Loading...
245487 + 24548� OR161NAL TO CITY CLERK � CITY OF ST. PAUL C�OE NCIL NO. OFFICE OF THE CITY CLERK COUNC S LUTI N—G�IE L FORM PRESENTED BY Robert F. Peterson COMMISSIONE 7F WHEREAS, Additions which might prove to be necessary in the Improvement described as the BURGESS-FARRINGTON RELIEF SEWER, Comptroller's Contract L-7084, Peter Lametti Construction Company, Contractor, have been provided for in the Specifications, and 41HEREAS, It has been found necessary to make the following Additions ADDITIONS Excavation, backfill, street restoration, boulevard restoration and curb restoration for lead water service connections replaced with copper 6 connections @ $125.00 = $750.00 - Additional �aanhole constructed at Milford and Marion to accommodate catch basin connections. Construct manhole (Type IV) 1 each @ $300.00 = 300.00 Reconstruct existing catch basin at south east corner of Wayzata and Marion. Reconst. catch basin - 2 lin. ft. @ $30.00 = 60.00 ��i Sand-gravel trench backfill to replace unsuitable existing material � as per special provisions. Sand-gravel backfill - 1043 tons @ $3.50 3650.50 Totel Additions $4760.50 and WHfiREAS, The total addition is $4760.50, and the Comnissioner of Public Works has agreed with the Contractor that the a�ount of $4760.50 i� the correct sum to be added to said contract, therefore be it RSSOLYED, That the City of St. Faul through its City Council approves the fore- going additions made in accordance with the Specifications in the sum of $4760.50, said emount to be added to the lu�p sum consideration na�ed in the contract, known as Co�ptroller's Contrset L-7084, and which amount is to be financed through the 1969 Local Improve�ent Fund 0920-701. SEP 4 1969 COUNCILMEN Adopted by the Council 19— Yeas Naya SE(� 41969 CarLson Dalglish pproved 19— Meredith �n Favor Peteraon � ' Sprafka Mayor A gainst Teclesco PUeLISHE, �''i�� 6 1969 Mr. President, Byrne � DUPL(CATE TO PRINTER ��� CITY OF ST. PAUL FOENCIL NO. � OFFICE OF THE CITY CLERK y COUNCIL RESOLUTION-GENERAL FORM PRESENTED BY COMMISSIONER Robert F Peterson DATF WHEREAS, Additions which might prove to bc necessary in the Improvement described as the BURGESS-FARRINGTON RELIEF SEWER, Comptroller's Gontract L-7084, Peter Le�aetti Construction Company, Contractor, have been provi,ded for in the Specifications, and WHEREAS, It has been found necessary to meke the following Additions ADDITIONS Excavation, backf ill, street restoration, boulevard restoration and curb restoretion for lead water service connections replaced with copper 6 conn�ctions @ $125.00 = $750.00 Additional manhole constructed at Milford and Marion to accommadate catch basin connections. Construct manhole (Type IV) 1 each C� $300.00 � 300.00 Reconstruct existing catch basin et south east corner of Wayzata and Merion. Rec�nst. catch basin - 2 lin. ft. @ $30.00 ffi 60.00 Sand-grav�l trench back�ill to rsplace unsuitabl� exiating material � as per special provisions. Sand-gravel backfill - 1043 tons � $3.50 3650.50 fiotal Additions $4760.50 and WHEREAS, The total addition is $4760.50, and the Coma+issioner of Public Works has agreed with the Contractor that the amount of $4760.50 is the correct sum to be added to said contract, therefore be it RESOI.BED, That the City of 5t. �'8u1 through its City Council approve� the fore- going additions made in accordance with the Specifications in the sum of $47b0.50, said amount to be added to the lump sum coneidexation nauned in the contraet, known as Comptroller'e Contract L-7084, and which amount is to be financed through the 1969 Local Improvement Fund 0920-701.. ��p � ���� COUNCILMEN Adopted by the Council 19—. �"�` r, ���i``�� Yeas Nays ���° � � � Carlson Dalglish Approve� 19— Meredith n Favor Peteraon Sprafku � Mayor A gainst Tedesco Mr. President, Byrne O