CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. CP4.01-34
ADMINISTRATIVE ORDER, Whereas, addiuons which proved to be necessary to the Improvement described
•
�
as Saint PaLl Civic Center Ex�gansion CP-0 Buildin�C.onstruction
known as Contract L- Ciry Project No.015117 M.A. Mortenson, is composed of the following:
1. Provide compressor and labor to perform exploratory blow holes at all footings
per Proposed Change Order #136. American Engineering and Testing supervised.
Reason: Required to determine if footings are above voids or tunnels.
2. Provide "power down° option for electco-mechanical release devices for poors
101D, 107B, 121C, 121D, 126J, 140B, 142E, 142F, 172C, 172D, 420E, 424B,
442, 490. Door 121D to be 10'-10" H per Proposed Change Order q139.
Reaso�: Contracror suggested doors be "power down' ro allow staff ro reset after
fire alarm trip-otherwise technician has to reset. Door 121D could not be 12' H due to
duct m[erference.
3. Provide firarated access doors a[ Elevators 7, 8, 9 and 13 per Proposed Change Order #153.
Reason: Contract Documenu had allowance of defined quantity of access doors - these
ue in addition w that quan[ity.
4. Add breakmetal at skyway link per Proposed Change Order #159.
Reason: Dimension change.
S. Revise window @ Sth Ftoor Reception per Requesi for Information #G641 and
PCO #160.
Reason: Steel beam interfered with window size.
No. �� 13'�5
Date In'ai /S�
Total
$7,664.00
3,�Q.�O
1,352.00
300.00
781.00
$13,097.00
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in accordance with the
specifications in the sum of $ 13 097 00 . said amount to be added to the lump sum consideration named in the
contract, known as contract L- and which amount is to be fuianced from:
93�-9Q30�-Q898-00000 Civic Center Expansion Fund.
AP VED AS TO FO M
���=- � �6 �Z .� 191�� M. . Mocte so _
ity Attorney <� �m .
19— L�t-�...
Expansio Coo dinaC g Committee
� , n �. r
Commi[tee
Director oF Civic Cemer
,����'JE�/
Architect
,�G1�2/ i9�
4G'— 1�
of Finance /D��fr/��
�;Y�,�/�i
[ant to the Mayor
� /v� ian Ri hts
IFAPPROVED:
' ja�ajq � GREEN SHEET
INITIAUDATE —
CT R E PHONE �� /f � DEPARTMENT DIRECTOR
�� � �C -�` y(l � ASSION GTYATTORNEY
� J � NUNBER FOR
�T BE ON CpUNC�L AGEN�A BY (DATE) p��N BUOGET DIRECTOR
ORDER � MAVOH (OR ASSISTANi�
TOTAL # OF SIGNATURE PAGES (CLIP ALL LOCATIONS FOH SIGNATUR
IF NOT
���,,�-�.- `�'d� � ��/ /'Y� j-� , f!���'���
_ PLANNING CqMMI$SION i
z,rt
Jq _ q6 COMMfTTEE � ,
�` _ SiAFF _ ,
�
i _DI5TPoCTCOURT _.
. SUPPOFTS WHICH COUNCiI OBJECTIVE?
PBOBLEM,
N°_ 51530
�0�3�5
O CINCOUNCIL _
�� GT�Y G4ERK _
� 7�ytN. 8 MGT. SERVICES
MRIAVDATE
PEHSONAL SERVECE COS7TpACTS MUST ANSWEH SIiE FOLLOWf1iG QUESTiONS:
t. Has this personffvm ever xroficed under a coMracl for this tlapartment�
YES NO
2. Nas this persontlirm ever been a c7ry empioYee?
YES NO
3. Does this personitirm possess a skill not nortriaily possessed Ey any current city employae?
YES NO
Ezplain ali yea answers on aeparate aheet and ettach to green sheet
Whst. W1ian. Where. WMI:
� �
OCT 2 7 1997
pE4T qP H�MAi� �4GH�S
���"��y����
�
OC T 2 3 i997
�fi���`S f3FFt�u
RECENEG"
�cr � s �s�7
���� ��.���.
��T 2 J �ss7
� p7
Z 7 ✓
fOTAL AMOUNT OF TRANSACTION $�✓ � (� COST/REVENUE BUDGE7ED (CIHCI,E ONE) VES NO
°UNDING SOURCE ���� 6��1+LC r �� �111u t �y�� 1 � ACTIVITY NUMBER P� `I � R a3 °� -0 8 ��' ` ° ° °°Z'
'INANQAL INFORHiA710N. (EXPLAIN)
'� �3�5
� C01�(TRAGTS�A'FiiS
.
.
�
PROJECT:
CONTRACTOR
Saint Paul Civic Center
Expansion Project
Saint Pauf, Minnesota
M.A. Mortenson
PO Box 7'10
Minneapoiis, MN 55440
Origina! Coniract Amount:
PO # 015117 $33,973,000.00
PO # 385,700.00
CO No. Deduct Add
C4.�1-01
C4.01-02
C4.01-03
C4.01-04
C4.01-05
C4.01-06
C4.01-07
C4.01-�8
C4.01-09
C4.01-10
C4.01-11
C4.01-12
C4.01-13
C4.01-14
C4.01-15
C4.01-16
C4.01-17
C4.01-18
C4.01-19
C4.01-20
C4.01-21
C4.01-22
C4A1-23
C4.01-24
C4.01-25
C4.01-26
C4.01-27
C4.01-28
C4.01-29
C4.01-30
C4. D 1-31
C4.01-32
C4.01-33
C4A1-34
Subtotal
Totai
(4,535.50)
(4,422.00)
(9,616.00)
(23,313.00)
�41 286 501
1,254,234.06
34,475.00
151,969.0�
29,684.00
'I 0,193.00
24,598.00
86,610.00
29,410.00
8,927.00
4,482.00
22, 000.00
15,460.00
50,000.00
3,253.00
24,7�5.00
29,188.00
40, 889.00
8,883.00
19,081.00
5,531.00
8,734.40
4,718.00
21,389.00
14,593.00
18,7Q0.00
10,723.00
182,948.00
354,744.56
28,970.00
37, 566.00
13, 097.00
$1 295 520.56
DATE ISSUED:
CONTRACT NO.:
CONTRACT TITLE:
CONTRACT DATE:
8 October 1997
CP-4.01
Building Construction
Muitiscope
18 January 1996
Net Amount of Contract
including this Change Order: $35,612,934.06
•
�
Contractor Proposai No.: PCO#136
Project: ST. PAUL CIVIC CENTER CP.4
Date:
`����15
Contract No.: 4.0'f
A change in the scope of the work is requested as indicated below: / J Ci �V 1
�I�is req ested the completion date be ( 1 extended, {) decreased, ( 1 unchanged by _
RE GE�v calenda days. The ad'}usted completion date will 6e
MP� Q��d�cripYi of the change: (Refer to drawings, specifications, addenda, if applicable).
Reference FP No.: ; FO No.: ; PCO No.: 136
3.(��� is of payment: (Check one)
(X) Firm price for performing this change is
Adequate supporting details and information
must be attached to allow Owner to evaluate.
() Time and material per contract, but not to exceed
() Actual cost at compietion of work
Submitted by: M. A. MORTEfVSON
�
�
LJ
S +7,664.00
(Increasedl (DeducU
Date: `�J '>
FOR CPMI USE
Action Recommended: (Check one)
( � Change will not be made. Explain:
CPMI Job No.: 3225
`�(j Proceed on the following basis:
�� () As indicated above, change and basis of payment is acceptable.
1) Change is acceptable, basis of payment is not acceptab{e.
( 1 Basis of payment shafl be S
� The foflowing modification is recommended:
( � Change in completion date is accepted.
O Change is acceptable with no change in price.
,�Change is acceptable with no change in completion date.
( 1 Other
2. Reason for Change:
( � Design Change ( 1 Client Request �ield Condition
( � Suggested by Contractor () Design Omission or Other iexplain)
C�
3. Is this a part of the original contract scope? ( 1 YES ��.'NO
4. Is Contractor`s Estimate attached? YES () SVO
5. AiE consulted. YES {� NO
Prepared by: ( �� (CPMq
Approved by� ���o/✓��"� �/•`a HGA)
Approved by Owner)
. . __. _ � �... � Illminarl
CPMI Inc., c/o Saint Paul Civic Center, I.A. O'Shaughnessy Piaza, 143 West Fourth
cc: Chris Hansen Mike Pederson Dick Zehring
Date� /D -
Date: /O ' 7 ` C / Z
Date:
Date:
: PauL MN 55102-5299
3225-
. z
� . . ,
5t6/97
• ��
Summary
S7. PAUL CNIC CENTER IXPANSION
300 EAGLESTREET JOB ID: 951042
SAINT PAUL, MN 55l02
PH: 6!2/293-9l54 FAX.' 612/293-9557
Description: PCO #'136
Title: Hole drilling for AET compaction testing 5 Amount
Mortenson Labor.
(Seeattached)
Mortenson Material:
(See attached)
Mortenson Equipment
(See attached)
Associated Costs
(Change Proposal)
$ 6,602
$ -
5 -
$ -
General Conditions: $
(Mortenson Work)
SUBTOTAL M. A. PAOrtenson $ 6,602
SUBCONTRACTORSNEN
�. $ -
• 2 $ -
3. $
4. $
5. $
6. $
7. $ -
8. $ '
9. $ -
t0. $
SUBTOTALSubNend $ -
M A. Mortenson Gompany Fee:
SubcontractorsNendors Fee 5%
M. A. Mortenson Work 15°l0:
SUBTOTAL Fee
SUBTOTALTax
St. Paul Civic Center 6cpansion
Change Proposal
Totai Materlal & Equipment $
M. A. Mortenson Material & EquipmeM Tax:
$
$
7°l0 $
990
990
SU6TOTAL:M.A.Mortenson+SubNend+Fee+Tax $ 7,593
8uildefs Risk
GCL Msurance Costs
Payment & Pe+formancz Bond
SUBTOTAt Insurance & Bonds
O.00W ($.72lThousand)
0.0038 ($3.77(Chousand)
0.�050 ($4.95931Thousand)
$ 5
$ 29
$ 38
$ 72
� TOTAL CHANGE PROPOSAL $ 7,664
Page 1
C�
• D
�
tR
J
\�
N
a
�
a
C
�V
b
�
�
�
)
i
h
Q
M
q
N
M
b
4
��
" r
a �
O `�
U `�
a
IU
o m
Z
a °-' m
U � 0
�0�3��
�
a� �Q�
� 6] n N N
Fg MN�
o d ,
�
Z O rn ° ° ° o 0 0
� o 0 0
N � p O O O
c� `"
a .
O o
N �
J q W �? O O O O O O
Y IL f� p O O O O
� W p N
O a
O
�. Z
Wa
}�` `* o 0 00 0
�' v o0 0
Y Z � N � p o 0 0 0
U � o
K �
m �
�
W
Z � �? o O o O o 0
a r N o 0 0 0 0
� o
Q
U
� W � o o 0 0 0 0
O st o 0 0
� Z r o� a o 0 0 0
gFo
lu O�n ,� � N � v N
m�a � � N m �m�
� O O M � (7 N (D
�
�
�
� g
R
N �
a � W
� LL O �
Z Y � m p� W�
p � S c � � m
� o` p o C7 Q m¢
� � � � � o o � o
m m� m m m
N
5 m o � LL �5�
61
N
d
3 225-�0 �:8
5J �
�
.
C �
Mo�r�rsoK
The Construction Organization
REC�iVED
7 May 1997
MAY 0 8 1997
CPMI
Susan Sones
CPM1
c/o St. Paul Civic Center
I. A. O'Shaughnessy Plaza
143 West Fourrh Street
St. Paul, MN 55102-1299
Re:
Subject:
Dear Susan:
Saint Paul Civic Center Expansion CP-4
Mortenson Project #45l �42
PCO #136 - Hole drilling for AET compaction testing
6UllDING DIVISION
Minneapolis Office
700 Meadow Lane North
P.O. Box 710 (55440-0770)
Minneapolis, Minnesota 55422-4899
Telephone: (612) 522-2700
Facsimile: (6t2) 520-3430
In accordance with labor required to drill holes for AET compaction testing of footings, we quote the sum of Seven
Thousand Six Hundred Sixty-Four pollars (+$�,664.00) for the added work. Enclosed is our price breakdown.
Please let me know if you need additional information or clarification on the enclosed and issue a contract change
order.
The amount quoted includes only the costs of the changes identified herein. Changes to the contract not specifically
identified as revisions are not included in this proposal and are excluded. Mortenson reserves the right to submit a
proposal for additional costs and tune related to the impact of this change on unchanged work or for the effect of
this change in combination with other changes.
Very truly yours,
� � ��
Allen S. Troshinsky
Assistant Project Manager
file: PCO #136
�
Minneapolis•Seattle •Denver•Colorado Springs•Milwaukee•Grand Rapids•Sa� Diego•San Francisco•Nonofulu•Los Angefes
•
•
�
Emp# Employee Name
12699 DONALD M. JOHNSON
12699 DONALD M_ JOHNSON
12699 DONAID M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHP1SOf3
12699 DONALD M.JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JONNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONA�D M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. SOHNSON
12699 DONALD M.JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JONNSON
12699 DONALD M.JOHNSON
1087 RODNEY A. VORLICEK
1087 RODNEY A. VORLICEK
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONA�D M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSOi�1
12699 DONAID M. JOHNSON
�2699 DONAID M. JOHNSON
12699 DONALD M JOHNSON
12699 DONALD M. JOHNSON
6488 THOMAS H GRIMLER
1087 RODNEY A VOR�ICEK
1087 RODNEY A. VORLfCEK
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
12699 DONALD M. JOHNSON
9855 GREGORY L. ANDERSON
9855 GREGORY L. ANDERSON
�0704 KENNETH M.NERUD
95'1042_995
Week Reg
Ending Hoars
960225
960225
960225
96�303
960303
960303
960303
960303
960310
960310
960310
960310
960310
960317
960317
960317
960317
960317
960324
960324
960324
960324
960324
960331
96�331
960331
960407
960407
960407
960407
960414
96�414
960414
8604z1
960428
960428
960428
960505
960512
960512
960519
960519
960526
960526
960609
960609
960804
4
4
2
4
4
3
4
4
3
1
2
3
3
3
z
3
z
5
3
2
8
3
5
5
4
5
3
4
3
4
3
2
8
4
d
4
3
3
3
3
2
2
3
2
2
5
Pco�`►�°
OT
Hours
Other
Hours
3zzs—�o�; z
i�i3�7��
RECEIVED
AUG 2 6 1997
CPM!
Page 1
:( �.. .
95'1042_995
• 10704 KENNETH M. NERUD 960915 g
TOTALS �gg � �
�
❑
R Ev D
AUG 2 6 793T
�M1
Page 2
� - ,
� .
�
�
Aciion Recommended: (Check one)
( � Change will not be made. Expfain:
i of the change: (Refer to drawings, specifications, addenda, if appiicabiey.
RFP No.: ; FO No.: ; PCO No.: 139
C J
�
Contractor Proposal No.: PCO #139 Date: June 5 1997
Project: ST. PAUL CIVIC CENTER CP.4 Contract No.: 4.01
1� c�h�ee-in thelsco�e of the work is requested as indicated below: 1��� Z
i�- -
1. It i requ sted the completion date be O extended, O decreased, ( 1 unchanged by
JU � Q 9��ndar �Jays. The adjusted completion date wilf be
�
Titfe: Electro-mechanicai reiease aev�ces ror ovei��Ga�
3. Basis of payment: (Check one)
(X� Firm price for performing this change is
Adequate supporting detai{s and information
must be attacfied to alfow Owner to evaluate.
O Time and material per contract, but not to exceed
() Actual cost at compfetion of work
Submitted by: M. A. MORTENSON
FOR CI'Ml USt
Ea
�`3�5
�
S
Date: 4
CPMI Job No.: 3225
() Proceed on the following basis:
() As indicated above, change and basis of payment is acceptable.
�Change is acceptable, basis of payment is not acceptable.
�Basis of payment shall be $���� �� �� �}��
'�QThe following modification is recommended:
��� O Change in completion date is accepted. ���U �d��_ �2����Z�b�
( � Change is acceptable with no change in price. [��" (�g ��E��=-�
�Change is acceptable with ao change in completion date, j12�rD} g���
I 1 otner 4�48. 44? 4 f Z),
Reason fior Change: � �
O Design Change O Client Request O Fie1d Condition �p( Ej,�}y��#.3LG �u�NCi=-
�Suggested by Contractor f) Design Omission or Other texplain) � �, f�yh(L � Lj f5
/ - � n
3. Is this a part of the original contract scope? O YES
4. Is Contractor's Estimate attached? �:1'ES
5. A/E consulted. �'ES
Prepared by: �,�_�__,_ .� (CPMq
�� . /
Approved by (HGA)
Approved by�_�/�f�iY"�L��Owner
roved
CPMI Ina, c/o Saint Paui Civic Center, I.A O'Shaughne
cc: Chris Hansen Mike Pederson
� To � �C� -ia � 9
1)NO �
(�NO
Date:_ �r�L��
Date:�
Date:��, �`'f 7
�
Plaza, 143 West Fourth StreeT, Saint Paul, MN 5 51 02-1 299
Dick Zehring 3225-
6/5/97
• w
Summary
ST. PAUL CIVIC CENTER EXPANSION_
300EAGLESTREET IOBID:951042
SAINT PAUL, MN 55102
PH:6tU293-9I54 FAX:6!?f?93-955�
Oescription: PCO #139
Title. Electro-Mechanical Release devlces for overhead doors
Mortenson Labor:
(See attached)
Mortenson Material:
(See attached)
Mortenson Equipment
(See attached)
Associated Costs
(Change Proposal)
5 Amount
5
$
S -
$
General Conditions �
(Mortenson Work)
SU6TOTAL M. A. Mortenson $ -
SU6CONTRACTORSNENDORS
1. Mahon Door $ 9,500
• Z $ -
3. $
4 $ -
5. �
6 $
7. $
8 $ _
9. $
�0 $
SUBTOTALSu6Nend $ 9.500
SUBTOTALFee
SUBTOTALTax
St. Paul Civic Center Expansion
Change Proposal
M A. Mortenson Company Fee:
SubcontractorsNendors Fee 5%:
M A. Mortenson Work 15%.
Total Material & Equipment $
M. A. Mortenson Material & Equipment Tax:
5
$
$
7i $
475
SUBTOTAI: M. A. Mortenson+ SubNend+ Fee t Taz "� 9
Builder's Risk
GCL Insurance Costs
Payment & Performance Bond
SUBTOTAL Insurance & Bontls
0.0007 (F 72(fhousand)
0 0038 ($3 77lihousand)
0.0050 ($4.9593/Thousand)
5 �
$ 38
g 49
5 9a
• TOTALCHANGE PROPOSAL $ 1Q069
Page 1
�� � � � � . i3�15
• I�— A D UaimTb't O N-Pi L I hl>5���liI�A-T C O+N=. I�
Contractor Proposal No.: PCO 139 Date June 5. 1997
Project: ST. PAUL CIVIC CENTER CP.4 Contract No.: 4.0'I
1. Description of the change: (Refer to drawings, specifications, addenda, if applicable).
Reference RFP No.: ; FO No.: ; PCO No.: 139
Title: Electro-Mechanical release devices for overhead doors
Please review the following information for evaluation of the pricing of the attached Contractor
Proposal. Contact us if you have any further questions.
1. Mahon Door proposes this cfiange to the fise rated overhead coiling doors because they be(ieve
that the specified electro-mechanical release devices are inadequate given the clearances and
conditions shown. The potential for injury or damage is substantial. In addition, the
maintenance cost will be very high to "re-set" the doors each time they release. This proposai
would "power down" the doors via a relay and extra contacts in the motor. The doors could be
reset by the key switch and motor instead of inechanically.
2. The cost per door for this work is 5500.
3. The 19 doors incfuded in this proposal are:—�96E 101D, 107B, 121C, 121D, 126J, 140B,
142E, 142F, 172C, 172D, , , , , 420E, 4246, 442, and 490.
•
C ,
J
�
MOR'i'ENSOH
The Construction Orgaaization�
5 June 1997
Minneapolis Office
700 Meadow Lane North
P.O. Box 710 (55440-0710)
Minneapolis. Minnesota 55422-4899
Telephone: (612) 522-2700
Facsimile: (612) 520-3430
�
•
Susan Jones
CPMI
do SY. Paul Civic Center
[. A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul, MN 5 5 102-1299
Re:
Subject:
Dear Susan:
Saint Paul Civic Center Expansion CP-A
Mortenson Projec[ #95 t042
vP�Vf�
PCO #139 - Electro-mechanical release devices for overhead doors
Mahon Door has suggested a change to the fire rated overhead coiling doors. See the additional information sheet
attached. We quote the sum of Ten Thousand Sixry-Nine Dollars (+$IQ069.00) for the added work. Enclosed are
copies of subcontracter quotations and our price breakdown. Please let me know if you need additional information
or claxification on the enclosed and issue a contract change order if you want to proceed with this proposal.
The amount quoted includes only the costs of the changes identified herein. Changes to the contract not specifically
identified as revisions are not included in this proposal and are excluded. MoRenson reserves the ri�ht to submit a
proposal for additional costs and time retated to the impact of this change on unchanged work or for tite effect of
this change in combination with other changes.
file: PCO#139
Very truly yours,
����,.eJ�-J
Allen S. Troshinsky
Assistant Pro�ect Manager
RECEIVED
JUtd 0 9 1997
� �
BUILDING DIVISION
Cc , �'� ���_� x 5��
�, � .�.�--- .
�l:a r
'� �` G� _ G������. �
�
MinneapolisSeattle •DenverColorado Springs•Mllwaukae•Grand RapidrSan Diego6an Francisco•HOnoluiu•los Angeles
I'INI'i' >
VIGG/J/ll(
RECEIVED
� MaRTEHSO
r�IC (.J/tflntcIIan tJr� --
�
�1��5�'
✓ c1� �J"�C'�"� �'
BUaLDING 0!`/ISION
Minneapolis GHice
70Q Mead�w I�ne �`%oMh
a.o. sox ��o :ssace���o)
Minneapoi�s, n�t[�nesota S�a22-J899
�'ACSII�IILE TRArSV1ISST4�i FORM
soa: ST. PAUL CiVTC CENTER CP-�
300 E�,GLE STREET
ST. PAiIL, MN. 5�102
F?,X: G(Z-293 �)i�7
SEP 0 5 1997
CPM �
CONIPANY
.�TTEVTION:
FrLY NL�MBER:
• RE:
F�iC1NI:
S �.
298- 5`ttfi
p�-( C�s
�fGiOh �.
r /
/ � ��
�� LJ(� �Clr``'
-- � �� �-�� �
-- -� � � - �`
�
Qu� CdHi/t�S«fron r y cl� l�'+Ls.,u�i+�Nq / (� I
4 / —� ���,
{�C �,,,_,i.-. d �Stl w�t �✓' a a. P)(�� l�
--� , � �� �.0
O/-��p �2/I� �.y! _91.f" w�_�� �G r'i j.
2- � o� r- t^ a -�--� � w a f f•
��� �' SGVIh p Pn fa f"�C' �aS �' �.
- - �-- fi(G� �� t !�
of ra��o _,`� tiu� ahc�+_�-
� �J�
° `l0 --�`` 0.
S�vufG� O(4�r
�.l�e �-o S.l_°�--
CO_Y1:�iF.�TS:
�a C oh�tf�
dnn„ �.,� � �
� 3oati _ ,�-lsa
� ti �
Numher nf pA¢e5 iitc[udtng [lti5 covcr sheer. , . If y<�u Ao nut recei�e all nf' ih��es� � "� "�
T � � �I I
pages, plense co�tEUCt `� � at (61?} 293-91 �a as soon }is ��} ���
lI
• poss�bie. Thunk you.
Minnefi00h5• •Ceme�•Cnlorado Spn�gs•bUlwa�ROe•Grer�cf Napics•San Ciege•Su�: Francsco•�nr.ol.,�u•�os >rge1�5
Teiephone: �612) 522-2500
Facsimilet ifif2) 520•3d3G
Date: ����9
.
� �. �
�> .
• �
•
.
Action Recommended: (Check one)
() Change will not be made. Explain:
�G3�15
C�r��it��o�sal - PCO# 153 Date: 22 Julv 1997
Project: ST. PAU C1VIC CENTER CP.4 CoMraci No.: 4.01
a di��,� �, ��97 cope of the work is requested as indicated below: // L/" �
1.
he completion date be () extended, ( 1 decreased, () unchanged by
The adjusted completion date will be
2. Description of the change: (Refer to drawings, specifications, addenda, if applicable).
Reference RFP No.: ; FO No.: ; PCO No.: 153
Title: Add Fire rated Access Panels @ Elevators 7/8 9 13
3. Basis of payment: (Check one)
(X) Firm price for performing this change is S 1.352.00
Adequate supporting details and information (Increased) (Deduct)
must be attached to allow Owner to evaluate.
( � Time and material per contract, but not to exceed $
() Actual cost at completion of work $
Submitted by: M. A. MORTENSON Date: 7�2�1�7
Co r�actor�
ti
Contractor Signature
FOR CPMI USE
�
2,
9
O Suggested by Contractor �Design Omission or Other (explaiN (aru�� Qut.x'� !n �� —
CPMI Job No.: 3225
`�proceed on the following basis:
�� () As indlcated above, change and basis of payment is acceptable.
() Change is acceptable, basis of payment is not acceptable.
() Basis of payment shall be S
�The following modification is recommended:
() Change in completion date is accepted.
() Change is acceptable with no change in price.
�Change is acceptable with no change in completion date.
( ) Other
Reasonfor Change:
4 1 Desi n Change (� Client Request ( 1 Field Condition
3. �s this a part of the original contract scope? O YES
4. Is Contrector's Estimate attached? YES
5. A/E consulted. ES
Prepared by:� � �tr' (CPMq
Approved by �� 1 �� ( U;�� (HGA)
y J
`/ /\ /� /
Approved by
Approved by: J � " wwneu
CPMI Ina, c/o Samt PaW Civic Center, I A. O'Shaughnessy Plaza, 143 West Fourth
cc: Chns Hansen � Mike Pederson Dick Zehring
�NO Q �� �
O NO
()NO
Date: �� �CP / 7
Date: /O — 7 - 97
Date
Paul, MN 55702-1
3225-
( '
�
•
7�22�g7 St. Paul Civic Center Expansion Summary
Change Proposai
���H ST.PAU�C�IV�IC CENTER EXPAN�lO D 9stoaz
T� �'� � SAlNT PAUL, MN 55101
PH 612/293-9154 FAX� 612/293-95� J
Description: PCO#�53
TRIe: Add Fire-rated Access Panels @ Eievators 718, 9. 13 . $ Amouoc
Mortenson Labor:
(See attached)
Mortenson Material:
(See attached)
Mortenson Equipment
(See attached)
Assoaated Costs
(Change Proposal)
$
$
$
$
General Condifions $
(Mortenson Work)
SUBTOTAL M. A. Mortenson $ -
SUBCONTRACTORSNENDORS
• 1. Mulcahy $ �'Z�6
2. $
3. $
4. $
5. $
6 �
7. $
8 $
9. $
50. $
SUBTOTALSUbNend $ 1,276
SUBTOTAL Fee
M. A. Mortenson Company Fee:
SubcontractorsNendors Fee 5
M. A Mortenson Work 15%.
Total Material & Eqwpment $
M A. Mortenson Mateciat & Equipmeat Tax
SUBTOTALTax
$ 64
$ -
$ 64
7°(0 $
SUBTOTAL:M.A.Mortenson+SubNend+Fee+Tax � �•
Buiiders Risk 0_0007 ($ 72lThousand) 3 �
GCL Insurance Costs 0.0038 ($377lThousand) S 5
Payment & Pedorma�ce Bond Q0050 ($4 9593fihousand) S -
SUBTOTAL Insurance & Bonds $ �'
• TOTAI CHANGE PROPOSAL $ "I,352
Page �
:, ,
�`^
�
�
•
� �����
�..�•�,:ra
5232 N. G! EN6ROOK AVE. d OAt:DALE, MN 55128
PHGNE: 770�5250
To: M_A. Mortenson
Attn_ Ran Scl�reiner
300 Eagle Street
St Paut, MN 551 �2
Date:
Project:
P�riicing;
Descrip4ion:
Ju1y 16, I997 R�vtS�. '7 21-� �
St. Paul Civic Center �xpavsiqn CP-4, 7ob �951042
[�ooi; ooz
� ���U =�
M JUt 2 Z 19 ���
9�
.q M co
As Re sted 62�v� s-r�.p
Provid�'� 2�° s 24" Fire Pated. Access Panels Installed As Directed:
Elevation 9(116 Level) Wall Sprinicler Aceess; Elevation i3 (level'76)
Sprinkier Access, Elevation 7& 8(Leve193) Ivfech/EIecT. Access �
ta�vrTro� q(w3 t�ue�� WAu, s�wkcER- �SS.
Coat umtpatv
• LaBor: Cazpenter Foreman
CaTpepter
Taper Foreman
Taper
' Flaster
Tender
Lahorer
'"EXti'd: . llFJe�' V I51 OIl
Sub Tot�.l Labcr
_,� Hours x $23.14
� Hours x $21_99
Hotus x $21.55
_.___ Hours x $20.55
�,_.._ Hoars x $21.80
�_.._._ I:ours x !S21.9fl
__ Hours x $15.50
i � 33 ,/ �ours x $25.00
--�
?S% Burden or_ Labor
4% Escalation on I.abor After Iv�ay '97
Totai Labor
07/2i%97 ' 14:•48 �.�13 612 ii0 3418 3tULCiHY INC.
.� .
I°'vv
�9
1�9
� _..2
yzs�
8`i, 96
33,25
L13.�?
i(� .33
�y.4Cn
��'���'-,�.`�
. *Due to Seheduie Requizeznents
��
>>
.� -
�• �
• Vlaterials:
9iULL`AHI I �C .
Studs:
Track:
Tncsii ation:
Crypsum Boazd:
Taping:
Fasteners: /?�'�
Tools & Equipmen •.j � �
Miscellaneous: Ac��s Panels (Fv-e 12atec3) � $150.Q0
Manlift/Scaffo ding:
lYlaterials Sub'Iota1
10% Escalation on vlate�'ials After January '98 =
Total 1YFatezia3s -
7% Sute & Ciry Ta� �
10% Escalation on Materials After 7anuary '97 =
i�
Labor & Matarial Cost
O.H.SiP@1�%
Bond Cost @, 1°/Q
Total Quotation
o7i�iia;� ia:as F'a3 si� ;,o aaia
r.
1Vi.A. Mort�nson
Page Two
i � .-
- Schedule Impact:
a
� ooz�ooz
��3�75
$�459.�10 C
45 . 0 ioe�.
.� �
� ��.Z�
� `14' 9� �
- �� ���.-,C
_ �q"':�` l�o��gl
_ � /2��'�
_ �d
� t��� _�
� ���
�-� •�-_
Please note that we cannot proceed witt, the abo��e work vnless no�ified in writing. If we do not
receive a response when the work is ready to stazt, u�e ��zll proceed on a verbal and the quoted
price will be used for Change Orders without ne�;onation.
�
� ----
Signed: d" ��-----
Mark A. Petersor�
Projcct Vfanagex
ISmn
��
•
r 1
\_J
` Y ' ' RECEIV�D � �a��
SEP 0 2 1997
J
C O Pt-7' R A C: Q R` S �
- . _ _ _... __
- `
Contracior Proposal No.: PCO# 159 Date: 28 Auaust 1997
Project: ST. PAUL CIVIC CENTER CP.4 Contract No.: 4.01
A change in the scope of the work is requested as indicated below:
� �M �
1
2
3
It is requested ihe completion date be ( 1 extended, 1 1 decreased, ( 1 unchanged by
calendar days. The adjusted completion date will be
Description of the change: (Refer to drawings, specifications, addenda, if applicablel.
Reference RFP No.: ; FO No.: ; PCO No.: 159
Title: RFI#G-627 Added breakmetal Sk wa Link
Basis of payment: (Check onel g 300.00
�X) Firm price for performing this change is (�ncreased) (Deductl
Adequate supporting details and information
must be attached to allow Owner to evaluate. $
() Time and material per contract, but not to exceed $
() Actual cost at completion of work
Submitted by: M. A. MORTEIVSON Date: �c3 z�? 47
Co ractor
� ����-_
Contractor Signature
FOR CPMI USE
� . Action Recommended: (Check one)
() Change will not be made. Explain:
CPMI Job No.: 3225
�Proceed on the following basis:
( � As indicated above, change and basis of payment is acceptable.
(� Change is acceptable, basis of payment is not acceptable.
( 1 Basis of payment shali be S
�The following modification is recommended:
() Change in completion date is accepted.
O Change is acceptable with no change in pnce.
�Change is acceptable with no change in completion date.
( ) Other
2. Reason for Change:
() Design Change ( 1 Client Request () Field Condition
( 1 Suggested by Cortractor �4�'Design OmSssion or Other (expiainl
��
3. Is this a part of the original contract scope? ( 1 YES o
4, is Contractor's Estimate attached? �,YES () NO
5. A/E consulted. �YES ( ) NO
Prepared by:�
� _jCPMq Date: l�'Iv" 9�
Approved by O/a0i✓S41Y��U�� �HGA1 Date: �� -�-��
qpproved by
Ownerl Date:�.—
Approved by: (Owner) Date:__�—
CPM� inc , Uo Saint Paul C�vic Center. I.A. O'Shaughnessy Piaza, 743 West Fourth Street, Saint Paul, MN 5 5 1 02-1 299
cc� Chris Hansen Mike Pederson Dick Zehring 3225-
8I28/97
� i�A�'1
Description. PCO#759
Titie: RFI#G627 Added breakmetal
Modenson Labor.
(See attached)
Link
5 Amount
S -
$ -
Mortenson Material.
(See attached)
S -
MoRensonEqwpment
(See attached)
$
Associated Costs
(Change Proposal)
$ -
General Conditions
(Mortenson Work) $ _
SUBTOTAL M.A.Mortenson
SUBCONTRACTORSNENDORS $ 283
• L Ga[eway $ _
2 �
3 g
4 $ -
5. g -
6. g -
7. $ -
g $ _
g § '
10. $ 283
SUBTOTALSubNend
M. A. Morterison Company Fee
SubcontrectorsNendors Fee 5 % � � 14
M �A'. MoRenson Waic 15%. $ -
SUBTOTALFee
•
ia
Totai Matenaf & Equipment $ -
M A Mortenson Material & Eqwpment Taz: 7% $ -
SUBTOTAITaz $
SUBTOTAL M. A. Mortenson + Su6Nend + Fee + Taz
$ 297
BuJdefs Posk 0 ��47 (5.72lihousand) S �
GCL insurance Cosis 0-0038 ($377lihousand) 5 �
Payment & Performance Bond 0.0050 ($4 9593l�housand) 5 }
SUB70TAL Insurance & Bonds � 3
TOTALCHANGE PROPOSAL $ ���
St. Paul Civic Center Expansion
Change Proposai
Summary
ST. PAUL CIVIC CENTER EXPANSION
3Q� EAGLE SlR6ET JOB ID:
SAINT PAUL. MN 55IO2
PN. 6!2/293-9154 FAX. Gl2/293-9557
Page �
AUG MON.C7�11 PM GRTEWA`I RCG INC.
;- r:� � -�•i�r=�
Au�czst 11, 1997
1�/i.A. M�rtenson
300 Eagle St.
St. Yau1, MN. ��401
Att Sason Law
Re: St. Paul Givic Center
P�FL N��. G-627
FAX N0. 6124885244
P. 06
� i 3`�5
Dcar Tason,
•
•
I have reviewed REi G-627 which addresses adding break meeal at tE�e,�ambs of the t'rame due to
n difference in dimensions from 1�/4-3A and 30!4-3A. Thcre �vill bc a cost impact for �ur SC��e
of w�rk for this change, �vhich r have listed belo���_
Add Brcak Metal at Ja��zbs {matenal)
I.abor to install
T'ax
l5%
Total
Pleas'e issue a change order if you would like �ne to proc;c;ed.
� 166.00
S; 69.68
$ l 1.E�2
S 35_70
$2b3.00
I f you have any addiYional questions pteasc fcct £rcc to <,�� e me a call. Thank Yoii.
Si cc •ly, `����
aul L. Neaic
I'ro�ect Nianager
889 PIERCE BUTLER ROUTE • S7. PAUL MINtVESOTA 55104
PHONE. (612! 488-057� • FAX: (G1 2) 4E3-5244
�I
� �
i�!3�5
C
The Constructiors Organiyatian
28 August 1997
SusanJones
CPMI
c/o Saint Paul Civic Center
I A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul MN 55102-1299
SEP 0 2 1997
cPMti
Re
Subject:
• DearSusan
.
Saint Paul Civic Center Expansion CP-4
Mortenson Project #951042
PCO#159 - RFI#G-627 Added bxeakmetal C�1 Skyway Link
Minneapolis Office
700 Meadow Lane North
HO. BOx 710 (55440-077 0�
Minneapofis, Minnesota 55422-4899
Telephone: (612) 522-2700
Facsimile: (612) 520-3430
CL ; / y' , J !%F�'-
In accordance with the response to RFI#G-627, wllerein we were requested to add breakmetal at the
Skyway Link, we quote the sum of Three Hundred Dollars (+$300.00) fox the added work Enclosed ace
copies of subcontractor proposaLs and our price breakdown. Please let me knox� if you need addirional
information or clazificarion on the enclosed. If this work is to proceed, please issue a contract change
order.
The amount quoted includes only the cost of the changes identified herein. Changes to the contract not
specifically idenfified as revisions are not included-u1 this proposal and are excluded. Mortenson reserves
flte right to suUmit a proposal for additional costs and time related to the impact of this d�ange on
unchanged work oc for the effect of this change in combutafion with other changes.
Veiy truly yours,
�� �����
Allen S.Troshinsky
AssiskanC Project Manager
Eite� CPMI
� PCO#159
Minneapohs•Seattle•DenverColoradoSpnngsMilwaukee•GrandRapidrSanDiego•San Francisco-HOnolulu•Los Angeles
-- �: �7i17is7 is-a� �eii zss sai7 crrn srcc ,---- g� i � ( � ����. �ooz
,_
aJ�rv
.
- - - -- - _`;="`---a'.�'�,�='r�".€l�����"�3-=-+�ar_a�.`;:— __ --
JUL 1. a i9°7
. Ccvic Center E�Qartsor. H��LtEST F'1c R QtiFORBttAT[CIK 710_= �-527
/� �
iniomo.iors � ,�cS 0 v�
[]e�na:ion C ? � j 4
^fT dnly t j
Paul Civic Cerstec �L14a�Y GPMI ?RL1JECr PIIJMF,Er�. 3225 CTa
iUu(����.
- i�l�i ;vtDnir..�`iS.'�I�[
�p�{
�1
L_J
Tp_ GPf1r7f
c10 Sairt� PauS Givic C.srrer
Z a� West Four�.h Sse�
Sairrt°3ut.MSN nat6Z-T�9
��373:i9. �•
�EtiiT Ci/iG"T� �1.
iiFSPOi�zO $Y. 711�IS7
gR1�V1�i�IG �'_A244 DET.a� a" _ iP -�+�' -'
QUES"F10[�E_ In res�arse t6 RA G-Sfi5 Q[rnsOcm �S_ PiFase reiar �o.de'G�s l5l�3R and 3�JC-3Q_ These
calttrcp v�+are insisiled at t�eren2 ticaes artd 7htis e�.c;h catunn de'�ad uras �Qcrzs'sLtY a�Pked by 2wa
d',if�ent geopte_ tf Ya¢ seview the zuro deta'Ls'�geifrer, ii yives Yau a a�:ersion oT 2'-S' to �e
east face af tfie fr3'mef or giid fine 242 fln detac"1 'ISl�3A_ Ugec: �rzvie�+e � de 3fll43A it calis o¢t for a
dimensiorz o£ 2-Z' 2a 2Fce sas side at ihe iraaie and 2� rnrer m grid 5'ine 24. Piease venfY �Y
�s�.afari .tvizh Ntifca Peders�+ �at tite beA frz ivr tiue s�;tirna snravld "ne :ar tE�e es5Y ia.ce-c: :he docrs
to Grz� v�s wiffi the �id 24 as shour2 aa de� 1�14-:1+ and @ de�7 301�7-34 we would add a piece af
6' PF aluninc,.-n ;iat stoc3c agsicss� tf�e bzick pier to ccver me s�d bacFar.g-
DESi� (FiCzls7 t�I F'iefd (CPM3i I�3
cec � a� sv���-sro,vsrcorvrn�r
_.. .. .._„_....,.. f7F- ^tP.K , ='ISF]N TJATE: 71'[ 1197
R�'-e}"ar'2�D TO 3.ht�C'c
3Y.- T S��r_ ) _.�.-sv-
OF:
b�_
DATE: `j
��y: 5 .Atf"��� 5K-�t""�� I�.� 2- .-�o" C�..tM w�
I.��f� . L-`V�`� aF �=L4� Si r��',��� �,rJ� 'Ptf7�J'f�kL
�,( N CV�?.1 �S i� �f'-�� �'T�? R..N t� i D J a t N� AS ���'�
Fi�J 04��H'. P�YDti1G ( 1 RF'i PEND!N� I l
����!'a� i�'II++�� �T�' s
�s • •
� � s
� DATc: �} J 4 J
6fiiC 1 / „J T _
��er ; ie a4we 4u�arn � t�=�e rn3hr wiU �.�n9e ra�:rac::;.:1 at�cy'� Ci�.'�:;� 3nY `�'eY, ti y�tt qn9V`2� a Chen9e�� h
C�+tiaC sam ar canir3C Lit�e 2 reaUired. rezsz scE�.'nf YJUt i:C.'Ii+L°_...'' L: �."�-�:� 17 Cr.�tl ir..r..�L�^:i�E)Y arti' b, rr �rn�2Cii
• �+R(k �n cu�on. - .
C2MS. 1�.. Ua Sa�ni Pau{ CJ`^c �*'=�. iw C'5�"°hnes,Y':aTZ, iL;'.✓es. ��h SusaL S.:ini ?1u7. M�l 5�70Z
c Q�ti�; Hertscn - •
iqup�
3ZIS F�Tt -- �ldS TiG�O 'ir�c oa- -rn o-����r ,� or.�„
�
.
1
.�
r=
i_
•
�� ;.�arc��.�v
4' S1 3�°= 3_0111
ALLTS CRi'GR1Ut�!_
L(.ti � CGt�C
� CqZ °��
6 ` ���Q� �
0
��_�.
AL4 : 5TG
tuc1�O;3'S
, :f_�:: f 5T ;
< aGOr�
��-3a
"'� .-..�U� J i : j�`=
_� �:��V f � L.�/ �f
<�'�
a
��'""� t�l"i t
R�� ��2�.
�GG �6��°�
��C 1 � �u+� ��
� GOLL't
_�' ,
� .' .,
�
/
3
�
LIN= � rJ..:'�C.
ZO'JR °�' OJ /
a = ;7'o'-O' '� �:2["
J
��'-'
�
- ��3�5
�� �
,; _ ;. ,
, ��� �: ,
i
�•-o• !
� ��
„��r-: src
umoous
.��, sTOtTc::-
< �cc�s
�
"�� AV.:i � ..'✓F•'�� -
G^i�
: ���L.; --��
,.,�... _ ... �.. _ . �
�'ENRN ��
tNTL ..to��!'�.
S�'t�- 2
� �62�
�
� t�} J � ��'
�- ��:c co! u� C, y
1
A
. t � � � �
✓ W � V� �./
•
•
r�
L
CONTRACTO R'S PROPOS'
�� sal N.: PCOf1 160 Date: 04 September 1997
Project: ST. PAUL CNIC GENTER CP.4 Contract No.: 4.01
CF p 5 199 `�/Lj -,�-�
A Ltiange in the scope f the work is requested as indicated below:
�. �P � e completion date be O extended, ( 1 decreased, O unchanged by
calendar days. The adjusted completion date will be
2. Description of the change: (Refer to drawings, specifications, addenda, if applicable). _
Reference RFP No.: ; FO No.:_� PCO No.: 160
Title: RFI#G641 Revise window size @ c„ rh Flovafnn
3. Basis of payment (Check one)
(X) Firm price for performing this change is S 781.00
Adequate supporting detaiis and information (Increased) (Deduct)
must be attached to allow Owner to evaluate.
O Time and materia4 per contract, but not to exceed $
() Actual cost at completion of work $
Submltted by: M. A. MORTENSON Date: `� 7
Contractor �
�l �� `lc.. % �"--a�
Contractor Signature
FOR CPMI USE
Action Recommended: (Check one)
O Change wdl not be made. Explain:
2
CPMI Inc.. c/o Saint Paul
cc: Chns Hansen
�,Proceed on the following basis:
( � As indicated above, change and basis of payment is acceptable.
( 1 Change is acceptable, basis of payment is not acceptable.
() Basis of payment shall be S
`�The following modification is recommended:
�� ( � Change in completion date is accepted.
( 1 Change is acceptable with no change in price.
�Change is acceptable with no change in completion date.
( 1 Other
Reason for Change:
(� Design Change O Client Request ieid Condition
() Suggested by Contractor () Design Omi sion or Other (explain)
3. ls this a part of the onginal contract scope? O YES
4. Is Contractor's Estimate attached7 YES
5. A/E consulted. YES
Prepared by: CPMI)
Approved by ,� ��� �/d< ���GN J.�'I�HGA)
Approved by %� (Ownerl
,�
Approved by: � _ (Owner)
O
ONO
()NO
CPMI Job No.: 3225
Date:_��
C�
Date: �` °' / ~
Date:
Date:
I.A O'Shaughnessy Plaza, 143 West Fourth Street, Sa�nt Paul, MN 5510Z-1
Mike Pederson Dick Zehring 3225-
\
.
�
•
h���
. �' �
9/4l97
Description: PCO#160
Title: RFI#G641 Revise window size @ South Elevation
MoRenson Labor
(See attached2
Mortenson Matenal�
(See attached)
MoAenson Equipment
(See attached)
Associated Costs
(Chaage Proposap
S Amount
S 224
� ss
b -
$
Generaf Conditions.
5
(Mortenson Work) � 280
SUBTOTAL M.A.Mortenson
St. Paul Civic Center Expansion
Change Proposal
SUBCONTRACTORSNENDORS
1. Gateway $ 302
� 2 Mulcahy $ 725
3. $
a
S -
5.
S -
S -
6
$
7.
$ -
8
$ -
9.
$ -
10.
SUBTOTAL SubNend $ 4Z�
SUBTOTALFee
SUBT�TALTax
M A. Mortenson Company Fee.
SubcontractorslVendors Fee 5 .
M. A'Mortenson Work 15°!0:
Total Material & Equipment $
M. A Mortenson Matenal & Equipment Tax
S 21
$ 42
$ 63
56
7% � 4
$ 4
SUBTOTAL:M.A.Mortenson+SUbNend+Fee+Tax � 774
Buiider's Risk
GCL Insurance Costs
Payment 8 Performance Bontl
SUBTOTALinsurance & Bonds
Summary
SL PAUL CNlC CENTER EXPANSION
3on E,sGtE S77tEe! Jos t�:
S,4INTPAUL. MN 5510?
PH�6l2/193-9154 FAX 612/293-9557
0 0007 (5 72(fhousand)
O.D038 ($3 77/Thousand)
0 0050 (54 9593/Thousand)
S t
� 3
� 4
S �
• TOTAL CHANGE PROPOSAL $ 78 �
Page 1
�
•
•
, � ��, •- .
�
C
O �
z
a
W
� �
W
~ O �
W . �
U V'^ �
U �J 2 �
j C $
� c�
� V J �
' � �
Q U �
a�,��
� C � '
y M h 4
O
9
m
J
0
� �
# �
� �
a
�
U
O �
Z
a =' °'
U K �
��J��
�
� N
Q a ' N (7
� Q � m
J Q � �
F J
� �
Z 1- � o 0 0 0 0
� o 0 0
a N N O O O O O
V W � N
p o
F- �
LL� N O O O
J F' � N O O O O O
Y� m N ° ° o 0 0 0 0
� LLf 0 N
a a
� O
� Z
w Q
}� � O N N M N
a� V M
Y 2 r�- �i � � c�i o� m
U � o `� 61
CL �
m �
� Z
W Q
Z�� m o o O O O
W u� � O O O
a Z r N O O O O O
[j K O
U �
�
�
� K m r �n
w W� c� � in M� w
� f] V M � � � c� r- O
� Z 1� O O c� N� V
Q � � N
J
� Z
W Q N M O O O
��� M p O O O O O
m � 1� O � O O O O
Q Q O
� U
K
O
¢
C J
� �
N Z
o � w
LL Q Z 0
Z � ? @ m w �'
�
� N = C a O m
� a o - °' a � a
� n � �? �m�-
� � � � � o o Q o
J � � m
CSl N ` @ N � � Q �
ro o `o N � �
Q m � }- LL
N
�
N
a
�, . •
•
th
.
� i 't� .
MaYI
SL PAUL CN(C CENTER IXPANSION
300EAGLESTREET JOBID-9�In12
SAINTPhUL. MN 55/�?
PH: 6!2/293-9l54 FAX 61?/293-955i
C.P No. PCO#160
Reference:
Date: gf4�9�
.
�
Material Quantity Unit Unit Cost Total
Measure
Brick S8 ea 0.35 30.80
Mortar/lnsulation/Adhesivel7ies 7 Is 25 25.00
0.��
0 00
0.00
0 00
0 00
0 00
0 00
0 00
o.00
o.00
0 00
0 00
0 00
Subtotal 55.80
Page 1
a�.y�?[��ti.S'.,i�:i:�f.�, i .��__.i.: �: _�:'... �.. �=�.��.�:r�.
WAY �CG INC. _ ' FAX fl0. 6124885244 P. D3
� � ���
•
C.,�l:?IlL� �'�.U. t70I?i f)�-'� J���� X 1�-•'.S J%S�� IC {i'�. =, �'" \ j'_�'"
This "i11 requi*� a n��v piacc of UL-7 gla.s=_ at �2��.Q0
ra:; 5 li.iti
1� ?u 5 ���.85
Tpt:�i 5= G? iiU
�J
1�u��ust it, t997
�3.A. Mortensun
30U £aete St.
St_ Yaui, ?vSN. »�O 1
Att= Jason L.aw
P�e: St. Paul Civic Center
RFL �1a. G-641
T�carJaSOn.
1 have ret�ietved RFi G-6�+1 ior any cost or schedule impact and have de^ennined that there i> a
cost increase and possibie scheCiile impact dcpendine on :he r�c�zpt of a ci�an�z ordcr. I ha��
listed the costs associatzd �vtth this RFI betow and can onl� say the !ead time on �lass is � to 1 t1
wccks from tl�e timz ;ce rzciev2 a fomial chan�e ord�r.
Arc;hicectural Framc Rcfercncc W-i
Please ic; mc kn0` ho���' you ��ould !ike ;r.e io procc�:� - f!:an� Yo4
i
�in crcl} � :l �^
���� �=^"'�' �' �
Paut L. tieal�
Yi
&89 PIERCc BUT��^ti RGU7E • ST. PAUL. M(NNESOTA 55104
PHONE. (o i 2) 48&-0574 • FAX: (612) 48&5244
ti�
'' � U9':Od?9i �� 0�1:51 FdS 612 ii�':5-(15 ?IL I\<. fCo�l(pb
�
M�I.G�HY
II2C.
�j0pi: i.ipl
v�JO7
5332 N. CrLfi1VBROOK AVE, OAKDALE, AZ?�T S512fi
PHONE 770-5250
� FIELI� WQRK ORQEt�
ros _�3 S Cc �f � c CE r�t �r� sti. PRICE CHrlNGE
LOCAT7oV . lN "t
DATE � U C'S _C � I��
❑ vo ca.�.�cE
❑ ADD .... .""'" ... ................ ..$
❑ DHDUCI'IOS ................._'_S
�j 'CO 8� DETERMII:ED
1. THE UhDERSIGNED, HAYE REQIIESTED THE FOLLUWIVG CH.MICE. THiS C!-[ATGE OVER41'LES THE PLAV .4ND SpEC1FICATIO\5 ptiD
nDDE'�nL-MS OR CH.LVGE ORDE}LS SIG`�F� pRiUA TO T:;E. ASOVC DATE.
7 REQL'EST THE FOLLOWIt`G CHA.VGE A.\D ASSli!riE Ft,7_.L RFSFO`s'f&IL1TY FaR THLS CFi.4'�Gc:
paa w���� F��.�,,�,�.,� ��u,^ _F��-r
1 j__ _ TWa
�. �. 1— C � " �ca � �
r
i X ��.� -- � (O,�
�
� � � �
--- — - � � � � � = �5 � }
� r�. o � � — �, s�'
tEE.4so, F�R CK4�CE : 1��- �/ 25. `b
i�tHdc� � A(�.Ji- GF,��rs 4 ~ ----�
�.nnlT[ON L1E REQ��IEtED HECAUSE OF e30VE CHn�cE u�ILL BE
� � � � � � C� ., } 4
SEP — 4 1997 � s
M A. �+�ORrE��S0A1 Cv.
Cn* �"n.4:: D,�.;'S. 1��
x �
�' /� � � U . r � r
sic�Tn! iy l.�1��.�
�� - - � �� �/
KEPR,St.?vTL\G /✓7 /!./-�i�.Y" _ _
SiG�"ED -���i -�----•�--'� ---�_�
REYR_ SE�TLhG 3.1iiLr_.q7-iY. C:C
�C?TL. ti� Hn�� AEQC�ESTED Yo� TO SIG� TFiE .q3vV'E F.Lat� 6EC.�tiSE ;fxi oF�� ..+,� �UY;L�TS HnV£ P.ESL �TEU tv ytiSi'vDER�:;:.�^-
i.\GS OP V$p�y�, OADEAS. WL- BELiEVE ,iND HGP{ THIS WiLL P'I.�bk�T.�`Y SUCA L'I�,q"vREL\:h�'f5
�'K YOU'
Fi_EAJE SiGN A.�*p J�c7'L'Rl�; O.':� COPy TO ZIitS OF�li �,
� 3 ��
�tV�D �
3 Q 1997 � —
_r,, R� � ..__.
Pf
sa�nt Paa! Civic C2n�er Eepans:or.
LS��
`� L4
JU� 3 Q 1997 l��
REi�UEST F�R 1NFOF.MAT70N !10_= �-04�
Infor.n�or. ZX7
Geviavcr. [ I
r I Only I :
O WNE4_
Sainr Pzu! Civic Center Auihcr)ty
GPMf PR0.3ECT i�[UM$E�: 3225
COi�'R^.CTOR= UlOP,TcNS6N
TO: CFMI
do Saint Paul C:vie C2nz2�
1=3 West Fourh S�ree*
Szirit �aul. ;v1N 551C2-i?°9
CON � �ACT: CP-?
RES?OIVD 3Y: 7130r97
Al ✓
�; ��e J
�tulc��Y ✓
GaTtu/pJ ✓
1
Sow�tS ✓
�asb� �
RE�E.DENCE:
D�AIL
SP°_C
GUESTTOPl=
i ne W'i window shown on .4 301 behnreen grid 4.0�."I s�ows tYe head os tne windo�v io 6e at an
e{evavon af "S�'-3 1i2�_ The s'sucivral beam 6ottom on gnd 8_°T is ai a 147"-la'". inis puts the
w;adow head ahoui � 112 " above ;he saucmral 6zam borcom , plus �ue ftave to �reproo� �+rnich w�t
.ower R more_ I think the s3r:tpfes: soIvrio� v,vouSd be to shrink the window dawn 1"-0 in height and
reorder l pane of giass- T1ais •xouId ailow enough room for :he 5reproonna and a sof==it'rrne around.
• the heam and have it terminate az the iowered window head_ I've reviawed tfiis witn T�m Carlson and
need an answer'.oday ? ihis wou[d Be the cheape� scluticn as we wouid only n2ed to re order 1 piece oi
glass and frame in at tfie head.
Design (HCzA7 CX7
�eld (CPMI} jXl
CONTRACTOR SU6GcS i IONS,•'COMSv7EN7S
ov.
Ta: �)f
O F:
OF:
DATE=
R�� Y SN�I��b T'1'�� tt1+ll�1 1 i {!� t{�i� �c.Yh1z�3 G{k��T�s 5��f��s
W�T�'t g�` C�,�St+�G �� A�fz`2 t� ¢�iO�c� �' 2'�r1 �' Sv ttlfi� Ttt� �?i�
=��� � i`'�ts,� �u�1 S �c��i�U ,*c�� �`rFt�GY���c16-G�iL�t-
�r� � O ER P_, D G( [ R. 2ENDfN -[ /
BY: ILFH�trt�'rLG�/ C�- _/�� _ OF' ILU7} t?A7c-�� - r
Rt i iJFNE� TO:
FE'i'UP,NEi� TO:
�sl�i
DATc=
DATE:
i �:.—
iJeiiher :he abave cu¢sLion Por :na respe_:,.re ra¢7y m•�+7 rliartgz cnn_,ac:c:al oblie,a� ens'n anv •.rav. if voe �rsic_r a enan�e in
� �, - �,-� - .1 •�vEtn °..''�°
conVac. SUm or conn-ar bmc �� re.qu�r=_c. �i�ase subnrt •/our ittm+2ed Oroposa[ _a C. MI immecia;ely ano
?M1, Inc., C!o Sz+n: ?aW Civic C:r,er, I.A_ O'Shaugnne::;� PIu2a. i W2,e, =ocr5 SL'e°i. S��rt: ?�vL Mfd a51C2-�2°
cc: Chris �3RSert _�
�icc� �� �}n�cw Cr`cPE wi) �-r r,�v�i r�' �c��u�'���
��0 f�h_ f wcu SE 5=f�" CM-v.� �NS t�1�or' `� ��','r1 rt�(��d'�rtJt1�
, ,�S^ nF� TKl` Fitu�2tDuyTtN� tEf�
t
� ���5
�
\ J
•
The Canstruc�ion Orgmiization
04 SeptemUer 1997
_3��
��
-��-.�
RcCEIVED
SEP 0 5 1997
Susan Jones t-- C PM �
CPMI
c/ o Samt Paul Civic Center
I. A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul MN SSIO2-I299
g Saint Paul Civic Center Expansion CP-4
Mortenson Pro�ect #951042
Minneapolis Office
700 Meadow Lane North
P.O. Boz 770 (55440-0770)
Minneapolis, Minnesota 55422-4899
Telephone: (672) 522-2700
Facsimile: (672) 520-3430
SubjecY: PCO#160 - RFI#G641 Revise window size Q South Elevarion (revised)
Dear Susan:
In accordance with the response to RFI#G-641, wherem we were requested to revise a wmdow size at the
South Elevation, ��e quote the sum of Seven Hundred Eighty-One Dollars (+$781.00) for the added cvork.
Enclosed are copies of subconhactor proposals and our price breakdown. Please let me kno��� iE you need
addirional information or darificafion on the enclosed. If this work is to proceed, please issue a confract
d�ange order.
The amount quoted indudes only the mst oF the changes identified herein. Changes to the conhact not
specifically identified as revisions are not included in this proposal and are excluded. Mortenson reserves
the right to suUmit a proposal for addifional costs and time related to the impacY of this change on
unchanged work or for the effect of this change in combination with other changes.
Veiy h�uly yours,
� � �-�v� "�'
Allen S. Troshinsky
Assistant Project Manager
file: CPMI
PCO#160