216229ORIGINAL TO CITY CLERK
!f
+T PRESENTED BY
COMMISSIONI
A7BLISI#tb ��o
CITY -OF ST. PAUL COUNCIL. NO. 4, 6229
OFFICE OF THE CITY CLERK ;
COUNCIL RESOLUTION — GENERAL FORM jsen_Fiie No. 216229 —By nQiiton
I . ereas, Additions which might
j ''p 'be necessary in the Improve
'-p - serried : b Grad!ng and Pa°
n DATE ..'1 h.V� 9 "� 57v_MTE fn ,
Whereas, Additions which might prove to be necessary in the Improvement described as
Grading and Paving of CLEVELAND AVENUE from Mississippi River Boulevard to St. Paul Avenue,
Comptroller's Contract L -6518, Palda & Sons, Inc., Contractor, have been provided for in the
Specifications, and
Whereas, It has been found necessary to made the following Additions:
ADDITIONS:
The existing material was unsuitable for backfilling water service and sewer
trenches so sand - gravel backfill was ordered.
Sand - gravel backfill for water service trenches 210 cu. yd. @ 3.50 $735.00 `
Sand - gravel backfill for sewer trenches 534 cu. yd. @ 3.50 1869.00 ✓
Disposal of unsuitable material from water trenches Lump Sum 165.00 r
Extra work for lowering the inverts of two existing manholes, At Norfolk
and Sheridan, including cutting the cast iron stand pipes, to the elevation
of the new catch basin leads Lump Sum $145.00
Extension of the catch basin at the S.W. corner of Itasca & Cleveland to
clear a gas main. - Additional depth of Catch Basin 2 Lin. ft. @ 25.00 $50.00
Extra for high early strength concrete in the north half of Magoff in St.
intersection to facilitate traffic movement 72 sq. yds. @ 0.60 $43.20
Furnish & install type A and type'B castings to replace existing
defective castings 15 sets A and B Castings @ 48.00 $720.00
The plans showed the location of 22 sewer stand pipes between Sta. 0+00
and Sta. 23 +50 which were to be adjusted and the sewer records in the Department
of Public Works indicated that they were 18" below the surface. In some cases
the actual location was not as shown on the plans and the depth to the structures
Varied from 18 inches to 3'k feet so that extra work was involved in exploring for
the standpipes and-extending them to the new grade.
Extra for locating standpipes Lump Sum $147.77
Extra cast iron pipe extensions for stand pipes (22 @ 24 ") Lump Sum $339.00
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 6-62
In Favor
t
r
A gainst
Adopted by the Council 19_
Approved 19—
Mayor
ORIGINAL TO CITY CLERK , t2 229
v CITY OF ST. PAUL FIOENCIL NO.
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION - GENERAL FORM
COMMISSIONER Milton Rosen DATE _
Removing and replacing pavement over a water valve box at Itasca Street
which had not been located by the Water Department prior to the paving operations.
Lump Sum $105.00
Total additions this agreement $4,318.97
and
Whereas, The total addition is $4,318.97, now therefore be it
Resolved, That the City of St. Paul through its City Council approves the foregoing
additions made in accordance with the Specifications in the sum of $4,318.97; said amount
to be added to the lump sum consideration named in the contract, known as Comptroller's
Contract L -6518, and which amount is to be financed from County Aid Funds.
The Commissipner of Public Works has agreed with the above named Contractor that the
sum of $4,318.97 is the correct amount to be added to the above contract.
6k COUNCILMEN
Yeas Nays
I_Pfftff91T__
Holland
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
sort "2
►r
✓ti - --- -
� 4h 15 1964
Adopted by the Council 19—
F,
� I$ 196
Approved �19—
Mayor
.. - � L
DUPLICATE TO PRINTER
CITY OF ST. PAUL COUNCIL NO.
FILE OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMM SSIIONER Hilton Rorltn
DATE _
Whereas, Additions which might prove to be pecessety in the improvement described as
Grading and Paving of CM ELAND AVENUE from Mississippi, River Boulevard to St. Paul Avenue,
Comptroller's Contract L -6518, Palda & gone, Inc., Contractor, have been provided for in the
Specifications, and
Whereas, It has been found necessary to made the following Additions:
ADDITIONS:
The existing x4terial was unsuitable for baekfilling water service and sswer
trenches so sand - gravel backfill was ordered.
Sand - gravel backfill for water service trenches 210 cu. yd. & 3.50 $735.00
Sand - gravel backfill for sower trenches 534 cu. yd. g 3.50 1869.00
Disposal of unsuitable material frose water trenches Lump Sun 165.00
Extra Work for lowering the inverts Of two existing manboles, At Norfolk
and Sheridan, including cutting the cast iron stand pipes, to the elevation
of the now catch basin leads Lump Sum $145.00
Extension of the catch basin Iat the S.W. corner of itasca & Cleveland to
clear a gas main. - Additional depth of Catch Basin 2 lin. ft. W 25.00 $50.00
Extra for high early strength concrete in the north half of Magoffin St.
intersection to facilitate traffic Movement 72 sq. yds. g 0.60 $43.20
Furnish & install typo A and type B castings to replace existing
defective castings - 15 sets A and B Castings 0 46.00 $720.00
The plans, showed the location of 22 sewer stand pipes between Sta. 0 +00
and Sta. 23 +50 which were to be adjusted and the sower records in the Department
of Public Works indicated that they were 180 below the surface. In some cases
the actual Location was not as shown on the plans and the depth to the structures
varied from is inches to A feet so that extra work was involved in exploring for
the standpipes and extending these to the now grade.
Extra for locating standpipes Lump Stun $147.77
Extra cast iron pipe extensions for stand pipes (22 0 2411) lump Sun 0339.00
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
font "2
In Favor
- A gainst
Adopted by the Council 19—
Approved 19—
Mayor
L
DUPLICATE TO PRINTER ^ ?1 h In 40
CITY OF ST. PAUL COUNCIL NO
_
OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
- PRESENTED BY
COMMISSIONER Milton Rosen DATE -
kenoving and replacing pavement over a water valve box at Itasca Street
which had not been located by the Water Department prior to the paving operations.
Lump sum $105.00
Total additions this agreement $4,318.97
and
Whereas, The total addition is $4,318.97r now therefore be it
Resolved, That the City of,St. Paul through itb City Council approves, the foregoing
additions made AA accordance with the Specifications in the sum of $4,318.97, said amount
to be added to the lump sine cotssideration named in they contract, known as CoMtroller's
Contract L•6518, and which amount is to be financed £roan County Aid Funds.
The Commissioner of Public Works has agreed with the above named Contractor- that the
sum of $4,318.97 is the correct amount to be,added to the above contract.
COUNCILMEN
Yeas Nays
pa49l6 ---
Holland
Leas---- -
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
10M 8-82
�� 1
1596A
J
Adopted by the Council 19—
��� 15 1964
Approved 19—
�In Favor
CD Mayor
Against