254931 OR161NAL TO CITY CL6RIC � �����
. CITY OF ST. PAUL H�EN�� NO. ��
OFFICE OF THE CITY CLERK
� CO CIL I�ESOLUTION-GENERAL FORM
PRESENTED!Y �� i J
COMMISSIONE A�
R&SOLVBD, That the Council �by approves the award of the Contract Co�nittee as
follows: �j
Furnish all labor, materials and equipment necessary or incidental
to the @ON3TRUCTION OF A 20-FOOT WIDB, 2-INCH BITUMINOUS 5URFACB
including necessary patching for apProxima.tely 2.8 miles on a private
road owned by the Water Department in the Vicinity of Sucker and
Vadnais Lakes, Saint Yaul, Minnesota -
1. Machine patching. I50 tons . . . . . . . . . cost per ton $7.55
2. Hand patching� 10U tons . . . . . . . . . cost per ton $7.55
3. Approximate 2" bituminous surface
3$00 tons . . . . . . . . . cost per ton $7.55
4. Bituminous material MC70 or MC2S0
2800 Gals ... . . . . . . . cost per gal $ .21
for the Water Department to Alexander Construction Co. , Inc. for the contract price
of . . . . . . . . . . . . . . . . . . . . . . . . . Approximately $31,165.50
in accordance with the specifications and drawings and Formal Bid No. 4655 of said
Alexander Construction Co. , Inc. such bid being the lowest and said Alexander
Construction Co. , Inc. being a responsible bidder and the Corporation Counsel
be and hereby ia directed to draft the proper form o�. contract-.therefor, and the
proper City Officials hereby are authorized to execute said �cantract on behalf of
the City of Saint Paul.
F. B. �4655
Req'n. ,�39911 - Code; 8000-000
�b�
APPROV$D: AS TO F�RM APPR4VE��, THE CONTRACT C01�4IITT8E
�
. � ��>� ' � �`� i; �
CORPORA COUNSSI. SSION&R 0 P T ES
. . �
ING COMPTROLLER
COUNCILMEN Adopted by the co��� ��� 14 191�19_
Yeas Nays
Butler J U L 14 �97�
� Conway pPro 19—
Levine �jn Favor
Meredith
Sprafka J Mayor
Tedesco ASainst ,
Mr. President, McCarty ��� 1 � �971
6/2$/71/j p/Smith PUBLISHED
�
,