Whereas, Additions which might prove to be.,necessary in the Improve-
ment described as the OXFORD-CENTRAL RELIEF SEWER SYSTEM-"A", Comptroller's ' ,
Contract L-6878, McDonald-Luben & Associates, Contractor have been provided
for in the Specifications, and �
,
Whereas, It has been found necessary to make the following Additions
and Deductions as per attached Contract Change Agreement No. 2
and
E,
�Thereas, The total additional amount is $1;952.24 and the Commissioner
of Public Works has agreed with the Contractor that the emount of $1,952.24
is the correct sum to be added to said contract, therefore be it
Resolved, That the City of St. Faul through its City Council approves
the foregoing additions made in accordance with_ the Specifications in the
. sum of $1,952.24, said amount to be added to the lump sum consideration
named in the contract, known as Comptroller's Contract L-6878, and which
amount is to be financed from City's share of Local Improvements Code
• ��0920-701. ,
. ,� � '
, � � <<
E ` -
h _
. y
�
. �U� 1919��
COUNCILMEN
Yeas Nays Adopted by the Council 19—
�
� �UL I 919G�'
L
Dalglish � '
� Approved 19—
Holland
Meredith In Favor •
� .
Peterson J Mayor
Tedesco A gainst � ,
� Mr. President, Byrne �PUC�I'S�t�E�1 JUL 2 2196�'
" ' ; ���
. I , '
, �
"{�� � ,� . CITY OF SAINT PAUL - DEPARTMENT OE PUBLIC WORKS � �
: . 234�41� �,
'_: T. � CONTRACT CHANGE AGREEMENT • N0. 2I ' + �
t
�ROJECT N0. 66-S-i2i7 ' CONTRACT N0. L'6878 CONTRACTOR �cDonald-Luben &, A�soc.,. . � �
PROJECT DESCRIPTION Ox,�ora.-Central Relief Sewer S.ystem- +r.A" ' , , �' ;�
, , � : I
' r
. �
In accordance with Section 95 of the Charter of the City of Saint Patil, the Commissioner j
F . of Public Works has agreed with the Contractor that the basis of payment and priceslfor +
� items listed in the changes described lielow, not otherwise included in the contract,, are ;
� the reasonable costs of" tho�e items for additions to, or� deductions f rom, the contr�ct, i
k Modifications�additionsl and d.eductions found to be necessary duxing thc � ' �
. . progess of the work. , , . .
� • ,
f ' • ADDITIONS - � ' �
� � , . : . .
t; Substitu�ion o� 18" extra s.tren�th V.C. pipe for 12" extra strength V.C. .
, . a , ' ' �
_ 1V. E. corner� Ox�oxd and Fu]1er " 8 I,in. Ft. � $2076 22;08� ,+ ; , .
� . S. �. corner, Oxford. and Univcrsity l0 Lin. Fte C� . 2076 � ' 27.60. ; � •
, . , , ,
, : ,�,, . , .
; Catch Basin lead re-arrangemcnt� at Sherburne and Oxford � � . . �_;
- r � .
' ; 8" V.C. Pipe Sewer � 70 Lin. Ft. CQ3 �+a�+6 312.20 ' _ , �
12" V.G. Pipe Sewer ` K 100 Lin. Ft. @ 5.00 500.00 . - �
� � � Chatsworth and. University : �
. � l2" v.Ce Pipe Sewer 89.8 I.in. Ft. C� 5.00 �+4g.p0 '
. _ ~� �+" Monol.ithic concrete sidewal.k 75 Sq. Ft. @ 0.50 37.50 '
�. Additiona7. work due to change 3.n sewer grad.e� Ox�ord 5t. between M.H. Noo 5 - .
and M.H. Noo 6 - ` �
Trench excavation 6006 Cu. Yd. C� 3,50 ' 2],2.10 •
Additional. M.H. Depth 1.0.59 Lin. Fte C� 25 0 00 26�+.75
' Additional M.H. excavation 15.1 Cu. Yd. C� 3.50 52,85 ; • . �
Change in sewer grade, M.H. 25 to M.Ho 27� Sherburne St. _ �.
Trench excavat3on 29 Cu. Ydso � 3,50 101.50 �
. ^ �
. , ,
- . }
, �. - � - : ; ' .
r�•.
''� " ' ` �-:-=-r��rc.- � "i 3 196 7 MeDons�1�l�Lub�n 8a l�s�ociat�s, Inc. . ,
� Con�tx�uction En�ineer Contractor , • !
���G1��c�� ���C.w �� i�� -B �f�. - , � ,
Chief Enginee� � Y -r�1'�y� �`�.�✓T�tl ��19 .�'
� �7'('*. � '�+. 1 f. �.[-a��- 19 ' •�- 7-�? lg �'� '
Commissioner Com troller �
� �''`-. p ;
Ori inal (White) Du licate (C � -
g p anary)•, Triplicate (Pink) Quadruplicate (Blue�) . �
To Contractor To Accounting Div. To Comptrolle'r To Engineer I ' ' �
, � .
� ^ . ' • k
.J ' " ' . , �
. , ' , . 1
. ' . �� - j
Y a • - • . I
Removal of Gatch Basin� Or.�ord S•t. bctween Sherbuxro.e and Charles 10.00 � ` '
,Construct:ton of TY.E� 538 C.B. .: 1.5b.00 ' I
� i
i
Removing a,nd rElayl.ng 200 Lin. Ft. of 18" R.C.P. eewer on �O.�ord � �
- St. M.H. No. 6 to M.H. No. 7 - � 602.32 � '
�
S�reet Restora-�ion University at� Oxfbrd ' �
_ 1
1
FI3.gh Er3xly etxen�r�h concret� � 10.5 Cu. Yd. @ 17.00 1'j$.50 _ �
Restoration of sewer sexwtce connect3.on of 1043 Charles Ave. 952.02 � ; �
Se�•r�r serv-.Lce revision at 1.07o shErbuxne = 9g�37 � `
Resnoval and relayin� of 32 Lino Ft. of 8" V.C. Pipe san3.tary sewer �
in Sherburne Ave. to conform to existing sewer service connection �
at 1078 Sherburne. r 330•38 - �
Tota1 Addit3.ons �+�oi.l7
. . ,
� Deduction�
N.W. corncr Oxford and Ft�J1er 1 Type lA C:B. L0.00 � '
� 5.�. corner Oxeord, and Ful.ler � Type lB C.B. up,pp �
S.E. corner Oxford. and Fu11.er ].2" V.C.P. 28 Lin. Ft. � 5.00 , 1�+0.00 ' '
S.W. corner Oxford and University V.C.P. 18 L3.n. Ft. � 5.00 yp�pp ', �
- ' � � �
• Sherbwrn.e and Oxfox�d �
` 12" V.C. Pipe C.B. Leads g�+ Lin. Ft. ` @ �+.00 � 376.00 ' ,
�+" MonoJ.ith3.c concretc walk 225 Sq. Ft. : Q 0.50 1Z2.50
� • 12" V.C. Pipe Sewer � ?+8 Lin. Ft.� C� 5.00 �2�+0.00 ' • �
,
Chatsworth and University � ' ,
12" V.C. Pipe Sewer 32 Lin. Ft. C� 5.00 160.00 : ,
18" V.C. P9.pe catch basin leads • 93 Lin. Ft. � C� 7.76 7271,.68 .
- Street Restoration-Ux�.versity at Ox�ord • .
7" concrete ba�e 55 sq• Yd @ 5•25 �•75 '
. ,
. Tota1 Deductions 23�•93 �
, - Ne� Additions 1952..?_1E . _
This additional amount to be �3.nanced �rcmi City's share of Loca1 �
, Improveanents Code� � 0920-701. � � � '
. . , ' , . j
• � �
' - �
, � ' �. .,
, � , ' �_ , �l ,
s (.�)('l�ryA A�
D�{rLICATE TO rRINT6R `,JL1�L1�'
- ` CITY OF ST. PAUL F,OENCIL N�� ��� �, _
� OFFICE OF THE CITY CLERK
,
COUNCIL RESOLUTION-GENERAL FORM -
PRESENTED BY
COMMISSIONER Robert F. Peteraon o�rF _
f
Whereas, Additions which might prove to be aecessary in the Improve-
�ent described as the OSFORD-CENTRAL RELIEF SEWER SYSTEM-"A", Comptroller's
Contract L-6878, McDonald-Luben & Associatea, Contractor hnve been provided
for in the Specifications, and
�Ihereae, It hns been found necessary to unke the following Addition�
and Deductions as per attached Contract Change Agreement No. 2
and
Whereae� The total additionBl euount is $1,952.24 and the Commiasioner
of Public Worke hes agreed with the Contractor that the amount of $1,952.24
is the correct sum to be added to �ttid contract, therefore be it
Resolved, That the City of St. F8u1 through its City Council approves
the foregoing additions aade in accordance with the SpQCif ications in the
sum of $1,952.24, �nid amount to be added to the lu�p sun consideration
named in the contract� known as Co�ptroller's Contrnct L-6878, and which
8�ount is to be f inanced from C ity's shere of Local I�provementa Code
,�0920-701.
COUNCILMEN ' ���, 1 9 1�a�
Adopted by the Council 19—
Yeas Nays
=����se� , ��. �� �.96�
Dalglish � Approved 19—
Holland
Meredith In Favor
Peterson � Mayor
Tedesco A gainst
Mr. President, Byrne
�mz2
. '` , 234341 � , �
' ' ' CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WORKS �
. . �
, � � _ CONTRACT CHANGE AGREEMENT N0. 2 ' � �
' , PROJECT N0. 66-5-].2].7 � CONTRACT N0. �878 . CONTRACTOR McDonald-Luben & Ass�oc. � '
,
. PROJECT DESCRIPTION Oxford-Cen.tra7. Relief 5ew�r Sy�stem.- "A" � ,•
, F " ' j
• ,. +
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissi�ner
of Public Works has agreed with the Contractor that the basis of payment and prices or �
items listed in the changes described below, not otherwise included in the contract, are ' �
� the reasonable costs of those items for additions to, or deductions from, the contra t: ' �
Modificationa�additions1 and deductions found to be necessasy durin� the ' ;
progess of the work. . � ' � �
� , , . , • �.
ADDI'rIONS - , , .
, {
Substitut3.on o�' 18" extra strength V.C. pipe for 12" extra strength V.C. �
N. E. cornex� Ox�ord and Fu11.er � 8 I,3n. Ft. C� $2076 22,08� '
� S. �. corn�r, Oxford and University ],0 Lin. Fta C� 2076 27.60 _ '
. , , � ,
Catch Basin lead re-arrangements at Sherburne and OxPord� . �
. 8" V.C. P3.pe Sewer . 70 Lin. Ft. CQ3 �+a�+6 312.20 '
12" V.C. Pipe Sewer 100 Lin. Ft. C� 5.00 500000 - ,
�
Chatsworth and Un3.versity �
• � �
l2" v.Ca Pipe Sewer 89.8 Lin. Ft. @ 5.00 �+�+9v00 � ' '
�+" Monolithic concrete sidewalk 75 Sq. Ft. @ 0.50 37•5� ' i
_ � : T
Additional. work due to change in sewex grade� Oxford St. betwecn M.H. Nao 5
and M.H. No e 6 _ � ,
Trench e:�cavation 6006 Cu. Yd. CQ3 3,�0 27.2.10 ; ' ,
Additional- M.H. Dep�th 10.59 Lin. F�o @ 250 00 26�+.75 � �
Addit3onal M.H. excavation 15.1 Cu. Ydo @ 3.5� 52�.85 �
Chr�nge in sewer grade� M.H. 25 to M.A, 27� �herbuzne St: � i
Trench excavation 29 Cu. Ydsa @ 3050 101.50 ' . '
, � � . �
� �� �� ' . ' . . .
-� �r.� �..�t.,�L. 7 �3 19� 7 MeDon�ldnLub�n & 11.s�ociate�
'" , Inc.
Cor��tx'uct:Lon EnRineer Contr�ctor � ,
� ,
�.�G'J��G"-�) f�=r�/`�Cl'`� "� 7 l�i� BYd �lJr_/c'i+�✓.r. �'�7�c��1,t��'J ��19� ,
Chief Enginee�f� � � ,/ '
� F��T i' � '����'1-(C� ,,-a .. � 19 � I'_I 1 19 ��,/ ',
Commissioner G�/�`=�^'�Comptroller ;
; � � i
Original (White) Duplicate (Canary)�, Triplicate (Pink) Quadruplicate (Blue�) .
' To Contractor To Acco�inting Div: To Comptroller To Engineer � � ; .
�, ' � � �
. , �
� � .
; . ,
A �. �
v . ♦
� � I
� Removal of Catch Bas3n, OxPord St. be-�ween Sherburne and Charles 10.00 � �
,�onstruction of Type 538 C.B. . �50.pp ' ' ;
. ;
Removing and rElayl.ng 200 Lin. Ft. o�' 18" R.C:P. s�wer on Ox�ord " � - ' ,
St. M.H. No. 6 to M.H. No. 7 " . = 602.32 . °
. � t
� ,
' . Street Restoration Universi�y at Oxeord '_ ' ;
Hi h Ear1 stx h concre-�e 10. Cu. � ��
6 Y �� 5 Yd. ° @ 17.00 1.78.50
. Restoration of sewer serv.tce connection of 1.043 Charles Ave. 952.02 � � f
• ^ • • � � �
Sewer service revision at 1070 Sherburne �' 4g�37 � • !
� ,
R�noval r�nd �relaying of 32 �.n. Ft. of 8" V.C. Pipe sanitary sewer � - 1
in Sherbu�ne Ave. to con.form to exi.sting scwer service connection � . �•
at 1078 Sherburne. � ° ' 330•38 - - �
R . . ' `
� ' Total Additions . �+�07:.17 ` .
� . ' r� . , , '
� Deductionr� '" � ° `
• N.W, corner Oxford and F�zL7.er , 1 Type ]A C.B. �,�.p.pp ' � �
r
• S.E. corner Ox�ord and Fuller 1 Type 1,B C.B. . 11,p,pp ;
, S.E. corner Oxfox�d. and �Z1.1.er ].2" V.C.P. 28 Lin. Ft. C� 5.00 1�+0.00
S.W. corner OxPord and University V.C.P. 18 Lin. Ft. C� 5.00 � gp,pp � � ' �
� Sherburne and Oxford ' � ' � � ' •
12" V.C. Pipe C.B. Leads 9�+ Lin. F�. G �+.oo �376.pq •
�+" Monolith3.c concrete walk ` 225 Sq. Ft. � Q 0.50 Z12.50 . �
12" V.C. Pipe Sewer �+8 Lin. Ft. � (� �.00 2�-0.00 - • '
- Cha�sworth and University , � � ,
J.2" V.C. Pi Pe Sewer 32 Lino Ft. C� 5.00 160.00 ' �
18" V,C. P3.pe catch basin ler�ci.s 93 �n• Ft• @ 7.76 721.68 - '
- i
Street Restoration-University at Oxford � '
, 7" concrete badse 55 Sq. Yd @ 5.25 28$.75 ; -
. ,
Tota1 Deductions • ' 23�•93 '
�
. rre-� �aaitio�.a z952.2�+ '
� .
This additiona7, smount to be �inanced fraQn City's share of Loca1 � �
Improvements Code� � 0920-701. . '