Loading...
219508ORIGINAL TO CIW CI&RK _pU�LISHI�rD 219508 r. ! CITI� OF ST. PAUL COUNCIL NO OFFICE OF THE CITY CLERK `�uncil File No. 219508—By COUNCIL RESOLUTION — GENERAL FORM Whereas The Ashbach Constriictiop --CmPany nas a contract with the M" >'- ESENTED QY `' H a Highway Department and .8, COMMISSIONED DATE ] ;,3pted to Gang Excav :: for excavation and WHEREAS, The Ashbadh Construction Company has a contract wiic',`aTn'`" " " the Minnesota Highway Department and has subcontracted to Gangl Excavating Company for excavation and hauling of material to be loaded near East Seventh Street between Broadway and John Streets and hauled to an area between the east end'of the new East Sixth Street Bridge and the new Mounds Boulevard Bridge for Interstate #94 roadway; said subcontractor desiring to do such hauling utilizing 15 cubic yard rubber tired turnapull scrapers and to haul over the following route: John Street between East Fourth and East Fifth Street's,_ and then East Fourth Street from John Street easterly to the vicinity of Hoffman; therefore, be it RESOLVED, That the Ashbach Construction Company be given permission to use the above streets as a haul road for scrapers, subject to the following conditions for the protection of City- iiwned property, viz: s 1. The City be supplied registered survey information acceptable to City in the form of field notes or profile drawings of present curb, gutter and street center line elevations at distances not exceeding fifty (50) feet for the above haul route streets as taken by a Registered•P;bfe.sslonal Engineer or Land Surveyor before beginning of hauling operations. 2. Permittee will notify City before actual hauling begins and will complete all hauling on this route by September,309 1964. FOR PRO ED 3. Permittee agrees in writing to replace or rebuild any curbing, pavement, manholes, catch basins, etc. damaged by his operations at the direction of and to extent directed Asst. Corp abon Counsel by the Chief Engineer. 4. Should actual- scraper operation reveal that the streets are receiving more excessive damage than anticipated, all such hauling shall be immediately discontinued upon written notice to the contractor from the Chief Engineer. 5. COUNCILMEN Yeas Nays If upon completion of the haulinglit is found the block surfacing or-base of the streets has been distorted, Dalglish Holland r � Loss Tn Favor Meredith Peterson Against Rosen Mr. President, Vavoulis ions ear R Adopted by the Council 19— r. pRIGINAL TO cITY CLERK 21 CITY OF ST. PAUL couNCll. OFFICE OF THE CITY CLERK FIDE NO COUNCIL RESOLUTION - GENERAL FORM PRESENTED BY ; COMMISSIONER DATE Page 2. settled, broken out or otherwise rendered hazardous or unusable as a public street in the opinion of said Chief Engineer, the permittee shall resurface such streets with a minimum two inch asphaltic concrete overlay in accordance with City Specifications and to the extent directed by the Chief Engineer. 1 6. The contractor shall provide bond and insurance protection meeting the approval of the Corporation Counsel of the _ -, City of St. Paul and indemnifying the City against all manner of claims resulting from said contractor's operations. 7. To insure full and prompt compliance with these requirements, the contractor shall post a $10,000.00 bond with the City of St. Paul, said bond not to be released until approved by the Chief Engineer*i COUNCILMEN Yeas Nays Dalglish �Io•Hsed, . Loss Meredith Peterson Rvs7 CHO 1V7r. Vice President (Rosen) 10M 6-62 Adopted by the Council AUG 5 W 19— App owed AUG 19- C_ i Tn Favor Mayor y Against I August 5, 1964 = - Ashbach Construction Co. - 1910 W. County Road C_, 3t. Paul,, Minnesota Gentlemen: Enclosed is a copy of a of tion, c ile No. 219508, granting , yotit permission to use c *n* street s listed as,a -haul road3 subject to various terms and c tions ass out" in the resolution, - V :6 y truly yotwe p ' -City Clerk A'° /3ft8 _ .`