WHEREAS, Additions which might prove to be necessary in the
Improvement described as the construction of the NORTH FAIRVIEW
STORM WATER RELIEF SEVER EXTENSIONS, Comptroller's Contract
L -6697, McDonald -Luben and Associates, incorporated, contractor,
have been provided for in the specifications, and
WHEREAS, it has been found necessary to make the following
Additions:
ATNlTTTONTfi
Removing existing pipe from structure
at Fairview Ave. and Clayland Place
and installing new pipe at changed
location:
Labor, equipment and material . . . . . . . 0 445•49
Offsetting four existing Sewer Services:
Labor and material 134.27
TOTAL 5 9.,76
an d.,
WHEREAS, the Commissioner of Public Works has agreed with the
above named contractor that the sum of $ 579.76 is the correct
amount to be added to the above contract, therefore be it
RESOLVED, that the City of St. Paul through its City Council
approves the foregoing Addition made in accordance with the
specifications in the sum of $ 579.76, said amount to be
added to the lump sum consideration named in the contract,
known as Comptroller's Contract L -6697, and which amount is
to be financed from City's Share of Local Improvements, code
0920 -701.
COUNCILMEN
Yeas Nays
Dalglish
H�
Loss
Meredith
Peterson
Rosen
Mr. President, Vavoulis
ions e-62
(2 Tn Favor
G' Against
DEC 11190
Adopted by the Council 19—
nl+ p 11 1964
,PUBLISHED DEC 19 1964
DUPLICAT[ TO PRINT=
CITY OF ST. PAUL COUNCIL NO 2210 �9
OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
COMMMMISSONEI MTT.TON ROSRN DATE December 91t 1964
WHEREAS, Additions which might prove to be necessary in the
Improvement described as the construction of the NORTH FAIRVIEW
STORM WATER RELIEF SEPVER EXTENSIONS) Comptroller's Contract
L -6697, McDonald -Luben and Associates, incorporated) contractor,
have been provided for in the specif icat ions) and
WHEREAS, it has been found necessary to make the following
Additions:
ADDITIONS
Removing existing pipe from structure
at Fairview Ave. and Clayland Place
and installing new pipe at changed -
location: � l�1�.5 49
Labor, equipment and material
Offsetting four eaieting Sewer Servieea:
Labor and material . . . . . .., 134-27
TOTAL $-579.,26 and,
WHEREAS, the Commissioner of Public Works has agreed with the
above named contractor that the sum of $ 579.76 is the correct
amount to be added to the above contract, trier of ore be it
RESOLVED, that the City of St. Paul through its City Council
approves the foregoing Addition made in accordance with the
specifications in the sum of $ 579.76, said amount to be
added to the lump sum consideration named in the contract,
knovn as Comptroller's Contract L -6697, and which amount is
to be financed from Cityi a Share of Local Tmprovementa, code
0920 -701.
COUNCILMEN
Yeas Nays
Dalglish
NbIid-
Loss
Meredith
Peterson
Rosen
Mr. President, Vavoulis
10M Mf
DEC 111964
Adopted by the Council 19—
DEC 111964
Approved 19_
Favor
(� Mayor
A $alllSt