COUNCIL RESOLUTION- GENERAL FORM
COUNCIL NO. 230660
FILE
Resolved; that a credit in the amount of $1,113.00 be allowed
under Contract No. L- 6744 -2 between the City of Saint Paul and the
Sheehy Construction Company, said contract for Lexington.Branch
Library, Saint Paul, Minnesota, and said credit to cover the follow-
ing changes in the work:
CREDIT
Delete hollow metal door and frame tag #129;
opening to remain eki.sting block and brick.
Delete 10101' in length of concrete block
surrounding the ladder opening at door #129.
'Delete concrete landing at door #129. De-
lete steel ladder from basement B1 up and to
landing at door #129. Add concrete floor and
steel joists in this area $254.00
elete hollow metal door and frame tag #127.
Delete concrete block around room #127 as
detailed 158.00
Fill in with concrete door opening B4 B com-
plete 95.00
Eliminate ridor B5 complete 606.00
I _
Delete _D B 4 A 225.00
Eliminate Rrts,-allation of dedication plaque 200.00"-
Eliminate installation of exterior sign f1,a00.00
i 14
Eliminate landscaping item 2.000.00
$4,538.00
EXTRA
Add reinforcing steel to augercast piling 199.00
' Modify 4T8" tunnel as per revised sketch S -4 831.00
COUNCILMEN
Adopted by the Council 19—
Yeas Nays O
1
j Carlson '
Dalglish - Approved ~ 19—
Holland
i Meredith In Favor
Peterson Mayor
Tedesco A gainst
Mr. President, Byrne
22 r
ORIGINAL T¢ CITY CLERK
CITY OF ST. PAUL COUNCIL NO 430660
i OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
1
Provide slab over widened tunnel $233.00
{
Additional work at Room B -1 per revised
'sketch S -4 1,296.00
Delete 15t4" of concrete block wall around
custodial room No. 128. Add concrete block
;in new custodial room #128 as detailed.
Hollow metal light to be reduced in size and
made part of hollow metal low frame #128 as
detailed on shop drawing 18.00
,Add seven cement brick courses and two
block courses to garage walls 180 feet along
grid lines A, 11 and B, to have 2tQ" parapet
'height as required by code 755.00
Cut 310" by 712" opening in existing con -
crete wall to right of giid line 9, to gain
entrance to existing basement B2 47.00
Cut opening in grade beam for access to
basement area 46.00
$3,425.00
t
this work having been requested by the Commissioner of Libraries,
Auditorium And Civic Buildings and agreement made with the con -
tractor and a memorandum of said agreement having been filed with
the Comptroller and countersigned by him.
Approved:
y City Comptroller
COUNCILMEN
{ Yeas Nays
Carlson
Dalglish
Holland
Meredith
�e�snn,
Tedesco
t I�n��IPresiclent,By��i� .�� ��
Mr. Vice President (Peterson)
t
�1 OCT 2 81966
Adopted by the Council 19-
OCT 2 81966
pproved 19—
In Favor
1 yor
Against Ida
PUBLISHED NOV 51966
22
OF PA
Capital of Minnesota
r
.mss, yl'M !Llil�; t�T - =.i._ ;,'.'�C. -w• cs .�'t �'i�.r�r�'si: t
+:;,.. � ` 0.%r' %•� ' ,L � - .�. �^ _ �— �- �` -�'�'� '.�95�,y�`:_ f:.' .1�TCS... — m.�f
t iy.-Y., r "�''•w.�.�/i\��.jtj frrflIl �{� l�161674141�.EEL4E7� ►17���Iti!'r '�5.`:,':_` 'f :�c
-
._ _ . _ 1f�r111 III ' .• . .��r+°t�� � _ �f i� _i; , r��i,: a.- �r::��, °`e %�`:,'•Lt?�f�:�1.6i�^ _ ���5�
>.. m -
BUREAU OF PUBLIC BUILDINGS
ROBERT L. AMES, City Architect 445 City Hall, 55102
October 24, 1966
223 -4212
Av
Commissioner Victor J. Tedesco �tu
Department of Parks And Recreation
And Public Buildings
Subject: Job No. 65 -98
Dear Sir:
Contract No. L 6744 -2 was awarded to Sheehy Construction Company
for the General Construction of the Lexington Branch Library_,
Saint Paul; Minnesota.
During the course of the work under this contract, the following
desirable changes are being submitted at the request of the
Commissioner of Libraries, Auditorium And Civic Buildings. Nego-
tiations have been conducted with the contractor who agrees to
make the following changes:
EXTRA
Add reinforcing steel to augercast piling $199.00
Modify 418" tunnel as per revised sket'ch'S -4 831.00
Provide slab over widened tunnel 233.00
Additional work at Room B -1 per revised
sketch S -4 1,296.00
Delete 1514' of concrete block wall around
custodial room No. 128. Add concrete block
in new custodial room ##128 as detailed.
Hollow metal light to be reduced in size and
made part of hollow metal low frame ##128 as
detailed on shop drawing 18.00
Add seven cement brick courses and two
block courses to garage walls 180 feet along grid
lines A, 11 and B, to,have 21011 parapet
height as required by code 755.00
Pg. 2
Cut 3101' by 712" opening in existing con-
crete wall to right of grid line 9, to gain entrance
to existing basement B2 $47.00
Cut opening in grade beam for access to
basement area 46.00
$3,425.00
CREDIT
Delete hollow metal door and frame tag #129.;
opening to remain existing block and brick.
Delete 1010" in length of concrete block
surrounding the ladder opening at door #129.
Delete concrete landing at door #129. De-
lete steel ladder from basement B1 up and to land-
ing at door 129. Add concrete floor and steel
joists in this area 254.00
Delete hollow metal door and frame tag #127.
Delete concrete block around room #127 as
detailed 158.00
Fill in with concrete door opening B4 B com-
plete 95.00
Eliminate corridor B5 complete 606.00
Delete doors B 4 A 225.00
Eliminate installation of dedication plaque 200.00
Eliminate installation of exterior sign 1,000.00
Eliminate landscaping item 2,000.00
$4,538.00
It is requested that a resolution be submitted to the Council
authorizing a credit in the amount of $1,113.00 to Contract
No. L 6744 -2 to cover the aboveKdescribed work.
e tr our
Robert L. Ame '
CITY ARCHITECT
H..a,
CC: Comsr. Meredith
Mr. Mitchell
Mr. Schnarr
Mr. 'Heldt
Mr. Bell
Mr. €ggen
a g rete Kuchenbacher
o �kPngnn
4
Pg. 2
Cut 3101' by 712" opening in existing con-
crete wall to right of grid line 9, to gain entrance
to existing basement B2 $47.00
Cut opening in grade beam for access to
basement area 46.00
$3,425.00
CREDIT
Delete hollow metal door and frame tag #129.;
opening to remain existing block and brick.
Delete 1010" in length of concrete block
surrounding the ladder opening at door #129.
Delete concrete landing at door #129. De-
lete steel ladder from basement B1 up and to land-
ing at door 129. Add concrete floor and steel
joists in this area 254.00
Delete hollow metal door and frame tag #127.
Delete concrete block around room #127 as
detailed 158.00
Fill in with concrete door opening B4 B com-
plete 95.00
Eliminate corridor B5 complete 606.00
Delete doors B 4 A 225.00
Eliminate installation of dedication plaque 200.00
Eliminate installation of exterior sign 1,000.00
Eliminate landscaping item 2,000.00
$4,538.00
It is requested that a resolution be submitted to the Council
authorizing a credit in the amount of $1,113.00 to Contract
No. L 6744 -2 to cover the aboveKdescribed work.
e tr our
Robert L. Ame '
CITY ARCHITECT
H..a,
CC: Comsr. Meredith
Mr. Mitchell
Mr. Schnarr
Mr. 'Heldt
Mr. Bell
Mr. €ggen
a g rete Kuchenbacher
o �kPngnn
DUrLICATE TO rRI BITER 2306 66;
CITY OF ST. PAUL FILE NO. NO.
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER
Llesolved,
under Contract
Sheehy Constru
Library, Saint
ing changes in
that a credit in the
No. L- 6744 -2 between
-.tion Company, said c
Paul., Minnesota, and
the work:
DATE -
amount of $1,113.00 be allowed
the City of Saint Paul and the
antract for Lexington Branch
said credit to cover the follow-
CREDIT
Delete hollow metal door and frame tag #129;
opening to remain existing block and brick.
Delete 1010" in length of concrete block
surrounding the ladder opening at door #129.
Delete concrete landing at door #129. De-
lete steel ladder from basement Bl up and to
landing at door #129. Add concrete floor and
steel joists in this area $254.00
Delete hollow metal door and frame tag #127.
Delete concrete block around room #127 as
detailed 158.00
Fill in with concrete door opening 34 B com-
plete 95.00
Eliminate
corridor B5
complete
606.00
Delete D000rs B 4 A
225.00
Eliminate
installation
of dedication plaque
200.00
Eliminate
installation
of exterior sign
19000.00
Eliminate
landscaping
item
2,000.00
EXTRA
Add reinforcing steel to augercast piling
199.00
$4,538.00
Modify 418" tunnel as per revised sketch S -4 831.00
COUNCILMEN
Adopted by the Council 19—
Yeas Nays
Carlson
Dalglish
Holland
Meredith
Peterson
Tedesco
Mr. President, Byrne
In Favor
A gainst
Approved 19—
Mayor
za
4 DUPLICATE ;,O- PRIWER
CITY OF ST. PAUL COUNCIL NO
OFFICE OF THE CITY CLERK FILE
COUNCIL RESOLUTION — GENERAL FORM
PRESENTED BY
COMMISSIONER DATE -
Provide slab over widened tunnel $233.00
Additional work at Room B -1 per revised
sketch S -4 19296.00
Delete 1514" of concrete block wall around
custodial room No. 128. Add concrete block
in new custodial room #128 as detailed.
Hollow metal light to be reduced in size acid
made part of hollow metal low frame #128 as'
detailed on shop drawing 18.00
Add seven cement brick courses and two
block courses to garage walls 180 feet along
grid lines A, 11 and B, to have 210" parapet,
height as required by code 755.00
Cut 310" by 712" opening in existing con-
crete wall to right of gild line 9, to gain
entrance to existing basement B2
Cut opening in'grade beam for access to
basement area
47.00
530660
46.00
$3,425.00
this work having been requested by the Commissioner of Libraries,
Auditorium And Civic Buildings and agreement made with the con-
tractor and a memorandum of said agreement having been filed with
the Comptroller and countersigned by him.
Approvedt
City Comptroller
COUNCILMEN
Yeas Nays
Carlson
Dalglish
Holland
In Favor
Meredith
Retersorr
Tedesco
_ `(I(\ -- 0 Against
..ICS Vice President (Peterson)
T 2 8 1966
Adopted by the Council 19—
09T 2 8 1966
K Approved 19—
Mayor
as