246138 . :�RI6INAL TO*CITY CLHRK ��V�,3$ �
� CITY OF ST. PAUL FOENCIL NO.
, OFFICE OF THE CITY CLERK
COUNCI LUTION RAL FORM
PRESENTED BY Robert F. Peterso
COMMISSIONE ATF
WHEREAS, A Contract has beeA avrarded to Barton Contracting Cea�pany,
�sseo, Flin�. for ia+provement of streets, alleys and sidewalks, referred to
ss Project 6-1889, Census Tract 9 � 10, and
MHEREAS, Certain provisians in the specifications of the contract are
not clear to the parties of the co�tract; therefore be it
RESOLVED, That the City of St. Paul thro�gh its City Council , approves
Change Order No. 1 , a copy of r�h i ch i s attached, and the Ca�a+i ss i e►�er
of Public Works is her�by autt�orized to execute the said Change Order �lo.
1 on behalf of the City.
�T 3 �. �969
COUNCILMEN Adopted by the Councii 19—
Yeas Nays ��-� 3 � ����
Carlson
Dalglish Approved 19—_
Meredith � Tn Favor
Peterson �l '
Sprafka �J Mayor
Tedesco A gainst
Mr. President, Byrne 1969
pu�.is�, NOV s
0
� . ��S
` ��
/ , CHANGE ORDER - ,PROCEED ORDER ISSUED, TIME NOT CHANGED
_dn Contractfng Company Phalen Park Community -
; ---� 10300 89th Ave. N. Neighborhood Code Enforcement
Osseo, H(nnesota 55369 Program One - Census Tract
, 9 � 10.
, Mi nn. :E-2
f
�
CHANGE ORDER N0. 1 '
� , Gentlemen:
In connection with Contract No. G-1889, dated October 21 . 1969 , for improvement
of streets� alleys and sidewalks in Census Tract 9 � 10, ProJect No. Minn. E-2,
St. Pau1 , Minnesota, Proceed Order No. 1 , dated , ordered changes
in accordance with:
1 . First paragraph on Page D2 states that the order of precedence shali
be as per article 3 on Page D1 , which places the general conditions
Part I and ll , which is the Federal Specifications, over these Special
� Provisions. This would indicate that wherever there's a discrepancy
between the Special Provisions and the Federal Specifications, the
Federal Specifications shall prevail . Item A-15.4 pp. SP 10 shall be
changed to reflect thts precedence.
2. Part II Federal Labor Standards provisions. Wherever the minimum wage
rates differ from the City of St. Paul wage scale ordinance, the
Contractor will meet higher minimums of the two wage scale rates.
3. Paragraph 114 Technical Specifications and Drawings shall govern over
paragraph A-1 Governing Specifications.
4. Section 9 pp. 3, shall govern over A-5 and paragraph A-5.�+ shall be
deleted from the contract.
5. Paragraph 111 b shal,l govern over paragraph A-6 and paragraph A-6 shall
• be deleted from the contract. �
6. Paragraph 110 shall govern over paragraph A-12 and paragraph A-12 shall
be deleted from the contract.
7. Page 9 shall be labeled 10 and page 10 shall be labeled 9.
8. Paragraph A-12.5 sha11 be incorporated into Paragraph 1116.
9. Paragraph 210� Equal Employment Opportuntty. The note and Section A, B
and C of Item l , shall be deleted from the contract. All of the items
under Item 2 shall remain.
10. Blank items of Part 1 and 2, Paragraph IOIE. They should be filled in
to read '?he term Engineer means the City Engineer of the Department
of Public Works or his duly authorized representative".
=;
�
. �
� 11 . Paragraph 132, General Guarantee. the missing blank should be filled
' in with a �eference to Section A-40 of the Special Provisions.
SubJect to conditions hereinafter set forth, a� equitable adjustment of the contract
price and the contract time is established, as follows:
THE CONTRACT PRICE IS NEITHER INCREASED NOR DECREASED AND THE CONTRACT �
TIME IS NOT CHANGED.
The conditions last above referred to are as follows: �
A. � The aforementioned change, and work affected thereby, are subj ect to all contract
stipulati.ons and covenants;
B. The rights of the City of St. Paul are not preJudiced, and .
C. All ciaims against the City of St. Paul which are incidental to or as a
consequence of the aforementioned change are satisfied.
� Signatures: � ,
j�L:���`c..%��"� ,/ j ,.' �L �" ,/
City of St. Paul
By
Title Commissioner of Pubiic Works
Date October 2g, 1g6g
. Accepted �� ��i`�� � � �,, .
- ' - "' ontrector °"
B j �
Y -.
- , �
. ,
Title %,
Date rl (� ��