, Additions which might prove to be necessary in the Improvement
described as the Grading and Paving of PELHAM BOULEVARD from Interstate No. 94
to University Avenue, Comptroller's Contract L -6666, Palda and Sons, Incorporated,
Contractor, have been provided for in the specifications, and
WHEREAS, it was found necessary to make the following Additions:
ADDITIONS•
Revision of existing storm drain at Wabash Avenue and
Pelham Boulevard: Labor; Material & Equipment $ 60.61
Railroad track area base�thru intersection of Pelham
Blvd. and Wabash Ave.:
50.91 cu. yds. of crushed rock base Q $3.60W 183.28
Total 243.89,
and
WHEREAS, said project was awarded and contemplated to be prosecuted in 196+,
but in order to coordinate the work with other City and State Highway construction
occurring late in the construction season, and to avoid traffic inconveniences -w
between seasons, it was postponed until 1965, and
WHEREAS, said postponement llresulted in additional expense to the contractor '
due to increased labor and insurance costs not contemplated when submitting a bid,
equal to the sum,P-f $1,,5,76-39, and
Wf1ERla,�AS, the Commissioner of Public Works has agreed with said Contractor,
as evidenced by the Change Order Agreement attached hereto and made a part hereof
and having the same effect as if,fully set forth herein, that an amount in the sum
of $1,820.28 represents the aforementioned increased costs and items of extra work
amounts sustained by said contractor, to be added to the contract consideration.
therefore, be it
r RESOLVED, that the City of Saint Paul through its City Council approved the
foregoing Addition made in accordance with the specifications, together with the
additional costs sustained by said Contractor, in the amount of $1,820.28, said
amount to be added to the consideration named in the contract, known as Comptroller's
Contract L -6666, and which amount is to be financed in part from Municipal State
Funds, Bond Fund ST -48 and assessments. gar,
COUNCILMEN
Yeas Nays
Dalglish
Holland
Loss
Meredith
Peterson
Cieo''o•P.iid'e'n�
W. Vice Presiaent (Rosen)
10M 6-62
Tn Favor
,AN 1 91
Adopted by the Council 19—
JAN 191966
A nnrnvefi 19—
4Gtivf Mayor
PUBLISHED JAN 2 2 1966
CITY`OF SAINT PAUL — DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT NO. i
1
PROJECT NO. 64 -P -330 CONTRACT W. L -6666 CONTRACTOR Pgldil & Sons, Ing,
PROJECT DFSCRIPT
\In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of*Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those i ems for additions to,or deductions from,the contract.
This project could not be started as soon as originally contemplated since
the closing of Pelham Blvd. had to tie co- ordinated with the progress of other
street work by the City and by the State Highway Department, and because the
construction'of Pelham Boulevard late in the season might result in additional
delays and inconvenience to the people and business establishments on Pelham
Blvd., this construction was deferred until the spring of 1965.
The Contractor claims additional labor costs for work done in 1965 due to
wage increases granted for 1965 over 1964 and additional costs due to increases
in workmens compensation, public liability and property damage insurance costs.
The net increase in,labor costs alre computed at 5.56% of the 1965 payroll
expense as follows:
$24,198.00 @ 5.56% $1,345.41•
Additional insurance costs 230.98
l 1 •• ,$19576439,
It is hereby mutually agreed that the contract amount shall be increased
by $1,576.39 as compensation in full for extra labor and insurance costs not
expected at the time bids for this project were opened.
This additional amount to be financed as follows:
Assessed against beneffitted property 31.9% $ 502.87 •
Municipal State Aid Project No. 64- 180 -03 16.1% 253.80
Bond Fund ST -48 52.0% 819.72
$1,576.39•
Extra items were required as follows:
Revision of existing storm drain'at S.E. corner of Wabash and Pelham.
Labor, material and equipment $ 60.61
Material used to provide base for railroad tracks area
thru intersection of Pelham and Wabash
50.91 cu. yds. Cl. 3 crushed rock base @ $3.60 cu. yd. 183.28
$ 243.89 $ 243.89
TOTAL ADDITIONS $1,820.28,
This additional amount to be financed from MuniJltate Aid Fu ds.
e4 ee-
19 �� -1 9 �1
Con uation Engineer C tractor'
A"/. Ae4 _ 19" By Y. 19
Chid Engineer gineer •;oaz�pr, !11 Ct3C11
MILTON
Q:dzy
19 _ 19��
C o . rolle���;aq�2ro�te
Deputy COM Ow once
Original (White) Duplicate (Canary) Tripli to (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div.- To Comptroller To,Construction Engineer
�fUr61CAT[ TO MINT[R ����
�4
° CITY OF ST. PAUL COUNCIL 11'71 33
OFFICE OF THE CITY CLERK FILE NO
COUNCIL RESOLUTION— GENERAL FORM
PRESENTED tr Milton tosea, Public Works pA,� JWWAV r 19, 195,6
COMMISSIONED
WHAB, ,Additions which night prove to be necessary in the Xsprovement
described as the Grading and raring of i3LHA1[ BVAAD from Interstate loo. 94
to University Avenues Comptroller's Contract L -6666.4 Palda and Sonss lncorporateds
Contractors have been provided for in the specifications, aad
s, it was found necessary to make the following Additions;
AMITiOW:
Revision of existing store drain at Wabash Avenue and
Palhsm Boulevards Labor, Material a Equipment 60.61
Railroad track area bas* ithru intersection of Pelham
Blvd. and Wabash Ave.a
50.91 cu. As, of crushed rock base . . • $3.6o 183. 28
and - ,
` O 243-89s
WAS, said project was warded and conteqalated to be prosecuted in 1964s
but in order to coordinate the work with other City and State Mighwsy construction,
occurring late in the construction season, and to avoid traffic inconveniences
between seasons] it vas postponed until i965s and
--kSs said postponement resulted in additional expense to the contractor
due to increased labor and insurance costs not canterplated When submitting.a bids
equal to the sum of 44 7 * 39e and
Wks the Commissioner of Public Works has agreed with said Contractor,
as evidenced by the Change Order Agreement attached hereto O nd made s part hereof
and having the same effect as if hilly set forth herein, that an amount in the sum
of $1,18W * a8 represents the aforementioned increased costs axed items of extra Vork
smounts Sustained by said aontrootors to be added to the contract consideration,
therefore, be it
iJ:SOLMW, that the Clay of Wnt Paul through its City Council approved the
foregoing Addition made in accordance with the specificaktions., together with the
additional costs sustained by said Contractors in the smaunt of *1.,880.28, said
amount to be added to the consideration named in the contracts known as Comptroller's
Contract L -6666, and vh1ch smount is to be financed in part from Municipal State
pundts, Bond Fund OT -48 and assessments, JAN 19 1966
COUNCILMEN Adopted by the Council 19—
Yeas Nays
Dalglish
Holland
Loss
Tn Favor
Meredith
Peterson
Against
President , Vayouli§i
Mr. Vice President (Roseza
IoM sus
JAW 1919a6
Approved 19_
Mayor
bITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS
226864
CONTRACT CHANGE AGREEMENT N0. i PROJECT NO. 64 -P -330 CONTRACT NO. L -6666 CONTRACTOR Pgldja & Sons, Inc.
PROJECT DESCRIPTION Gradine and PavinLy PELHAM BOULEVARD from I.S. #94 to
`In accordance with Section 95 of thelCharter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
This project could not be started as soon as originally contemplated since
the closing of Pelham Blvd. had to be co- ordinated with the progress of other
street work by the City and by the State Highway Department, and because the
construction of Pelham Boulevard late in the season might result in additional
delays and inconvenience to the people and business establishments on Pelham
Blvd., this construction was deferredluntil the spring of 1965.
The Contractor claims additionalilabor costs for work done in 1965 due to
wage increases granted for 1965 over 1964 and additional costs due to increases _
in workmens compensation, public liability and property damage insurance costs.
The net increase in,labor costs axe computed at 5.56% of the 1965 payroll
expense as follows:
$24,198.00 @ 5.56% $1,345.41 -
Additional insurance costs 230.98
•$19576.39,
It is hereby mutually agreed that the contract amount shall be increased
by $1,576.39 as compensation in full for extra labor and insurance costs not
expected at the time bids for this project were opened.
This additional amount to be financed as follows:
Assessed against
benefitted property
31.9%
$ 502.87
Municipal State
Aid Project No. 64- 180 -03
16:1%
253.80
Bond Fund ST -48
52.0%
819.72
$1,576.39
Extra items were required
as follows:
Revision of existing
storm drain
at S.E. corner
of Wabash
and Pelham.
Labor, material
and equipmen�
$ 60.61
Material used to provide base for railroad tracks area
thru intersection of Pelham and 3iabash
50.91 cu. yds. Cl. 3 crushed rock base @ $3.60 cu. yd. 183.28
$ 243.89 $ 243.89
TOTAL ADDITIONS $1,820.28,
This additional amount to be financed:from Municip 1 tat= Aid Fu ds.
, 9 Af_1 9
/
Con uation Engineer _�— C" trac `r'
Chie Enf gineer .;Oo °F'
MILTON I Q:a:Y
19
C II o �rol
Deputy • one,
Original (White) Duplicate (Canary) . Triplic to (Pink)
To Contractor To Accounting Div. To Comptroller
^�J 11`.1112criell
� j; $� Ch�CI•
39 re"
e �saaifo�'ie
Quadruplicate (Blue)
To Construction Engineer