Wf�REAS, The Civic Center Authority, by authority of the Laws
of Minnesota lg6g, Chapter 1138, has awarded contracts for the
construction of the Civic Center Multipurpose Arena, said contract
awards contained in Civic Cent�Authority Resolution No. 249, a
copy of which is annexed; and
WI�REAS, Said law provides that all contracts entered into
by the Authority must be approved or disapproved by the Council
of the City of Saint Paul; and
WHEREAS, The Housing and Redevelopment Authority of the City
of Saint Paul, pursuant to Section 129 of the Charter of the City
of Saint Paul, will pay to the City adequate comp.ensation for the
z� - vacat�on and discontinuance of the public streets and alleys in
�•-
� . the area upon which the Multipurpose Arena will be constructed;
c;
�
r_
� and
S; (��
� G WHEREAS, the City Council has determined that an additional
c�
� �1,000,000 is available to the Civic Center Authority for their
�,
��� .
construction funds enabling such Authority to imclude the concourse
in the proposed Civic Center Arena; now, therefore, be i;t
COUNCILMEN Adopted by the Council 19—
Yeas Nays
Butler
Carlson '� —19—
Levine _ln Favor
Meredith '
Sprafka ayor
Tedesco Against •
Mr. President, McCarty
��
+ � �51��2
Oitt6�NA�ti'O L1YY CLBRK �
. ' �''� CITY OF ST. PAUL couNCa
� ° � FILE NO.
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION—GENERAL FORM
PRESENTED BY
COMMISSIONER eqTF
Page 2
RESOLVED, that the Council of the City of Saint Paul
hereby approves the award of contracts made by the Civic Center
Authority in said Authority's Resolution No. 249 adopted by
said Authority on the seventh day of November, 1970 .
�,jp� 91970
COUNCILMEN Adopted by the Council 19—
Yeas Nays � � 1'�O
�Butler
�arlson °e� 19—
�I,evine �n Favor
�'�Meredith
� J yor
�prafka
�Tedesco A gainat
�r. President, McCarty
RUQLISHED N�V 1 0 1978
��
. .� � � �
`� ' � 2..,
WHEREA5, the Mayor has called a sp�cial meeting of
the Couacil for 9:�U A.M. , �ovember 9, 1970, to eonsider matters
pertaining to the Civic Center and the Civic Center l�nthority,
aow, therefore, I her�by, pursuant to Section 111 of the City
Charter, do hereby waive notice of anch special m�eting.
.
. _. _
1
��_. � � �
� - �-�. �, !- Y
� '7 1
i�-�'Q-c `� �-
�
z__-�
,. �e CIVIC CENTER AUTHORITY �S
OF THE `�
CITY OF SAINT PAUL `�.�`-��
AUTHORITY RESOLUTION �
. . . . .
CCA 249
WHEREAS, The Civic Center Authority authorized and directed
the preparation of amended plans and specifications for rebidding
the Saint Paul Civic Center Multipurpose Arena Project; and
WHEREAS, Instructions to bidders, advertisement for bids, and
amended plans and specifications were drafted and issued, and formal
bid openings held at -�2:00 P.M. on October 21, 1970; and
WHEREAS, The Civic Center Authority has analyzed bids sub-
mitted and determined that certain deduct alterna.tes must be accepted
to bring the Multipurpose Arena. Project within available construc-
tion funds, all as more fully shown on Exhibit I attached hereto
and made a part of this resolution; and
WHEREAS, The Civic Center Authority understands and states
�hat contracts awarded must reflect the exa.ct amount of the work to
be performed by the lowest responsible bidder as of the date of
award; and
WHEREAS, The Civic �Center Authority has been advised that funds
� are now available in the amount of $800,000.00 for an addition to
Column B in the Construction Fund Ana.lysis Report as outlined in
Exhibit A attached to Resolution, CCA 247; and
WHEREAS, Said additiona.l Construction Funds were ma.de avail-
able through representations of the City Council and the Housing
and Redevelopment Authority tha.t the $800,000.00 formerly designa.ted
for Arena. site land acquisition ma.y now be transferred to avail-
able construction funds, and such amount will be offset by an equa.l
- amount paid by the Housing and Redevelopment Authority for the cost
� of vacating the streets; now, therefore, be it
� .
0
Q� � RESOLVED, That the Civic Center Authority, based upon repre-
� o sentations of the Mayor �nd the City Council, finds and determines
� '� that sufficient funds are available for the construction of the
�,� u Multipurpose Arena, including the connecting Concourse; and, be it
� �
¢ � FURTHER RESOLVED, That the Civic Center Authority hereby
` f accepts the lowest responsible bids as outlined in Exhibit I and �
o Q ma.kes the following contract awards:
1. The contract for General Construction work is awarded
to Bor�Son Construction in the amount of $8,590,573.00, said amount
and award ma.de after accepting all deduct alternates as outlined
Yeas in Exh�aiS I, thereby permanently and irrevocably deleting those
Y
Farrell
Gepha.r t
Judd In Favor Approved Ns v 7 , 19�D
Leider
Meredith
Pesek
Radman -
Tedesco � Against
Mr. Chairman, Harmon Chairma.n
CIVIC CENTER AUTHORITY
• '� OF THE
CITY OF SAINT PAUL
AUTHORITY RESOLUTION
- CCA - 249 �
Page 2.
items from the award of contract.
2. The contract for Mechanical Piping and Controls work
is awarded to Anderson-Cherne Company in the amount of � 1,678, 864. 00
said amount and award made after accepting all deduct alternates
as outlined in Exhibit I, thereby permanently and irrevoeably
deleting those items from the award of contract.
3. The contract for Mechanical Sheet Metal work is awarded
to Como Specialty Company in the amount of � 1��Sb ,930.00 , said
amount and award made after accepting all deduct alternates as
outlined in Exhii�it I, thereby permanently and irrevocably de-
' Tet-ing those items from the award of contract .
4. The contract for Electrical work is awarded to Peoples
Electric Company in the amount of �1 608 542 .00 � said amount and
award made after accepting all deduc� al�ernates as outlined in
Exhi�it I, thereby permanently and irrevocably deleting those
. items from the award of contract; and be it
F�`lRTHER RESOLVED, That the Civic Center Authority recommends
such awards• to the Counc il of the City of Saint Paul for ratif ica-
ti on and approval the reof; and be it
FINALLY RESOLVED, That CCA Resolution No . 247 , adopted
November 4, 1970, is hereby in all respects re.scinded.
Yeas Nays .
Farrell
Gephart
Judd � In Favor Approved /�/p v '7 , 19�
Leider
Meredith
Pe s ek �� ��,...�
Tedesco Against =i►�
Mr. Chairman, Harmon Chairman
—�1- . . __ _ _
, . Page 1.
Exhibit 1
� CNIC CENTER OF SAINT PAUL
Construction F�.ind Ana.lysis Report as of November 6, 1970
Bond Estimated Constructio�
Funds Committed Future �nds
Available Funds Fro 'ects Available
A B C (D
1. PARKING RAMP
a. Gen. Contractor $3,240,�11. -
b. Elect. Contractor 477,246.
c. Mech. Contractor 114,020.
d. Architect Fees . 236,688. _
e. Other Expense 9�.399•
TOTAL PARKING RAMP �4,159,064.
2. TUNNEL
a. Gen. Contractor ($132,209. ) Est. $9,500.
b. Architect ( 7,933•) �
TOTAL TUNNEL (�140,142.) Est. �9,500.
_ See page 2 .
�j. ARENA - CONCOURSE
a. Est. Land Acquisition City
b. CONST. COSTS (net bids) $13,o34,go9.
c. ARCH. COSTS (per A-E) 821,95�•
d. CGNTINGENT FUND 4.95% 6�5+082•
e. Architect Resite fee (94,633.) City _
TOTAL ARENA CONCOURSE FUND $14,501,943• _
4. OTIiER CC�NTRACTING
a. Expense - Misc. $10,207. �
b. Expense - Prelim. l,']�6. .
TOTAL - OTHER . $11,993•
5. E UIPr�NT
� a. Equip. Purch. Auth to date $17,50C.
b. Equip. Reserve $300,O�J0.
TOTAL EQUIPMENT $17,500. $300,000.
GRAND T07.'Ai,s �19,000,000. �4,1.g8,o5?. �3�,�0. �14,501,9�3.
By M. L. Blanchard
Executive Secretary
� Page 2
Exhibit 1
CNIC CENTER OF SAIIv'T PAUL
. INFORMATION SHEET
ARCHITECT'S EXPLANATION OF LOW CC�NSTRUCTION BIDS
GENERAL Base Bid $8,916,000.
less accepted Alternates 325,427.
Total low net GENERAL (Page 3) $$,59�,573•
MECHANICAL piping & Controls
Base Bid $1,691,764.
less accepted Alternates 12,900.
TOTAL LOW NET MECHANICAL (P&C)(Page 4) $1,678,864.
MECHANICAL sheet metal
Base Bid $1,298,630.
less accepted Alternates 141,700.
TCTAL LOtd NET MECHANICAL (SM)(Page 4) $1,156,930.
'ELECTRICAL
Base Bid $2,014,237.
less accepted Alternates 445,695•
TOTAL LOW NET MECHANICAL (Page 5) $1,608,542.
TO�PAL LOW CONSTRUCTION BIDS (Ref. 3B) $13,034,909.
ARCHITECT'S FEE CALCULATION
Accepted low CONSTRUCTION bids $1�,O�j�#,909-
. 6� A-E Fee $?82,�95•
Alternates NOT awarded 885�722•
4.5% A-E Fee 39,857•
TaTAL ARCHITECT FEES (per Architect)(Ref 3C) $821,952•
HOUSING RIDEVELOPMENT AUTHORITY
FUND SUMMARY
Funds budgeted to �ivic Center to date $629,000.
Committed Funds to date - 416,000.
Ref. chan�e - Tunnel projeet (transfer to H.R.A. fund - 132,209.
on 2A �
BALAPdCE H.R.A. FUNDS to be assigned + 80,�9L
f Page 3.
� E3chibi.t 1
� � CIVIC CENTER OF SAITdT PAUL
� GENERAL CONSTRUCTION (G)
St. Paul �ivic �enter Multi-Purpose Arena
Rebid (10/21/70)
*
I II III IV
Base Bid $9,900,000. $9,760,000. $g,174,000. $8,916,000.
Accepted Alternates (Deducts)
Alt. G-1
A1t. G-2 lol,000. io3,000. 92,000. l02,000.
Alt. G-3 (Not included)
Alt. G-4
�.t. G-5 32,000. 36,000. 38,000. 2g,000.
e1t. �-6 � .
Alt. G-7 .
alt. G-8 500. 500. 5oa. Soo.
Alt. ,G-9 .
Alt. G-10 � ?,800. 7,800. 7,800. 7,800.
A1t. c-il 5,000. 5,000. 5,000, s,000.
n�t. c-i2 8,000. 8,oao. 8,000. 8,000.
�t. G-13 8,800. 8,000. 8,8oa. 9,000.
�t. G-i4 70,000. ', 125,000. 85,000. 9i,627.
Alt. G-15
A].t. G-16
Alt. G-17 � �
Alt. G-17A .
Alt. G-18
Alt. G-18A
alt. G-19 lo,000. 13,000. 9,000. 10,500.
�t. c-2o 12,000. 18,000. �.3,000. 15,000.
Alt. G-21
Alt. G-22
Alt. G-23 100,0�0. 90,000. 109,000. 47,000.
�otal Deducts (-)355,1�• (-)414,300. (-)376,100. (-)325,�27•
NET BIDS $9,5�+�+,9�• �9,345,700. �8,797,900• $8,590,573 '
Recommended Award $8,59a,573•*
R .
• Page 4.
� Exhibit 1
CIVIC CENTER OF SAINT PAUL
MECHANICAL (MPC)
�
I II III N
Base Bid $1,692,764. $1,720,000. $1,883,000. �1,900,000.
Accepted Alternates
Alt. MPC-1 6,000. 5,3�. 4,7�• 5,000.
Alt. MPC-2
Alt. MPC-3 3,100. 3,300. 2,800. 3,700.
Alt. MPC-4 .
Alt. MPC-5 .
�. A1t. MPC-6 200. 350. 180. 600.
Alt. MPC-7
A].t. MPC-8
Alt. MPC-9
Alt. MPC-10
A1t. MPC-11 2,500, 3,200. 1,800. 1,650.
Alt. MPC-12 20,000. 17,800. 16,500. 19,000.
Alt. MPC-13 3,600. 4,200. 2,970. 3,100.
Alt. MPC-14
Alt. MPC-15 2,500. 2,700. 2,000. 2,200.
Alt. MPC-16
ait. r�c-17 (+) 25,000. (+) 33,000. (+) 35,600. (+) 50,000.
A1.t. t�c-18 -
. Total Deducts (-)12,900. (-)3,850. (+)4,650. (+)__14l750.
NET BIDS $1,678,864.* �z,716,150. �1,887,650. ��,91.4,750.
Recommended Award $1,678,864 *
MECHANICAL G�ISM)
*
' I II
Base Bid $1,298,630. $1,400,000.
Accepted Alternates
Alt. MSM-1 9,5�• $,5�•
Alt. MSM-2
nit. MsM-3 15,000. 20,000.
alt. MsM-4 54,000. 48,000.
A1t. MSM-5 63,200. 68,000.
A1.t. MsM-6
Alt. MsM-7
Total Deducts (-)141,700. (=)144,500.
NET BIDS $1,156,930•* �1,255,5�•
Recommended Award $1,156,930•*
. �
' Page 5.
. , ' Exhibit 1
CIVIC CENTER OF SAINT PAUL �
ELECTRICAL (E)
_ *
I II IIi IV V
Base Bid �2,145�30Q. �2�014�23?• $2�160�000. �2�198�700. �2�219�422.
Accepted
Alternates
ait. E-1 244,265• 27?,262. 287,800. 303,000. 351,780.
Alt. E-2. 1,350. 1,200. 2,900. 2,200. 2,586.
Alt. E-3 4,911. 5,660. 5,5�• 5,200. 3,825.
alt. E-4 863. l,000. , 1,550. 1,300. 1,464.
Alt. E-5
,��1.t. E-6 . '
Alt. E-7
Alt. E-8 � 4,500. 1,000. 3,380. 4,200. 5,947•
�t. E-9
Alt. E-IO ' 76,000. 84,800. 82,500. 103,000. 96,742.
Alt. E-11 45,900. 34,773. 39,5�• 41,000. 33,580.
Alt. E-12
Alt. E-13
Alt. E-14
Alt. E-15
Alt. E-16 - . `
Alt. E-17 ' �
Alt. E-18
Total Deducts (-)377,?$9. (-)�+45,695• (-)423,130. (-)459,9�0. (-)495,9z4•
NET BIDS �1,767,511. �1,6o8,54z.* $1,?36,870. �1,738,800. $1,723,498.
Recommended Award $1,608,542.*
� SUMMARY �
Low Bidders: General $8,59�,573•
Mech. Piping & Controls 1,678,864.
Mech. Sheet Metal 1,156,930.
Electrical 1,608,542.
�13,034,909. *
* Ref. Page 1, Column 3D
EXPLANATORY NOTES ON ALTERNATES :
G-2: Deductive Alterna.te for omitting moving walks accepted,
since it is not essential to the function.
G-5 : Deductive Alternate for Mezzanine Office Suite accepted
since existing Administration Suite can suffice.
G-8: Deductive Alternate for Plaque accepted, as it is not
necessary to commemorate the work.
G-10: Deductive Alternate for Graphic Sign Allowance accepted
as this work is deemed not essential to the function.
G-11: Deductive Alternate for landscape planting accepted, as
it is deemed not essential to the function.
G-12: Deductive Alternate for omitting automatic exterior sign
is accepted, as ,it is not deemed essential to the function.
G-13: Deductive Alternate for cha.nging vinyl wall covering to
paint is accepted, since it is not essential to the function.
G-14: Deductive Alternate to omit all walks, curbs, blacktop
and sodding is accepted, as the work is not deemed
essential to the function.
G-19: Deductive Alternate for omitting cooler and freezer
accepted, as it is not deemed essential to the function.
G-20: Deductive Alternate for omitting flagpoles accepted, as
it is not deemed essential to the function.
G-23: Deductive Alternate for omitting shale excavation accepted.
This alternate complies with sound engineering principles .
MPC-l: Deductive Alternate for omitting piping and control work
for Mezzanine Administration Suite accepted, since
Alterna.te G-5 is accepted.
MPC-3: Deductive Alternate for substitution of dry c linder
compressor refrigerant R22 system for ice rin� refrig-
eration accepted, to the extent that the less sophisticated
equipment substituted will perform satisfactorily.
MPC-6: Deductive Alternate for omitting stainless steel access
wa11 cover assemblies and substituting brass cleanout
plugs accepted, as it is not deemed essential to the
function.
MPC-11: Deductive Alternate for omitting hydronic flow measure-
ment system accepted, as it is not deemed essential to
the function.
NiPC-12: Deductive Alternate for omitting electric hoist units
accepted, since they are not deemed essential to the
function.
MPC-13: Deductive Alternate for omitting flow switch and
annunciator system accepted, since this equipment is
not deemed essential to the functioning of the system.
MPC-15: Deductive Alternate for omitting control panel tem-
perature gauges accepted, since such equipment not
deemed essential to the functioning of the equipment.
MPCT17: Additive Alternate for substituting unit heater system
at all entries and exits in lieu ducted air handling
' unit heating system accepted, since a net credit is
effected in conjunction with acceptance of Alternate
' MSM-5.
MSM-l: Deductive Alternate for omitting Mezzanine Office Suite
air conditioning accepted, since Alternate G-5 is
accepted.
MSM-3: Deductive Alternate for substituting 1oca11y fabricated
' plenum panels in lieu of factory fabricated panels
accepted, as their acoustical efficiency will be equa.l.
MSM-4: Deductive Alternate for substituting dry filter assem-
blies in lieu of electronic filter units accepted, as
this substitution is not deemed essential to the function.
MSM-S: Deductive Alternate for omitting ducted air handling
heating system at entries and exits accepted, since
Alterna.te MPC-17 is accepted and such change is not
deemed essential to the function.
E-1: Deductive Alternate for omitting electric snow melting
accepted, since it is not deemed essential to the function.
E-2`: Deductive Alternate for omitting moving walks accepted,
- since Alternate G-2 is accepted.
E-3: Deductive Alterna.te for omitting Mezzanine Office Suite
accepted, since Alternate G-5 is accepted.
E-4: Deductive Alternate for omitting electric hoists accepted,
since Alternate MPC-12 is accepted.
E-8: Deductive Alternate for omitting wiring for entry heating
system accepted, since Alterna.tes MPC-17 and MSM-5 are
accepted.
2.
E-10: Deductive Alternate for omitting fixtures types I and W
(color TV lighting) accepted, as it is not deemed
essential to the function.
E-11: Deductive Alternate for omitting exterior lighting fixture
types AB through AG acc� ted, since it is not deemed
essential to the function. �