Loading...
D001458White � City Clerk Pi��� -Finance Dept. Ca�Sary - Dept. Accounting Blue - Engineer �en - Contractor No. D l.�l_7 � �'� 5 ( ) Date v � � - 1 � CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATlVE ORDER for CONTRACT CHANGE AGREEMENT NO. _� ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the �mprovement described as elevator addition and interior remodeline at Arlington Hilis Branch Library known as Contract 13119 , City Project No. 4�41_00, Merrimac Construction Compan� Inc. , Co�tractor, is composed of the following: 1. 2. 3. 4_ 5. .. Change to lighting fixtures as instafled . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 149.00 Rewire exterior flood fights above main (East) entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 470.00 Rewire switch inside East entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246.00 Conduit replacement required because of ceiling removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 658.0� Additional electrical supply and switching changes a. Remote wiring for sconce ballasts 383.00 b. Mount electrical box at circulation desk per Owner (Larry Kasella) 7 73.00 c. Pull 'Phone modem cables to Librarians' Off. per Owner (Larry Kasella) 331.00 d. Shorten fixture stem above East entry 7 58.00 e. Change switching of Kitchen lighting 100.00 F. Add secondary 3-way switch for at-grade entry per Owner (Larry Kasella) 667.00 TOTAL..................................................................... 1,812.00 Patching required in elevator shaft after Elevator contractor installation of door sills ........... 2,713.00 Replace existing foot scraper mat in at-grade entry with new mat . . . . . . . . . . . . . . . . . . . . . . . . . . 735.00 Replace carpet & base in the Auditorium per Owner (Larry Kasella) . . . . . . . . . . . . . . . . . . . . . 5,696.00 7otai ..................................................................... $11,813.00 ORDERED, That the Gity of Saint Paul, through its Mayor, approves the foregoing additions made in accordance with the specifications in the sum of $- 11 813.00 , said arraount to be added or deducted to the lump sum consideration named in the contract, known as contract 15726 , and which amount to be financed from: Funding Codes: C96-9T026-0898-9300� Summ�yr : GL-001-03404-0277 (7,137.00) ContractAmount .............. $352,969.00 Change order #1 . . . . . . . . . . . . . . . . . . 237.00 Change order #2 . . . . . . . . . . . . . . . . . 5,866.QQ This Change Order . . . . . . . . . . . . $ 11,813.00 TOTAL ..................... $370,885.00 AS TO Assistant � � Manager 79 �� 79�/6 � ,`y • . �'� 79�� Services ✓ ESTATE DIVISION I Date: ll15l98 Pe�soa and Phove Num6er. 2b6-8850 L. Holzsehuh be on Coimcfl Agenda by: # OF SIGNATURE PAGES _i 1 2 L Green DIl2EG'COR nrro� � 4 Bi1DC,El' DII2ECTOR 3 YOR (OR ASSISI'ANCi /� A S �` Y �� ALL LOCATIONS FOR SIG: Cqalti���1T-�3.�CK,� )N REQiTESTED: Sighatures required for Change Order 1{3 for the elevator addition and interior remodeling at Arlington Aills Branch library RSONAL SERVICE CONTRACTS MUSP ANSWER TAE FOLLOWING: Has the person/firm ever worked mder a coniract for this department? YE5 NO PLAMYING COMA'IISSION A srnae FIas this person7ficm ever been a City employee? [y1� � lyy4 COUNCII, OBJECTIVE? CO[RVCII, WARD(S) 2. 3. 4. 5. 6. 7. 8. YES NO Dces this personlfitm possess a skill nM normally possessed by any YES NO current City employee? Esplain a11 YES answers on a separate sheet and attach. (� DI3TRICT PLANNING COUNCIL S PROBLEM, ISS[JE, OPPORI'ONITY (Who, What, When, Where, WLy?): Wrong lighting fixture specified in kitchen. Electrical supply to elcterior flood lights over the East entry was removed during ceiling demolidon. Wiring of switch inoperative. Some conduit in the ceiling which was to be reused was removed during ceiling demoli6on. Various changes needed to the electrical supply and switehing to complete the work. The install�tion of steel angles to support the elevator doorsills damaged the sheetrock shaft interior. Foot scraper mat ordered incorrectly. 5torm water dama�e to the Auditorium required the renlacemem of the caruet. IF APPROVED: can be comnleted as desiened and as reauired for DTSADVANTAGES IF APPROVED: None. 1ISADVANTAGES IF NOT APPROVED: A. The electrical supply and lighting would not work properly. B. The elevator installation cannot be approved for use by the City elevator inspection staff. C. The Auditorium would not be usable. Mold had begun to�spread through the old carpet wtrich had mat, aMOVNr ox •rxnxsnc•►�ox: $10,165.00 cosT�vEwE suncE�n ccmci,E o� �s xo �s�c sovxcE: CpL acrivrrsr rnm�Ex: C96-9T026-0898-9300�and GL 001-03404-0271 fANCIAL INFORMATION: (EXPLAIN) �- W The 'GL' # is for purchase and installation of the new carpet and base in the Auditoriwn and certain electricai chan�es. This work was not nart of the ori�inal scone oF work.