227026ORIGINAL TO CITY CLERK
CITY OF ST. PAUL
OFFICE OF THE CITY CLERK
PRESENTED BY
COMMISSIONER "�+�'��'R��PTI DAB
326
F LENCIL NO
a d Dedductti ns
Whereas, Additions which mi919t prove to be necessary in the Improvement
described as the HAZEL -EAST THIRD STREET STORM SEWER, Comptroller's Contract L -6740,
Peter Lametti Construction Company; Contractor, have been provided for in the
Specifications—,an-4- _
Whereas, It has been found necessary to make the following Additions and
Deductionst,,as set forth in Contract Change Agreement No. 2 attached hereto:
ADDITIONS
Extra Concrete removal and replacement required
to
conform
to existing conditions:
17.3
sq.
yds. of removal
@
$1.50
$25.95 '
17.3
sq.
yds. of walk removed
@
.50
8.65•
23.7
sq.
yds. of 1 course conc. in place
@
5.50
130.35•
63.0
sq.
ft,3.of 4" mono. concrete walk
@
.45
28.35,
Excavation for offsetting 6" water main north of Manhole No. 6;
also 611 main at Fremont and White Bear Ave: Labor & Equipment 201.41_
Lowering Sewer Service connection at 543 & 553 White Bear Ave.
i Labor, Material and Equipment 336.35.
_ Total Additions
DEDUCTIONS f , - - _
1,800 lin. ft. of treated foundation piling @ $2.00 $3,600.00
400 lin. ft. of reinforced concrete cap & cradle @ $15.00 6,000.00
Total Deductions $ 9,600.00
Total Additions 731.06
$ 8,868.94
and
Whereas, The total net deduction is.$8,868.94 and the Commissioner of Public
Works has agreed with the Contractor that the amount of $8,868.94 is the correct
sum to be deducted from said contract; therefore be it
Resolved, That the City of St. Paul through its City Council approves the
r foregoing deduction made in accordance with the Specifications in the sum of
$8,868.94, ,said amount to be &®r
ted from the lump sum consideration named in the
contract, known as Comptro - 6740., N ,Z 1966
COUNCILMEN Adopted by the Council "�� 19—
Yeas Nays
Dalglish JAN 2 8 1966
Holland Approved 19—
Loss
Tn Favor
Meredith 6�4 � 0,�
eon P ac$i11y Mayor
Against ;
zn� - P.UBLISHED FEB 5 1966
Mr. President, *a mr,7Pe e Yne
4
ions yes
DUPLICATC TO "INMR r " v ,1•,7 ./U
CITY OF ST. PAUL COUNCIL NO W7�1 !C/ 1�1
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY Milton Rosen
COMMISSIONED DA*�
Whereas o Additioni9whioi�_ i3P "prove to be i ocesbary in the improvement
described as the HA7.NL•RAST TpIRD STRRRT STORM S$W0, Comptroller's Contract L -6740,
Peter Lametti Construction Company, Contractor, have been provided for in the
Specifications, and
Where". It has been found necessary to make the following Additions and
Deductionstas not forth in Contract Change Agreement No. 2 attached hereto:
ADDITIDAS
Zxtra Concrete ramoval'and replacement required to conform to existing conditionst'
17.3 sq. yds. of removal . . . 0 $1.50 $25:95
17.3 sq. yds.-of walk removed N .50 81,65
23.7 sq. yds. of 1 course cone, in place 0 5650 130:35 '
63.0 sq. fts.of 4" mono, concrete walk ! .45 281,35
Excavation for offsetting 6" water main north of Manhole No. 61
also 6" main at Fremont and White Rear Ave: Labor & Rquipment 201.41
Powering SewerService etonnection at 543 4 553 White sear Ave.
Labor, Material and Squipment 336.35
Total Additions $ 731.06
DRDDCTIONS
1,800 lin. ft. of treated foundation piling 0 $2.00 $3,600.00
400 lin. ft.-of rai nforced concrete cap & cradle 0 $15400 ,6,()00.00
Total Deductions 4.9,600.00 2
Total Additions 6
and $ 80868.94
Whereas, The total net deduction is $8,868.94 and the Commissioner of Public
Storks hae agreed with the Contractor that the amount of #8,868.94 is the correct
sum to be deducted from said contract, therefore be it
Resolved, That the Citi of St. Paul through its City Council approves the
foregoing deduction made in accordance with the Specifications in the sum of
$8,868.94, said amount to be deducted from the lamp sum Consideration named in the
contract, known as Comptroller's L -6740, and ��142 8 ISM
COUNCILMEN Adopted by the Council 19.—
Yeas Nays
Dalglish
Holland
Loss
Meredith
Peterson
os�i en
a-e ident f avoulis'-
10M east
l
Tn Favor
Against
3ANy 2 8 1�`34 �
Approves 19—
Mayor
CITY OF' SAINT PAUL — DEPARTMENT OF PUBLIC WORKS 42
CONTRACT CHANGE AGREEMENT NO. 2!
PROJECT NO. 65- S -986H — CONTRACT N0. — 6)71140 CONTRACTOR?'•Lor.ettj Conatr. CO.
PROJECT DESCRIPTION
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
-'7_ ln
A -
1 9 66
Con uction Engineer
San . 1 6�
9
. LAmlrmll CONST.CO:: Uri 66
9
Contractor
/
Jan .�l 19 66
By
C,ilier Engineer 66
4 '1 —
19 --- ---- --
Commissioner ` r Comptroller
Original (White) Duplicate (Canary) Triplicate (Pink) k): Quadruplicate (Blue) er
To Contractor To Accounting Div. To Comp 4W
Extra Concrete removal and replacement roquired to
conform to existing; cond.itionst
1 �3 sqv yda, of removal . . . . . * « . . � t'
':
1950
50
a 2 9:65 95
9q .60, Of �aalk �►c►Mv0d . . r . . .
23.7 oqw yds* of 1- course oonarate In plo.co
5.
130.35
f
63.0 sq. ft. Of � 110no. Cone. :1 lk � � .,.
� 5
2;x.35
Excavation for offse t tI 60 water main north
of " -=bolo Aga. 6; aloe 10 anin at Fremont & W-bite
Bear
AveaLabor ar, wquibmenL .
201.41
Lo oring 'tow rEarvlce C0=00tian ut 543 and 553
,y ear
Vihite Labor, Material and Equ* "nt .. . •
Total Additions,
731.06
#:ts Dijel' T 01113S
10800 11n. fw,, of tr6atad foundation piling a a
2.00
a 3, 600 00
400 lin, tto of rol-nforeed concrete Cap &-
15.00
?
a
Cradle . .. ... 00
Total reductions
9060o?.Ofl
Additlons
U1 eo6
TOTAL UL, VILDUCTION
s ; ?.
-'7_ ln
A -
1 9 66
Con uction Engineer
San . 1 6�
9
. LAmlrmll CONST.CO:: Uri 66
9
Contractor
/
Jan .�l 19 66
By
C,ilier Engineer 66
4 '1 —
19 --- ---- --
Commissioner ` r Comptroller
Original (White) Duplicate (Canary) Triplicate (Pink) k): Quadruplicate (Blue) er
To Contractor To Accounting Div. To Comp 4W
CITY OF SAINT PAUL — DEPARTMENT OF PUBLIC WORKS
��02
CONTRACT CHANGE AGREEME NT NO.
Y
PROJECT NO. 65-- 1 -986D CONTRACT NO. L -6LO CONTRACTOR P.Lametti Constr. co.
PROJECT DESCRIPTION 'gAZRL °EA 4`11' TIURD '"TR 'ST STOP:'% ",Eyfi�g
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
Extra Concrete removal and replacezent required to
conform to existing; cond.1tionau
17.3 s q. Vd a. of removal . . . . . . . 0 e 1.5 � 2� � 65
x.703 sq, Yees. Or walL" rOmvOd . . . . . 0
23.7 sq. yda. of 1- courso oonare to In 'Q . 5 pla -0103 5.�0 130.35
63.0 sq, ft. of � ljono. cone. - al'k u 28,35
Excavation for offs6ttl 60 water main north
of t- -anliole Pzo. 6; aiaea 0 nmin at : =iyo-amont t-bite Bear
AveaisW- r and Ei u:.tment . . . . . . . . . r • 20i.4
Lowering "ouer kervios ConlloctiOn At and 553
thite Bear AV0. ?
Labor, Uate3rial and SquipmMt
Total Additions. � 731x6
Is X300 11n. ft. of
400 li.n. ft. of
Cradle
LJMir"I i L:7NS
troated foundation. piling' 0 0 2.00 'cl-, 3,600.00
roinforood concroto Cap &
. ... . A 15.40 Q,pC0.a0
Total eductions 9,6on.00
N Ad3ditione 7�1:0b
T'OT'AL MET =DM ON A ' * a) 212�
Jan.S �9 66
Con ruction Engineer
4�oe Jan e.2 9 66
Chie Engineer
Jan. 66
19
Commissioner
Original (White)
To Contractor
Duplicate (Canary)
To Accounting Div.
P. LAMM COVST.CO.Zan. 19 66
Contract r
11-2 .�€�n.� 19 66
By
Jan. 66
1 9
L Comptroller
Triplicate (Pink) Quadruplicate (Blue)
To Comptroller :`'To Construction Engineer