CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. C4.01-A-9
L J
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Saint Paul Civic Center Exnansion CP-4 Buildin�Construction Multiscope - Parking Ramp
known as Gontract L- City Project NoA15117 M.A. Mortenson, is composed of the following:
1. Pill mnnel nea� Minneso[a Club tunnel per Field Order (PO) #4.13
Reason: Unknown site condition.
2. Add sheet metal liner at Type F shafr walls per Request for Proposal (RFP) #4.41.
Reason: Code requirement.
3. Upgcade parkiog ramp control system.
Reason: Owner request to match existing ramp system.
4. Use accelerators to decrease amoun[ of [ime for curing of CLSM:
A. PCO #33
B. PCO #48
C. PCO #68
Reason: Allow workers on soonec.
$5,822.00
10,804.00
12,774.00
1,659.00
1,078.00
1,870.00
$34,007.00
Total
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in accordance with the
specifications in the sum of $ 34 007 00 . said amount to be added to the lump sum consideration named in the
contract, known as wntract L-_
147-76009-0899-68050
APP D AS TO FO
<
Assistant City Attomey
d�l'� a f Department of Finance
D�
Ciry of Saint Paul (PSD)
• Archite �
and which amount is to be financed from:
� � � `l 19�
__���19�
�/z. / 19��-
:� i ,�
♦
M.A. Mortenson
r � -- r i .
Admuristrative Assistapft to the Mayor
���� 37551
� � �,.�,� ��� - f'� ` �kQ
C'J
TOTAL # OF SIGNATURE
�� � GREEN
6- 6 6 y3( �IGN L � RyATTORNEV �—
NUYBER FOfl
POIRINCa �BUDGETDIRECTOR
ORDEF � MAVOFi (OR ASSISTANT)
> � (CLIP ALL LOCATIONS fOR SIGNATURE)
CITY CAUNpL
CI�TV CLERK
➢fN. 8 MCaL SERVICES
iNmnwnre
��. C/�Li�ln � ��-Q�v�T� � � `� �/ —� '
� �� ��-�� ���. �' � �`� �''...�' �"."
or
_ PLANNING CAMMISSION _ CIVIL SERVICE COMMISSION
_ CIB COMMITTEE _
_ STAFF _
_ DISTRICTCOUfiT _
SUPPORTS WHICH COUNCIL OBJECTIVE?
PERSONAL SERVICE CONTRACTS MUST ANSWER TNE FOLLOWING QUESTIONS:
1. Has this personffirm ever worketl under a contract for this tlepartmeM?
YES NO
2. Has this person/firm ever been a ciTy employee?
YES NO
3. Does this personttirm possess a skill not normally possessed by any current ciry employae?
YES NO
Explain all yes enswers on separate sheet anE attaeh to green sheet
INITIATINCa PROBLEM. ISSUE, OPPOFiTUNITV (Who, What, Whan, Where, Why):
T � C/�.o� D.��, �-,r.u—.p.o -f�- c.o�.�..-P �.a �,,� �—
�1 a rti�--� �t Ge.�t.�°.�.-� � ��-P �"
�� � ca ��,� � 6 �f °z G�` ��'�
��
� �(i'�-�
Gv�� � �-5,e� �- �° G�-�r��.ev�- wc� ���
O
C�
����.����
�IAR 2 6 1°9�
�f < y.
,<
�.
�tAR 2 � 199�
, ,� ��.�.,.��. � ��
� :,��•��=�� ;,� � ���� A�������
RECEIVEd
APR 41997
ClTY CLERK
ASADVANTAGESIFNOTAPPflOVED� //a/,
�/' �'-� `� `� " ' � �� �
{� ��
AMOUNTOPTRANSAC710N $ ��
FUNDIIdG SOUBCE
FINANCIAL INFORFnAT10N: (EXPLAIN)
COSLREVENUE BUDGETED(CIRCLE ONE) r�� NO
ACTIVITVNUMBEH /y7- 7/av� - U735 - 6�oSo
a �1
�atz��
CONTRACT STATUS
C�
•
PROJECT: Saint Paul Civic Center
Expansion Project
Saint Paul, Minnesota
CONTRACTOR M.A. Mortenson
PO Box 710
Minneapolis, MN 55440
Original Contract Amount: $4,397,090.00
CO No. Deduct Add
C4.01-A-1
C4.01-A-2
C4.01-A-3
C4.01-A-4
C4.01-A-5
C4.Q1-A-6
C4.01-A-7
C4.01-A-8
C4.01-A-9
Subtotal
199,979.00
30,353.00
17,283.00
21, 529.00
51,688.00
27,70�.00
6,539.00
2,583.00
34,007.00
�391.661.00
DATEISSUED:
CONTRACT NO.:
CONTRACT TITLE:
CONTRACT DATE:
26 February 1997
CP-4.01
Building Construction
Multiscope
18 January �996
Net Amount of Contract
including this Change Order: $4,788,751.00
•
SJ'
�O I2��
C �
�
The Canstruction Orgarzization�
BUILDfNG DIVISION
Minneapolis Office
700 Meadow Lane North
P.O. Boz 710 (55440-0710)
Minneapolis, Minnesota 55422-4899
r1
LJ
•
24 January 1997
Susan Jones
CPMI
c/o Saint Paul Civic Center
[.A. O'Shaughnessy Plaza
143 West FouRh Street
St. Paul, MN 55(02-1299
Re:
Subject:
Dear Susan:
Saint Paul Civic Center Expansion CP-4
Mortenson Project No. #951042
FO#4.13 - Fill Sandstone Tunnel @ MN Club
; �.r�".�i.����� s��1 �2-2100
j Facsimile: (672) 5203430
1, ,iG;d 2 7 1997 ��
i
: , J i
' :_: Ni! _;
I �`� ,
[n response to FO#4.13 regarding flowable concrete fill of tunnels at the MN Club and per our unit cost agreement
re�arding lean fiIl at tunnels dated March 22, 1996, we are submitting our costs incurred as follows:
30 CY of flowable fill @$625/CF $5,063.00
MoKenson Markup 15% $ 759
SUBTOTAL $5,822.00 � f
Bonds and [nsurance @.98% • q/ W�.J �� w1� �� �� 3 ` �� 7
TOl'AL � � A C y n
E�closed are copies of concrete material delivecy tickets from Cemstone Produc[s Company dated 30 April
Please let me know if you need additional information or clarification on the enctosed. Please issue a contract
change order.
The amount quoted includes only the cost of the changes identified herein. Changes to the concract not specifically
identified as revisions are not included in this proposal and are excluded. Mortenson reserves the ri�ht to submit a
proposal for additional costs and time related to the impact of this change on unchan�ed work or for ttie effect of
this change in combination with other changes.
Very truty yours,
r
� 9� �.,��--�
Allen S Troshinsky
Assistant Project Manager
File: CPMI
FO#4.13
MinneapoliS•Seattle •Denver•Colorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•HOnolulu•Los Angeles
��
CEMSTONE PRODUCTS COMPANY WYATT READY MIX
• 2025 CENTRE POINTE BLVD. North Suburbs - 784-3512
MENDOTA HEIGHTS. MN 55120 West Suburbs - 446-9090
Twin City Are2 - 688-9520
Sand 8 Gravel - 774-7575
CEMSTONE PRODUC7S COMPANY
South Central MN - 7(800) 366-6910
Cannon Falis
Faribault
Montgomery
Northfield
Zumbrota
( `/'�1�.� � /G'-U'� � � � f�l•>l � �
WARNING: PLASTIC CONCRETE MAY CAUSE iNJURY • SEE OTHEft SIDE FOR MATERIAL SAFETY DATA SHEET
�= sde aM e�usrve liabAiry oi me sen¢r ;or any tle(ect in me aaeo�� 9�5 shan be Gmned to repan�g or repladng me WATER AOOED AT CUSTOMER REQUEST (GALLONS)
-5 a5 ine se4�er sha4 e'ect. The ob:ga!+on ro:epart or reptace the goods ShzA temtinate dro monihs afler ilu tlelrvery
z urJOaaing ume ot 7 irvnutes per yutl to be compu;ed lrom amval on pb Demu�age at S60 oo pe: Mur must te paitl by FIRST MIDDLE LAST
s,urch95er IhereaY.er.
�Y�JOWLEDGETMATCEMSTONEPRODUCTSGO.isnd6abiefwtlamayeofanynzm:eorWntliriwrreabymyrequest The concrete streng;h shown on �his tick¢t is Ihe POTENTIAL strengfh z.�d
-ove auck past curb Iine or right ot waY ��mes, ar.0 ac¢nowledges winmgness to pay wrecker tees or cas, in :epamng 9uaranteetl onty whert tested antl sarnDled in accordance with A.S T1.
.�a;ed propem�. sp¢�ifications. Our concrete mixes are des�gnetl fo� specihc slump renges, a^
:USTOMER RELEASE SiGNATURE addinonal watervoitls ail guarantees.
It is the buyer's responsibility to protea fresn'y pouretl concre�e from fre=_nr
tluring �he Gcst seven tlays aker tl2livery
_., 1 �i ���'� S_...',��,.. .. 'tr._. ,` _ :i_: .....,�d _!i�SiT.fi 12'. v,"].��� 5:���^�ti n�� r�;F,�; ��: � r.� ..
? I �f:±i ;'>il � i+'=;I '�f_1F I�iR:`i3R
D TO:
Li: ,...:t:L�_.i ,. n
= ".� r� _ �r! ... "' �T:�' _ r 1� �..�{�rJ.:.�
":S
1 i v` -3 ":;
�`32ti riSi.i_ Si f, T'ri;tU tHr Til;dNc_.
..<, cjRT ;�,c-�:; :'t:�H Y c.VcRY `..._Ar>�.»TH,i.7�:';
iiL::..�'S1L)� >>lAiYl tliTLiJ
�
� `�_�
//
/ /
•
1
7'U.'t:4: L
LOAD TIME A
,... — f� ^ — _F;�
CC SLUMP
;? . �?"'i' � i , l `c:
7NE METERREADING
y
The oPeamr of mis �mcx s a"�a
a maarmum oi _ m =
wh�Ch 40 unload Tmc4s �he�'
�abs�tes longer wnl Oe 5�'�ed s
curcent M1olaina bme rate
CEMSTONE PfiODUCTS COMPANY WYATT READY MtX
• 2025 CENTRE POINTE BLVD. North Suburbs - 784-3512
MENDOTA HEIGHTS, MN 55120 West Suburbs - 446-9090
Twin Ciry Area - 688-9520
Sand 8 Gravel - 774-7575
� �� �, .
CEMSTQNE PRODUCTS COMPANY
Souih Central MN - 7(800) 366-6910
Cannon Falis
Fari6ault
Montgomery
Northfield
Zumbro:a
WARNING: PLASTIC CONCRETE MAY CAUSE INJURY • SEE OTHER SIDE FOR MATERIAL SAFETY DATA SHEET
--, sole anC exGusive IiaDtliry ol ihe sNler for any tletM in �fre acccp[etl gootls snail he Hm�ea to re0a��9 o� replanng the WqTER ADDED AT CUSTOMEFi REQUEST (GALLONS)
. 25 �PP 52�°( Shdll ¢1ECl 1:12 0�`4y]➢On ;0 tPp21l Ot f2Fl2t¢ IhE SfiJ�a S�id1112f!Illnd:_ (OO�IDS dbE! Ol¢ OEliv¢P/.
.e ur.:caCmS'ine o( 7 mmute5 ;er ydrtl to be cemDV=tl kem amval on IW Demur2ge at S'c0.00 per Frour mus! be paitl �y p�RST MIDDLE LAST
�. cvrchase� J`ereaRer.
4':dNOw!EDGETHATCEMSTONffPRODUCT5C0 isnolhablefortlamageolanynamreorbntlincurredbymryreoeest The concre�e strengih shown on Ihis bcket is �he POTENTIAL slrecgtn and
.' �.ve vuci G�st wro llne or nghf ot way hmili znd aumorAec3es wiNmgness �o pay we¢ciz: !ees or cost m repanng 9ua�an[eetl only when �estetl antl sampletl ln accortlance v,ith A.S i:
_. 7:^-Certi. -
speciLCat,ons. Our concrete mixes are designed for specific slump rznges, ar
CUSTOMER RELEASE SIGNATURE addmonal rizter voids ali guarantees
It is the buyer's responsibiliy to profect treshly poured concrete from fre�r
dunng ihe fr,st seven tlays afrer de6very
.12, , _.iU :?t�: ._ �; _ ..:.... .2�:� _.. .'.i f� . _ ..,., ,_.__ a CiZ A: 'A ��'/.'. �'�i: � �
.iC�l'i`.� ._....
. � ,_.._, :f+ .. .:
,- :� -�.}? _. =.�_.i'� '�..��{�'=�:
�:: _
AER N0. TIME DUE
..._._� ,r,.'+�_
T NO. P.O
_�,�. < <�G'i_. .
C � :L.C:�:: �
ij`_I : f_-°_
;?'=; _; -� : 7
�'� �. A 'r1i1.E. ,.,'C L: 'i :}:ii ri rG i'i.ii?'*`iiL� �- . .
. '. .T:�T!�"i�—y'i^.'`-^'e` -. .__ _`.' _,-..J: �':'i t.i_��+ .> -.. ' _
- `.1.��tf,EQf+ i ii i � LCIS.� !-
_..:,�r
�"..
Z � ��t i� �O
J_.P.., r _: .. .v � �
: . . �G'r CCi% .._ � _ i
= c :'._�. .., :L ,�.
r '�
`_"� _
- . , ,^�,: �i �
- n� 7F-,
l'. �,,, ( . _
Ii; - � -
The ooeraror of P�5 tr�dR 3=,
a inaximuin of __ m: ,_
wM1¢M1 t0 onioao TNCts P5
�obsn.es lo�aer wCl ee N��ec e
turrent holtlmp Ore:a!a
� J
'i, i2�)`i
CEMSTONE PRODUCTS COMPANY WYATT READY MIX
• 2025 CENTRE POINTE BLVD. North Suburbs - 784-3512
MENDOTA HEIGHTS, MN 55120 West Suburbs - 446-9490
Twin City Area - 688-9520
Sand & Gravel - 774-7575
CEMSTONE PRODUCTS COMPANY
South Central MN - 7(800) 366-6970
Cannon Fails
Faribault
Montgomery
NoRhfield
Zumbrota
WARNiNG: PLASi'fC CONCRETE MAY CAUSE SNJlSAY • SEE OTttER SfDE �OR MATERIAL SAFETY DATA SHEET
i �e so!c a�tl ezGUSrv¢ Ifab:4ly ot t�e SEller for dny tletM in Ne aaeptetl goaQS sf�all b_ IuMetl �o repalnng o� replaqng �he WATER ADOED AT CUSTOMER REQUEST (GALLONS)
]^a`s as iCe selier shall e!ecl The o0iiga;io0 to rMair or replace tYR g�otls sf WI tertnma:e ivro monu`�s afler p:e CNrver/
=�E_ unkad�g ��Re e: T minutes p2� Ya�d to tl<cor�y�ul¢tl (ran arriv�l on p0. Cemurrage at $6000:er iw�� must be Fa�tl by FIRST !d(D�LE LAST
T2putC:Id52(�hE2dR¢f '
ACKnCNIEDGETHATCEMSTONEPR00UCTSCO �snol6abiefordamayeotanynawreorwrtlir.arrcdhymyre�ues� Tne Concrete 5trength shown on this 6ckel i5 the POTENTIAL sxength artl
-0 mov? !mck pa5t cu�b hne or nght ot way I:mfs. ar.tl acknowlByas wtllingness �o pay wrrccRer fees o� cosl m repeinng
'ama;etl O�openy. guaranteed only when tes�etl and sampletl in acwrtlance ���rth A.S 7.::
specifications. Our mncrete mixes are tlesigned for specific siump ranges, z-
�US70MER REIEASE SIGNA7URE addinonal water voids ali guarantees.
It is the b�yer's re5ponsibtliry to protect freshly pouretl concrate frem f;eer-
tlut�ng the firsl seven days aftec tlelwery.
, ..� , 1., a..... �..�_ .��.�,.. �.._, .: ,.� . ..�... _ . ,.__.. . .,.. .. . �. . _'
..'" .��U � ��'-�'.�1.,. '1311���i..l��:._." r.. .__ _..�.ii : _j... ��._ ,...-t 't' _' .�i^..'i .. � ';i?f:�. '+:� _.:! � _
l �i
_,.. =;d� �S_lid t1 .`.
tYil ..rf.... fii,'i�.ii<
' , -�... �,T'._":'}`=i::�r'I'=. ,=2i°�..,
';�� I .:.'�_, � ���;�a�,�._
. �_ :7 .- ....� =!`.,._..
TNO. P.O.NO.
.i ?�
_ .. ;fG;-_ ., ._ rs.�,?
�':I�s i.�L'e_ 5'l' & ia�iiU TriE "iUti;,�_.
- .• -'��,1iri. '�:!i�C;H�;< EnCH 5 c��E..Y Lt'?.:�=�' . "iFi_.`1�,
' .- �ifCi�i ?}1i.1'
�J
,,, „�I<F L�:IL'
;n— _... =t,
... �". :-�?
� . �
a maximum ot _� mmc�
wh�ch to anbzc 'rucks n=:
jobsites �ong=r �nA Oe b�!retl �
Lulf6nf hOIC�nO JT¢!d(2.
•
•
° D
CPMf �° �
FIELD ORDER
PROJECT: Saint Paul Civic Center Expansion FIELD ORDER NO.:
CP-4 Building Construction
DATEISSUED:
OWNER: Saint Paul Civic Center Authority
I.A. O`Shaughnessy Pfaza
143 West Fourth Street
Saint Paul, MN 55102-1299
�
�0►Z��
-�
F4.'I 3
3 May 7 996
3225
CP-4.01
CPMi PROJECT NO.:
CONTRACT NO.:
• NOTES:
1.
2.
TO: MA Mortenson CONTRACT: Multiscope
300 Eagle Street
Saint Paul, MN 55102
Attn.: Todd Schilling
You are hereby directed to execute promptly this Fie{d Order which interprets the Contract Documents or
orders minor changes in the Work without change in Contract Sum and Contract Time. If you consider a
change in Contract Sum or Contract Time is required, please submit your itemized proposal to CPMI
immediately and before proceeding with the work. '
DESCRIPTION:
Fill sandstone tunnel @ Minnesota Club.
Fill sandstone tunnels near the future Minnesota Club tunnel with flowable concrete.
Submit timesheets DAILY.
ATTACHMENTS:
COST, P�qNNINC✓AND MANAGEMENT INTERNATIONAL, WC.
i'
i
'-/� �,� ,., �,�
Mar Gunde'rson
Assistant Project Manager
cc: Chris Hansen Dick Zehring
Gephart Metropolitan
A\PORMS\FIELDOD.DOC
Mike Pederson Frank Berg
Bloomi�gton 3225-404.5
•
•
Contractor Proposal
Project: ST. PA
� iZo7
Date: .lanuarv 07, 1997
Contract No.: 4.01
A change in the scope of the work is requezted as indicated below:
/� �
It is requested the completion date be () extended, () decreased,�unchanged by
calendar days. The adjusted completion date will be
C�
2. Description of the change: (Refer to drewings, specifications, addenda, if apphcable).
Reference RFP No.: 4.41 ; FO No.: : PCO No.:
Title: Add sheet metal liner at tvpe F shaft walis in Ramp
3. Basis of payment: (Check one)
(X) Firm price for performing this change is S 10,804.00
Adequate supporting details and information (Increased) (Deduct)
must be attached to allow Owner to evaluate.
() Time and material per contract, but not to exceed S _
() Actual cost at completion of work S
Submitted by: M. A. MORTENSON Date: Januar 7 199
Contra��� � �r�p�, ff��'„u!/��
/ , r/�1 �d�91'� ��2?1��
�
ConYractor S+gnature
FOR CPMI USE
Action Recommended: (Check one)
() Change will not be made. Explain:
CPMI Job No.: 3225
�Proceed on the following basis:
() As indicated above, change and basis of payment is acceptabte.
( 1 Change is acceptable, basis of payment is not acceptable. /�'�
() Basis of payment shall be S _//,r� wI �,.�
'�The following modification is recommended: T FZ���C��
() Change in completion date is accepted. �� y�y �y��p�±� ��
O Change is acceptable with no change in price. nfG��rTi GIJ� .
D(Change is acceptable with no change in completion date. �
( ) Other CV . ��'�'��M�
Reasonfor Change:
�Design Change () Client Request () Field Condition
O Suggested by Contractor ( 1 Design Omission or Other (explain)
•
3. Is this a part of the original contract scope? () YES
4. Is Contractor's Estimate attached? �,YES
5. A/E consult �,YES
Prepared by: �4�i.C/ � (CPMq
Approved by / �%�i�GY'�X��" (HGA)
Approved by y���G� (Owner)
�QIO
()NO
()NO J
Date: / / �
Date: � /7
Date:��_
Approved by: (Owner) Date:
CPMI Inc., c/o Saint Paul Civic Center, I.A. 0'Shaughnessy Plaza, 743 West Fourth Street, Saint Paul, MN 5 5 1 02-1 299
cc: Chris Hansen Mike Pederson Dick Zehring 3225-
1i7/97 St. Paul Civic Center Expansion Summ�
Change Proposal � �� �
` J
SL PAUL CIVIC CENTER EXPANSION
300 EAGLE STREE7 JOB [D: 951042
SAINT PAUL, Mh' S5102
PK 612/?93-9l54 FAX� 612/?93-955i
Description: RFP#4.41R
Titie: Add sheet metal liner at
Modenson Lsbor:
(See attached)
Mortenson Material:
(See attached)
Mortenson Equipment
(See attached)
Associated Costs
(Change Proposal)
..__T __ _ —.—�s;
��'�'����'/�� � G
p �.� , �
S Amount
5
$ -
$ -
$ _
General Conditions: � -
(Mortenson Work)
SUBTOTAL M.A.Mortenson $ -
SUBCONTRACTORSNENDORS
7 Mulcahy $ 10,193
• 2 $
3 $
q $ _
5. $ -
6 $ -
7. $ -
g $ _
9. $ -
10 $
SUBTOTALSubNend $ 10,193
SUBTOTAL Fee
SUBTOTALTax
M. A Mortenson Company Fee:
SubcontractorsNendors Fee 5°/o:
M. A. Mortenson Work 15%:
Total Material & Equipment $
M A. Mortenson Material & Equipment Tax:
$ 510
$ -
y^ 510
7% $ -
x _
SUBTOTAL:M.A.Mortenson+SubNend+Fee+Tax $ 10,703
Bwlder's Risk
GCL Insurance Costs
Payment & Pehortnance Bond
SUBTOTAL insurance & Bonds
0.0007 ($.72lihousand)
0.0038 ($3.77/Thousand)
0.0050 ($4.9593(fhousand)
� 8
$ 40
$ 53
$ 101
• T07AL CHANGE PROPOSAL $ 10,804
Page 1
F shaft walls in Ramp
.
•
�
To:
Date:
Project:
Pricing:
Description:
� � ��
M.A. Mortenson
Attn: Ron Schreiner ;°—� — -. ,-. _
300 Eagle Street #:; ,_ i`�, i i�;
St. Paul, MN 55102 �-e.; , �� � �% �
�-°
January6, 1997 ��`'�'� � 7 ��''
St. Paul Civic Center Expansion CP-4, Job #951042 ;y ;;; �� ; _ ; ., v`J �, v � .
P.R. #4.41R
Insta112,000 SF 28 Gauge Flat Sheet Meta1 Shaftliner As Described As
Requireai (Inciudes Caulking}
Cost Sum�arv
• Labor: Carpenter Foreman 66 Hours x$23.14
Carpenter � Hours x $21.99
Taper Foreman Hours x $21.55
Taper Hours x $20.55
Plaster Hours x $21.80
Tender Hours x $21.90
Laborer 14 Hours x $16.50
Sub Total Labor �—_ `_____ _,_
75% Burden on Iabor
4% Escalation on I.abor After May'97
Total Labor
• Materials:
Studs: 2,000 SF 28 Ga. Sheet Metal @.795
Track:
Insulation: 1,350 LF caulk @ .275
Gypsum Boazd:
Taping:
Fasteners:
Tools & Equipment:
Miscellaneous: 2,000 SF Adhesive @ Shafts @.10
Manlift/ScafFolding:
Materials 5ub Total
7% State & City Tax
10% Escalarion on Materials Afrer January '97
10% Escalation on Materials After January'98
Total Materials
mu�c���
-�.
5232 N. GLENBROOK AVE. • OAKDALE, MN 55128
PHONE: 770-5250
�
a
$1,527.24
1,804.76
229.00
���� �`7'"
� 2�� �
0
$6,232.00
$1,590.00
371.00
200.00
an
2,161,2�
151.28
231.25
$2,543.79
�...,t�R..� ��d�
• M.A. Mortenson
Page Two
Labor & Materiai Cost
O.H.&P@15%
Bond Cost @ 1%
Total Quotation
• 5chedule Impact:
a
a
Please note that we cannot proceed with the above work unless notified in writing.
• Signed:
Mark A. Peterson
Project Manager
/smn
$8,775.79
$1,316.36
$100.92
$10,193.00
CJ
REC�f t �
�
JAN 0 g �gg�
i-?�!
The Construction
Minneapolis Office
�00 Meadow Lane North
P.O. Boz 7�0 (55440-0710)
Minneapolis, Minnesota 55422-4899
07 January 1997
Susan Jones
CPMI
c/o Saint Paul Civic Center
I. A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul MN 55102-1299
Re:
Subject:
•
Dear Susan:
Saint Paul Civic Center Expansion CP-4
Mortenson Project #951042
3z�� -�.�
BUILOING DIVISION
Telephone: (612) 522-2100
FacsimAe: (612) 520-3430
RFP#4.41R - Add Sheet Metal Linex to Type F Shaft W alls in Ramp
In accordance with RFP#4.41 dated 10 June 1996, wherein the required sheet metal liner at type F shaft
walls is described, we quote the sum of Ten Thousand Eight Hundred Foua Dollars (+$10,804.00) for the
added work. Enclosed are subcontractor quotations and our price breakdown. Please let me know if you
need additional information or clarification on the enclosed. We understand�that this work is to proceed
immediately, so as not to further impact the Ramp completion date. Please issue a contract dzange order.
The amount quoted includes only the cost of the changes identified herein. Changes to the contract not
specifically identified as revisions are not included in this proposal and are excluded. Mortenson reserves
the right to submit a proposal for addirional costs and time related to the impact of this change on
unchanged work or for the effect of this change in combmation with other changes.
Very truly yours,
1���� ��'�"" �
Allen S. Tioshuvsky
Assistant Project Manager
fIle: CPMI
• �1 RFP#4.41R
Minneapolis•Seattle•Denver•ColoradoSprings•Miiwaukee•GrandRapids•SanDiego•San Francisco•HOnoiulu•LOSAngeles
��--' ED
�
u
It is requested the completion date be ( 1 extended, ( 1 decreased, () unchanged by
calendar days. The adjusted completion date will be
Description of the change: (Refer to drawings, specifications, addenda, if applicablel.
Reference RFP No.: ; FO No.: ; PCO No.: 81
7itle: Uparade ramp parkinq control svstem
Basis of payment: (Check one)
(X) Firm price for performing this change is S 12.774.00
Adequate supporting detaiis and information (Increased) (Deduct)
must be attached to allow Owner to evaluate.
) Time and material per contract, but not to exceed
) Actual cost at completion of work
�Proceed on the following basis:
() As indicated above, change and basis of payment is acceptable.
() Change is acceptable, basis of payment is not acceptable.
() Basis of payment shall be $
O The followi�g modification is recommended:
() Change in completion date is accepted.
�Change is acceptable with no change in price.
�) Change is acceptable with no change in completion date
( ) Other
Contractor Proposal No.:
CONTRA�CT
''$�PROPO
�i���
A change in the scope of the work is requested as indicated below:
3.
CPMI Job No.: 3225
Submitted by: M. A. MORTENSON Date: Januarv 22 1997
Contrector �
�� '� �_-,
Contractor Signature
FOR CPMI USE
Action Recommended: ICheck o�e)
() Change will not be made. Explain:
2.
3.
4.
5.
Reas n for Change:
(�sign Change ( � Clfent Request ( � Fiefd Condition
O Suggested by Contractor O Design Omission or Other (explain)
!s this a Qart of the original contract scope? O YE�o
Is Contractor's Estimate attached? P�Y�ES
A/E , , .,�,.
Prepared b
Approved I
• Approved
CPMI Ina, Go Saint�Paui Civic Center, I.A. O'Shaughnessy Plaza, 743 West Pourt
cc: Chris Hansen Mike Pederson Dick Zehring
AL
� ���
No.: 4.01
(�T Iv0
ONO
(�NO
/�/°/ �
�
F ��
I M N�Enil�7��.
�.C` YT�
Date: d� �0 �
Date: tr
Date:
Saint Paul, MN 55102-1
3225-
b ��wnG� I
� CPMI
c/o Saint Paul Civic Center
I.A. O'Shaughnessy PVaza
143 West Fourth Street
Saint Paul, MN 55702-1299
612/298-5409
TRANSMITTAL
To: Dept. of Planning and Economic Development
14th Floor City Hall Annex
25 West Fourth Street
Saint Paul, MN 55102
Attn.: Paul LaPointe
� (��
RECE EVI p
FEB 0 6 1997
CPiy�
Date: 23 January 1997
RE: Saint Paul Civic Center
Message: Please review and sign if you approve ASAP. Thank you.
• We are sending you: �' attached
_ under separate cover via
Copies
!
Action
1
i
Contractor Proposal PCO #81
Upgrade Ramp Parking Control
aY: �-c-��Lc2.n� J� �
Susan Campbell Jones
Project Manager
cc: Jim O'Leary Mike Pederson 3225-131
A\3225\lotyed
For your review &
signature ,
322�-Q�.�
� ���
�
The Constaection
Minneapolis Office
700 Meadow Lane North
P.O. Box 770 (55440-0710)
Minneapolis, Minnesota 55422-4899
22January 1997
SusanJones
CPMI
c/o Saint Paul Civic Center
I. A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul MN 55102-1299
Re:
Subject:
• Dear Susan:
•
Saint Paul Croic Center Expansion CP-4
Mortenson Project #951042
RECEVVED
JAN 2 2 ?997
CPiv�l
PCO#81- Upgrade Ramp Paxking Contcol System
DIVISION
Telephone: (672) 522-2700
Facsimile: (672) 520-3430
In accordance with the Ownei s recent duect communicafion with Harstad, regarding che upgrade of the
ramp parking control system to a hands free model, we quote the sum of Twelve Thousand Seven
Hundred Seventy-Four pollars (+$12,774.00) for the added work. Enclosed are copies of suUcontractox
quotaHons and our price breakdown. Please let me know if you need additional informaHon or
clarfficarion on the endosed. Please issue a contiact change ozdei if this added work is to p�nceed.
Please note that any additional conduit Lequired fo� this upgrade is not included in our proposal. IE
required, Gephart should Ue contacted immediately, as the underground rough-in is nearly complete.
The amount quoted includes only the cost of the changes identified herein. Changes to the mntract not
specifically identified as revisions are not included 'm this proposal and are exduded. Mortenson reserves
the right to suUmit a proposal for additional costs and time related to the impact of this change on
unchanged work or for the effect of this change in combinafion with other changes.
Very truly yours,
�������= ^
Allen S. Troshinsky
Assistant Project Manager
file: CPMt
PCO# 81
Minneapolis•Seattle •DenverColorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•HOnolulu•Los Angeles
RECEIVED
�
Contractor Proposal No.
A change in the scope of the work is requested as indicated below:
/�/YI ¢�
It is requested the completion date be () extended, ( 1 decreased, () unchanged by
calendar days. The adjusted completion date will be
Description of the change: fRefer to drawings, specifications, addenda, if applicable).
Reference: PCO#33 �
Title: CLSM curinq time acceleration
L�
3. Basis of payment: iCheck one)
(X) Firm price for performing this change is
Adequate supporting details and information
must be attached to allow Owner to evaluate.
( � Time and materiai per contract, but not to exceed
�) Actual cost at completion of work
'�o �z��
S 1,659
(Increased) (Deduct)
Suhmitted by: M. A. MORTENSON Date: September 16, 1996
Contractor
\ t U ka 7� � ,o.J \ ` /
Contrector Signature
FOR CPMI USE
Action Recommended: (Check one)
(� Change wili not be made. Explain:
CPMI Job No.: 3225
� Proceed on the following basis:
�kAs indicated above, change and basis of payment is acceptable.
l) Change is acceptable, basis of payment is not acceptable.
() Basis of payment shall be S
�The following modification is recommended:
( 1 Cha�ge in completion date is accepted.
() Change is acceptable with no change in price.
�Change is acceptable with no change in completion date.
( ) Other
2. Reason for Change:
O Design Change t 1 Client Request ( 1 Field Condition
�Suggested by Contractor () Design Omission or Other (explain)
3. Is this a part of ihe original contract scope? O YES �510
4. Is Contractor's Estimate attached? �YES ( 1 NO
5. A/E consulted. �4-YES ( ) NO
Prepared by: � CPMq
Date:_���
Date:
� Approved by_ a �� IHGA)
�
Approved by �DD ���Owner)
Date•
CPMI Inc., c/o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paui, �
cc: Chris Hansen Mike Pederson Dick Zehring 3225-
No.: 4.01
•
.
•
9/16/96
� � «��
St. Paui Civic Center Expansion Summary
Change Proposal
ST. PAUL C/V/C CENTER EXPANSlON
300 EAGLE SCREET JOB ID:
SAlNT PAUL, MN 55102
PH�612/193-9754 FAX�6/2/293-9557
Description: PCO#33
Title: CLSM wre time accelerafion $ Amount
Mortenson Labor. $
(See attached)
Mortenson Material: $ -
(See attached)
Mortenson Equipment $ -
(See attached)
Associated Costs $ '
(Change Proposal)
General Conditions: $ -
(Mortenson Woric)
SllBTOTAL M. A. Mortenson � -
SUBCONTRACTORSNENDORS
1. Midwest CeI{ular Concrete
$
$
$
$
$
$
1,565
8.
9.
10.
SUBTOTALSubNend $ 1,565
M. A. Mortenson Company Fee:
SubcontractorsNendors Fee 5°/a:
M. A. Mortenson Work 15%:
SUBTOTAL Fee
78
ToNal Material 8 Equipment $ -
M. A. Mortenson Material & Equipment Tax: 7% $ - �
SUBTOTALTax $ -
SUBTOTAL:M.A.Mortenson+SubNend+Fee+Tau $ �,643
Buiider's Risk 0.0007 ($.721Thousand) $ 1
GCL Insurance Costs 0.0038 ($3.77ffhousantl) $ 6
Payment & PerFortnance Bond 0.0050 ($4.9593lThousand) $ 8
SUBTOTAL Insuranee & Bonds $ �
TOTAL CHANGE PROPOSAL $ 1,659
$ 78
$ -
Page 1
: . ` � oo - YQO � Cr�/y c -�. : �- - Z3 -�L
. ��„'� �' � ,�s-T�� C -I38 y;�id s��T�120�
�z� �
� STARl CY�INT7ERS C,Y.. 6�+�crl'cp "?_7=}�� l,�rtit Wt=W tZ��•Y�eiD=1i� Ve%,�,C.
i�sXl-IFlP,6� Sc n•�t � L 1�11j= e W� Z ._�/ f
"Id
_`� � /D✓3 39.� 3�•�
Z7 !� �� ���, Z �
�_ t{ rr .3 �,
7 � ,� � 32��
/lJO �, �r -3 �-�1
� ai 'r'<-
� "� #',-`..:.'� ;:t ' �( �( � -
`,�QRM(1�� # = 1 ' � , -
` T`�7t'R' # 1 = 102 LB
`�Itdr # 2. _ 'i'` LB
PATC:HED bIT = /.'�`7 LB
• 15�5a {r3,'�3,"�E.
, .ID 11
.# 1 �2
� �� i� � � i ��4� l-�i -
?','�AT�:HED 4�1T = F LB ;
� :;� r � .
aa..,,,-
����:
"°' , :SC:22
,� � Z„�'t E
, �IIMPtaR`I REPi �F;T . -
.��,:,,
t°•PY Fl�Rhtl_ILFI
,':i�,� •,i -,
= .,� § ` : #t i = - i•;1�' LH
� � = iiii LE�
��?": # 3 - pi) LP
'� xr�: .
�'��`�xv';..'. # 4 = O �F?
`�*'- # 5 = CtCt lE�
�.., •.
. - #FY1ICI��R �i LP
#{ Z = ��U•-I'�J LA
fiC1TAL = '��J'�'1�' LPS •
�, 15�5;;=ZT
� �i: ; '2:> t •?,'.
r_a�r -- —
� m rn e�n'E'S � ���� �, '� �/�" i �� � ix �� Z
30o e /3z �f' C�m�t �s� 3992 a l�
��� F � �Q� M;X 13 200 iof�2 "� /22.25
2G, �20 /6s @
\
. j
�
3� fc �i.
�-r sTAar
TjtS�l-I AR �
�
�
7g A
_
-� �-;-.•�
-= - -_-. _.�.�; �l.-„ = := = -- b; �-� � ; 8 - 2 a - 9.�
. _ _.- ``=�- _ •�: -�- . : --- - � : G✓es �
- - -=�=�' - SEcT(ot�t
-- _=�=��sTn�_�-C_=138.--. y;�l�/ .
_ - P/a2�
CYU�tCESa's C.Y.�?. Bn,-crtcp -27={�/� �,l Wt=W �Ze�.Yiew=jQ Ve/v�.c
sc a.�t - � z � w, x
��:,Y; 7 9 0 2 9,3 29 7
N << 2q�o
i. i� �, �
�� /i Z�,�
,a-s3 3�, 0 3� � o
„ „ ���
„ ,,
�� �,
,. <, . _
:- r;�= ,:.. =- ��, _. __-_—.-..�
. _ � ,,;,;.. . _ ,;�:,.
,� rw :._. 4 ,� -;�'��- "`.?-=� -
_- .. _ �.�..
-.. -: �'Et"- - -� � � � `' � '
,. . . S -c'�=e-•_� : r'. -
_�)'3 . _. � _ .. " _... �-,,.!�::..:�."!3_`-��r � _ ' = "i . .
QS Q5 LTl ._`a... - � . ._ . _ . .. _ _
---� � - y.1 � .. " _
�,; � _ ::
� r� �� n �y = ==
� � " ra t�? u _ ' ' J J .J _I � �¢i St ¢Y - �
� _ . . - , -� -.1 J ..�J
c�-: . ' . . Cl G G G �..'J.. " v (� : ?j�:
� �. C' LG !'J
n - ' _~ - _ _. [Y C� -- � t� v . F .-Y.:�.
y '
C' fi Ii fi II _.. . _- a j�� r4 � . O¢.T��J.
. �`- I2J =! ' Q. .�_
� .-. C4 3 G �y � L ' _ � ' -: Lt! �,j'v
� �. £; �.
-'" -- ��: J' � Y. _C ct T}- �lt il 1! 11 Z il. �_ L17:�6:"••�[� _a,..
'':"'f .�CC�'2- .V'SY���:.. il!(d-l��'��LpL��_
� l�' _. ��c�.� �? cY it� .-' CJ J V�_ry Q
'-!�n � � . _ r .��-.`� Y _5..' - .,�1'�; 1�- :!• \.E"'c^�+'s'+'.
�
. fJ �O_(�J—J_
��.'�~ ' " _"' _. -_-�''. - t
t_�"='; — �
��.r = :
- : .- _ F
': '��`<,:. ,�r�,= :_ .,.: �
L-�1_�,;:.ymtrl_�._.� . • ' _' _ i
S1'' �L " �
s ��J.�_( -' Y ,1:� . - : _ 1
✓ O�G O''�'"..:�.p . , S
:� G ✓t'�_1--sLO'i ,___-.�,�__ _._ �
_ - .. r: -' Z �U t0 . � � S
- `r` _C'�'r�'._" - . i ' £ _
-`=' '- -. - W' �''e'''-._ ' ' �
.:�.: _ ��i�� ,;�r-:_,::��....- - - - . ..
7 11 11 J `� �' - .
� �4 s
�I z -'S.a,L � � ; - , .
R+S- . `�J'.� _ __ . _ _
_ ' _ _ . . . _ - - `� = s ._ - . - 's _ . _ � � %� ' • �.-
� � ..
•31ez-� �^#"'n{�,�sT�"r � _
7 g C Y � I'�I t�X !00 C
� r� w�e� � �v �� � C Y yo a PA
� �� /�
� S,Ca�.t 3 ao - Yo6 ��'Y�-u � l e_ l' . �t%�� uaeo� �G6 Yi
= - cloo
- - _--- - �9 '�%X
. . , � _ � i :. - -.. - -- - �„ «, ii
�
�
CO_T�tTA�4GTOR`-&- FRD°P-4ASA,
Contractor Proposal No.: PCO# 48' _, ___�'. _.:_' `.___�e: Nov
Project: ST. PAUL CIVIC CENTER CP.4 Contract Nc
A change in the scope of the work is requested as indicated below:
3.
�� i��
/7�M ��
It is requested the completion date be ( � extended, ( 1 decreased, ( 1 unchanged by
calendar days. The adjusted completion date will be
Description of the change: (Refer to drawings, specifications, addenda, if applicable).
Reference RFP No.: ; FO No.: ; PCO No.: 48
Title: Additional CLSM requested bv CPMI
Basis of payment: (Check one)
(X) Firm price for performing this change is S 1,078.00
Adequate supporting details and information (increasedS IDedUCt}
must be attached to allow Owner to evaluate.
t) Time and material per contract, but not to exceed S -
( � Actual cost at completion of work $
Submitted by: M. A. MORTENSON Date: November 10. 1996
Contractor
C�� `� �� ,�,�_�-
Contractor Signature
FOR CPMI USE
Action Recommended: (Check one) CPMI Job No.: 3225
( � Change will not be made. Explain:
�Proceed on the following basis:
O As indicated above, change and basis of payment is acceptable.
( 1 Change is acceptable, basis of payment is not acceptable.
() Basis of payment shall be $
�The followi�g modification is recommended:
() Change in completion date is accepted.
{ � Change is acceptable with no change in price.
�hange is acceptable with no change in completion date.
() Other
�
2. Reason for Change:
Date:
^Z
Date:
Approved by: (Owner) Date:
CPMI Ina, c10 Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299
cc: Chris Ha�sen Mike Pederson Dick Zehring 3225-
( � Design Change O Client Request ( 1 Field Condition
'6d'Suggested by Contractor () Design Omission or Other (explain)
l �
3. Is this a part of the original contract scope? ( 1 YES �_,NO
4. Is Comractor's Estimate attached? �YES ( 1 NO
5. A/E consulted. YES {) NO
Prepared by: ��� CPMi)
Approved by if HGA)
Y
AQproved by ` Owner)
� •
N
'I 1i10l96
St. Paul Civic Center Expansion
Change Proposal
�iz��
Summary
ST. PAUL C!V!C CENTER IXPANSION
300 E,4GGE STRf.6T JOB ID: 951042
SAINI'PAUL. MN 55102
PK� 612/293-9l54 FAX� 6!1/193-9557
Description: PCO#48
Tdle: Additional CISM material
Mortenson Labor:
(See attached)
Mortenson Material:
(See attached)
Mortenson Equipment
(See attached)
Associated Costs
(Change Proposal)
CPMI
$ Amount
$ 123
$ -
S -
$ '
General Conditions: $ _
(MOrtenson Woric)
SUBTOTAL M.A.MOrtenson $ 7z3
SUBCONTRACTORSNENDORS
1. Midwest Cellular
3
4
$
$
$
$
$
$
882
SUBTOTALSublVend g 882
SUBTOTALFee
44
18
63
M. A. Mortenson Company Fee:
SubcontractorsNendors Fee 5%: $
M. A Mortenson Work 15%: $
Totai Material & Equipment � -
M A Mortenson Material 8 Equipment Tax: 7°l0 $
SUBTOTAL Tax e
�
SUBT07AL:M.A.Mortenson+SubNend+Fee+Tax $ 1,068
Builder's Risk
GCL Insurance Costs
Payment & Perfortnance Bond
SUBTOTAL Insurance 8 Bonds
0 00�7 (y72lThousand)
0.0038 ($3.77lfhousand)
0.0050 ($4.9593/Thousand)
S t
$ 4
$ 5
5 70
TOSAL CHANGE PROPOSAL $ � ��g
Page 1
•
�
�
N
� � � o o � m �
c m m N m � � m o
O� O e d m r � A
'-{ LD � � a' a � �
D � D � ° o c
m �� m .. S a O
A m W = � � 2
� Z � � N
m � o
Z �
m �
� v
�
m
O
A
o O �
N W( � � N � p� Q
o m n� o ia m � 3 p
� � o o <n �n o m
Z TI
o � �
0 0 0 0 o m �
o f n Z O
° o ° o ° o ° o °o o N m m
A A
D
o �
0 00 0 0 � .,� v
o �, m
° o a o ° o ° o � � �
m
�
o `W
C A
o JJ G�
O O O O O O N p Z T�
O O O O O p �{�
� j
D m
Z A
o T
�
A �o a u ' � � � m �
� p � N � � � � � r
O O O N O . n
.� �
OO
v � �
0 0 0 0 0 � � m A
0 0 0 0 0 � � �� Z
` � m
0
�
� �
0
�
� m � �
w � W
�a o�
A D
N �
W
O
m
0
m
W
A C)
m �
m -
� o
m
�
O
�
�
�
����1
� j
Z �
q ?
� Z
N �
w C
r
e 3
a �
� �
k C
` ��
N
b
b
v
r
v
s
O
•
DWEST CELLULAR CONCRETE oFwiscoNSiN
7�0; /�/I ar 7 seK
�,�»».�: Jay.�r �,e��a�
f wdr,� /�er C,nep —
✓
20 C� o� �et�u�av
�rave q In : ,Y
✓
t�� �Z��1
Mound, Minnesota 55364
(612) 472-5080
FAX (612) 472-6687
�0-23
3C a Ce......� ya o F'.�t_
C od�' �yy,Ip Pe✓ C.y,
zv cY C� yy�o = �a8z,00
�
/Uo {na�i: �� 2a�%a� c�.A� eol
�
CERTIFIED MEARLCRETE APPIIGATOR
D�f� j��O�J LANDSCAXE / CONERACTOR O SUPPLIE3 CARL 4 3P 200 OR 866-0430 ����
�O �
•
� AU�TONALWATEflAODEOTOiTdSCONCREfEWILLflEDUGE�TSSTflENGTH.
� OFFICEPHONE: (672)867E067 ANYWAiEflADDEDLSATCUSTONER5W5K
FFICE FAX: (612) 867-5597 '�
CAUTION: Freshly mixed cement, mortar, concrete or grout may cause skin
injury. Avoid con[act with eye5 where possible and wash exposed skin
prompGy with water. If any cemeat mizture gets into eyes, rinse immediately ' qRaNE / '[�
� and repeatedly with water and get prompt medicai treatment. _ JOB 1 �
People who are sensiti�e to overexposure fo the sun may also be sensitive SEE REVERSE FOR TERMS,
to contact wi(h coal tar pitCh or exposure to reflections from coal tar pitch. � CONDITIONS AND RETURN CHECK CHARGES POUR j i�
These individuals may aeed protective Gothiog or sunscreen when placing
and finishing HCCT'" concrete. FINISH
POUR
..�r.... e�.... n.x n uuuacv ' uce�iFMOP OROEPE�BV � • . PHpNE
.l .�ll' .. .
STOMER�NO. TAXCOOE SOLDTO
j•�7� , aa'r[ i bir��6p f, i �' :n t,r� � i�
:IIVERY
)DRESS :nl: ( ;:q,! 1 � 1 . . � "� L ii
iTRUCTiONS:
i� 1 1.in ;ei' °? t: ti;�
. _.i t Cl'iji_ i_Lh1ic:: Er.�,i � .i:
I�i"• i�: i, f.��l `.ili'Il�� I!' 1t�f I, i���. 'F�I:�1 i�:l jlfFljif,�."
NO CREDIT ALLOWED
��filiL� � ��I�I f'6?�liili;i i�; . ��
�.!. f I �,i_L.l` 11
, r:'� , i' � 1 I.II j yF' �'7 �_
I ��"
ZONE SCNEDULEO aftRNAL
,�i• It'���� �
il�i�i;`. j : i.�'p}
NED
_._ ' � -
rn;r:, : , � :`�I
_ r .
.z :::�
MAP PAGE
li�
i i��!(• ��fti :�-I rt� I;riil t��it:_:" Gi9�H;i11
`�.4�15 , �r.'!T.44O Y�! ,
I . Gi�r ��, r���; '
F
� , r _
� � � ' -� � �; A �
; ;� •� ` '' ��'_ ��t'e���
. f` t� , � ' � /�(.,� ,� . �,', ` �
t : �/;1%,T� � ,✓
tr' t ,
;.: , i
i
;�i,:ii f:i.. ia�!t."� .,. , i - ii-:.i r.�„' ,:.f[ ;;ii��
��SC( :i�li . . . I�' iliii m1:JL:ii . , . i�LYL;IIi .-.
't`il :.,.; .��n� � i•; ; �1;' , �.n] !9 � i:, .�:n �,���
.v�Li• iJ `..it:. :.�v.� ..i�� i:._ ._.S:j ii• :cd.��k: 1 ��'
i rk11P�.i - "S �i5� .. .. .. , : �..l;'. . � �.. .. . t'�,4`:l {_�•.
� ly,'?i::. �4�5� ' �... i.4➢� _aCii l i. . '�0 't� ' ,,..: ._ _,
,Ji;i�l`= .. .�,�,�. ,__.. .'i:� _ ;1�
' � . ..ir� �.�.. �. , � ..�. .'- .. ... .:.i; � _ , .. �
_�j�rC?f i�f�Yi.l �. _ ._. ,. _ :, `
i;�,� nl i
,_r-7. �1��
0
CUSTOMER COPY
. _Y.. �... ..�,� .. ...,�..�, ...., .
����J� S�O� IANDSCAPEACONTRACTOR �SUPPl4ES�CAl�4 3P2200 OR 866-0430 �����
•
AODfi1011Al W PTER AOOEO TO SH15 CONCREfE WfLI REOUCE RS STPENGTH.
�FFlCE PHONE: (612) 861-6041 ANY WATEfl ADDED 15 AT CUSTOMER$ HISK
FFICE FAX: (672) 867•5597
CAUTION: Freshly mized cement, mortar, concrete or grout may cause skin
injury. Avoitl contact wiih eyes where possible arW wash ezposed skln
promptly with water. If any cement mizture gets into eyes, rinse immediately
and repeatedly with water and get prompt medical Ireatment.
People who are sensitive to overexposure to the sun may also be sensitive
to contact with coal tar pitch or exposure to reflections from coal tar pitch.
These indrviduais may need protective clothing or sunscreen when placing
and finishing HCCTM concrete.
�� � ;t't( t"�
STOMER NO TAX CODE SOLD TO
.. �:.11�, ?If;.�1 � '
=IIVERY
�DRESS � , � �;: l : , . - , : I'
>TRUCTIONS.
i ; 1,:_:9 , :i.
`:1 t'i0i� � i"�. ' !.iuli :. . !� �
I�f!- I; r i 'j:%11 ., :i!� �
t tal: 1 I"? 4 �� -`�
� �:
I Il t. I lib.� �' I f �t� i� itti"i; i
ARRIVE ' -�
JOB
SEE REVERSE FOR TERMS,
CONDITIONS AND RE7URN CHECK CHARGES START
POUR �
FINISH
POUR �/� � �
OROEREOBV PHONE
1.(:( 1
ZONE SGHEDULEO ARRIVAL TRUGK NO �RNER NAME
... 1'":: -t 1���.. i'I(:y �. i.�liY
i I:'f �iI : i "�.�' _.{t6 . c:�,1
NO CREDIT ALLOWED FOR CONCRETE RETURNED
5•i '=�' ;'NI;�'Iii i f�l !� 11: !�1 i _'U• �:1 . '-I-'! I���; i
�i i .� ��''_(�wai . ' :{��.� � ie,cu.1 1l.iflr ii�
� 11�1�!I�i:':1� i.,�'1 �
r
� � � ; � ' � � � �� � , ,�--�- �
; � �-1;,
/` f
, .�' n i"" li�ni I'.
liSM ..: i.�,;�_f,L I'l.i.. i, .�..--
t�;{ � � ,1:'�,-!'�
?.i,i_i�', ,p ..",�-'- '�;-,
_�,r� - i � t,: G'. � _, t C-
lN`�7;F�. .,. . c;, iL ...0 � :, .
.if ..' `.Y: __ 4.t� 4'�i� !:.
�.; �ir�i_i�;:
.L-1 /� { � '_
`�
� /� / /i �� �
, � � ; ,.��, ,� : �--�
i
r tI N;_
�•i.iNr!S
- :i'
:'. i .i
..�d:i� ; i'
a ., � i.'r.
i
F�'.� {dHTc;� �
!!�'f n RI I
p„:i�,
; ,J,� !' _
d.:r: t_;
P.i:d iSt:.
'.�".�,. - .. hi,lt,d4�� ' _. ., :i�i - 14.,-..
. - . `f f �" ip:7Ci �J.yx;.:�'.i .. � , . . . ,� , _ ` I�sl: ;
�::?.i: �uir: . �. - , t,=, .- . .
� � p � � ✓
i �. � r: : � J�-� '
TAX
SUB TOTA�
TRUCK TIME
OTHER
TOTAL
GROSS
TARE
NET
1 /yt�.l�- � \
\�
i �.
� 'i;
CIIST(1MFR RECEIVEDBY
�� � ��
��
L
IIie Constn�ction Organi;ation�
l4 October 1996
Susan Jones
CPMI
c/o Saint Paul Civic Center
I. A. O'Shauahnessy Piaza
]43 West Fourth Street
Saint Paui, bN »102-1299
Re:
Subject:
•
Dear Susan:
Saint Paul Civic Cznte: Expansion CP-�
Mortenwn Iob� 9510d2
PCO� d3 - Addicioral CLSM matuial
6UILDING DIVISION
Minneapolis Office
700 Meadow Lane North
P.O. Box 710 (55340-0710j
Minreapolis, Minnesota SSt22-�85?
Telephone: (672) 522-27C0
Facsimile: (672) 520-3a3C
In accordance with your !0 October I996 conversation with Allen S. Troshinsky of our office reQardin_� addinonai
CLSVt material requesred b7 HGA, please be advised that we are proceedins wich the added work pe: }'our
directive. As we explained. Mornnson had installed thz oriainal CLS�f material in accordance widt the Con[rac.
Documents. Mortenson has in no way compromiszd or damaoed the installed matzrial. Wz believe that any
additional CLSM material required w restore the installed CLS�t to desisn criteria is beyond our scope ot �rork ard
not our fmancial obli�a[ion
At this time, the total impact to our Schedule, if any. is no� discemible. If and when an impact is renlized. CP�(1
will be advised accordinsh�. We resz:ve our rishts under the Conttact to adjustment in contract time and _price for
any delay resulting from the additional CLSM issuz.
V -v trutv yours, , .�
'�� j �
�6n Schreiner
Project Executive
• file: PC0�43
CPMI
Minneapolis•Seattie •DenverColorado SpnngrMiiwaukee•Grand Rapids•San C�ego•San Franasco•Y,ono�ulu4os Angeies
t _ : _ _ -__ _
- - �_. �� -_
�
�:� ..
. _ ,��,
r.�-,
��.`_ ;1
The Construction Organization �
10 November 1996
3 �S �94�75
-���z�,
BUILDING DIVISION
Minneapolis Office
700 Meadow Lane North
P.O. Box 770 (55440-0710)
Minneapolis, Minnesota 55422-4899
Telephone: (612) 522-21�0
Facsimile (672) 5203430
SusanJones
CPMI
c/o Saint Paul Civic Center
I. A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul MN 55102-1299
Re:
Subject:
•
Dear Susan:
•
Saint Paul Civic Center Expansion CP-4
Mortenson Project #951042
PCO#48 - Additional CLSM requested by CPMI
In response to your 10 October 1996 verbal request, confirmed in our 14 October 1996 correspondence, to
install additional CLSM as infill around mechanical and electrical piping located between grids 3.8 and
4.0, north of grid 8.3, as the original acceptable CLSM installarion had been compromised Uy others, we
quote the sum of One Thousand Seventy-Eight Dollars (+$1,078.00) for the added work Enclosed are
copies of subcontractor quotations and our price breakdown. Please let me know if you need additional
informafion oi clarifica6on on the enclosed. Please issue a contract change ordez.
The amount quoked includes only the cost of the changes identified herein. Changes to the contract not
specifically identified as revisions are not included in this proposal and are excluded. Mortenson reserves
the right to submit a proposal for additional costs and time related to the impact of this change on
unchanged work or for the effect of this change in combination with other changes.
Very truly yours,
�
�"_ � �
Allen S. Troshinsky
Assistant Project Manager
R�
file: CPMI
PCO# 48
�
MinneapolisSeattle •DenverColorado SpringsMilwaukee•Grand RapidsSan Diego•San Franasco•Honolulu•Los Angeles
�i�
�ECEIVED
�
CJ
Contractor Proposal No.:
No.:
��
Project: ST PAULCIV1CCtNltHCr;4 �p�� �����<<
L
A change in the scope of the work is requested as indicated below:
K�
It is requested the completion date be () extended, ( 1 decreased, 1) unchanged by
calendar days. The adjusted completion date will be
Description of the change: (Refer to drawings, specifications, addenda, if applicable).
Reference RFP No.: ; FO No.: : PCO No.: 68
Title: Accelerate CLSM Pour Strip Curinq Time
Basis of payment (Check one)
(X) Firm price for performing this change is S 1.870.00
Adequate supporting details and information (Increased) (Deduct)
must be attached to allow Owner to evaluate.
() Time and material per contract, but not to exceed $ -
() Actual cost at completion of work $
CONFRA¢TO
Submitted by: M. A. MORTENSON Date: Januarv 03, 1997
Contractor
�bDk � � .o.��-�
Contractor Signature
FOR CPMI USE
Action Recommended: (Check one)
() Change will not be made. Explain:
Prepared
Approved
() Design Change () Client Request 1 1 Field Condition
�$}�ggested by Contractor O Design Omission or Other (explain)
3. / Is this a part of the original contract scope? ( 1 YES �NO
4. Is Contractor's Estimate attached? �YES O NO
5. A/E consulted. �-1'`ES �) NO
yy_eroceed on the following basis:
� () As indicated above, change and basis of payment is acceptable.
{) Change is acceptable, basis of payment is not acceptabVe.
() Basis of payment shall be S
�The following modification is recommended:
( 1 Change in compfetion date is accepted.
() Change is acceptable with no change in price.
�Change is acceptable with no change in completion date.
( � Other
2. Reasonfor Change:
b �L�' CPMp
bY ���� (HGA)
• Approved by_
Approved by: G
CPMI Inc., c(o Saint Paul
cc: Chris Hansen
CPMI Job No.: 3225
Date:___s���
(Owner) Date:
I.A. 0'Shaughnessy Piaza, 743 West Fourth Street, Saint Paui, MN 55102-1
Mike Pederson Dick Zehring 3225-
�/4/97 St. Paul Civic Center Expansion i1,�1, I ry�mmary
Change Proposal � �--U
•
ST. PAUL CIVIC CENTER EXPANSION
3D0 EAGLESTREET JOB iD_ 9i1042
SA/NT PAUG MN 55101
PH: 6l2Q93-9154 FAX� 61ZQ93-95�i
Description: PCOii&8
Titie: Accelerate CLSM Pour
MoRenson Labor:
(See attached)
MoRenson Material:
(See attached)
MoRenson Equipment
(See attached)
Associated Costs
(Change Proposal)
Time
S Amoun[
5 -
5 -
$ -
$ -
General Conditions: $ -
(Mortenson Work)
SUBTOTAL M.A.Mortenson $ -
SUBCONTRACTORSNENDORS
• 1 Midwest Cellular S 1,764
2. $
3 $
4 $ -
5. $
6 $ '
7. $ '
8. $ '
9. $ '
70 $ '
SUBTOTAL SubNend $ 1,764
M. A. Mortenson Company Fee.
SubcontracforslVendors Fee 5%:
M. A Mortenson Work 15%:
SUBTOTALFee
Total Material & Equipment $
M. A Mortenson Material & Equipment Tax:
SUBTOTALTax
$ 88
$ -
$ SS
7°l0 "d -
S -
SUBTOTAL: M. A. MoRenson + SubNend + Fee + Tax S 1,852
Builder'S Risk
GCl Insurance Costs
Payment & Pertormance Bond
SUBTOTAL Insurence & Bonds
0.0007 ($.72/Thousand)
0 0038 ($3.77lfhousand)
0.0050 ($4.9593/Thousand)
$ 7
$ 7
5 9
$ 18
• TOTAL CHANGE PROPOSAL $ 1,870
Page 1
�0��9 �
YO� � ���
� �
��c�o��l� Cover �h��t
TO:
Company_
Phone:
Fax:
T o Sl,;., s k
2 93 - 95S 7
From: ,./ y.r/ N2,eAC.
Campany: MIDWEST CELLULAR CONC(1�TF_
Phone: G12-472-5030
-- -- -- — -- - -- -------
Fax: 612-472-6�87
•
D ate:
Pages including
this cover page:
/z-s'-9G
z
Comments: P YOPoSd� � �J H+�X PrePery 7» c�C��NNG �'+�dX��ur.t
s��e�9�'�► wi�� c�ens;{� no� � exc�ec� �YOPe�,
�
Qr; d(�p.ouec� �;x -�� laop
/OO Ce.neHT
3 v o +y e"c': {'J as 1,
zy ya wa��,-
2� �p�f �
�� �35.70 �C y
m
�ad �ao �br ac�,��t �6ay2 _ zs: Za
l..ess 300 /65 F.A. �° �• °/ =� 3, 00�
Acce/<���er
2'� C° 8i,so//°i 3.00
. . ,¢'�c�./.,
Proposcd /y%X -
700 /b �e.�e.,f
yo ga � W 8�Gr
Y� P�f
�7 /�Jp Clotiae dCtarat'Qy
s 3S. 70
ZS. Zo
'� � o , 90 %�Y
��O��J�J S�O�f ,. LANDSCAPE / CONERACTOR SUKP IES CCLL 423P2200 OR 866-0430 . ����
t
AOOi(IONAL W 0.TER MOEO TO THIS CONCFlEfE YALL AE�UCE R3 9iRENQiH.
AIN OFFICE PHONE: (672) 867-604t y ' ANYwAiER AoDE IS AiCUSTOMER'S RI3K ; -�
�IN OFFIC£ FAX: (612) 861-5547 `
.c q:
CAUTION: Freshly mixed cement, mortar, concrete or gfout may cause skin , y
injury. Avoid contact with eyes wfiere possible and wash exposed sitin-
prornptly wilh wate�. If any cement�niXturg ggt5 into 2yef, ��nse immediatCly _ ' `, �' ARRNE
and repeatedty with water and gel prompt medical treatment. . ��B
SEE flEYERSE FOF} 7ERMS,
People whaare sens�tive to overez�osure to the sun m�y also be sensitive CONDITIONS AND RETURN CHECK CHARGES START '
� to contact with coal tar pitch or e�osure to refiections from coai tar pitch. pOUR
These indivjduais may need protective clothing or sunsCreen when plac5ng - ' ,
arxl finishing HCC concrete. � �; _ F ` FINISH
� � POUR'�
TICKET NO PLANi 0/ TE P.O NUM fl LLQAGE COOE OflDERED BY k � PHONE
131m20 1 1�1�96 - JOh1N '
19�1 _ I 000� MIDWEST CFLLUI_AR�CONCRETF
ADDRESS 1`43 W 4TH ST—S7 PpUL (5TG CIVIC CENTER)
Sl�.'K �� N. 5, fl. P. �t .. r
ST PALJL,CI9IC CENTEFt� ,
C�ME PN �F(= W STH —60 Itd RLI.EY BE�IJFEN WILKINS � ORDWRY
t*LDOt'< FiJR PUt�IR�� . �
� .
Y NO CREDI ALLOWED FQR CONCRETE RET
Sl�
ORD#a �
,
('
!
(
t
,
I
r
w
r <` ._� ..__ 4
� �.;
� PROD CDUF_ RRODUCT•PESG. OFC1 PTY �OAD �'�l` SENT UtdIt PRICE
, �_--�---------_-_---------------�-------------------------�--`---------
� EL.L�i; rELI. MI X� C � 7�.'�� {'f�. �� "70. 0� � YD ,� i
RICbL CALCIUh1 �HLORTUE , I" � �.0 � 0� 0N i
EXS �..+ E�'(ERIai�SLGB 1.00 0.�0
HEA7' � HER"f Y _ 1. 00 k�. 0�+ t
� 4 t E _
l
VTDUS TRUCK : t
ITF?S
�.j?';�,adJ 1 t.�.S�r1"'.. �V� €r�^ li. t (�i;h�
..:�lE.: "i1�1�'V��. 'Y})�.�'�Li. .::�t �i`�_;L..) � �_� e :yi.ii�tf, .,..
'
t4IX 6[SICdd M.C. ' G<SIREU
0'JEN DFY (kd7UNi
CG.D NNT
61R'fER -
tl�RRGE
C4�Cf 6_
sib L8S 0. �- 6G3 LBS
� lDS R.08 444 L$S
7� LCS 0.4� 29fif LBS
Q.6 CT5 0.08 56.0 CTS
SLUMP = tG.Q�e�
Pf.Tlql FREE NAiER t �
AF'�IR�T ��1diMT - ".'�
666 L8S 660.0N L8S
§35 l65 4?5.28 L8S
2D16 L8S 0.0N LBS
57.6 CTS 161.29 LBS
� M 4WTER = 6.0 GF�./YAR� SYSTE}t TIME = 19:d4 ''
F1L �REE IJlITER = 1P95.8t1 L&5 NAX t1DD t#rTER = P f�flLS
NATlLFM RRTIO MIX = 0.0N ACT = 0.?A
�1MOUNT
�-----
Y
:
a
�
Y ,
�
!9
;,
WATER HDDED ; ��{-•
TAX ,
SUBTO7AL
TRUCK TIME
OTHER
TOTAL !
GROSS
TARE
N ET
RECEIVED BY
NS,
5 b{1c8� � 0:0d�
�•
CUSTOMER COPY
� '� !�
%
32z�-4-����
�
Tl�e Construction Organization
Mlnneapolis Office
700 Meadow Lane North
P.O. Box 710 (55440-0710J
Minneapolis, Minnesota 55422-4899
03January1997
SusanJones
CPMI
c/o Saint Paul Civic Center
T. A. O'Shaughnessy Plaza
143 West Fourth Street
St. Paul MN 55102-1299
Re:
Sub}ect:
•
Dear Susan:
Saint Paul Civic Center Expansion CP-4
Mortenson Project #951042
PCO#68 - Accelerate CLSM Pour Strip Curing Time
������
BUILDING DIVISION
Telephone: (612) 522-2100
Facs�mile: (612) 520-3430
In accordance with CPMI's 11 December 1996 verbat directive, confirmed Uy Mortenson ut wrifing the
same day, regarding the acceteration of the curing time for the CLSM pour strip, we quote flie sum of One
Thousand Eight Hundred Seventy Dollars (+$1,870.00) Eor the addiHonal work. Enclosed are copies of
suUcontcactor quotations and our price Ureakdown. Please let me know if you need additional
information or clarification on the enclosed. Please issue a contract change order.
The amount quoted includes only the cost of the changes identified herein. Changes to the contract not
spec�fically identified as revisions are not included in Ehis proposal and are excluded. Mortenson reserves
the right to submit a proposal for addirional costs and fime related to the impact of this change on
unchanged work or for the effect of this change in combinafion with other changes.
Very huly yours,
� t�- � �
Allen S. Troshinsky
Assistant Project Manager
fi1e: CPMI
• l� PCO# 68
j�CEIVED
JAN 0 6 1997
Minneapolis•Seattle•Denver•Colorado Springs�Milwaukee•Gcand Rapids•San Diego•Saa Fra�c�sco•HonoiW u•LOS A�geles
�
�
RECEfV�D
DE-.; i � 1996
The Coristruction Organi�ation
Minneapolis Office
700 Meatlow Lane North
P.O. Box 7l0 (5544a-0710)
Minneapolis, Mi�nesota 55422-4899
I 1 December 1996
Susan Joaes
CPMI
c/o Saint Paul Civic Center
I. A. O'Shaughnessy Plaza
143 West FouRh Street
Saint Paul, MN 55102-1299
Re:
Subject:
. Dear Susan:
Saint Paul Civic Center Expansion CP-4
Mortenson Job# 951042
L�1��
PCO# 68 - Accelerate CLSM pour suip curing time
�
����
BUILDING DIVISION
Telephone� (612) 522-2100
Facsimile: (672) 520-3430
In accordance with our conversation today regarding the acceleration of the curing tune for the remaining CLSM
pour, and the associated benefit that the Owner would realize in the Level t 16' Pour 8 activities, we will proceed
with the altered mix design. Basically, the new mix will be composed of cement and water onty, eliminating the fly
ash, and an acceleratoc Please note that Midwest Cellular assures us that the specified 40pcf will not be
compromised, however, HGA recommends that the Special Inspector monitor this pour.
As we discussed, the estimated cost for acceleration, to be reimbursed by the Owner, was $2,000.00. This amount
was arrived at by multiplying the approximate 70cy pour by the additional $2520/cy price of CLSM, plus mark-up.
Upon completioa of the work, an actual quantiry will be applied to the unit price and a final cost wi{f be submitted.
Please advise us immediately if our understanding is incorrect.
Very truly yours,
��0�
Allen S. Troshinsky
Assistant Project Mana�er
��: ��, P��.��,�
� ���
C fi��seY%
�2�. �- 4���
• file: PCO#68
CPM[