2203614
I•
' 1
' ORIGINAL TO CITY CLERK
CITY OF ST. PAUL
OFFICE OF THE CITY CLERK
COUNCIL A=WTION- GENERAL FORM
PRESENTED BY
COMMISSIONER / DATE
COUNCIL NO
220361
WHEREAS, By Council File No. 220041, approved September 17, 1964,
the City Council approved plans and specifications for the ST. ANTHONY
PARK STORM WATER RELIEF SEWER - CONTRACT "A ", and by Council-File No.
220167, approved September 29, 1964, approved Addendum No. 1, and
WHEREAS, In order to accomplish the work contemplated by said
plans and specifications in the most economical and efficient manner,
it has become necessary to further amend the plans and certain portions
of the special provisions of the aforementioned plans and specifications,
and all bidders sent a copy of Addendum No. 2 relating to said special
provisions and their amendment,
NOW, THEREFORE, BE IT RESOLVED, That action of the City Engineer
and of the Department of Public Works in drafting and transmitting the
hereto attached Addendum No. 2 to all interested parties and so amending
the plans and special provisions of the aforementioned plans and speci-
fications, is hereby ratified, approved and authorized.
4
k
OCT 15 1964
COUNCILMEN Adopted by the Council 19—
Yeas Nays
Dalglish OCT 151964
Holland Approved 19—
Loss Tn Favor A.,
Meredith
Mayor
8 0
Against
—RD=ea
n ca�:la ••::a: : : s
iE3EEl�♦Elif:�'.2Q°>?EE'.�
lOMr Yij �'`G22C�
&62'7)W
PUBLISHED
OCT 17 1964
�w
r
TOLTZ, KING, DUVALL, ANDERSON SAINT PAUL, MINNESOTA
AND ASSOCIATES, INCORPORATED
ENGINEERS AND ARCHITECTS OCTOBER 14, 1964
ADDENDUM NO. 2
TO
ST. ANTHONY PARK STORM WATER RELIEF SEWER SYSTEM
FOR
CITY OF SAINT PAUL DEPARTMENT OF PUBLIC WORKS
CONTRACT DESIGNATION 64 -S -460 -A
6242 -34 T.H. 280 Minn. Proj. F 047 -1 ( )
SP 6282 -66 T. H. 94 Minn. Proj. 1 094 -3 ( ) 235
I hereby certify that this Ad py'�ZgEisterewd 2 as repare y me or under my direct
supervision and that I am a Pro na ineer under the laws
of the State of Minnesota.
RiSycb B. Hansen
Reg. No. 2414
Addendum No. 2 revises the plans, specifications, Special Provisions, Schedule
of prices and all other contract documents as follows:
A. Wherever in the plans, specifications, Special Provisions, Schedule
of prices and other contract documents reference is made to "Solid
Sandrock" or "Solid Sandstone" the word "solid" shall be deleted.
B. SECTION 13, DESCRIPTION OF BID ITEMS AND INSTRUCTIONS
FOR PREPARING BIDS.
Bid Item No. 10, page 6 of the Special Provisions.
Bid Item No. 11, page 6 of the Special Provisions.
Bid Item No. 12, page 6 of the Special Provisions.
Bid Item No. 13, page 6 of the Special Provisions.
Bid Item No. 14, page 6 and 7 of the Special Provisions.
-1-
4556 -A
i
In the description of each of the above referenced bid items, the word
lagging skull be added between the words bracing and dewatering as an additional
item of work to be included in the unit price bid for these items.
C. SECTION 25. TUNNEL CONSTRUCTION.
In the second paragraph on page 11 of the Special Provisions the
sentence beginning ''At least 257o of the perimeter of the tunnel - - -"
shall be deleted and the following substituted: ''The Engineer shall mark
the progress of the bore and, whenever material• other than sandrock
first appears in the tunnel heading, will notify the Contractor that the
applicable Tunnel Section 12 XR, 12LP, 13 XR or 13LP, as shown on
Drawing 3119, shall be used and that payment for construction of these
tunnel sections will be in accordance with the Schedule of Prices, which
follows page 26 of the Special Provisions. Likewise the Engineer will
notify the Contractor when material other than sandrock no longer appears
in the tunnel heading and tunnel construction will again be in accordance
with the applicable Tunnel Section 12R, 12P, 13R or 13P as shown on
Drawing 3119 and that payment for construction of these tunnel sections
will be in accordance with the applicable unit price bid per lineal foot
of tunnel.
Addendum No. 2
-2- 4556 -A
DUA%CATC TO rRINTiR � ^���� w
CITY OF ST. PAUL COUNCIL NO c�
OFFICE OF THE CITY CLERK C
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
WNiliEitASt . ey ,' Counci 1 11le 'ilo. 220041 s ,approved September 17, ,1964v
the City Councl1 :approved plans and specifications for tha ST. ANT"ONy
PPAK STOR14 WATER R$tOF $9W9R +* CMITWT 'W'* and by ;oUncl 1, F1 le 'No.
20167; approved September 29*, 1964* approved Addendum No, 1s and
WWREO; , in ,order to accompllsh, the -work conOmplated by sold
plans and sped f l cot i ons in the +Most sconomt ca l and off Want .mwner,- , ,
It has to further amend the plant, and aertaln : portions
of the spatial provisions of the afbrementiOmW puns and specifications,
and al i bldilars - seat, a copy ,of Addend► No., 2 ralating to sal,d; special
provl slons� and thei r' amareeleent,: -
NQWs ,TW9R9VORR,. , 89 IVRESOLY91l, ,That action of the City. 9nglnear
and of the Department of Public Works in drafting and tram mitting the
hereto attached Addendum No. 2 to all- interested parties and to amending
the plans and special provisions of- the aforemsntiomd plans and speci-
ficationss is hereby ratifledr, approved and authorised.
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Meredith
Peterson
RZTU --_
Mr. President, Vavoulis
tonal 6-m
OCT 15
Adopted by the Council 19—
Approval
GOT 15
:. 1� 19—
Tn Favor
Mayor
Against
a
2? 0361
TOLTZ, KING, DUVALL, ANDERSON SAINT PAUL, MINNESOTA
AND ASSOCIATES, INCORPORATED
ENGINEERS AND ARCHITECTS OCTOBER 14, 1964
ADDENDUM NO. 2
TO
ST. ANTHONY PARK STORM WATER RELIEF SEWER SYSTEM
FOR
CITY OF SAINT PAUL DEPARTMENT OF PUBLIC WORKS
CONTRACT DESIGNATION 64 -S -460 -A
6242 -34 T.H. 280 Minn. Proj. F 047 -1 ( )
SP 6282 -66 T. H. 94 Minn. Proj. 1 094 -3 ( ) 235
I hereby certify that this Ad ryR No. 2 was repare y me or under my direct
supervision and that I am a giste red Pro is ineer under the laws
of the State of Minnesota.
A'x5`yce B. Hansen
Reg. No. 2414
Addendum No. 2 revises the plans, sdecificatLons, Special Provisions, Schedule
of prices and all other contract documents as follows:
A. Wherever in the plans, specifications, Special Provisions, Schedule
of prices and other contract documents reference is made to "Solid
Sandrock" or "Solid Sandstone" the word "solid" shall be deleted.
B. SECTION 13, DESCRIPTION OF BID ITEMS AND INSTRUCTIONS
FOR PREPARING BIDS.
Bid Item No. 10, page 6 of the Special Provisions.
Bid Item No. 11, page 6 of the Special Provisions.
Bid Item No. 12, page 6 of the Special Provisions.
Bid Item No. 13, page 6 of the Special Provisions.
Bid Item No. 14, page 6 and 7 of the Special Provisions.
-1-
4556 -A
In the description of each of the above referenced bid items, the word
lagging shall be added between the words bracing and dewatering as an additional
item of work to be included in the unit price bid for these items.
C. SECTION 25. TUNNEL CONSTRUCTION.
In the second paragraph on page 11 of the Special Provisions the
sentence beginning "At least 2510 of the perimeter of the tunnel - - -"
shall be deleted and the following substituted: "The Engineer shall mark
the progress of the bore and, whenever material other than sandrock
first appears in the tunnel heading, will notify the Contractor that the
applicable Tunnel Section 12 XR, 12LP, 13 XR or 13LP, as shown on
Drawing 3119, shall be used and that payment for construction of these
tunnel sections will be in accordance with the Schedule of Prices, which
follows page 26 of the Special Provisions. Likewise the Engineer will
notify the Contractor when material other than sandrock no longer appears
in the tunnel heading and tunnel construction will again be in accordance
with the applicable Tunnel Section 12R, 12P, 13R or 13P as shown on
Drawing 3119 and that payment for construction of these tunnel sections
will be in accordance with the applicable unit price bid per lineal foot
of tunnel.
Addendum No. 2
-2- 4556 -A