COMMI9510NE O r M GJ W8
TF Ju lX 13� 19'71
WfffiREAS, Additions vhich might prove to be necessarq in the Isprove�ent
described as Grading and Yaving JEFFERSON AVSNUB from Lesington Parkwsq to West
Seventh Street and Bridge No. 62517 over the Short Line Road , Comptroll�r�s
Contract L•7289, Citq Project No. 70-P'-0483, Sheehy Bridge Construction Coapanq,
Contractor, have been provided for in the Specifications, �nd
3�REAS, It has been found necessarq to ffiake the fallowing Additions:
ADDITIONS
As per attached Ccntract Change Agreement No. 2 $3,705.13
As per attached Contract Char�ge Agreemen� No. 3 61,640.59
As per �ttached Contract Change Agreement No. 4 1,814.45
TOTAL CONTRAiCT CHANt� AGR�TMENTS NO, 2, 3, & 4 = $67,160.17
and
C WHEItLAS, The total additfoa is $67,16�.17, and the Co�issioner of Public
� � '�orks bas agreed with the Contractor that the as�ount of $67,160.17 is the correct
s�m to be added to said contract, therefore be it
R&SOLVBD, That the Citq af St. Panl thrcugh its City Cou�cil approves the
foregoiag additions made in accc>rdance with the Speciffcations in the sum of
�$67,160.17, said amount tc� be added to the lump sun consideration named in the
� �contract, know�a as Can�tr�ller's Contract L-7289, and which additional amount is
�to be ffnanced as Eollows:
� Contract Chattge Agreement No. 2 is tc be financed froa 1970 Municipal
c� '1' St�te Aid Funds.
� Contract Change Agreement No. 3 is to be finanaed by Minnesota HighWay
p Departme�t Agree.a�ent No. 56S68.
� Cc►ntract Change Agre�ent No. 4 is to be financed bq the Water DepartmenC.
�
�
� Adopted by the Counc��L 21 1971� 19—
COUNCILMEN
Yeas Naya
Butler � JUL 2 2 197�.
ov� 19—
�
T�-�""�� .1 Tn Favor
Meredith
Sprafka � Mayor
A gainst
.Tatl�ca—� �
Mr. President, McCarty ���� )
PUBLiSHED �__ � 4_ 1�7�
��
CI3'Y OF SAINT PAL'L - DEPARTMENT OF PUBLIC WORKS �i��
� CONTRACT CHANGE AGREII�NT � N0.__�____
9�'8
PROJECT N0. 70 P-0483 CONTRACT N0. L-7289 CONTRACT���,ig,e�y BridQe�st. Co.
PROJECT DESCRIPT�ON Gradin� S avin� of JEFFERSON AVENUE - Lexin�ton Pkw� to 'West
Seventh St. and Bridt�e No. 62517 over the Short Line Road
�
� In accordance wi'th Section 95�af the Charter of the�City of Saint Pavl, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the contract,
are the reasonable costs of those items for additions to,or deductions from,the contract.
Additions
Rebuilding sewer service connection to drill hole at
908 Jefferson I.ump Sum (Based on Force Account Reaords) $188.45
Relocating catch basins and 12-Inch R'.C.P. sewer leads at sfa
locations; also furnishing aad installing 12 lin. ft. of 12-inch
V'.C.P, sewer and 38 lfn. ft. of 8-Inch cast iron sewer catch basia
leads Luaq� Sum (Based on Force Account Records) 1,064.82
Constiuct special curb adjacent to bridge appmaches - not shown
on the paving plan 68.6 lin. ft. @ $3.68 252.45
Constructed 3B catch basin tStructnre No. 72) two feet deeper
than standard because of utility oonflict
2 lin. ft. @ $25.00 50.00
Gtiring ouncrete �rith plastic blanket and applying oil cure at
request o£ City in lieu of Contractor's option to apply a
membrane cure. Additional cost to Contractor - Iump Sum 161.00
Construct joints in concrete pavement not included in Plans
and Specifications
Joint C1D-1 312 lin. ft. @ $1.00 � $312.00
Joint E2 17.5 lin. ft. @ $15.95 = 279.13
Joint E2D 98.9 lin. ft. @ $13.20 � 1305.48
Joint L2ICP - 490 lin. ft. (Tie Bars Onlq)
327 l.bs. @ $0.20 = 65.40
Joint E21 48 lin. ft. @ $0.55 = 26.40 _
1,988.41
TOTAL CONPRAL`P CHANGE AG � � NO'. 2 = $3,705.13
This additional amount to be financed from 1970 Municipal State Aid Funds.
� f /
e . � L 19�/ Sheeh�BridQe Const. Co� 19
ons �an Engineer � Contractor
'� r'" � 5 a .+i. � �fr.ir�
r ��� � 91 �i, ��"���.1 l � �. $y ��./ frVY %L 19��
Chi'e.._ Engine �
- -- 7 , y �9� a�-��c, 12/ ���7-i�19 7/
C' ` ssioner Comptroller
�-
Original (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller To Construction Engineer
." ' � CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC WbRKS
' CONTRACT CHANGE AGREEMENT NO,�
PROJECT N0. 70-Y-0483 CONTRAiCT Np. L-7289 CODiTRA�CTOR Sheehv Brid_e Const. Co,
PROJECT DESCRIPTION Gradin� and Favin� of JEF�'FERSON AVENUE - Leuin�ton Pkwv to West
Seventh St. and Bridge No. 625Y7 over the Short Line Road
In accordence with Section 95 of the Charter of the City of Saint Paul, the Commissioner
- � of Public Works-_has agreed with the Contractor that� the basis of payment and prices for
items listed in the changes described below, not otherwise included in the contract, are
the reasonable costs of those items for additions to, or deductions from, the contract.
ADDITIONS
The following additional work was done nnder this contract through Cooperative Constiuc-
tion Agreement No. 56568 (City of St. gaul with Minnesota Highway Department) in the
vicinity of the future bridge crossing of Jefferson Avernie by Interstate Trnnk Highway
No. 35E.
Excavating muck to a depth of 20 feet and backfilling with grarnilar materiel; also
relocating approximately 300 lin. ft. of S ft. diameter ooncrete sew�er.
SC�ED�JI� OF AiCTIJAI. QtTANTTTIES AND GOSTS
Spec.
Item No. Work Item Unit Unit Price Qnantity Cost.
Itoadway
2105.505 Muck Excavation Cu. Yd. $ 1.55 16,496.4 $25,569.42
2105.501 Common Excavation t�. Yd. 0.79 13,802 x 1.3 = 17,943 14,174.97
Sub-Total $39,744.39
Stornn Relocation
2104.511 Remove Manhole Struct. 165.00 1 I65.00
2104.515 Remove.Pipe Sewer Lin. Ft. 13.20 280 3,696.00
2503.502 48�� RCP, g-4, C1.III Lin. Ft. 36.30 304 ' 11,035.20
2506.508 Construct Manhole,
Type III Manhole Struct. 1400.00 2 2,800.00
2506.508 Construct Manhole,
Type V Manhole Stzuct. 2100.00 2 4,200.00
Sub-Total $21,896.20
TOTAL CONTRA�T CHANGE AGREEMENP NO'. 3 = $61,640.59
This additional amount to be financed bq Minnesota Highway Department .Agreement No. 56568.
GoMp, �+/e . .2177
� `
7�� 9 Sheehv Bridge Construction ComPany
nst ction E�g er Contractor
_ � � ��4 , �
r i9 $y .� 7— i9 ��
�; � ,.
k
e gi �er
�19� � � 2� - �U �?G ������-- �19 �/
�G'" issioner ��= Comptroller ��q,,,�
w^'�",�
Original (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue) _ ,,
To Contrector ' To Accounting Div. To Comptroller To Engineer
• � � � CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC G1pRKS
CONTRACT CHANGE AGREEMENT Np. 4 ,
PROJECT N0. 70-P-0483 CON'!'RAiCT Np. L-7289 CONTRACTOR Sheehy BridRe Const. Co.
PROJECT DESCRIPTION�rading and YavinQ of JEFFERSON AVENUE - Lexin�ton Pkwv to West
��v�nth St. and BridEe No. 62517 over the Short Line Road �
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
of Public Works has agreed with the Contractor that the basis of payment and prices for �
items listed in the changes described below, not otherwise included in the contract, are '
the reasonable costs of those items� for additions to, or deductions from, the contract.
ADDITIONS -
The following additional work was done nnder this oontract as the result of a shear ia
in a 12-Inch water main which occuned during the winter of 1970-71 near the intersection
of Jefferson and �ilton.
Item ant. Unit Dnit Frice Amount
Sawed Joints 55 Lin. Ft. $1.10 $ 60.50
Remove G�rb and Gutter 90 Lin. Ft. 1.16 104.40
Remove Asphalt Surface 20 Sq. Yd. 1.65 33.00
Remove Coacrete Driveway Pavement 100 Sq. Yd. : 2.89 289.00 '
Aggregate Base Elaced, Class S 5 Cu. Yd. 5.78 28.90
Concrete Curb and Gutter, Design B-624 90 Lin. Ft. 2.89 260.10
7" Concrete Driveway gavement 100 Sq. Yd. 9.01 � 901.00
Extra Cost for High Ear1y Concrete 19 Cu. Yd. 2.b5 50.35
Concrete for Base Repair 4 G�. Yd. 21.80 87.20
TOTAI. OONrRA�.T CHANC� AGREEMENT I��. 4 = $1814.45
This additional amount to be financed by the Water Department. .
P.U/.-=0� lsosy - 7-8-7/
W�rE,� .!o �P�cC� 2 8�Z�
.
� 19� Sheehy Brid�e Construction Company
C nstructidn E�gine r Contractor
�f 4�'�;i: � f �
��'i� �
Y�/;�:, . � ',�� �' 19 sy �,y-r�-.-� �19�
Ch e E Engiri" '
� �19�� / �—/� 19 7� •
� issioner �,p,Comptroller G���
�
0 riginal (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller To Engineer
• �
cu�l.�cwrs�ro�RU�rcR
CITY OF ST. PAUL �uNd� NO
' OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION—GENERAL FORM
n�e�r�u er Ro�ar M. Conw�r � .ru iv 13� 1'�T�
COMMISSIONER � DA �—
WBBREAS, Additions whiah ai�ht pxov� to b� n�aas�asy ia � Lpro�w�tet
daaribad as Greding anc! laving J1�l1�E1t�011 AVL�110E froe Lauington P�rkMay to ilesC
Sav�tU StrNt ard Dridss I�o. 62317 ov�r th� Sbose Lin� Road . Cosptra►il�r�r
conlraat L-7ZS9, city rro�•at Za. '0-r-o483, stwe�► Bs�i..ag. csonst�,iatyon Oo�pary,
Coatractor, tu�ve b�sn providsd for in t.t��e 8pacif i�atl�ons, �ad
t�kEAB, it has b«aa fownd naoassty to s� ttw fol�oving Addi�ions s
ADDITIONS
As p�r attachad Contr�ct Cbange Agsw�rnt Ifo. 2 $3,703.13
Aa p!s ateach�d Contract Chang� Agre�a��t lio. 3 61,640.59
Aa per attaat�d Contract Cban�e Agz�ant No. 4 1,814.45
�_
TOTAL (;ONTRIIC'r C8Ai1G�i I�RBS�1P�s N0. 2, 3� b 4 • g67,i60.i'�
�
�BRBAS, Tha total additLca ia $b7.160.17, and t� Co�issiontr of lublic
Works bas �c�ed irttb t1M Co�raator tt�at tiN naunt of �67.160.1T is t�a corr�at
aw� to b� �dd�d to said aontssct. tbes�os�e b� it
RE80LV�D, That t.b� City of St. �aii t'hralgh its City Connail apps+av�a Che
tos�oing additLcros � in aaeaorrd�ca vith tba �p�aiticati� iu t1w au� o!
$67,160.17, s8id e�ount to ba add�d to th� lu� am� a�na�+d�rat�an n�wd f�uu t1r
coaatsaat. W�awa a� Co�p�cv�ler'a Contnct L-7ZS9, aad vltieb �dditZonal a�ouut is
to ba �in�ncect a,� follovs s
Coal.ssat Cha�g� Agt�nt llo. 2 ia to bt linaeta+�d #�ra� 1970 Muutaip�2
8lats Aid Funda.
Centtaae C't�p� A�nt 110. 3 ir to b� tl�aae�d by bi�uota Bi�y
D�paYb�eat AgsseMnt llo. 56568.
Contraet Chann Ags�ot lb. 4 i� to i� �i�a�d by th� ilat�r D�pattarat.
� ,lUL 21 197�
COUNCILMEN Adopted by the Coimril 19_
Yeas Nays
Bu�� �� aa �9n
� Appro� 19—
� _ln Favor
Meredith
C.J ��r
Spr&�8 Aeaninwt
�'Af�Q�
� Mr. President, McCarty
�8
C TT� OF 5A INT PAL�L - DEPARTN�NT OF PUBLIC WORKS
� CONTRACT CHANGE AGREII�IENT N0.�_�
��/�p
PROJECT N0, 70 P-0483 CONTRACT N0. L-7289 CONTRACT�t,��i��y BridQe Const. Co. V
PROJECT DESCRIPTION Grading & Pavin� of JEFFERSON AVENUE - Lexington Pkwy to S�lest
Seventh 5t. and Bridge No. 62517 over the Short Line Road
r
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner'
of Public Works has agreed with the Contractor that the basis of payment and prices
for items listed in the changes described below, not otherwise included in the con�.x�act,
are the reasonable costs of those items for additions to,or deductions from,the contract.
Additions
Rebuilding sewer service connection to drill hole at
908 Jefferson Iump Stun (6ased on Force Acoount Records) $188.45
Relocating catch basins and 12-Inch It:C'.P. sewer leads at sia
locations; also furnishing and installing 12 lin. ft. of 12-inch
V'.C.P, sewer and 38 lin. ft. of 8-Inch cast iron sewer catch basia
leads Iump Sum (Based on Force Acconnt Reoords) 1,064.82
Construct special curb adjacent to bridge approaches - not sl�ova
on the paving plan 68.6 lin. ft. @ $3.68 252.45
Constructed 3B catch basin (StYUCture No. 72� two feet deeper
than standard because of utility oonflict
2 lin. ft. t� $25.00 50.00 '
G�ring concrete with plastic blanket and applying oil cnre at
request of City in lieu of Contractor's option to apply a
membrane cure. Additional cost to Contractor - Iump Sum 161.00
Construct joints in concrete pavement not included in Plans
and Specifications
Joint C1D-1 312 lin. ft. @ $1.00 = $312.00 _
Joint E2 17.5 lin. ft. @ $15.95 = 279.13
Joint E2D 98.9 lin. ft. C� $13.20 = 1305.48
Joint L2ICP. - 490 lin. ft. (Tie Bars Only)
327 lbs. @ $0.20 = 65.40
Joint E21 48 lin. ft. (� $0.55 � 26.40 -
� 1,988.41
TOTAL CONTRACT CfiANGE AGREEMENT 1�0'. 2 = $3,705.13
This additional amount to be financed from 1970 Municipal State Aid �nds.
f /
, r �Z 19�l Sheehv Brid„�e Const. Co. 19
ons c�[qn ;Eh�gj,neer Contractor
�..�- � � �
� r'� �� � � �:,��'� _ j �/ 1� By �.� c--,.z�--'��19 �i .
Chie_ ._ Engine'
;- - 7 � z �9� a�, 12/ �r� �i�19 �/
G� ssioner Com:ptroller
Q�-i'�..
Original (White) Duplicate (Canary) Triplicate (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller To Construction Engineer
. � CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC W�DRKS
' CONTRACT CHANGE AGREEMENT NO.�
PRO.IECT N0. 70-F-0483 CONTRt�CT D10. L-7289 CODiTRA�TOR Shee Bridge Const� Co.
PROJECT DESCRIPTION Grading and Pavin� of JEFFERSON AVENUE - Lexin�ton Pkwq to West
Seventh St. and Bridge No. 62517 over the Short Line Road
In accordance with Section 95 of the Charter of the City of Saint Paul, the Commissioner
"of Public Works has agreed with the Contractor that the basis of payment and prices for
�items listed in the changes described below, not otherwise- included in the contract, are
the reasonable costs of those items for additions to, or deductions from, the contract.
ADDITIANS
The followiag additional work was done nnder this contract Chrough Cooperative Construc-
tion Agreement No. 56568 (City of St. Paul with Minnesota Highway Degartment) in the
vicinity of the future bridge crossing of Jefferson Avertue by Interstate Tnink Highway
No. 35E.
Eacavating muck to a depth of 20 feet and backfilling with grar�ular material; also
relocating approximately 300 lin. ft. of 5 ft. dismeter concrete sew�er.
SCHEDOLE OF AGTUAL QUANTTTIES AND COSTS
. Spec. ,
_ Item No. Work Item Unit Unit Price antity Cost•
Roadway
_:.2I05.505 Muck Excavation Cu. Yd. $ 1.55 16,496.4 $25,569.42
:-2105.SOi Ca�aon Excavation Cu. Y3. 0,79 13,802 x 1.3 = 17,943 14,174.97
• Sub-Total $39,744.39
SCornn Relocation
�_2104.511 Remove Manhole Struct. 165.00 1 165.00
_2104.515 Remove P ipe Sewer Lin. Ft. 13.20 280 3,696.00
�2503.502 48" RCP, R-4, C1.III Lin. Ft. 36.30 304 . 11,035.20
� 2506.508 Construct M.anhole,
• Tqpe III Manhole Struct. 1400.00 2 2,800.00
_:.2506.508 Constxuct rfanhole,
Type V Manhole Strnct. 2100.00 2 4,200.00
Sub-Total $21,896.20
TOTAL CONTRACT CHANGE AGREEMENT NO'. 3 = $61,640.59
This additional amount to be financed by Minnesota Highway Department Agreement No. 56568.
�en-s�T No . .2/7�
= :� - � t .
7� 9 Sheehv Brid�e Construction Company
i nstrsction E�vg' er Contractor
- �' � ����i ��' ��`°k
� i9 ay -�¢.�.. � �9 ��
ie� ngirieeri
� 2.- 19'7 � /2���(l �l ��.«— �19 7/
�
�o issioner �� Comptroller
�
0 riginal (White) Duplicate tCanary) Triplicate (Pink) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller To Engineer
• CITY OF SAINT PAUL - DEPARTMENT OF PUBLIC �RKS
� CONTRACT CHANGE AGREEMENT Np. 4 . . .
PROJECT NO. 70-Y-0483 CONTRt�CT Np. L-7289 CONTRAiCTOR Sheehy Brid�e Const. Co.
PROJECT DESCRIPTION Gradin¢ and YavinQ of JEFFERSON AVENUE - Leuin�ton Pkwv to West
�e�renth St. and Bridee Ne_ 62517 over the Short Line Road
In accordance with Section 95 of the Charter of the City of Saint Paul, the Comm3ssioner
of Public Works has agreed with the Contractor that the basis of payment and prices for
items listed in the changes described below, not otherwise included in the contract, are '
the reasonable costs of those items for additions to, or deductions f rom, the contract.
ADDITIONS
The following additional w�rk was done ander this ooatract as the result of a shear in
in a 12-Inch water main which occurred daring the ainter of 1970-71 near the intersection
of Jefferson and Fulton.
Item ant. Unit Dnit Yr3ce Amaunt
Saw�ed Joints SS Lin. Ft. $1.10 $ 60.50
Remove (hirb and Gutter 90 •Lin. Ft. 1.16 104.40
Remove Asphalt Surface 20 Sq. Yd. 1.65 33.Q0 •
Remove Concrete Driveway pavement 100 Sq. Yd. 2.89 289.00 �
Aggregate Base Placed, Class 5 5 Cu. Yd. 5.78 28.90
Concrete Curb and Gutter, Design B-624 90 Lin. Ft. 2.89 260.10
7" Concrete Driveway �avement 100 Sq. Yd. 9.01 901.00
Extra Cost for High Early Concrete 19 (�. Yd. 2.65 50.35 -
Concrete for Base Repair 4 Cu. Yd. 21.80 87.20
'TO'rAI. C�NTRACr CHANGE At�tEEMENr N0. 4 = $1814.45
This additional amount to be financed by the Water Department.
P.W.-sa� �soSy - 7-5- �1
W�re,� .�D ,2E c� 2�Z 6
� � , .
19� Sheehy Brid�e Construction Company
C nstruc iou E�gine r Contractor
.� �,;
� ,��� d, �; �t`
�a�<*, 19� BY Zn ��� ��19�L .
Ch e ngin �
� � , � �19�� ''� !�V / ��� 19 7�
m issioner p,()�Comptroller ���`
�
0 riginal (White) Duplicate (Canary) Triplicate. (Pfnk) Quadruplicate (Blue)
To Contractor To Accounting Div. To Comptroller To Engineer