WHEREAS, Additions which might prove to be necessary in the
Improvement described as the HAZEL -EAST THIRD STREETS STORM
SEWER, Comptroller's Contract L- 6740, Peter Lametti Construction
Company, contractor, have been provided for in the specifications,
and
WHEREAS, it has been found necessary to make the following
Addition, as evidenced by the attached Contract Change Agreement
to -wit:
ADDITION
The Fremont Avenue portion of the above project was
extended north along the west side of White Bear Ave.to
Fourth St. to provide storm water relief.
336.5 lin. ft. of 211' reinforced concrete pipe,
catch basins and catch basin leads installed,
including the removal and restm ation of
pavements, driveways, curbs, sidewalks, trees,
top soil, sod, etc. as required: LUMP SUM . .$8.,500.00.,
and,
WHEREAS, the Commissioner of Public Works has ,agreed with the above
named contractor by virtue of /88Rract Change Agreement referred
to in the paragraph next preceding, that '-tiie sum of $ 8,500-00 is
the correct amount to be added to the contract consideration;
therefore, be it
RESOLVED, That the City of Saint Paul through its City Council,
,_
approves the foregoing Addition made in accordance with the
h A-- specifications, amounting to $ 8, 500.00, said amount to be added
to the contract consideration, Comptroller's Contract L- 6710,
and which sum is to be financed from CODE 0920 -701 funds.
FEB 21966
COUNCILMEN Adopted by the Council 19—
Yeas Nays
Dalglish -nx
Holland
Loss
Meredith
Peterson
- Rvse>r-
Mr. President, Vavoulis
10M "2
I' Tn Favor
U
Against
FEB 2,999
PUBLISHED FEB 5 1966
CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS
X04
• CONTRACT CHANGE AGREEMENT NO. - I
PROJECT NO. 65 -S-96B CONTRACT NO. L -6740 CONTRACTOR
R etQr L,gnet
._ti Cenat. Co.
PROJECT DESCRIPTION HAZEL -BAST THIRD STRELT STORM SM1ER
In accordance with Section 9$ of the•Charter of the -City of Saint Paul, the Commissioner '
of Public Works has agreed with-'the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those itema'for addit "ions to,or deductions from,the'contract.
r .., ..r ; . •. - • •• • • „}'11DDiTiOAT' } .. 1 1 .1 f ; , • , .
Ths.Fremont Avenue portion of this stoma Gower project will be extended
north along'the'Uest'side of White Bear Avenue to Fourth Street in occordance
with Drawing No: 3245'in order to providerstosm water relief
In this critical area.
Furnish and install 336.5 Lin. Vt. of 21' inch R.C. i e
Avenue to Fourth Street. catch 'basins and catch•basin leadapinaccordance with
Drawing No. 3245; including removal and restoration of pavements, drivei#ays, curbei
sidbwalks, txoes, top soil; 'sod,,etc.1a required, for the
• „I'J1 } }'r'c 1: i 1., r7, t • r r } .d, ,• r. 11.1umputii^ ..86500.00
r ;r... ;.r 1 . r'! i .r•, r � JI , 7'• 1, A .; A, r i : u 1'r1 r r 1 -
. This eddlCione ' a .: : , ,; • � . ., `' •;• .,!' •, . �: , v4Yo .-70� ' • ; : , .. ,
l .amount to .ba,rfinanced ,from• funds.
l/
�`�L�rs�s >r /C.otrsy 19 �S-
ction Engineer Contractor ..0 41-'d 14, _!2 -.09 Z�: .0-
M
Original (White)
To Contractor
dam__ 9 By 19 _LL_
.r
AUG 25 1965
aer of er.
Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue)
To Accounting Div, To Comptroller 'To Construction Engineer
i
. , s 2217104
DUPLICATE T = rRINT[R
CITY OF ST. PAUL COUNCIL NO
OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
(RESENTED BY
COMMISSIONER DATE February 1, 1966
'r','HEREAS, Additions which might prove to be necessary in the
Improvement described as the HAZEL -EAST THIRD STREETS STORM
SEWER, Comptroller's Contract L- 6740* Peter Lametti Construction
Company, contractor, have been provided for in the specifications,
and
ti' WHEREAS, it has been found necessary to make the following
Addition, as evidenced by the attached Contract Change Agreement
to -wits
ADDITION
The Fremont Avenue portion of the above project was
extended north along the west side of White Bear Ave to
Fourth St. to provide stows water relief.
336.5 lin, ft. of 21" reinforced concrete pipe,
catch basins and catch basin leads Installed#
Including the removal and restcr ation of
pavements, driveways, ourba, sidewalks, trees,
top soil, sod, etc, as requireds LUMP SUM . 4%500.00,
and,
WHEREAS, the Commissioner of Pubj Works has agreed with the above
named contractor by virtue of/ ract Change Agreement referred
to in the paragraph next preceding, that the sum of $ 8,500.00 is
the correct amount to be added to the contract considerations
therefore, be it
RESOLVED, That the City of Saint Paul through its City Council,
approves the foregoing Addition made in accordance with the
specifications, amounting to $ 8,500.00, said amount to be added
to the contract consideration, Comptrollerrs Contract L- 6740,
and which sum is to be financed from CODE 0920 -701 funds.
F 2196
COUNCILMEN Adopted by the Council 19—
Yeas Nays
Dalglish
Holland
Loss
Meredith
Peterson
Rosen--- -
Mr. President, Vavoulis
ions 6-ft
C
Tn Favor
0
Against
._g 21966
Approved 19—
Mayor
CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE AGREEMENT
r
22'7.04
NO._
PROJECT N0. 65- S_986B ^ CONTRACT NO.—L-6740 CONTRACTOR PggQr Lamat
tt Const. Co.
PROJECT DESCRIPTION HAZEL -EA;T THIRD STEtM STORM g ?ER
In accordance with Section 95 of the'Charter of the City -of Saint Paul, 'the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed iri the changes described below not otherwise included in the contract,
are the reasonable costs of those items ''for additions' to, or deductions from the 'contract.
Ths.Fremont`Avenue "porti.on of this storm sewer project will be extended
north along the Nest'side of White Bear Avenue to Fourth Street in accordance
with Drawing No: 3245'in order to provide storm water relief in this critical area.
Furnish and install 336.5 Lin. Ft. of 2i 3nch R.0
` Avenue to Fourth Street, catch basins and catch basin leads'Ineacco dance with out.,
Drawing No. 3245; including removal and restoration of pavements, drivmways, curbs, '
sidewalks, trees* top so31; `sod,'eec. as requirads for the
I•m+ el I ;,L,—MP IPumtof,.$89500.00
c a .;lr ..i,. Ii :r .1l;° •r�h2.�p ..�gllr• '�TJ ^! !'tl
This"; add9 Rio nal amou�t to
:tie f financed from• funds.
• •• '''� i '1.117 ,S a 'r . ! I• I ' ? � '. .
' - ' .•I 7 1 rl v i_' i � ..fl; ! l• 11 , ; ,,!ICI 1'I.. .li•! i ' I
Cptr
ptruction En ire 19 �S-
g _ ,� Contractor g
er
Ch ' En ine By 19 _
M► N s AUG 25 1965
Deputy Tonunissioner ' at?-, ompt of erS
Original (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue)