WHEREAS, Additions which might prove to be necessary in the Improvement described
as the BURGESS-FARRINGTON RELIEF SEWER, Comptroller's Contract L-7084, Peter Lametti
Construction Company, Contractor, have been provided for in the Specifications, and
41HEREAS, It has been found necessary to make the following Additions
ADDITIONS
Excavation, backfill, street restoration, boulevard restoration and
curb restoration for lead water service connections replaced with
copper 6 connections @ $125.00 = $750.00 -
Additional �aanhole constructed at Milford and Marion to accommodate
catch basin connections. Construct manhole (Type IV)
1 each @ $300.00 = 300.00
Reconstruct existing catch basin at south east corner of Wayzata
and Marion. Reconst. catch basin - 2 lin. ft. @ $30.00 = 60.00
��i Sand-gravel trench backfill to replace unsuitable existing material
� as per special provisions.
Sand-gravel backfill - 1043 tons @ $3.50 3650.50
Totel Additions $4760.50
and
WHfiREAS, The total addition is $4760.50, and the Comnissioner of Public Works has
agreed with the Contractor that the a�ount of $4760.50 i� the correct sum to be added
to said contract, therefore be it
RSSOLYED, That the City of St. Faul through its City Council approves the fore-
going additions made in accordance with the Specifications in the sum of $4760.50,
said emount to be added to the lu�p sum consideration na�ed in the contract, known as
Co�ptroller's Contrset L-7084, and which amount is to be financed through the 1969
Local Improve�ent Fund 0920-701.
SEP 4 1969
COUNCILMEN Adopted by the Council 19—
Yeas Naya SE(� 41969
CarLson
Dalglish pproved 19—
Meredith �n Favor
Peteraon � '
Sprafka Mayor
A gainst
Teclesco PUeLISHE, �''i�� 6 1969
Mr. President, Byrne
�
DUPL(CATE TO PRINTER ���
CITY OF ST. PAUL FOENCIL NO. �
OFFICE OF THE CITY CLERK y
COUNCIL RESOLUTION-GENERAL FORM
PRESENTED BY
COMMISSIONER Robert F Peterson DATF
WHEREAS, Additions which might prove to bc necessary in the Improvement described
as the BURGESS-FARRINGTON RELIEF SEWER, Comptroller's Gontract L-7084, Peter Le�aetti
Construction Company, Contractor, have been provi,ded for in the Specifications, and
WHEREAS, It has been found necessary to meke the following Additions
ADDITIONS
Excavation, backf ill, street restoration, boulevard restoration and
curb restoretion for lead water service connections replaced with
copper 6 conn�ctions @ $125.00 = $750.00
Additional manhole constructed at Milford and Marion to accommadate
catch basin connections. Construct manhole (Type IV)
1 each C� $300.00 � 300.00
Reconstruct existing catch basin et south east corner of Wayzata
and Merion. Rec�nst. catch basin - 2 lin. ft. @ $30.00 ffi 60.00
Sand-grav�l trench back�ill to rsplace unsuitabl� exiating material
� as per special provisions.
Sand-gravel backfill - 1043 tons � $3.50 3650.50
fiotal Additions $4760.50
and
WHEREAS, The total addition is $4760.50, and the Coma+issioner of Public Works has
agreed with the Contractor that the amount of $4760.50 is the correct sum to be added
to said contract, therefore be it
RESOI.BED, That the City of 5t. �'8u1 through its City Council approve� the fore-
going additions made in accordance with the Specifications in the sum of $47b0.50,
said amount to be added to the lump sum coneidexation nauned in the contraet, known as
Comptroller'e Contract L-7084, and which amount is to be financed through the 1969
Local Improvement Fund 0920-701..
��p � ����
COUNCILMEN Adopted by the Council 19—.
�"�` r, ���i``��
Yeas Nays ���° � � �
Carlson
Dalglish Approve� 19—
Meredith n Favor
Peteraon
Sprafku � Mayor
A gainst
Tedesco
Mr. President, Byrne
O