual review of the status of the City's
s capital projects; and
a
s WHEREAS, a recent review of capital projects has identified over 200 projects that may be closed out; and
6
� WHEREAS, several of the completed projects contain surpluses that must be removed and placed
e in contingency before the projects may be closed; now therefore be it
s
io RESOLVED, by the Council of the Cify of Saint Paul, upon recommendation ofthe Mayor and advice of
7� the Long Range Capital Improvement Budget Committee, that the Capitai Improvement Budget, as
iz heretofore adopted and amended by this Council is hereby further amended in the following particular:
13
i4 Current Amended
ts Budget Changes Budget
is FINANCING PLAN
n Harriet Is Design/ Site Dev
ia C87-3C010
19
zo HRA Fund 143 319,278.00 1,358.36 320,636.36
zi Miscellaneous Revenue 0.00 3,749.62 3,749.62
22 319,278.00 5,107.98 324,355.98
23
24 SPENDING PLAN
25 Harziet Is Design/ Site Dev
26 C87-3C010
27
2s Design 319,278.00 5,107.98 324,385.98
2s
30
31
32 FINANCING PLAN
a� Levee Specific Design Work
3a C87-3C011
35
ss HRA Fund 143 53,398.41 0.00 53,398.41
a� PortAUthority 0.00 22,999.43 22,999.43
3e 53,398A1 22,999.43 76,397.84
39
ao SPENDING PLAN
at Levee Specific Design Work
a2 C87-3C011 .
43
a4 Design 53,398.41 22,999.43 76,397.84
45
46
47
48
Q9
50
5�
52
53
1
sa
u
ss
�
�
ss
so
s�
s2
�
ea
ss
ss
s7
68
69
70
�t
72
73
74
75
7s
77
�a
�s
80
81
az
83
84
85
86
87
se
es
so
s�
s2
93
94
ss
96
97
sa
99
100
907
i o2
t03
io4
��
ios
�07
�08
l09
iio
7t7
7 12
113
tia
115
�16
117
t18
1 19
720
121
FINANCING PLAN
Marina Lower Harbor Improvements
C87-3C013
HR.4 Fund'143
CIB 1986
SPENDING PLAN
Marina Lower Harbor Improvements
C873C013
Design and Construction
FINANCING PIAN
Harriet Island Adventure Playground
C87-3C014
HRA Fund 143
Contributions
SPENDING PLAN
Harriet Island Adventure Playground
C87-3C014
Design
FINANCING PLAN
Hillcrest Community Center
C87--3P001
GIB 1987
Transfer from Special Fund
SPENDING PLAN
HiAcrest Community Center
C87-3P009
Design
FINANCING PLAN
Rec. Center Site Reuse Project
C87-3S003
GB 1987
Transfer from special funds
CIB 1988
Miscellaneous Revenu
SPENDIRlG PWIJ
Rea Center Site Reuse Project
C873SD03
Construction
164,092.0�
35,000.00
199,092.00
199,092.Q0
300,000.00
5,000.00
305,000_00
305,000.00
15,OOQ.00
0.00
15,000 OD
��� ��
40,O�D.00
17T,117.00
0.00
0.00
211,1 t7.00
211,117.00
(7,SOQ.00)
0.00
(7,500.00)
(7,500.00)
(1,358.36)
0.00
(1,358.36)
(1,358.36)
0.00
225.00
225.OD
225 00
o.00
798.64
2,D49.68
1,371.99
4,160.31
4,160.31
!�' �f�
15Q592.00
35,000.00
19'1.592.00
791,592.00
298,641.64
5,000.00
303,641_64
303,641.64
15,000.00
225.00
15,225.00
15,225.00
40,000.00
17Y,915.64
2,049.68
1,311.99
215,277,31
215,277.31
2
1��v
izz FINANCiNG PLP.N
i23 Valley Rec. Ctr. SitelPlay Area
r2a C88-3G001
i25
izs Ofher Pyency
i27 CIB 1988
�26
12s
�3o SPENDING PLAN
i3t Valiey Rea Ctr. Site/Play Area
132 C88-3G001
733
�� Cons4vction and Design
��
73G
137
tsa FINANGNG PLAN
�39 Como Park Restoration
ia0 C88-3J003
7ai
ta2 MetropolitanParksAct
743
iaa SPENDfNG PLAN
i45 Como Park Restoration
746 C88-3J003
�47
iqs Building lmprovements
ias
iso
�s�
ia2 FINANCING PLAN
�ss Higfiland Golf Irrigation
�sc C88-3P002
l55
is6 Metropolitan Parks Act
757 G61988
158
f59
iso SPENDING PLAN
is� Highland Golf Irrigafion
�s2 C88-3P002
163
7sa Design and Construction
tss
166
167
tsa FINANCING PLAN
tss C.S.CapitalMamtenance-88
vo C88�T021
ni
i72 CIB 1988
773 Transfer from Special Fund
17a
175
ns SPENDING PLAN
�» C.S. Capital PAai�tenance - 88
na C8&3T021
»s Design and Construction
iao
181
�82
783
184
185
786
187
I88
189
. � ��� ��
��� i�
��� �
391,000.00
1,542,ODD.00
7,542,OOD.00
62,829.02
308,061 _00
370,890.02
370,890.02
200,000.00
114,485.00
374,455.00
314,485.00
0.00
(1,592.40)
(1,592.40)
(1,592.40}
(127.44)
(127.44)
0.00
(3,395.00)
(3,395.00)
(3,395.00)
(5,227.16)
5,227.16
0.00
� ��
80,000.00
309,407.60
389,407.60
389,407_60
1,541,872.56
1,541,872.56
62,829.02
304,666 00
367,495.02
367,495.02
194,772.84
119,712.16
314,485.00
314,485.D0
3
�� s�
ieo FINANCtNG PLAN
�el Bums Ave Park Acquisi5on
ie2 C893A003
is3
i9a Miscella�eous Revenue
��
iss SPENDING PLAN
�s7 BumsAveParkAcquisition
isa C&9-3AQ0.3
tss
2� Acquisition of Cand
2oi
2oz
203
2oa FINANCING PLAN
2os Phalen Pk. Path Improvements
2os C89-3ED01
zo�
zo& CIB 1989
2os Sale of Plans
2io
zi7
2i2 SPENDWGPLAN
zia Phalen Pk. Path Improvements
2�a C893E001
zis
2is Design and Construction
217
218
279
zzo FINANCING PLAN
22i Wheelock Pkwy. Acquisifions
222 C89-3F003
223
22a Metropolitan Parks Act
225 CIB 1892
22s qB 1990
227 CIB 1988
229
229
2sa SPENDING PLAN
2s� Wheelock Picwy. Acquisition
232 C89-3F003
233
23a Design and Construction
235
236
237
zas FINANCING PLAN
2ss Groveland Handicap Accessibility
24o C893N001
24I
2a2 CIB 1993
243
za4 SPENDING PLAN
z45 Groveland Handicap Accessibility
zas C893N001
za�
2aa Design and Constnrotion
249
250
251
252
253
254
255
256
257
� ��� ��
� ��� ��
85,296.62
72.00
85,368.62
85,368.62
95,000.00
8,000.00
20,000.00
10,200.00
133,20Q.00
133,200.00
26,500.00
26,500.00
(752.41)
(752.41 }
(6,650.45)
(6,650.45)
(6,65D.45)
0.00
(1,455.07)
O.OD
O.OD
(1,455.07)
(1,455.07)
(372.03)
(372.03)
29,247.59
29,247.59
75,646.17
72.00
75.718.17
78,718.17
95,000.00
6,544.93
20,000.00
10,200.00
931,744.93
131,744.93
26,127.97
26,127.97
4
25a FINANCING PLAN
zss Sackef Rec. Center Sfte Imp.
2so C90-3B001
2s�
26z CDBG
z63
2sa SPENDING PLAN
z5s Sacket Rec. Center Site Imp.
266 C90-380�'I
2s7
2sa Design and Construction
269
270
271
272 FINANCING PLAN
273 Rice Rec. Center Enfrance
z7a C90-3F005
2�s
27s CDBG
277
z�e SPENDING PLAN
27s Rice Rec. Center Entrance
28o C90-3F005
281
za2 Design and Construction
283
284
285
2ae FINANCING PLAN
2e7 Scheffer Rec. SitelPlay Area
2aH C903G002
2E9
2sa CDBG
291
zsz SPENDING PLAN
zsa Scheffer Rec. SitelPlay Area
2s4 C90-3G002
2ss
2ss Design and Construction
297
298
299
soo FINANCING PWN
aoi Old Hoofed Stock Barn Renovation.
302 C90-3J006
303
soa Metropol�tan Parks Act
305 Transfer from Special Fund
aos
307
sos SPENDING PLAN
3os Old Hoofed Stock Barn Renovation.
370 C9�-3J�Of>
31�
3i2 Design and Construction
313
314
3i5 FINANCING PLAN
3�s Langford Oukdoor Crt. Lighting
3n C90-3L001
318
ais CDBG
320
329 SPENDING PLAN
sn Langford Outdoor Crt. Lighting
3z3 C90.3L001
324
sz5 Desigo and Construction
21,886.03
21,886.03
117,500.00
117,500 00
159,531,01
159,531 A1
245,000.00
0.00
aas,000.00
245,000.00
47,000.00
• 11� �1
7�p — ,7,Y!
30.00 21,916.03
30.OQ 29,916.03
(4,390,00}
(4,390.00)
113,1 T 0.00
113,110.00
20.00 i59,551.01
20.00 159,551.01
0.00
10,000.00
10,D00.00
1Q000.00
1,292.40
1,292.40
245,000.00
1D,000.00
255,000.00
255,000.00
48,292.40
48,292.40
5
9! -S�
326
327
328
329
330
��
332
333
334
335
336
337
338
33s
340
347
342
343
aac
345
346
347
349
349
350
351
asz
353
354
355
356
357
358
359
360
361
362
363
364
365
3se
367
368
369
370
37 1
372
373
374
375
376
377
378
379
380
381
382
383
384
385
366
387
3ae
389
390
391
392
333
FINANCING PLAN
East Side Communty Center
C90-3S020
Contributions
CIB 7990
SPENQlNG PL4N
East Side Communfy Center
C90-3S020
Design and Construction
FINANCING PLAN
Battle Creek Reg. Park
C91-3A005
Residual Equity Transfer In
Metropolitan Parks Act
Miscellaneous Revenue
Transfer from Special Fund
SPENDING PLAN
Battle Creek Reg. Park
C91�A005
Construction
FINANCING PLAN
EI Rio Vista Playground Equip
C913C008
CDBG
SPENDING PLAN
EI Rio Vista Playground Equip
C913CD08
�esign and Construction
FINANCING PLAN
Lilydale/Haniet Is Regional Park
C91-3C015
Residual Equity Transfer ln
Miscelfaneous Revenue
SPENDING PLAN
Lilydale/Harriet Is Regional Park
C91-3C015
COf15}fUCt101'1
��� ��� ��
� ��� ��
� ��� ��
510,040.00
D.00
0.00
0.00
D.DO
0 00
� ��
.. ��� 1�
.. � �� ��
0.00
0.00
0.00
� �1
(20,0�O.OD)
0.00
(20,000.00)
(20,000.00)
78,812.97
127.44
707.88
1,522.07
21,170.36
21,170.36
2,482.00
2,482.00
6,84524
9,915.58
16,760.82
16,760.82
'� �� ��
� r�� ��
..� ��� ��
tVT�
18,812.97
127.44
707.88
1,522�7
z�,a7o.ss
21,170.36
68,482.00
68,482.00
6,84524
9,915.58
16,760.82
16,760.82
�
9G �'y
a5a FINANCING PLAN
ass Cherokee Park Playground Equip
3ss C91-3C016
a97
39s CI81994
�
aoa SPEND(NG PLAN
nm Cberokee Park Piay Equip
ao2 C91-3C076
403
a0a Design and Construction
aos
aos
m�
aoa FINANCING PLAN
409 lockwood Recrea5on Ctr Site
4�0 C913E002
a�7
aiz CDBG
473
nia SPENDING PLAN
ai5 Lockwood Recreation Ctr Site
ai6 C913E002
nn
ais Design and Construction
ats
420
421
422 FINANCING PLAN
423 Municipal Athletic Facifity
42a C913L003
425
42s Intrafund Transfer ln
427
42a SPENDING PLAN
azs Municipal Athlefic Facility
a3o C91-3L003
431
a32 Llesign and Construction
433
434
435
43s FINANCING PLAN
4a� Crosby Farm AcquisiBon
4sa C913P006
ass
aao Metropolitan Parks Act
441
aaz SPENDING PLAN
aas Crosby Farm Acquisition
a4a C91-3P006
aas
aae Design and Acquisffion of Land
447
448
449
aso FINANCING PLAN
asi Hidden FaIIs/Crosby Farm Reg. Park
a52 C91-3P007
453
asa Metropolitan ParksAct
ass
a5s SPENDING PLAN
a57 Hidden Falis/Crosby Farm Reg. Park
a5a C91-3P007
ass
aso Design
46�
67,100.00
. �� ��
179,214.71
�79,214.71
� ��
� ��
� ��
� ��
� ��
� ��
(3,06978)
(3,06978)
(50.00)
(50 00)
38,000.00
38,000.00
3,799.75
3,79975
2,636.M13
2,636.13
64,03022
64,03022
179.164.71
179,164.71
38,0O�,OD
38,000.00
3,799.75
3,799.75
2,636.13
2,636.13
7
�i� ���
462
4sa FINANCING PLAN
464 Linwood Community Rec. Cerrter
4�5 C91-3Q002
466
467 CIB 1991
468
asq SPENDING PLAN
a�o Linwood Community Rec. Center
a7i C91-3Q002
472
aT3 Design and Construcfion
a�a
475
476
nn FINANCING PLAN
a�a Citywide Tree Planting
47s C91-3T014
nao
4ai Residual Equity Transfer In
4sz Donations
qas All Other Financing
484
aes
4as SPENDING PLAN
qa� Citywide Tree Planting
aea C91-3T014
ass
aso
49 I
492
as3 FINANCWG PLAN
qe4 C.S. Contingency
4es C91-3T991
49fi
a9� Residual Equity Transfer In
498
ass SPENDING PLAN
50o C.S. Cordingency
5oi . C91-3T991
soz
5os Intrafund Transfer Out
s0a
505
506
so7 F�NANCING PLAN
soe Linwood Community Centar
sos C9234003
s�o
sii CIB 1992
512
s�s SPENDING PLAN
eia Linwood Community Center
sis C923Q003
sis
si7 Design and Construction
sis
519
520
521
522
523
524
525
526
527
528
529
206,500.00
i�I�'.�
0.00
0.00
260,000.00
260,000.00
260,000.00
(1.93'1.47)
(1,931.47)
18,175.00
45,545.00
0.00
63,720.00
63,720.00
0.00 47,201.69
0.00 47,201.69
470,000.00
470,000.00
(3,125.55)
(3,125.55)
204,568.53
204,568.53
18,175.00
45,545.00
260,000.00
323,720.00
323,720.00
47,201.69
47,201.69
466,874.45
466,574.45
�
9�-56
sso PINANCING PLAN
53i Hazel Pk. Rec. Ctr Improvements
532 C933B002
533
53a CDBG
535
sss SPENDING PfAN
s37 Hazel Pk. Rec. Ctr Improvements
ssa C93-36002
539
sao Design and Construction
sai
saz
sas
saa FINANCING PLAN
sa5 S St. Mthony Pk.: Outdoor Equip
54s C933L004
547
sas CDBG
sa5
sso SPENDING PLAN
ss� S St. Anthony Pk.: Outdoor Equip
552 C933��04
553
ssa Design and Construction
555
556
55�
55s FINANCING PLAN
559 Mississippi River Blvd. Rec-93
5s0 C933S015
56t
5s2 CIB 1993
ss3 MSA 1993
ss4
ss5
ss6 SPENDING PLAN
ss7 Mississippi River Blvd. Rec-93
ssa C93-3S015
569
57o Design and Construction
s7i
s�z
573
s74 FINANCING PLAN
s�s Rice Sfreet Brench Librery
57e C883F002
577
57a CDBG
579
sao SPENDING PLAN
sai Rice Street Branch Library
sa2 C88-3F002
sa3
ss4 Design and Construcfion
585
586
587
588
589
590
59I
592
593
594
595
596
597
: ��� ��
28,000.00
65,000.00
65,000.00
86,OOO.QQ
52,000.00
138,0OO.OQ
138,000.00
33,400.00
33,400.00
(4.31)
(4.3I )
(1,204.49)
(1,204.49)
�.0�
(52,000.00)
(52,000.00)
(52,000.00)
(17,565.20)
(17,56520)
27,995.69
27,995.69
63,795.51
63,795.51
86,��0.a0
0.00
86,000.00
:. ��� ��
15,834.80
15,834.80
0
�� r ✓ �
s9a FINANCING PLAN
sss CenUal Library Roof
soo C893R012
601
so2 Hill Reference Library
sos Cf6198fi
soa CIB 1989
605
606
so7 SPENDING PLAN
sos Central Library Roof
sas C813R012
s7o
si i Design and Construction
si2
613
614
sis FINANCING PLAN
s7s Northwest Team Police Remodeling
s97 C90-4H001
sis
s7s HRA Fund 147
szo CIB 1990
621
sz2 SPENDING PLAN
s23 NorthwestTeain Police Remodeling
s2a C90-4H001
s25
s2s Constructian
627
628
629
sso FINANCING PLAN
s3i K-9 Facility Improvement
ea2 C94-4T003
633
s34 C18 1994
635
s3s SPENDING PLAN
s3� K-9 Facility Improvement
ssa C944T003
639
sao Construction
s4i
642
643
s4a FINANCING PLAN
s45 Fire Contingency
s4s C91bT99t
sa�
eaa Residual Equity Transfer in
sns
sso SPENDING PLAN
ssi Fire Contingency
s52 C91-5T991
653
s54 Intrafund Transfer Out
sss
sss
ss�
sss
sss
660
661
662
663
664
665
179,200.00
33,4W.00
290,000.00
502,600.00
502,600.00
60,000.00
250,000.00
310,000.00
310,000.00
40,000.00
40,000.00
(23,06626)
(23,066.26)
(23,066.26)
(60,000.00)
0.00
(60,000.00)
(60,000.00)
(360.12)
(360.12)
0.00 13,610.00
0.00 13,610.00
156,13374
33,400.00
290,OD0.00
479,533.74
479,533.74
0.00
250,000.00
250,000.00
250,000.00
39,639.88
39,639.88
13,610.OD
13,610.00
10
��-sb
6ss FINANqNG PLAN
�7 1988 Prepaid Assessmertt
�e C88-9T288
sss
s7a Assessment Revenue
57t
s72 SPENDWG PLAN
s�3 1985 Prepaid Assessment
s�4 C88-9T288
s�s
s7s Intrafund Transfer Out
677
678
679
5ao FINANCWG PLAN
6s� 1989 Special Assmt Bond Proceeds
6a2 C89-9T189
6a3
6ea Bond Proceeds
6s5
sas SPENDING PLAN
6s� 1989 Special Assmt Bond Proceeds
6aa C89-9T189
6as
eso Cost of Bond Issuance
5si Intrafund Transfer Out
692
693
69R
695
sss FINANCWG PLAN
ss7 1989 Prepaid Assessment
ssa C89-9T289
sss
70o qssessment Revenue
7oi
7oz SPENDING PLAN
7os 1989 Prepaid Assessment
�oa C89-9T289
70.5
7os Intrafund Transfer Out
707
�oa
�os
��o FINANCING PLAN
�ti 1991 Prepaid Assessment
7�2 - C91-9T29t
713
7�4 Assessment Revenue
715
7�s SPENDING PLAN
7n 1991 Prepaid Assessment
7�s C91-9T291
��s
72o Intrafund Transfer Out
72i
722
723
724
725
726
727
728
729
730
73i
732
733
0.00 49g,g81.51
0.00 499,981.51
1,843,700.00
23,700.00
1,820,000.00
1,843,700.00
5,700.00
(14,450.76)
20,150.76
5,700.00
D.00 369,919.67
0.00 369,919.67
� ��
� ��
272,150.94
272,150.94
499.981.51
499,98L51
1,849,400.00
9,249.24
1,840,150.76
1,849,400.00
369,919.67
369,919.67
272,150.94
272,150.94
11
y��s�
734
735
736
737
738
739
740
741
742
743
��
745
746
747
748
749
750
751
7s2
753
754
755
75s
757
75e
75s
7so
�s�
762
763
764
765
766
7s7
768
769
�70
771
772
773
774
775
�7s
�n
77a
ns
7ao
789
782
783
784
7a5
786
787
7sa
789
790
791
�s2
793
�sa
�ss
796
797
�sa
7ss
aoo
soi
FINANCING PLAN
1992 Special Assmt Bond Proceeds
C92-9T192
Intereston Inves4nents
Bond Proceeds
SPENDING PLAN
1992 Special Assmt Bond Proceeds
C92-9T192
Cost of Bond Issuance
Intrafund Transfer Out
FINANCING PLAN
1993 Prepaid Assessment
C93-9T293
Assessment Revenue
SPENDING PLAN
1993 Prepaid Assessment
C93-9T293
Intrafund Transfer Out
FINANCING PLAN
1993 Special Assmt Bond Proceeds
C93-9T193
Interest on Investments
Bond Proceeds
SPENDING PLAN
1993 Special Assmt Bond Proceeds
C93-9T193
CostofBondlssuance
Intrafund Transfer Out
FINANCING PLAN
1994 Special Assmt Bond Proceeds
C949T194
Interest on Investments
Bofxf Proceeds
SPENDING PLAN
1994 Special Assmt Bond Proceeds
C949T194
Cost of Bond Issuance
Intrafund Transfer Out
0.00
2,242,255.00
2,242,255.00
40,000.00
2,202,255.00
2,242,255.00
68,075.17
23,900.00
91,975.17
(24,158.55)
116,133.72
91,975.17
0.00 483,263.34
0.00 483,263.34
0.00
2,589,825.00
2,889,825.00
40,000.00
2,849,825.00
2,sss,825.00
� �•
�� ��� ��
�� ��� ��
0.00
1,500,000.00
1,500,000.00
38,499.95
(471,375.00)
(432,875.05)
(24,888.85)
(407,98620)
(432,875.05)
52,504.17
387,555.00
440,059.17
15,876.38
424,182.79
440,059.17
68,�75.17
2,266,155.00
2.334,230.17
15,841.45
2,318,38872
2,334,230.17
483,263.34
483,263.34
38,499.95
2,418,450.00
2,456,949.95
15,111.15
2,441,838.80
2,456,949.95
52,504.17
1,887,555.00
1,940,059.17
15,876.38
1,924.182.79
1,940,059.17
12
9G-S�
soz FINANCING PLAN
eo3 1995 Special Assmt Bond Proceeds
aoa C95-9T195
sas
aos Interest on Investrnerds
ao7 Bond Proceeds
aoa
809
aio SPENDING PLAN
aii 1995 Special Assmt Bond Proceeds
ai2 C9S9T195
813
a�a Cost of Bond Issuance
sis Intrafund Transfer Out
816
a17
818
819
a2o FINANCING PLAN
a2i Midway Athletic Facility
s22 802-G0951
823
sza Pre 1991 PIR Contingency
825
a2s SPENDING PLAN
e27 Midway Athletic Facility
a2a 802-60951
azs
s3o Construdion
831
832
833
a3a FINANCING PLAN
sss Pre 1991 PIR Contingency
836 802-6�9$4
837
aas Use of Fund Balance
839
aaa SPENDING PLAN
aa9 Pre 1991 PIR Contingency
aa2 802-60954
eaa
sqq Intrafund Transfer Out
aqs Transfer to Capital Project Funds
sas
sa7
Eqa
849
eso FINANCING PLAN
ss� B.N. CorridorTrail
a52 C93-3D005
853
ssa C18 1984
ass PIR Contingency
856
s57
sss SPENDING PLAN
ass B.N. CorridorTrail
a60 C93-3D005
86 i
as2 Design and Construction
aea
ssa
ass
866
867
8fi8
869
0.00
0.00
0.00
0.00
0.00
0.00
32,390.52
2,965,705.00
2,998.095.52
15,702.45
2,982,393.07
2,998,095.52
0.00 5,985.90
0.00 5,985.90
� ��
0.00
0.00
o.ao
75,000.00
0.00
75,000.00
75,000.00
165,77723
90,77723
75,000.00
� ss,n�.2s
(75,000.00)
75,000.00
0.00
� ��
32,390.52
2.965,705.00
2.998,09552
15,702.45
2,982,393.D7
2,998,095.52
5,985.90
5,985.90
165,777.23
90,777.23
75,000.00
165,77723
0.00
75,000.00
75,000.00
75,000.00
13
�6 S�
s�o
s�i
572
873
874
a75
876
87�
a�s
87s
aao
��
eaz
8&3
884
885
886
sa7
asa
ass
aso
89I
&92
893
ssa
ass
ass
ss7
asa
899
sao
soi
soz
903
944
905
906
so7
soe
sos
s�o
s�i
s+z
913
914
915
916
s�7
s�a
919
s2o
s2i
s22
923
s2a
s25
s2s
s27
s2a
szs
930
937
932
933
934
935
936
937
FINANCING PLAN
Lexington Rec: Lincoln-University
C90-2S031
PIA 1990
CIB 1990
SPENDING PLAN
Lexington Rec: Lincoln-University
C90-2S031
Construction
FINANCING PLAN
Signal Installations
C88-2T820
CIB 1983
MSA 1988
MSA 1986
CIB 1990
PIA 1988
PIA 1989
MNDOT
SPENDING PLAN
Signal Installations
C88-2T820
Construction
FINANCING PLAN
Signal Installations
C89-2T821
PIA 1988
PIA 1989
CIB 1983
MNDOT
College of St. Thomas
C1B 1990
MSA 1988
MSA 1989
MSA 1986
MSA 1992
SPENDING PLAN
Signal Installations
C89-2T821
Construdion
�P� ��
•� �i� ��
: �i� ��
i: �i� ��
4,125.00
578.08
117,686.42
743.60
a,sso.00
1,134.07
78,967.14
212,194.31
212,194.31
5,940.00
8,486.00
5,400.00
70,894.89
zo,ssa.�a
15,749.52
19,646.02
46,328.63
6,708.56
225.90
200,073.66
200,073.66
(1,032.62)
0.00
('1,032.62)
(1,032.62)
(794.00)
0.00
(SS,84321)
0.00
o.00
0.00
0.00
(59,637 21)
(59,63721)
0.00
0.00
0.00
(186.98)
o.00
(5,400.00)
(19,646.02)
0.00
0.00
0.00
(25,233.00)
(25,233.00)
'126,967.38
100.000.00
226,967.38
226,967.38
3,331.00
578.08
58,84321
743.60
8,960.00
1,134.07
78,967 14
152,557.10
152,557.10
5,940 00
8,A86.00
5,400.00
70,707 91
20,694.14
10,349.52
0.00
46,328.63
6,708.56
225.90
174,840.66
174,840.66
14
�� v ��
sae
sss
sao
94I
942
�na
s4a
ea5
sas
947
sqs
sas
sso
95I
952
953
ssa
sss
956
ss�
ssa
959
9fi0
ssi
ssz
sss
ssa
ss5
ses
ss�
ssa
sss
s�o
s7i
w2
973
974
s75
s7s
sn
s�a
s7s
980
981
sa2
983
saa
sas
sss
sa�
98s
sss
990
99�
ss2
993
994
995
996
ss7
ssa
999
�000
100I
t002
1003
10D4
1005
FINANCING PLAN
Signal Installations - 1991
C91-2T823
MNDOT
MSA t991
CIB 1990
CIB 1989
CIB 1991
SPENDING PLAN
Signal Installations -'1991
C91-2T823
CO�trUCSon
�FINANCING PLAN
Raymond/Kasota Realignment
- C87-2L002
MSA 1987
MSA 1985
PIA 1987
Water Utility
SPENDING PLAN
Raymond/Kasota Realignment
C87-2L002
Construction
FINANCING PLAN
Warner Rec-Sibley-Childs
c87-2so02
MSA 87
CIB 87
Miscellaneous
SPENDING PLAN
Warner Rec-Sibley-Childs
C87-2S002
Construction
fINANGWG PLAN
Warner L�q:-Sibley-Childs
C87-2S003
MSA 1987
SPENDING PLAN
Wamer Ltq:-Sibley-Childs
C87-2S003
Construction
3,087.16
45,435.38
0.00
'1,869.82
13,731.00
64,123.36
64,123.36
905,079.70
4,515.11
16,947.60
5,003.10
931,545.51
931,545.51
54A,424.91
200,000.00
1,375.09
745,80� 00
745,800.00
41,000.00
41,000.00
42,348.22
(45,435.36)
7.13
0.00
0.00
(3,080.03)
(3,080.03)
0.00
4,515.11
0 00
0.00
4,515.11
4,515.11
(35,088.84)
0.00
0.00
(35,088.84)
(35,088.84)
(37,125.92)
(37,125.92)
45.435.38
0.00
7.13
1.869.82
13,731.00
61,043.33
61,0A3.33
905,079.70
9,030.22
16,947.60
5,003.10
936,060.62
936,060.62
509,336.07
200,000.00
1,375.09
710,711.16
710,711.16
3,874.08
3,87A.08
15
��-s�
ioos
iao7
iooe
ioos
ioio
ioii
m'12
1013
ioia
iois
io�s
i on
ioia
1019
1020
1021
1022
1023
7o2a
�025
io2s
�02�
1o2s
�o2s
ioso
1031
1032
1033
7034
1035
1036
1037
1038
1039
ioao
ioai
�oa2
1043
ioaa
1045
1046
ioa�
ioaa
1049
1050
7051
1052
1053
7054
�055
�056
1057
1058
1059
ioso
iosi
iosz
1063
10fi4
ioss
1066
�os�
iosa
ioss
io7o
io�i
�m2
1�73
FINANCING PLAN
Shepard Ltg:-13SRobert
Cs7-2SO05
FAU
MSA 1987
SPENDING PLAN
Shepard Ltg:-13SRobert
C87-2S005
Constrvction
FINANCING PLAN
Traffic Signal Enhancement-87
C87-2T801
CIB 87
q B 1986
SPENDING PLAN
Traffic Signal Enhancement-87
C87-2T801
Construcfion
FINANCING PLAN
Shepard Rec-135-Randolph
. C88-21003
MSA 88
PIA 88
CIB 88
SPENDING PLAN
Shepard Rec-135-Randolph
C88-21003
Construction
FINANCING PLAN
Shepard Overlay-135-THS
C88-21005
MSA 88
MSA 87
MSA 90
PIA 88
SPENDING PLAN
Shepard Overlay-13STH5
C88-2100$
Construction
•� ��� ��
��� ��
��� ��
"174,000.00
ao,000.00
3,992.47
83,992.47
83,992.47
376,330 45
60,000.00
8,063.00
444,393.45
444,393.45
115,153.28
o.00
0.00
2s,000.00
141,15328
141,15328
(140,000.00)
(34,000.00)
(174.000.00)
(174,OD0.00)
o.00
(3,992.47)
(3,992.47)
(3,992.47)
(64,478.97)
0.00
0.00
(64,478.97)
(64,478.97)
64,478.97
106,2t4.76
29,229.63
0 00
199,923.36
199,923.36
0.00
0.00
0.00
Y P�
� ��� ��
� ��
:� ��i ��
80,000.00
311,851.48
60,000.00
8,063.00
379,914 48
379,914.48
179,63225
106,214.76
29,229.63
26,000.00
341,076.64
341,076.64
16
��-5�
io74 FINANCING PLAN
io75 Spruce Tree Square Signals
so7s C88-2M003
ion
io�s clB 92
�o7s Cf6 90
ioao MnDOT
iosi Miscellaneous
1082
ioss
ioea �SPENDING PLAN
ioes Spruce Tree Square Signals
toss C88-2M003
�oa�
ioes Construction
ioss
ioso
iosi
ioe2 FINANCING PLAN
�os3 PIA Longside Subsidy-89
iosa C89-2T512
ioss
�oss Miscellaneous
ioe7 Assessment
ioss PIA 90
noss PIA 93
�ioo PIA 92
1101
�io2
iio3 SPENDING PLAN
1io4 PIA Longside Subsidy-89
i�os C89-2T512
iios
iio7 Construction
iioa
1I09
1110
ii7i FINANCWG PLAN
t�i2 Third(HancockChannelization
iii3 C90-2D004
iiia
7115 CIB <Jp
iiis
iia7 SPENDING PLAN
iiis ThirdlHancockChannelization
i7is C90-2D004
1120
'1127 ConSlfUCtio❑
��22
1123
1124
ii2s FINANCING PIAN
7i2s Marshall Rec-Otis-Finn
�iz7 C90-2M008
1I28
�i2s PIA 90
iiao MnDOT
1131
1132
'1133 SPENDING PLAN
ii3a Marshall Rec-Otis-Finn
i�35 C90.2M008
�136
i�3� ConShUCtion
ii�
I139
1140
I141
19,196.80
3t,267.69
72,652.86
82,054.06
205,171.41
205,171.41
6,856.00
54,257.16
0.00
0.00
0 00
61,113.16
61,113.16
2,287.Q0
2,2$�.��
1,64528
9,165.99
10,81127
10,81028
(7.749.33)
0.00
0.00
0.00
(7,749.33)
(7,749.33)
0.00
(17,091.67)
1,645.28
3,99A.60
10,000.00
(1,45179)
(1,45179)
(2,287.�0)
(2,287.00)
(1.645.28)
(9,165.99)
(10,81127)
(10,81028)
1'1,447.47
31,267.69
72.652.86
82,054.06
197,422.08
197,422.08
6,856 00
37,165.49
1,645.28
3,994.60
1 QOD0.00
59,661.37
59,661.37
� ��
� ��
0.00
0.00
0.00
� ��
17
9��s�
iia2 FINANCING PLAN
ii43 Street Light Infra Repair-90
iiaa C90.2TA13
I145
iia� CIB 90
tt47
»4a SPENDING PLAN
�iae Street Light Infra Repairv90
iiso C90-2T413
iist
iis2 Constrvction
1'153
t154
�I55
iiss FINANCING PLAN
��57 Rallroad Crossings-90
�isa C90-2T730
�iss
»so MSA90
tisi
��sz SPENDING PLAN
aisa Railroad Crossfngs90
t164 C90-2T730
�iss
11ss Construction
1167
t168
1169
�no FINANCING PLAN
ii�t Phalen Park Footbridge
i�72 C91-2E006
7�73
ii7a Metro Parks
�ns CIB 88
t�76 CIB 90
it77 CIB 91
ina
ins
iiao SPENDING PLAN
iisi Phalen Park Footbridge
iia2 C91-2E006
1183
iiaa Construction
1185
H86
I187
i9ss FINANCING PLAN
��as Street Light Infirastructure RprS1
i�so C91-2T414
i7si
�as2 CIB 91
1193
i9sn SPENDING PLAN
i�ss Street Light Infrasiructure Rpr-91
i�ss C91-2T414
i�w
i�sa Construction
1199
1200
t201
�202
1203
1204
12a5
1206
1207
1208
1209
. ��� ��
65,000.00
42,� 65.31
42,165.31
100,000.00
1,063.31
86,501.45
136,43524
324,000.00
324,000 00
65,0�0.00
65,000.00
(262.81)
(262.81)
(36,973.77)
(36,973.77)
0.00
(1,063.31)
0.00
(14,411.64)
(15,474.95)
(15,474.95)
(2,605.42)
(2,605.42)
64,737.19
64,737.19
5,191.54
5,191.54
100,000.00
0.00
86,50'1.45
122,023.60
308,525.05
308,525.05
62,394.58
62,394.58
18
����
i2io FINANCING PLAN
�2» Citywide �tg E�hancement�91
i2i2 C91-2T423
1213
i214 q6 91
i2i5 CIB 92
�2is Contributions
t217
121a
i2is SPENDING PIAN
�zzo Citywide Ltg Enhancemenis-�J1
i22i C91-2T423
1222
t223 COf15truCt10n
1224
1225
1226
i227 FINANCING PLAN
i22a Rice-Acker Pond
izzs C91-2E017
1230
i2si Residual Equity Transfer In
1232
1233 SPENDING PLAN
i2aa Rice-Acker Pond
i235 C91-2E017
1236
iza� Intrafund Transfer Out
1238
1239
7240
�24i FINANCING PLAN
izaz Chesfiut & Eagle
i243 C91-21006
1244
izas MSA
i2as
i2a7 SPENDING PLAN
�24a Chestnut & Eagle
�zns C91-21006
izso
izsa Construction
1252
1253
1254
i255 FINANCING PLAN
�25s Cretin & 194
i2s� C91-2MO21
�zsa
izss MNDOT
i2so
izst SPENDING PIAN
izs2 Cretin & 194
'1263 C91-2MO21
1264
9zss Construction
1266
1267
1268
1269
127a
127I
1272
1273
1274
1275
t276
1277
� ��� a�
� ��
�� ��
�� ��
159,200.00
� ��
� ��
17,017.a6
2,342.98
(1,142.75)
18,21729
18,21729
43,874.55
43,87A.55
0.00 1,763.68
0.00 1,763.68
0.00 3,980.01
0.00 3,980.01
147,017.06
2,342.98
28,05725
177.A17.29
�77.417.29
43,874.55
43,574.55
1,763.68
1,763.68
3,980.01
3,980.01
19
9G-�,6
iz�a FlNANCW6 PLAN
�ve RR Crossing Gonstrucpon
i2so C91-21739
izsi
i2s2 MSAPriorto'1987
1283
iza4 SPENDWG PLAN
i2as RR Crossing Construction
,z�s cs�-znss
,za�
izaa
izas Intrafund Transfer Out
i2so
izsi
izs2
�2s3 FINANCING PLAN
izsa Lake OverFlow
12s5 C91-2T950
tzss
�zs� Residual Equity Transfer In
�2sa Transferfrom Special Fund
1299
1300
�soi SPENDING PLAN
iso2 Lake OverFlow
�303 C91-27950
1304
13os Transfer Out
1306
1307
1308
isos FINANCING PLAN
�a�o SewerAvailabilityCredits
i3�i C91-2T951
1312
'I3'13 Residual Equity Transfer In
1314
�sis SPENDING PLAN
�3�s SewerAvailabilityCredits
i3n C91-2T951
1318
1319 COi15ffUCtlofl
1320
1321
1322
i323 FINANCING PLAN
i32n Sewer Suspense Fund
132s C91-2T952
1326
�327 Residual Equity Transfer In
1328
�32s SPENDING PLAN
i33o Sewer 5uspense Fund
ia�� C9t-2T952
1332
i�as Transfers Out
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
� ��
� ��
0.00
0.00
0.00
� � �.
9,926.11
9,926.11
1,160,906.81
63,350.00
1,224,256.81
1,224,256.81
0.00 648,275.00
0.00 648,275.00
� ��
'� � �
560,553.39
560,553.39
9,926.11
9,926.11
1,160,906.81
63,350.00
1,224,256.81
1,224,256.81
6A8,275.00
648,275.00
560,553.39
560,553.39
20
�6 �,5�
isas FINANCING PLAN
�3a7 Pu61ic Works Contingency
ia4a C91-2T955
1349
iaso lntrafundTransferin
issi Residual Equity Transfer In
1352
1353
iasn SPENDING PLAN
ia55 Public Works Contingency
i35s C91-2T955
1357
�a5s Construction
iass
'1360
1361
i3s2 FINANCING PLAN
1363 P.I.Apriorto1987
iasa C91-2T96D
I365
isss Residual Equity Transfer In
1367
iasa SPENDING PLAN
iass P.I.Apriorto1987
i37o C91-2T960
1371
i372 Operating Transfer Out
i373 Construction
1374
�375
1376
�s77 FINANCING PLAN
is�a County Aid priorto 1987
i37s C91-2T970
1380
isai Residual Equity Transfer In
1382
7383 SPENDING PIAN
i3e4 County Aid prior to 1987
iaes C91-2T970
t3as
13s7 Consiruction
1388
�389
1390
i3s� FINANCING PLAN
ias2 Warner Overlay-Childs-TH 61 �
ias3 C92-2A006
1394
1395 PIA 92
1396
i3s7 SPENQING PLAN
iasa Warner Overlay-Childs-TH 61
isss C92-2A006
iaoo
'1401 Construction
1402
1A03
9404
1405
1406
1407
1408
1409
9410
94'11
1412
1413
0.00
0.00
0.00
• ��
1 II
0.00
0 00
0.00
� 1�
� ��
10,000.00
10,000.00
43,874.55
280,431.41
324,305.96
324,305.96
10,342.79
6,700.00
3,642.79
10,342.79
153,118.29
153,118 29
(10,000.00)
(10,000.00)
43,874.55
280,431.41
324,305.96
324,305,96
1 Q342.79
6,700 00
3,642.79
10,342.79
153,11829
153,11829
� ��
� ��
21
��-s�
iaia
iats
1416
1417
,a,s
1419
iqzo
ta2i
1422
1423
1424
ia25
142fi
1427
142a
742s
I430
1431
1432
1433
ia3a
�r�3s
1436
1437
t438
1439
ia4o
1441
i4az
1443
1444
1445
1446
1447
7448
14A9
i45o
t451
1-052
I453
1454
1455
I45s
1457
1458
1459
14fi0
1469
1462
1463
7464
1465
1466
74�
iass
�4ss
1470
ia7�
�A72
1473
14�4
1475
ia7s
�a»
ia�e
ia�s
iaeo
iaei
FINANCING PLAN
Highwood-PF Douglas-McKnight
C92-2A008
co�rny .va sz
PIA 92
Assessment
Co�tnbutions
SPENDING PLAN
Highwood-Pt Douglas-McKnight
C92-2AOO8
Construction
FINANCING PLAN
Sewer Serv Conn Repairs-92
C92-2T655
Assessment
SPENDING PIAN
Sewer Serv Conn Repairs52
C92-2T655
Cons4vction
FINANqNG PLAN
Randolph Turn Lanes
C93-2P003
County Aid 93
Assessment
SPENDING PLAN
Randolph Tum Lanes
C93-2P003
Construction
FINANCING PLAN
Sidewalk Reconstruction-93
C93-2T725
PIA 93
Assessment
CIB 93
SPENDING PLAN
Sidewafk Reconstruc}ion-93
css-zn2s
Construction
472,000.00
200,62�.00
198,380.00
259,355.86
1,130,355.86
1,130,355.86
33,000.00
33,000.00
119,000.00
3,000,00
122,000.00
122,000.00
472,000.00
505,000.00
50,000.00
1,027,000.00
1,027,000.00
(47,313_31)
0.00
(2'1,03422)
0.00
(68,347.53)
(68,347.53)
2,612.38
2,612.38
(109,07327)
(3,000.00)
(112,07327)
(112,07327)
(10,691.55)
(260,133.05)
0.00
(270,824.60)
(270,824.60)
424,686.69
200,620.00
m,sas.�a
259,355.86
1,062,008.33
1,062,008.33
35,612.38
35,612.38
9,926.73
0.00
9,926.73
9,926.73
461,308.45
244,866.95
50,000.00
756,175 40
756,175.40
zz
/ lv-',�
iaa2 FINANCING PLAN
i4e3 Alley Improvements-94
insa C942C013
iaes
i4es PIA 94
i4a7 Assessmenis
iaea
iass
7aso SPENDING PLAN
iasi Alley Improvements-94
�4s2 C942C013
1493
t494 CotYStnlCtlon
1495
7496
1497
iase FINANCING PLAN
7nss Pkwy Little League Ped Crossing Lt
isoo C942D009
isoi
7502 CIB 94
1503
i5oa SPENDING PLAN
�sos Pkwy Little League Ped Crossing Lt
ieos C94-2D009
ism
�sos Construction
1509
1510
1511
isiz FINANCING PLAN
7513 Wheelock Pond
�sia C94-2F016
15IS
i5is PED
isn CIB Priorto'85
�sie
vsis
i52o SPENDING PLAN
�szi Wheelock Pond
is22 C942F016
1523
i52a Consfiruction
1525
1526
1527
i52a FINANCING PLAN
iszs Snelling/Minnehaha Bump Out
isao C94-2K007
1531
i532 CIB 94
1533
�s3q SPENDING PLAN
isss Snelling/Minnehaha Bump Out
�53s C942K007
1537
'1538 Co05trUCtlon
1539
1540
154i
1542
1543
1544
1545
1546
1547
1548
1549
.� ��'� ��
��� ��
�• ��� ��
�•� ���
:� ��� ��
:� ��� ��
40,000.00
50,0�0.00
90,000.00
•� ��� ��
(10,000.00)
(99,OW.aO)
(109,000.00)
�ios,000.00)
(12,937.67)
(12937.67)
(262.80)
(262.80)
(262.80)
950.00 (950.00)
950.00 (950.00)
0.00
�.Q�
0.00
� ��
67,062.33
67,062.33
40,000.00
49,737.20
89,737.20
89,737.20
� r�
� ��
23
[ � ��
isso
i�i
is52
1553
issa
isss
isss
i�
issa
�559
1sEo
,se,
,ssz
isss
issa
isss
1566
1567
issa
is6s
1570
1571
1572
ISJ3
157q
1575
I576
1577
1578
9579
1580
�sai
1582
1583
1584
�ses
tsss
1567
asea
1589
tseo
i5si
�ss2
�593
1594
isss
isss
iss7
issa
1599
1600
isoi
iso2
1603
�604
1605
1606
I6W
�soa
1609
�610
I611
�612
I613
1614
9615
1616
t617
FINANCING PLAN
Sidewalk Reconstruction-94
C94-2T726
PIA 94
GIB 94
Assessment
SPENDING PLAN
Sidewalk Reconstruction-94
csa-znzs
Construction
FINANCING PLAN
Neighborhood Parfiership - 1993
C93-7T013
C18 1993
SPENDING PLAN
Neighborhood Partnership - 1993
C93-7T013
Construction
FINANCING PLAN
CIB Contingency
C95-OT100
CIB Priorto 1985
CIB 1986
CIB 88
CIB 89
CIB 90
CIB 91
CIB 92
CIB 93
CIB 94
SPENDING PLAN
CIB Contingency
C95-OT100
Construction
��� ��
� ��� ��
��� ��� ��
��� ��
945,000.00
186,851.00
186,851.00
0 00
0.00
0.00
o.00
0.0�
0.00
0.00
0.00
0.00
0 00
1 �1
O.00
0.00
{81,424.33)
(81,424.33)
(81,424.33)
(19,416.88)
(19,416.88)
262.80
3,992.47
9,228.19
6,650.45
7.949.81
1,931.47
9,986.97
19,788.91
17,317.57
77,108.64
7�,��8.64
495,000.00
50,000.00
318,575.67
863,575.67
863,575.67
167,434.12
167,43412
262 80
3,992.47
9,225.19
6,650.45
7,949.81
1,931.47
9,986.97
19,788.91
17,317.57
77,108.64
77.108.64
24
�� s:�
+sis
1619
�szo
�szi
as�2
1623
1624
is25
lszs
1627
i 5za
1629
isso
irti
ifi32
1633
is3a
is35
isss
1637
is3a
isss
is4o
isa�
isa2
9643
�saa
1645
i6as
�sa7
1648
1649
16W
�65�
1652
1653
1654
tsss
isss
1657
1658
1659
isso
issi
7662
issa
1664
isss
1666
1667
1668
1669
I670
1671
1s72
1673
1674
1675
is7s
isn
is7a
1679
isao
issi
1682
1683
1684
16&5
FINANCING PLAN
MSA Corrtingency
C9S2T0'18
MSA Prior to 1987
MSA 88
MSA 90
MSA 91
MSA 93
MSA 95
SPENDING PLAN
MSA Contingency
C95-2T018
Construction
FINANCING PLAN
PIA Continge�y
C95-2T051
PIA 90
PIA 93
PIA 94
SPENDING PLAN
PIA Contingency
C95-2T051
Construction
FINANCING PLAN
PIR Contingency
C95-0T120
C.S. PIR Contingency
Fire PIR Contingency
Pre 1991 PIR Contingency
SPENDING PLAN
PIR Contingency
C95-0T120
Construction
FINANqNG PLAN
County Aid Contingency
C95-2T027
County Aid 92
County Aid 93
SPENDING PLAN
County Aid Confingency
C95-2T027
COf15YNCtiOf1
0.00
0.60
0.00
0.00
0.00
504,314.00
504,314.00
504,314.00
OAD
0.00
o.00
0.00
� i�
0 00
0.00
0.00
0.00
� ��
0.00
0.00
0.00
� �f
9,926.11
'19,646.02
7,744.14
45,435.38
52,�00.��
0.00
134,751.65
134,751.65
1,032.62
6,696.95
10,000.00
17,729.57
17,729.57
47,201.69
13,610.00
46,791.33
107,603.02
107,603.02
47,313.31
109,07327
156,386 58
156,386.58
9,926.11
19,646.02
7.744.14
45,435.38
52,0�0.00
504,314.00
639,065.65
639,065.65
1,�32.62
6,696.95
1 Q000.00
17,729.57
17,729.57
47,201 69
13,610.00
46,791.33
107,603.02
107,6D3.02
47,313.31
109,073.27
156,356.58
156,386.58
25
���5�
,�
,��
1688
1689
1690
769I
1692
If53
t694
1695
1696
1697
Ifi98
1699
1700
1701
1702
1703
1704
1705
1706
t707
1708
1709
1710
1711
17 12
1713
1714
17IS
17I6
1717
ma
nis
��zo
nz,
1722
1723
1724
1725
nzs
nv
nza
nzs
1�30
1731
! t� i�' � 2�. j F 9
� � . _ ti. �, �;. �
.l"ue Sf. Pau! Long - R.ange Capitad L-nprovem�.;,
Badget Compnittee zeceived this zequest on
�data) (2 /
A � � a12d SEC0T1yL,@ .'.:3
-----�R�Ja�'— -----_._
Si�aad:
26
B „ dg �o�;� 1vo8/95 GREEN SHEET NO. 31121
�hTACfYfltSONSPHONB � DEPAR]MENLDIRECI'OR � CflYCOUNN. � �
JosephReid (266-8543) ,u,eeararsa 0 �"T''O� � `�°�
JSIBEONC0111dCQ.AGS1.'DABY�h'1� oM9� O SOM£iD]RECIOR SO FBA&MG2.SERVIffSD1R
MnYOR(oRnS515'IhVI) a
OTAL # OF SIGNATURE PAGES (CLIP ALL LOCATTONS FOR SIGNATURE)
aoaix&Q�'¢n
,pprovat of Council Resolution amending capital pmlect budgets to facilitate close out of projuts and transfer of swplus fimds to contingency
�ecora.�cmwnoas: npfeoK cN �� tAl
PLnTII'.6�GCOT.ID9s5ioN _cIVI1.sSRVICECOMIdIssION
X CB���g —
sTwFF _
D)s'IIt1CtCOUAT _
iUPPORIS w'fIICH Cot1NCQ, OBJSLTNEI
I�TIATINSGPROffi.B � ESl1E.OPPOR1VN31'1 (Nho. W1ui 0.fia� Vfia4 a1T1�
], g¢s (bjs pe�un/{� evec wodced unda a conttect foriLis depaz
ypS NO
2 Has this Pason/fmn evefbem a city employee?
yES NO
3. Does this pe�son/Emi possess a skill not nom�slly possessed by
YES NO
fExolain all ves anrners on seDarate sheet and attach to green �.
ital Allocation Policy F-11 requires an annual review of the status of the Cit}�s capital projects. This resolution reflects changes to those projects
may be closed out.
IFAPPAOVID.
completed capital projects may be closed out in the finance/accounting system and project surpluses may be transfeaed to contingency.
�n:.�
°°F�. .," �S �$l�il
JiJQE'-i�:� :e:��-�"*:>t;'?ti
�F�a'`ra� �. � sg��
.. . _ ., � �. �� � �<�.:�,�� �
�
S,
�jects will remain active on the finance/accounting system until closed out in the future. Project sucpluses available for reallocation to contingency
other projects in need of additional financing will not be accessible.
COSI/R%V&N�EB➢DG8I8D(CIACLEONL� O NO
PIA CIB MSA. CA. other wcnvmNa�a Various from funds C87 through C95
,,.:,,,:.�,,�
OFFICE OF THE MAYOR
BUDGETSECTfON
Joseph Reid, BudgetDirector
CITY OF SAINT PAUL
Norm CoLem¢q Mayor
���a;��=..
�Ati 95 199�
. , ^ fi2� I °i�ya
To:
FROM:
DATE:
RE:
240 CiryHall
I S West Kellagg Boulevard
SaintPaut,?vfirmesota S�IO2
MEMORANDUM
9� -Sb
Telephone: (6l2) 2668543
Facsimile: (6I2) 266-8i41
RECEIVED
JAN 03 1996
Mayor Norm Coleman � �` �/
Members of the City Council ���� �`[��i o�� R
Department and Office Capital Project Managers
Bruce Engelbrekt, Budget Analyst � �/ �Q� �
�R�.�r-
January 3, 1996
Capital Improvement Budget: Project Closeout Resolution
Attached is a CIB Committee-approved budget resolution that closes out more than 100 capital
improvement projects from 1987 through 1995. An additional 100 projects have been closed
through administrative orders prepared by city department staff over the past several weeks.
Project financing reflected in the resolution includes fourteen different funding sources as well
as other contributions and transfers. The most signif'icant sources are Capital Improvement
Bonds, Public Improvement Aid, Municipal State Aid and assessements.
Generally, projects are closed out either by increasing their budgets to recognize additional
fmancing not originally approved, or by decreasing budgets to reflect financing not collectable
ar transfers of surpluses to contingency.
For 34 projects, $7,804,000 of increased financing is reflected in one of three ways: 1) as
additional project funding received but not originally budgeted; 2) as additional assessment
fmancing levied but not originally budgeted; and 3) as a recognition of remaining available cash
balances from the former Permanent Improvement Revolving (PIR) Fund.
For 19 projects, $806,000 are deleted from the budgets since these funds are not collectable.
Most of the fmancing eliminated is assessments that could not be levied for projects at the level
originally budgeted.
For 62 projects, $940,000 is transfened between them to cover deficits with surpluses, and to
transfer surpluses to contingency. Of this amount $782,000 is transferred to contingency.
�"3j'• 6�t v. E S �1"\�IV �.J� 1J
? r i�
'y,�; � ` � '��,' i S ",: t f ; � 1
���d�� - /��I��
City of St. Paul
Resolution Approving Assessment
and Fixing Time of Hearing Thereon
and Fixing Time of Hearing on the Award
of Damages
AMENDED
�
In the m^`*°- ^f '
VOTIATG ""`�",_ In tHe ma[[er of condemning aod acquiring pezmanen[ righ[ of vay
easenene and Gemporary cons[rut[ion easements in connection with
WARD the eonstruction of [he nev Nabasha Street Bzidge �62555 and Lhc
2 new Navy (Raspberry) Island Bridge /62580; ,yaid easemen[s are
des�ribed as follovs:
under Admini,
Preliminary 0
Final Order—
The Dir
for the takinr
also having s�
RESOL\
RESOL�
of the award
Chamber, in 1
February,
he is directed
COUNCILM
Yeas�'
�/B3.akey
i/�ostrou
� erin
Ijarris
i�Megard
i�ettman
t/i'hune
A permanenC righC of vay easement over, under and acrosa [hat par[ ��
of Lot 4, Block A, Robertson's Addition to Vest 5[. Paul, Ramsey �
Coun[y� Hinnesota. lying southwea[erly of a line ahich is parallel I
with and 65.00 feec nor[heastezly of, measured at a zight angle Co, '
tlie folloving described aenter line: ,
Commencing a[ the incersection of [he eenter lines of Nabasha and �
Four[h S[reets as shovn on the recorded pla[ of the City of St.
Yaul� Ramsey Councy, Minnesota, said Sn[ezsee[Son more specifically I
deecribed ae being the folloving poin[ in [he Ramsey County
Coordinate Sys[em as published by the Ramsey County Pu611c Norks I
Depar[men[, Land Survey DSvision� final adjuetment December 17,
1991� based upon [he Nor[h American Datum ot 1983 (1986 adjusement)
(Y—�oordinaCe � Y56192.901 fee[ and X—coordina[e - 575004.621
fee[); [hente Sou[h 34 degrees 32 ¢lr.uiea 47 eetonds East (all
beazfngs hecein being per said Ramsey County Coordlna[e Syetem) I
along the center ltne of said Nabasha Screet, 351.44 feet to the I
folloving point in said Ramaey County Coozdinate System (Y—
eoordinate � 15590J.LJ3 feet and X—Coordinate � 575203.314 feet): i
thence Noz[h SS degrees 41 minu[es I1 seeonda Eas[, 0.49 fee[ to �
[he point of beginning of [he center line to be deseribed� ehence
South 34 degreea 32 minu[es 47 seeonde Eas[ 119.60 feet; thence
South 32 degrees 2� m3nutea 47 seeonds East 547.99 feet; thenee
Southeasterly along a 984.25 foot radiue Cangential curve, �onaave
to [he southvest� central angle 09 degreee IS minutes 59 seconds,
a dis[ance of 159.18 feet; Chenee South 23 degrees 07 minutes 48
setonda Eeae� [angent [o said curve� 596.41 feet; [henee
Southeasterly� along a 2952.75 foot radiva tangen[ial curve.
coneave to the northeast, �encral angle OS degreea 07 minuees 18
seconde, a distance of 263.95 feet; thenee South 28 degrees 15
minutes 06 seconda East, tangent to said eurve, 227.63 feet to the
een[er line of Fillmore Avenue (formerly knovn as Fourth Street on
the plat of RoberGSOn's Addition to Hest Sc. Paul� Ramsey County,
Hinnesota) and [here Cerminating. (Said poiot of Cezmina[ion, for
informa[ion purposes only� lies 0.28 fee[ northeasterly of the
centec line of Wabasha Street� as measuzed along the eenter line of
said Fillmore Avenue.)
Together vith [hose parta of Lots 5, 6 and 7, Block 176,
Robec[son's Addition to West St. Paul, Ramsey County, Hinnesota,
lying southwesterly of a line vhi�h ie parallel vith and I5.00 feet
northeas[erlq of� measured at a right angle to� the southvesterly
line of said Lote 5, 6 and 7; together vl[h that pat[ of said Lot
5 lying northvesterly of a line running from a poln[ on the
northvesterly line of said Lot 5� a discance oE 25.00 feet
northeast from the northwesC eorner of said Lot 5, measured along
said nozthvesterly line, to a poin[ on the southvea[erly line of
said Lot 5� a distance of 25.00 feet southeast from sald northvest
eorner, measnred along said southvesterly line, and [here
terminating. .
Also condemning and taking temporary construction easements as
shovn on flle in the Depariment of finance and Nanagement Services.
Sa1d temporarq easemen[s to expire on December 31, 1997� or at [he
comple[ion of the project, vhichevez occurs firs[.
E � � i l I
�
��
ages awarded
payable; and
°refore be it
a confirmation
at the Council
day of
�inance be and
Mayor