210700PUBLISHED
ORIGINAL TO CITY CLERK woo
-
CITY OF ST. PAUL FILE ONCIL
NO.
1 OFFICE OF THE CITY CLIn-
40-
)�_ r11
a.
Total = $2460.70
Ia °• 1
.WHEREAS, the total-:addition is $2460.70, now therefore be it
RESOLVED, that the City of St. Paul, through its City Council
approves the foregoing addition made in accordance with the
specifications in the sum of $2460.70., said amount to be
added to the lump sum price named in the contract, known as
Comptroller's Contract L- 6380 -A, for the making of the above
improvements. This additional amount of $2130.70, to be
assessed against benefited property. The remaining amount
of $330.00 to be charged to 31E -1 Funds,
THE Commissioner of Public Works has agreed with the above named
Contractor that "the sum of $2460.70 is the correct amount to
be added to the above Contract,
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 8-82
JAN 6 1 'd03
r
Adopted by the Council 19—
a�
JAli 8 1963
Approved 19_
Favor
Mayor
Against
INN
O' NCIL RESOLUTION — GENERAL FORM
Fiie No. zio�oo —sy Miit ,
PRESENTED BY
COMMISSIONER
!//
DATE
Additions -which r i -
.,vs, be necessary k, %h,- it ,�.,�
.crib d as ths• gr.,di =,
�- Leone, t.
or I I'
WHEREAS, additions which might prove to be necessary
in the improve-
ment described as the grading and surfacing of
Leone, Louise,
Kennard, and Lyon Streets, Comptroller's Contract No. 61 -G -1381,
L- 6380 -A, Robert W. Moore, Contractor, have been
provided for in
the specifications, and
�i
WHEREAS, it has been found necessary to make the
following additions:
1
- each #1 manhole 9.31 deep =
$ 209.50
1
- each #1 manhole 9.0' deep =
205.00
1
- each #2241 manhole 5.0' deep =
202.00
2
- each 3C catch basin ® $200.00 =
400.00
30
- Lin. Ft. F. &I.i' 12" V.C. Pipe @ 3.64 =
109.20
15
- Lin. Ft. F. &I.,• 8" C.C. Pipe ® 4.74 =
70.50
1335
- Cu.Yd. Swamp Ekcavation ® 0.70 =
934.50
33
- Ea. Adj. manholes or catch basin ®10.00 =
330.00
40-
)�_ r11
a.
Total = $2460.70
Ia °• 1
.WHEREAS, the total-:addition is $2460.70, now therefore be it
RESOLVED, that the City of St. Paul, through its City Council
approves the foregoing addition made in accordance with the
specifications in the sum of $2460.70., said amount to be
added to the lump sum price named in the contract, known as
Comptroller's Contract L- 6380 -A, for the making of the above
improvements. This additional amount of $2130.70, to be
assessed against benefited property. The remaining amount
of $330.00 to be charged to 31E -1 Funds,
THE Commissioner of Public Works has agreed with the above named
Contractor that "the sum of $2460.70 is the correct amount to
be added to the above Contract,
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 8-82
JAN 6 1 'd03
r
Adopted by the Council 19—
a�
JAli 8 1963
Approved 19_
Favor
Mayor
Against
DUPLICATE TO PRINTER ^� ��U�
�- CITY OF ST. PAUL COUNCIL NCIL N _
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
WHEREAS, additions which might prove to be necessary in the Improve-
ment described.as the grading and surfacing of Leone, Louise,
Kennard, and Lyon Streets, Comptroller) s Contract No. 61,G -1381,
L- 6396 -A, Robert W. Moore, Contractor, have bean provided for in
the specifications, and
WHEREAS, it has been round necessary to make the following additions:
1
- each
#1
manhole 9.31 deep _
209.54
1
- each
#1
manhole 9.0' deep. =
205.00
1
- ea.oh
#2241 manhq a 5.0 + deep
202.00
2
- each
3C
catch basin • @ $200.00
400.00
30
- Lin.
Ft*,F.
&I.• 12N V.C. Pipe.0 3..64
109.20
15
- Lin.
Ft.,
F. &Y. 8" C.C. Pipe a .74
70.50
1335
- Cu.Yd. Swamp Excavation ® 0.70 =
934.50
33
- Ea. Adj.
manholes or catch basin 010.00
320.00
Total - $2460.70
WIMEAS, the total addition is $2460.70, now therefore be it
RESOLVED, that the City of St. Paul,. through its City Council
approves the foregoing addition made in accordance with the
specifications in the sum of 02460.70., said amount to be
added to the lump sum price named in the contract, known as
Comptroller's Contract L- 6380 -A, for the making of the above
improvements. This additional amount of $2130.70, to be
assessed against benefitted property. The remaining amount
of 0330.00 to be charged to 31E -1 Funds.
THE Commissioner of Public Work ®.has agreed with the above named
Contractor that the sum of 02460.70 is the correct amount to
be added to the above Contract.
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 8-82
In Favor
Against
Ali 9 1963
Adopted by the Council 19-
J4% g 1963
Approved 19_
Mayor