Loading...
210581N i MmLISHED 2-10581 rr „ COUNCIL FILE NO ......................... FINAL ORDERS By------------------------- -I a• 'ncil File No. 210581 —, 1 FINAL ORDER the matter of improving ST. PAUL �t NUE from Edgcumbe Road to, VVe I Street by regrading arri a •�4 '� aJv:!-_ar t •: •'veway..r.:�"" In the Matter of =i t imliroving ST,: PAUL AV i;<CTE`�troar Edg0Uhbe.. Road -to est�-SeyOnth Street- •by'"re"�""`y ='. grading, .and paving" the" xoadb'e�d:j,. by �grdding and gatvixi ' °:6tree_t alYey and driveway returns; by constructing ,curbs; by grading and sodding boulevard areas; by. reconstruct",, the; ,paving, curbing and sidewalks on intersecting streets where ziot in conformitr with said improvement; by constructing traffic control facilities Where necessary ;, by reconstructing storm water. drainage facilities; by constructing sewer, water and gae pervice connections where necessary; and by doing all-other work which is necessary and incidental to complete Bard im rovemeng ............. unae xiumninary rdexB ...... ....... - -- ...approved ....... -- ----.....,T U1Y _:3p...1962..................... Intermediary Order .. ...................... ................... .. _ipproved • --------- ....------------ - - - - -- ------ - - - - -- A public l:cring baring been-had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is improve ST: PAUL AVENUE' from. Edgcuihb Road` to Rest Seventh Street 'by j-e , grading and. paving the roadbed; ,'by, ag''aud,,pavingfstreet,; a,lley•$nd driveway .returns; by constructing, urbspEby grading and•sodding boulevard areas ;' by reconstructing ,the pavipge. "curbing and sidewalks on intersecting streets where not in cariY67ai.ty' Wi ihd improvement; by' constructing, traffic control facilities where nece#$ary3. by reconstructing storm water t ;1 La $il arknvdur and, ,gas service connections vher smart 11�y, ; 2 ;a ar�ib o rkiwY�: ch ,.i�dcine0strxyiah&d4cidenterld and d&Qcl &1q.t4p0d4)i1 {pr,9*49ptfientions for said improvement, and submit same to the Council for approval; that upon paid approval, the proper city officials are hereby authorized and directed to pro- ceed with the malting of said improvement in accordance therewith. y Adopted by the Council ----.----- JANI ---- _a9-------------------- JAN 196 L , �_Cleh. �• -L,�. . Approved__ -_ File 15861 Councilman Dalglish Councilman Holland Councilman Loss , Councilman Mortinson Councilman Peterson Councilman Rosen Mayor Vavoulis b-02 3M 22 J,,�) - -- ----- - - - - -- Mayor. IM r J r t 4 y OFFTGE OF THE COMMISSIONER OF PUBLIC WORKS REPORT TO COMMISSIONER OF FINANCE To the Commissioner of Finance of the City of Saint Paul: �aa November 5. 1962 The Dorm issioner of Public Works, having had under consideration the pre- liminary order of the Council,, known as Council File No. 207948 Ped July 3. 19 62 relative to Vjtiproving ST. PAUL AVENUE from Edgcumbe Road to West Seventh Street by grading and paving the roadbed; by grading and paving street, alley and driveway returns; by constructing curbs; by grading and sodding boulevard areas; by reconstructing the paving, curbing and sidewalks on intersecting streets where not in conformity with said improvement; by constructing traffic con- trol facilities where necessary; by reconstructing storm water drainage facilities; by constructing sewer, water and gas service connections whore necessary; and by doing all other work which is necessary and incidental to complete said improvement under Preliminary Order C.F. 207948 approved July 3, 1962. Also for improving DAVERN STREET from St. Paul Avenue south to the Chicago, Milwaukee, St. Paul and Pacific Railway right of way by grading and paving the roadbed, by constructing curbs, by grading and sodding tho boulevard areas, and by doing all other work which is necessary and incidental to complete said improvement. 2. A lam profile or sketch of said p � p improvement is hereto attached and made Y� 0581 a part hereof. •� ., Initiated 3. by the Commissioner of Public Works g r 4. Improvement is asked for upon petition oCommissioner of Public Wor s GEORGE M"SHEPA`R0 • STREET NO HIGHWAY ENGIhIE'j..G COORDINATOR O CITY t Tom } � t DEPA" R' Honorable James J. Dalglish Commissioner of Finance City of St. Paul B U I L D I N G Dear Sir: HBO; S A -1 N T zPA OE of,�Minnesorta 3 o ' o bi MIPUBUC ' p'-C " tl�1II�Fo - 9 OUit i Use ■�Q) ■ r.: —.A 9 N R O "li dil Ll Im � �m LI —W, kWAM P. BEHRENS r r r • az t� tt�' 3f DepuWdommissioner — { ! I I November 5, 1962 E V. AVERY ENGINEER :077ER�� NTENDENTJbF SANITATION' a 3 o. I transmit herewith a preliminary estimate of cost for improving ST. PAUL AVENUE from Edgcumbe Road to West Seventh Street by grading and paving the roadbed; by grading and paving street, alley and driveway returns; by constructing curbs; by grading and sodding boulevard areas; by reconstructing the paving, curbing and sidewalks on intersecting streets where not in conformity with said improvement; by constructing traffic con- trol facilities where necessary; by reconstructing storm water drainage facilities; by constructing sewer, water and gas service connections where necessary; and by doing all other work which is necessary and incidental to complete said improvement under Preliminary Order C.F. 207945 approved July 3, 1962. Also for improving DAVERN STREET from St. Paul Avenue south to the Chicago, Milwaukee, St. Paul and Pacific Railway right of way by grading and paving the roadbed, by constructing curbs, by grading and sodding the boulevard areas, and by doing all other work which is necessary and incidental to complete said improvement. Estimated paving cost $207,090.10 Engineering and inspection 10% 20,709.90 Water Department charges 0.00 Total Estimated Cost $227,800.00 Estimated property assessment 41,256.00 Citys share of cost M.S.A. $186,54F4,..00 Estimated property share of cost is based on making the following assessment rater per front foot: Iry Estimated Pavinr- Frontages and Assessments Commercial and Apartments - 11410 ft. @ $7.00 = $9,870.00 Residential 42473 ft. @ $5.00 = 22.365.00 ?, 2 Total Estimated Paving $32,235.00 ' ti - ; cr' Estimated Curbing Frontages and Assessments 1p'.��y]�� \/� 61014 ft. @$1.50= $9,021.00 TOTAL ESTIMATED ASSESSMENT $4F1,256.00 �G iveways will be assessed at the rate of $6.00 per square yard. 1 �C��` Yours very truly, f' Claude L. Thompson T /gs Design Engineer Approved. Approved: Eu ene V. Avery, ie g1neer M on Rosen, omm.o Public W ,Z� Ln rn O E E-LER'�j ST. Nz- > N) DAVER N W Q O 3AQ10 0 SfJE LING 3: o 0 z 0 C: N OD / b � O MADISON Sr ti 0 • ti ST. Nz- > N) DAVER N W Q O 3AQ10 0 SfJE LING 3: o 0 z 0 C: N OD / b � O MADISON Sr ti 0 •