Loading...
227026ORIGINAL TO CITY CLERK CITY OF ST. PAUL OFFICE OF THE CITY CLERK PRESENTED BY COMMISSIONER "�+�'��'R��PTI DAB 326 F LENCIL NO a d Dedductti ns Whereas, Additions which mi919t prove to be necessary in the Improvement described as the HAZEL -EAST THIRD STREET STORM SEWER, Comptroller's Contract L -6740, Peter Lametti Construction Company; Contractor, have been provided for in the Specifications—,an-4- _ Whereas, It has been found necessary to make the following Additions and Deductionst,,as set forth in Contract Change Agreement No. 2 attached hereto: ADDITIONS Extra Concrete removal and replacement required to conform to existing conditions: 17.3 sq. yds. of removal @ $1.50 $25.95 ' 17.3 sq. yds. of walk removed @ .50 8.65• 23.7 sq. yds. of 1 course conc. in place @ 5.50 130.35• 63.0 sq. ft,3.of 4" mono. concrete walk @ .45 28.35, Excavation for offsetting 6" water main north of Manhole No. 6; also 611 main at Fremont and White Bear Ave: Labor & Equipment 201.41_ Lowering Sewer Service connection at 543 & 553 White Bear Ave. i Labor, Material and Equipment 336.35. _ Total Additions DEDUCTIONS f , - - _ 1,800 lin. ft. of treated foundation piling @ $2.00 $3,600.00 400 lin. ft. of reinforced concrete cap & cradle @ $15.00 6,000.00 Total Deductions $ 9,600.00 Total Additions 731.06 $ 8,868.94 and Whereas, The total net deduction is.$8,868.94 and the Commissioner of Public Works has agreed with the Contractor that the amount of $8,868.94 is the correct sum to be deducted from said contract; therefore be it Resolved, That the City of St. Paul through its City Council approves the r foregoing deduction made in accordance with the Specifications in the sum of $8,868.94, ,said amount to be &®r ted from the lump sum consideration named in the contract, known as Comptro - 6740., N ,Z 1966 COUNCILMEN Adopted by the Council "�� 19— Yeas Nays Dalglish JAN 2 8 1966 Holland Approved 19— Loss Tn Favor Meredith 6�4 � 0,� eon P ac$i11y Mayor Against ; zn� - P.UBLISHED FEB 5 1966 Mr. President, *a mr,7Pe e Yne 4 ions yes DUPLICATC TO "INMR r " v ,1•,7 ./U CITY OF ST. PAUL COUNCIL NO W7�1 !C/ 1�1 OFFICE OF THE CITY CLERK COUNCIL RESOLUTION — GENERAL FORM PRESENTED BY Milton Rosen COMMISSIONED DA*� Whereas o Additioni9whioi�_ i3P "prove to be i ocesbary in the improvement described as the HA7.NL•RAST TpIRD STRRRT STORM S$W0, Comptroller's Contract L -6740, Peter Lametti Construction Company, Contractor, have been provided for in the Specifications, and Where". It has been found necessary to make the following Additions and Deductionstas not forth in Contract Change Agreement No. 2 attached hereto: ADDITIDAS Zxtra Concrete ramoval'and replacement required to conform to existing conditionst' 17.3 sq. yds. of removal . . . 0 $1.50 $25:95 17.3 sq. yds.-of walk removed N .50 81,65 23.7 sq. yds. of 1 course cone, in place 0 5650 130:35 ' 63.0 sq. fts.of 4" mono, concrete walk ! .45 281,35 Excavation for offsetting 6" water main north of Manhole No. 61 also 6" main at Fremont and White Rear Ave: Labor & Rquipment 201.41 Powering SewerService etonnection at 543 4 553 White sear Ave. Labor, Material and Squipment 336.35 Total Additions $ 731.06 DRDDCTIONS 1,800 lin. ft. of treated foundation piling 0 $2.00 $3,600.00 400 lin. ft.-of rai nforced concrete cap & cradle 0 $15400 ,6,()00.00 Total Deductions 4.9,600.00 2 Total Additions 6 and $ 80868.94 Whereas, The total net deduction is $8,868.94 and the Commissioner of Public Storks hae agreed with the Contractor that the amount of #8,868.94 is the correct sum to be deducted from said contract, therefore be it Resolved, That the Citi of St. Paul through its City Council approves the foregoing deduction made in accordance with the Specifications in the sum of $8,868.94, said amount to be deducted from the lamp sum Consideration named in the contract, known as Comptroller's L -6740, and ��142 8 ISM COUNCILMEN Adopted by the Council 19.— Yeas Nays Dalglish Holland Loss Meredith Peterson os�i en a-e ident f avoulis'- 10M east l Tn Favor Against 3ANy 2 8 1�`34 � Approves 19— Mayor CITY OF' SAINT PAUL — DEPARTMENT OF PUBLIC WORKS 42 CONTRACT CHANGE AGREEMENT NO. 2! PROJECT NO. 65- S -986H — CONTRACT N0. — 6)71140 CONTRACTOR?'•Lor.ettj Conatr. CO. PROJECT DESCRIPTION In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. -'7_ ln A - 1 9 66 Con uction Engineer San . 1 6� 9 . LAmlrmll CONST.CO:: Uri 66 9 Contractor / Jan .�l 19 66 By C,ilier Engineer 66 4 '1 — 19 --- ---- -- Commissioner ` r Comptroller Original (White) Duplicate (Canary) Triplicate (Pink) k): Quadruplicate (Blue) er To Contractor To Accounting Div. To Comp 4W Extra Concrete removal and replacement roquired to conform to existing; cond.itionst 1 �3 sqv yda, of removal . . . . . * « . . � t' ': 1950 50 a 2 9:65 95 9q .60, Of �aalk �►c►Mv0d . . r . . . 23.7 oqw yds* of 1- course oonarate In plo.co 5. 130.35 f 63.0 sq. ft. Of � 110no. Cone. :1 lk � � .,. � 5 2;x.35 Excavation for offse t tI 60 water main north of " -=bolo Aga. 6; aloe 10 anin at Fremont & W-bite Bear AveaLabor ar, wquibmenL . 201.41 Lo oring 'tow rEarvlce C0=00tian ut 543 and 553 ,y ear Vihite Labor, Material and Equ* "nt .. . • Total Additions, 731.06 #:ts Dijel' T 01113S 10800 11n. fw,, of tr6atad foundation piling a a 2.00 a 3, 600 00 400 lin, tto of rol-nforeed concrete Cap &- 15.00 ? a Cradle . .. ... 00 Total reductions 9060o?.Ofl Additlons U1 eo6 TOTAL UL, VILDUCTION s ; ?. -'7_ ln A - 1 9 66 Con uction Engineer San . 1 6� 9 . LAmlrmll CONST.CO:: Uri 66 9 Contractor / Jan .�l 19 66 By C,ilier Engineer 66 4 '1 — 19 --- ---- -- Commissioner ` r Comptroller Original (White) Duplicate (Canary) Triplicate (Pink) k): Quadruplicate (Blue) er To Contractor To Accounting Div. To Comp 4W CITY OF SAINT PAUL — DEPARTMENT OF PUBLIC WORKS ��02 CONTRACT CHANGE AGREEME NT NO. Y PROJECT NO. 65-- 1 -986D CONTRACT NO. L -6LO CONTRACTOR P.Lametti Constr. co. PROJECT DESCRIPTION 'gAZRL °EA 4`11' TIURD '"TR 'ST STOP:'% ",Eyfi�g In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner of Public Works has agreed with the Contractor that the basis of payment and prices for items listed in the changes described below, not otherwise included in the contract, are the reasonable costs of those items for additions to,or deductions from,the contract. Extra Concrete removal and replacezent required to conform to existing; cond.1tionau 17.3 s q. Vd a. of removal . . . . . . . 0 e 1.5 � 2� � 65 x.703 sq, Yees. Or walL" rOmvOd . . . . . 0 23.7 sq. yda. of 1- courso oonare to In 'Q . 5 pla -0103 5.�0 130.35 63.0 sq, ft. of � ljono. cone. - al'k u 28,35 Excavation for offs6ttl 60 water main north of t- -anliole Pzo. 6; aiaea 0 nmin at : =iyo-amont t-bite Bear AveaisW- r and Ei u:.tment . . . . . . . . . r • 20i.4 Lowering "ouer kervios ConlloctiOn At and 553 thite Bear AV0. ? Labor, Uate3rial and SquipmMt Total Additions. � 731x6 Is X300 11n. ft. of 400 li.n. ft. of Cradle LJMir"I i L:7NS troated foundation. piling' 0 0 2.00 'cl-, 3,600.00 roinforood concroto Cap & . ... . A 15.40 Q,pC0.a0 Total eductions 9,6on.00 N Ad3ditione 7�1:0b T'OT'AL MET =DM ON A ' * a) 212� Jan.S �9 66 Con ruction Engineer 4�oe Jan e.2 9 66 Chie Engineer Jan. 66 19 Commissioner Original (White) To Contractor Duplicate (Canary) To Accounting Div. P. LAMM COVST.CO.Zan. 19 66 Contract r 11-2 .�€�n.� 19 66 By Jan. 66 1 9 L Comptroller Triplicate (Pink) Quadruplicate (Blue) To Comptroller :`'To Construction Engineer