Loading...
210700PUBLISHED ORIGINAL TO CITY CLERK woo - CITY OF ST. PAUL FILE ONCIL NO. 1 OFFICE OF THE CITY CLIn- 40- )�_ r11 a. Total = $2460.70 Ia °• 1 .WHEREAS, the total-:addition is $2460.70, now therefore be it RESOLVED, that the City of St. Paul, through its City Council approves the foregoing addition made in accordance with the specifications in the sum of $2460.70., said amount to be added to the lump sum price named in the contract, known as Comptroller's Contract L- 6380 -A, for the making of the above improvements. This additional amount of $2130.70, to be assessed against benefited property. The remaining amount of $330.00 to be charged to 31E -1 Funds, THE Commissioner of Public Works has agreed with the above named Contractor that "the sum of $2460.70 is the correct amount to be added to the above Contract, COUNCILMEN Yeas Nays Dalglish Holland Loss Mortinson Peterson Rosen Mr. President, Vavoulis 10M 8-82 JAN 6 1 'd03 r Adopted by the Council 19— a� JAli 8 1963 Approved 19_ Favor Mayor Against INN O' NCIL RESOLUTION — GENERAL FORM Fiie No. zio�oo —sy Miit , PRESENTED BY COMMISSIONER !// DATE Additions -which r i - .,vs, be necessary k, %h,- it ,�.,� .crib d as ths• gr.,di =, �- Leone, t. or I I' WHEREAS, additions which might prove to be necessary in the improve- ment described as the grading and surfacing of Leone, Louise, Kennard, and Lyon Streets, Comptroller's Contract No. 61 -G -1381, L- 6380 -A, Robert W. Moore, Contractor, have been provided for in the specifications, and �i WHEREAS, it has been found necessary to make the following additions: 1 - each #1 manhole 9.31 deep = $ 209.50 1 - each #1 manhole 9.0' deep = 205.00 1 - each #2241 manhole 5.0' deep = 202.00 2 - each 3C catch basin ® $200.00 = 400.00 30 - Lin. Ft. F. &I.i' 12" V.C. Pipe @ 3.64 = 109.20 15 - Lin. Ft. F. &I.,• 8" C.C. Pipe ® 4.74 = 70.50 1335 - Cu.Yd. Swamp Ekcavation ® 0.70 = 934.50 33 - Ea. Adj. manholes or catch basin ®10.00 = 330.00 40- )�_ r11 a. Total = $2460.70 Ia °• 1 .WHEREAS, the total-:addition is $2460.70, now therefore be it RESOLVED, that the City of St. Paul, through its City Council approves the foregoing addition made in accordance with the specifications in the sum of $2460.70., said amount to be added to the lump sum price named in the contract, known as Comptroller's Contract L- 6380 -A, for the making of the above improvements. This additional amount of $2130.70, to be assessed against benefited property. The remaining amount of $330.00 to be charged to 31E -1 Funds, THE Commissioner of Public Works has agreed with the above named Contractor that "the sum of $2460.70 is the correct amount to be added to the above Contract, COUNCILMEN Yeas Nays Dalglish Holland Loss Mortinson Peterson Rosen Mr. President, Vavoulis 10M 8-82 JAN 6 1 'd03 r Adopted by the Council 19— a� JAli 8 1963 Approved 19_ Favor Mayor Against DUPLICATE TO PRINTER ^� ��U� �- CITY OF ST. PAUL COUNCIL NCIL N _ OFFICE OF THE CITY CLERK COUNCIL RESOLUTION — GENERAL FORM PRESENTED BY COMMISSIONER DATE WHEREAS, additions which might prove to be necessary in the Improve- ment described.as the grading and surfacing of Leone, Louise, Kennard, and Lyon Streets, Comptroller) s Contract No. 61,G -1381, L- 6396 -A, Robert W. Moore, Contractor, have bean provided for in the specifications, and WHEREAS, it has been round necessary to make the following additions: 1 - each #1 manhole 9.31 deep _ 209.54 1 - each #1 manhole 9.0' deep. = 205.00 1 - ea.oh #2241 manhq a 5.0 + deep 202.00 2 - each 3C catch basin • @ $200.00 400.00 30 - Lin. Ft*,F. &I.• 12N V.C. Pipe.0 3..64 109.20 15 - Lin. Ft., F. &Y. 8" C.C. Pipe a .74 70.50 1335 - Cu.Yd. Swamp Excavation ® 0.70 = 934.50 33 - Ea. Adj. manholes or catch basin 010.00 320.00 Total - $2460.70 WIMEAS, the total addition is $2460.70, now therefore be it RESOLVED, that the City of St. Paul,. through its City Council approves the foregoing addition made in accordance with the specifications in the sum of 02460.70., said amount to be added to the lump sum price named in the contract, known as Comptroller's Contract L- 6380 -A, for the making of the above improvements. This additional amount of $2130.70, to be assessed against benefitted property. The remaining amount of 0330.00 to be charged to 31E -1 Funds. THE Commissioner of Public Work ®.has agreed with the above named Contractor that the sum of 02460.70 is the correct amount to be added to the above Contract. COUNCILMEN Yeas Nays Dalglish Holland Loss Mortinson Peterson Rosen Mr. President, Vavoulis 10M 8-82 In Favor Against Ali 9 1963 Adopted by the Council 19- J4% g 1963 Approved 19_ Mayor