D001387No. D tSL r 3��1
Date: � � � dL )� 1
�J
CITY OF SAINT PAUL - OFFICS OF `THE MAYOR
ADMINISTRATIVE ORDER
£or
CONTRACT CHANGE AGREffi�NT NO. 4
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the
Improvement described as: Como Park Conservatorv - Phase Two: Sitework
known as Contract 18654 , City Project No. B95-00-15B , Monette Construction Co.. Znc.
Contractor, is composed of the following:
l. Adjust storm and sanitary sewer structures (item no. 1) and lower stozm
under water service (item no. 2) of Proposal No. 12, Revision No. 2.
}1DD $5,160.00
ORDERED, That the City of Saint Paul, through its Mayor, approves tke foregoing
additions made in accordance with the specifications in the sum of $5.160.OD , said
amount to be added to the lump sum consideration named in the contract, known as
Contract 18654 , and which amount is to be financed from:
r�
L..J
C96-3T110-0882-34161
Original Contract Sum $786,000.00
Change Orders to Date 17,991.13
Amount this Change + 5.160.00
New Contract Sum $809,151.13
Chief Engineer
Director of
cc: City C1erk
Finance Department
Department Accounting
• Project Manager
Contractor
Inspector
Of£ice Copy
Contract File Copy
1/-/a lg�/�-
!( !U 19_� %
reation
19
Monette Construction Co.. Inc.
Contractor
By Letter dated 11/5/97
�(� %�� /��l�s'�
Dir ctor of Financial Services
���. ,�•-- 6Z� ���1�-1 R�
Ad ' istrative Assistant to the Mayor
�
DEPAqTMENT/OFFICE/COUNpL DATEINRIATED GREEN SHEET `y� � O. 60138
" Parks and Recreation � ���� � 4��
t 0
COMACTPEFSONANDPHONE INfT1AL/DA7E INfiWJDATE
ilI Pesek 664�9 � � DEPARfMEN�OIRECTOR __CfiYCOUNCIL
NUMBEF FOfi Z CT' ATTORNEV 4 CRY CLERK
MUST BE ON fAUNCIL AGENOA HY (OA'TE� ROUfING
OHDER 3 FINANCIAL SEFVICES Dttt. ��� ( 5 PARKS & RECREATION
NA MAYOR �OR ASSISTANT�
TOTAL %OF SIGNAiUqE PAGES � (CLIP ALL LOCA710N5 FOR SIGNATURE�
ACTtON REaUESiED:
Approval of Contract Change Agreement No. 4
Como Conservatory - Phase Two: Sitework
RECOMMENDATIONS: Approve (A1 or Rejec[ (F7 PERSONAL SEqVICE CONfAACTS MUST ANSWER THE FOLLOWING QUESIIONS:
_PLANNIN6 COMMISSION _CIVIL SERVICE COMMISSION �, Has this persOn/firm eve� worketl untle� a conhact tor [M1is tlepartment?
CIB COMMITTEE _ YES NO
A STAFF 2. Has [his person/firm eve/ bee� a city employee?
-- YES NO
DISTRICT COVNCIL
— — 3. Does ihis pereon/tirtn passess a skill rtoi �w�mally poss¢ssed Oy aoy wrtenS ary employee?
SUPPORTS WHICH COUNQL OBJECTNE? YES NO
Expiain all yes answe�s on sepa�ate shaa[ and attach m green sheM.
INITIATING PROBIEM, ISSUE, OPPORTUNITY (Who, What, Wh¢n, Where, Why�:
Adjustments to existing storm and sewer structures required in order to meet proposed finish grades.
Storm sewer pipe lowered in order to pass under water service line encountered during trenching work.
ADVANTAGES iF APPROVED:
Sewer structure adjustments will allow contractor to complete finish grading of site.
Storm sewer alignment will be achieved as per plan.
Storm sewer and water line will be separated at proper distance as per City code.
DISADVANTAGES IF APPROVED: _
RECEE4`E[;
None
NOV Y�CL.ERK j ����� ' . ,
DISADVANTAGES IF NOT APPROVED: �
�`�� � 21,9c ��
Contractor wifl not be paid for additional work completed. ��
Work will not be in compliance with City piumbing code. �.
���
TOTAL AMOUNT OF TRANSACTION $ 5.160.00 GOST/REVENUE BUO6ETED (CIRCLE ONEI YES NO
DIN6SOURCE C�B ACTNRYNUMBER C96-3T1 1 0-0882-341 61
FINANCIAL INf-0RMATION: (EXPLAIN) ^1 j
�i W�
NOV- 5-37 WED 17:37 MONETTE.CONSTRUCTION C0. FAX N0. 6127708101
� Li�1 L5 �� L5
�
� CDNSTRUCTION MPANY'"� _ . .
196 RYAN LANE
LITTLE CANADA, MN 55117
N�v�wber 5, 1997
Bill Pt5e6c L.R, '
Divisi�io af Parks & Re:�cr'e�ti.��rr
3k'� City Ha1.1 Armzx
St, FTaU1, I�N. ra:lI2.aG
RI._: I�.[dtiri Cor�serva•tor.y SitewoY`k - PhtdE>2 TWn
CHAI4GG URDEic Pit�K�O�AL - RD. Y� c R�VI�I0�1 Itip. : �].
fiF+�r Bi I ].,
TEL. 770-7663
FAX 770-B101
• Fallawir�a is our prnp��sal far utili2y wurk a�rciifir.ati�ns �r;
rPquested Yy yr,ur l�.�t�`er af '�-24-37 a»ci rc�vis�ci eY y�ur •Fax
roern� of im-iD-9.7. 1r�r_ludes atems 1 a�°�d 2 oi,ly. it�rn 3 waYl �2
inclucied in ai•�othEr chan�c artlnr pronasrzl,
Li•.,s._ MEC?'le�Y11Cd1� It'iC. Ri^OOOSdI -..�..,-
h3�rkun [�n sut�cur�trhrL wo���k @ �� --•-
T07f�L -C1�RNGE QAD�:R --•-
Rasgactfully Subrnitted,
E.�'�`�`E�_ i�� `�----'.�,�_
Thooias P. Mun�t P:e
P. 01
I ' 13� �7
- GENERAL CONTRACTORS
��f, 31 t�3:�
�:�,f�. Q�`1�
-- ."aS� 16�T. S�h
•
NOV- 5-37 WED 17;38 MONETTE CONSTRUCTION CO3 FAX N0. 6127708101
United States Mechanical, Inc.
• 15857 Forest Blvd. Nortb
Hugo, MN 55438
PLone (612�29�i268
Fas(G 12)429-0821
October23,i997 ,
Mr. Tom Monette
Monette Conswction Co.- °
19b Ryan Lane
Little Canada, MN SSI 17
Re: Cvmo Conservatory
Utility Work Modifications
Revisgd Pricing
P. 02
1�13��
Dear Tom,
. Our price to make the revisions described in field report correspondence per Bil! Pesek is:
Item #i Align Storm and Sanitary MH's c� CB's �3,480.00
ltem #2 Lower 12" RCP Under Water Service $1,200.00
____---�
Subt�iai 4, 6ao. o0
5°1oMargin . 234•00
Totai ,4dd 84,9�4• 00
Tf the owner woutd fike us to perform the above work, please issue a change osder for
�4,9�4.00 � �_ _
�
Res tfuJly, � ...
teven row
. President
MONE77E CONSTRUCTS(IiV CUMPa�NY� INC.
13E kYA1V LAIJF
t.I7TLE CANflDa, IHTNI�ESU'CA `�.`�,117
p7��ilt �F b �` �%' �%U°C
/O �27- 97
t�i3g�
DNISION OF PARKS AND RECREATTON
CITY OF SAINT PAUL
Nonn Coteman, Mayor
September 24, 1997
�+�ri l�D� �-
.
Tom Monette
Monette Construction Company, Inc.
196 Ryan Lane
Litde Canada, Minnesota 55117
Re: Conservatory Restoradon, Phase Two
Request for Cost Proposal 9/23/97
Dear Tom:
300 Ciry Haft Anner Telephone : 612-26664Q�
25 West Fourth Street Facsimile : 672-292-7405
Saint pauf, MN55102
�f�61�t'S { � 1
Piease find enclosed additional work items required to be completed in Sitework
Contract. Upon review, please submit cost proposals for each of the following items:
1. Adjust existing storm and sanitary structures as shown on plan sheet #1. Verify
materials and methods proposed. Adjustment rings used shalt be mortared
at min. i" thickness between units and inside and outside of unit faces.
2. Adjust elevation of overflow pipe located at east end of frog pond in order to
install under existing water main to new road C.B. See plan sheets t/1 and #2.
3. Remove structurally unsound catch basin located on So. side of roo�
end of Frog Pond azea.. Install new catch basin. Reinstail existing curb casting.
Install addiGonal2' pipe extension to stormceptor pipe above baffle unit as
shown on pla� sheets #1, {{ 2 and #3.
Instali 1.5' fiberglass extension to North House cistern manway. See sheet #1
for location. Supply gaskets as required. Contact Edwards Fiberglass,
Inc.,refer to shop drawing, P.O #1351, No. 3577, for conect pipe
diameter size and miscellaneous supplies repuired. Teleohone n�.
816.826.3915.
If you have any further quesrions, please call me at 266-6419.
. mceXely,
�'/ V k �
i I�m�P�e , L.
Project M ager
cc: Dan Paulson, BKBM
Rich Thompson LIEP
7oei Maier, BKBM
t:1wp\cmcop.924
C�
� ����' 'Y���
- „_a
„� ir ; �,��'
�"�'�� .,_,.�
.t
.�
�
J
�
q
`!
�.�,�w�, -.�. ._
�' ,;,�»»-- ,��• .��. �� t�
'"�" "� `t.ay "wo� `�^af
a
°E•
�
�
`R.�
s..._,.-t'� a� �w., ,�
>.�,=:w --�e�.,... < r4
�
�
� �
. ,..,'��_��,�/":• �:co� r- 3> -., -..�""_ ,,,l1...�-+
.� �
•
r �
L �
,
�
J CfTY OF SAINT PAUL
DIVIStON OF
PARKS AtVD RECREATION
��..
LETTER OF TRANSMITTAL
-ro: '('OM 1M,O�it'�.'f�'(%
IMoN ��`� �i C.�xJS�[ �T
DATE: 1�� I b � a�
RE: �, �/ !�
�w1�'r•Ni� To t�T
��fP�Cr/ � 4�'��'f �
A � ?.�# ��t'1
WE ARE SENDlNG YOU � ATTACHED � UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS:
P DRA1fVfNG5 ❑ PRINTS ❑ PLANS ❑ SAMPLES ❑ SPECiFICATIONS
❑ COPY OF LETTER ❑
COPIES
1
�QJ 13g�1
300 City Haff Annex
25 West Fourth Street
Saint Paui, Minnesota 55102
672-266-6400 Fax_ 672-292-7405
�-o
THESE ARE TRANSMITTED AS C4iECKED BELOW:
❑ For Approval ❑ Approved as Submitted
� or Your Use ❑ Approved as Noted
��
❑ As Requested ❑ Return for Corrections
❑ For Review and Comment
�
❑ Resubmit _ Copies
❑ Submit
❑ Return
Copies for Distribut+on
Corrected Prints
� � _ �, , / i.. �
, � ► , 1 ,� � ' �� ,�'1 � I �
� � i ,� � i
I. � J
• If enclosures are not as noted, kindly notify us at once.
cc: �!�//�} �[ �,}G�� � Design Section
�jt,vl� l��t r4-P2----- - - -
DESCRIPTION
�
I
�
�L✓v 1 ' `
DNISION OF PARKS AND RECREATION
i�i3��
CITY OF SAINT PAUL
Nortn Coleman, Mayor
September 24, 1997
Tom Monette
Monette Construc6on Company, Snc.
196 Ryan Lane
Litfle Canada, Minnesota 55117
Re: Coriservatory Restorafion, Phase Two
� ' Request for Cost Proposal 9/23197
Dear Tom:
� �n�
PC�vt�x� �rfl „
V�� ��Y��
-�' Nti�iTN�Ds �
Please find enclosed additional work items required 6 be completed in Sitework
Contract. Upon review, please submit cost propo dls for each of the following items:
��Oh�; �,�� � 'ust existing storm and sanitary structures as shown on plan sheet #1. Veri�y-
3 �m terials and methods proposed. Adjustment rings used shall be mortared'
��p ��{� min. 1" thickness between units and inside and outside of unit faces.
Adjust elevation of overflow pipe located at east end of frog pond in order to
install under existing water main to new road C.B. See pl�an sheets #i and #2
3. Remove structurally unsound catch basin located on So. side of Estabrook at
end of Frog Pond azea.. Install new catch basin, Reinstall existing curb casting.
Install additional2' pipe extension to stormceptor pipe above baffle unit as
shown on plan sheets #l, # 2 and /f3. •
r �� ,��}
���QQ �y�/'
1 '�l�
Install 1.5' fiberglass extension to North House cistern manway. See sheet #i
` for location. Supply gaskets as required. Contact Edwazds Fiberglass,
Inc.,refer to shop drawing, P.O #/1351, No. 35'77, for correct pipe
diameter size and miscellaneous supplies required. Telephone no.
816.826.3915. � �
If you have any further questions, please call me at 266-6419.
, 'nce�� , ���
William Pese �, L.A.
Project Manager
300 City Hall Annez Telephane : 612-266-64W
2S West Fourth Street Facsimife : 6I2-292-7405
Saint Paul, MN 5510?
/G�ri�i ��iR ,''
Z�uts t �` Z
cc: Dan Paulson, BKBM
Rich Thompson LIEP
Joel Maier, BKBM
t:\wpkmcop.924
C7
� ����
,. .
•�� � a
���:
..���� :� m>.
�����{,
��.
� ��. �=�� � r �..�:
�
:�
.�
;;
�
i
�
�
�
�
x
�
„ � � w.;;, -
-,�.a� �- �:.w.�.�,+..,.,,^�..,� _ �
.:�'=`�..
:
w
•
,���. g
'�:-. 3` ._ _3�'
..- -- . .. . ;.�-- .-:,:�'e,. _ ,�, >�„ .�R�:,_>-, ���K- ,' _�.�. -�
-