Whereas, The Port Authority of the City of St. Paul has completed construction,
at their own expense, of a new Sanitary Sewage Pump Station located at 151 E. Plato
Street to serve the Riverview Industrial Park Area and, also, contiguous areas such
as St. Paul Downtown Airport, and
Whereas, This new Plato Street Sewage Pumping Station replaces the old dis-
mantled Chicago and Robertson Sewage Pump Station, and
Whereas, The Port Authority of the City of St. Paul through letter from its .
Engineering Consultant, Toltz, King, Duvall , Anderson and Associates, dated
October 2, 1964, a copy of which is attached hereto, has recommended and is
desirous that the City of St. Paul accept this Plato Street Sewage Pump Station
for future maintenance and operation, and
Whereas, The Port Authority agrees that it will save harmless and defend the�
City of St. Paul against all claims, causes of action or actions arising out of or
by virtu�e of construction of said Pumping Station and that said Pumping Station
shall be transferred to the City of St. Paul free of all claims, liens or
encumbrances of any nature, therefore be it
Resolved, That the Council of the City of St. Paul hereby approves acceptance
by said City of St. Paul of the Plato Street Sewage Pumping Station and the
responsibility for its use, operation and maintenance, with said Pumping Station
to become a part of the Public Sanitary Sewer System of the City of St. Paul.
� . FEg 101965
COiJNCILI�N Adopted by the Council I9—
Yeas Nays
Dalglish FEB 1 Q �
Holland � Approve 19_
Loss Tn FaVOP G�����-^
Meredith
Pete rs on U MByOr
�_ A gainst o�G'�1'A�
' e �xr.^�•::�a;:....... ... F EB 1� 1965
x
1vfr. vice Pres�t"��' '�`�, PUBLISHED
(Rosen)
iont e.sa
. � ` � •
5� ' �,` ' �� �} • , .
�,�.18 � �`
� ,�� . 8� � �
, TOLTZ, KING, DUVALL, ANDERSON � �
� AND ASSOCIATES, INCORPORATED �Q r p�� ��1�J �(,�/ ;
ENCiINEERS AND ARCHITECTS 1 �� � �� � �
� , _ 6n�
ARNDT J.DUVALL 1408 PIONEER BUILDING
6ERA�0 A.ANDERSON SAINT PAUL,MINNESOTA bb101
M.P.ARNESEN 224-7Bfl1
. October 2, 1964
' ;� �, �`� '�., � P���' =� ��.� '
��N 4
Mr. Eugene V.� Avery ,
City Engineer, � City of St. Paul .
City Hall and Court House OC�' � ����
' St. Paul, Minnesota 55102 �
i��r__ �^ • •� �!^ �Il:l���5 �
J_�' I. lJI" f'l�U�.�.. � � �♦
� Re: Phase III Construction �y��;: L:•�C�r�cEr`�
Riverview rndustrial Park
Commission 4639
Dear Mr. Avery:
The sewage lift station constructed in the Riverview Industrial Park area �
has been tested a.nd final inspection has been made. The results of the pump '
tests are stated in a letter received from Mr. N. T. Waldor of Waldor Pump
and Equipment Company, who are the local representatives of Chicago Pump �
Company.
Chicago Flushkleen type pumps were specified and installed. The construc-
tion pla.n.s were furnished you prior to receiving of bids. The As-Bui.lt plans �
for this sewage lift station, as well as the As-Built plans for the sanitary and
storm sewers constructed in the Riverview Industrial Park area, will be fur-
nished you at a later datea
We are enclosing two copies of a letter from Chicago Pump Company for your � ;
reference and files.
�
The kick brace mentioned in the last paragraph of Mr. Waldor's letter is being ;
designed and will be installed. In operation we have noticed a slight movement .
in the discharge header when the third pump was started and two pumps were in
operation. This, however, is not normal operation. The station is designed
to operate with one pump and the second pump to start when the sewage to the ,
wet well continues to rise with one pump operating. The third pump is a stand-
by unit. However, in our opinion, the kick brace is required and will be
installed in order to prevent any movement in the headero
Mro Maguire and Mr. Shonberger of your department witnessed the test and
were present at the final inspection, The station has been connected to the ' .
� sewer system which serves the St. Paul Downtown Airport and other existing
buildings contributing sewage to the new sewer system installed in the Riverview
Industrial Park area. ,.
r�, „ • •
�
� -T
1 `J Mr. Eugene V. Avery -2- October 2, 1964 '
. Under separate cover we will furnish you with a complete set of shop drawings
of the equipment installed in the project. A list of the items required to be
furnished by the manufacturers for maintenance and operation of the equipment
has been handed Mr. Maguire. •
We recommend that the aewage lift station for the Riverview Industrial Park
. area be accepted by the City of St. Paul for maintenance and operation.
- , Yours very truly,
TOLTZ, KING, DUYALL, ANDERSON
AND ASSOCIATES, INC. .
� ;., � �
, �--�-�'- ` �/7' � .
.�..•-�.�:i , °���-- _ �-- -
AMS:f � Arnold M. Steffes �
Encl. �
cc Mr. Marzitelli ,
Mr. Ramsted '
,f .
4