Loading...
231261• ORIGINAL CITY CLAK - 231261 CITY OF ST. PAUL FILE No. NO. OFFICE OF THE CITY CLERK COUNCIL RESOLUTION — GENERAL FORM PRESENTED BY Robert F. Peterson COMMISSIONER DATE Whereas, Additions and Deductions which might prove to be necessary in the Improvement described as the POINT DOUGLAS ROAD SANITARY SEATER - BATTLE CREEK SOUTH INTERCEPTOR, SECTION II, Comptroller's Contract L -6815, Peter Lametti Construction Company, Contractor, have been provided for in the Specifications, and Whereas, It has been found necessary to make the following Additions and Deductions as per attached Contract Change Agreement No. 1 ADDITIONS Contract Change Agreement DEDUCTIONS Contract Change Agreement and Total Additions $7265.44 Total Deductions $ 862.64 Total Net Additions $6402.80 Whereas, The total addition is $6402.80 and the Commissioner of Public Works has agreed with the Contractor that the amount of $6402.80 is the correct sum to be added to said contract, therefore be it Resolved, That the City of St. Paul through its City Council approves the foregoing additions made in accordance with the Specifications in the sum of $6402.80, said amount to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L -6815, and which amount is to be financed from City's share of Local Improvement Code 0920 -701 (1966). COUNCILMEN Yeas Nays Dalglish Holland Meredith In Favor Peterson Tedesco Against Mr. President, Byrne D�(; 211966 Adopted by the Council 19— DEC 2 11966 Approved 19— Mayor PUBLISHED DEC 24 406 Paz CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS 231261', 1; • CONTRACT CHANGE AGREEMENT NO.- PROJECT NO. $3.1.1152 CONTRACT NO. L.66813 — CONTRACTOR peter Lmtti Consto–Qr'..' PROJECT DESCRIPTION P01" I*VWM ROAD SANUART OEM i 11ATTIA CUM jgLaj[jffjjB —INCTIDN 11 In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are - t: the reasonable coats of those items for additions too or deductions from, the d.bntia ate. extra cost of trench 620kTatiolk In hard sandstone which required drilling and blasting for rosioval, 2440 ev,, ydo 4 0 3,00 4896.00. gravel sub&baso material for foundation between lift stab 0 "&j flg 205 tons • 3000 1013.00 Construct extra minbolog Type 3A at Springaidg, Drive to pr"ido an Outlet for existing drainage lines 430#00 ftrnish i Install anodes for the lift station furnished by the Citys 67!22 Remove damaged 611 Cie 1 sleeve flange on lift station and replace With now fittings Matra cost of short radius' ,bends to offset sewer between SprIngaide Ore ■ishwood Ave, due to high pressure gas main thiab could hot be roved Short radius bonds 6 line ft* 4 $6j77 40.62 Raw! & replace cone* curb &•driveways bi6ssa Spri"'I'side Drs 0 lighweiW Aver on account of sewer aligmment revision Cone* curb* Type3 .200 line ft. 4 02.73 350,000..: course soneodre 143 sqo yd• • 6030 AU Total Additi JA • 6im PorAICTIONS 1buo to reconstruction work on T.Ne 61 by the State ItIghway, %pte the following items were obanged or aliminatedt one course cone* pavement to •ighwood Ave* i N S► ringside bre replaced with temporary bit. suffating badu4tion due to lesser cost of temporary surfacing 211404..* 91INIftation of bituminous *Uft&dinj lot Widening of T.Nq 61 between, Xtgbmod Ave# & 2prInSsIdd qWj AS 6 Total Deductions Total Net Addition* 6402*80 This a It on I nt to be financed from Cityls share of Local Improvement Lodi 0920-701 Lame zu on Cow c •e– e- 4�7� 19 cater ttl COnst atj .one cue on Engineer Contractor To Caht'racto• %S-19 19 0)dptra ffer Triplicate (Pink) Quadruplicate '(Blue)* To Comptrolilki., To Engineer catb (Canary) To Accounting Div6 DUPLICATE TO PRINTER; CITY OF ST. PAUL COUNCIL 231261 oENCIL NO. _ OFFICE OF THE CITY CLE� , COUNCIL RESOLUTION - GENERAL FORM PRESENTED BY COMMISSIONER Robert F: Peteranh _ DATE Whereas, Additions and Deductions which bight prove to be necessary in the Improvement described as the POW DDUGLAS ROAD SANITARY SRW$R - BATTLE CRRW SOUTH IIfI'$RCXMR# SECTION II, Comptroller's Contrast L -6815, Peter Lamstti Construction Company, Contractor, have been provided-for in the Specifications, and Whereas, 'It has been found necessary to make the following Additions and Deductions as per attached Contract Change Agreement No. 1 ADDITIONS Contract Change Agreement DED[ICTVN$. Contract Change Agreement Total Additions $7265.44 Total Deductions $ 862. Total Net Additions $6402.80 and; Whereas, The7t6tal addition' is $6402.80 and, the Commissioner of Public Vbrks has agreed with the�Contractor that the amount of _$6402.80 is the correct sum to be added to-said contract, therefore be it Resolved, That the City of St. Paul through its City Council approves the foregoing additions made in accordance with the Specifications in the sum of $6402.80, said amount to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L -6815, and whichiam(Nint is to be financed from City's share of Local Improvement Code 0920 -701 (1466). COUNCILMEN Yeas Nays - Garlson- Dalglish Holland Meredith _ �In Favor Peterson Tedesco Against Mr. President, Byrne DEC 211956 Adopted by the Council 1 19— DEC 211966 Approved 19— Mayor zs - CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE AGRE8MENT 231.261 No. I PROJECT NO. 63 -6 -1132 CONTRACT NO. L6$$15 CONTRACTOR pater Lsmetti Const, Co. t PROJECT DESCRIPTION ]POW DOVWAX 1pAD $AhI &II QEVU w JIM= CItBEic Sp, IRYERCSPTqRs SECTION II In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the conttact, are the reasonable cbsts 6� those items for additions to, or deductions from, the cbntraet.' DIT P Extra cost of trench oxeirattoA in hard sandstone which required drilling and blasting for removal* 244E cue yd. 's $ 2000 4896. . . , � 00 • . Gravel sub +base matrrtal for foundetioh between lift stab A N.Se ilg 205 tons 0 5.00 1013.00'• ` Construct extra manhoteg Type 3A at Springside DriVe to provide an 7 outlet for existing drainage lines Furnish i Install anodes for the lift station furnished by the City. Rmwvo damaged 6" Cl. 1 slooVo b flange on lilt station And replace with new fittings Extra cost of short radius,bends to offset sewer between Rpringside Dr. i /ighwood Ave, due to high pressure gas mailt which could hot be moved Short radius bends 6 line ft. 0 $6:77 Remove i replace cone. curb b driveways between Springside Dr. 6 Nighwoor Am on account of sewer alignment revision Cone. curb$ Type3 .200 tin, ft. 0 #2.75 1 course eoneedre 14.3 sq. yd. M 6.30 REDUCTIONS, Total Additions Due to reconstruction work on T.H. 61 by the !hate Eighway Dept* the following items were changed or aliminated= one course copse pavement in Nighwood Ave* i Bpringside Dr. replaced with temporary bit. wwfaeing Deductiou due to lesser cost of temporary surfacing Elimination of bituminous surfacing for widening of T.N� 61 between, ■ighwood Ave. A Springsidr Dr. Total Deductions Total Not Additions 67.22 ,14!:33 �, '' ,•� • • ', • 40.69 r 350.00 e4225 7265.44 , !11:04 , . # S6 6402. a0 This ad t o 1 nt to be financed from Cityla share of Local Improvement Code 0920 -101 �.c Z19.0 ]?star Lametti Construction Co�ipany Construction Engineer Contractor To Contractot ' cat. (Canary) To Accounting Div, �. By /3 Ca.rte %/-fJ ee :�r Fyn- >>, "rj•r :A.�1' P' " 19 lea ��eity Q:c�t, :u1�•c]I -��, t: ' , Triplicate (Pink) Quadruplicate '(Blue) ; To Comptrolibi, To Engineer