D001111L � _ - City Clerk ` - Finance Dept- _ - Dep[. Accounting (Civic Center) _ - En�ineer (HGA) - Contracror _ - Project Manaeer (CPMn and which amount is to be financed from: CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. CP4.01-10 ADMINISTRATIVE ORD&R, Whereas, addi[ions which proved to be necessary to the Improvement described • � as Saint Paul Civic Center Expansion CP-4 Building Construction lmown as Contract L Project NoA15117 M.A. Mortenson, is composed of the following: 1. Delete Wilkins embed p(ates per Contracror Proposal (CP) f14.30 Reason- Embeds not required under Wilkins walkway. 2. Delete Wall Type V2 at Stair 13 per CP #4.37. Reason: Drywa1L not required at exit stair. 3. Revise Restroom Area 116 and 118 per CP #f4.50. Reason: Existing Arena footings higher then expected. 4. Rebuild steps at Volume Services per Field Orde� (FO) #4.54. Reason: Existing steps slope into new dock/office area and area floods when it rains. 5. Add closure panels at Elevator #11 & 12 per Proposed Change Order #64. Reason: Building code-fire separation. 6. Sawcut concrete B.5/3.1 per FO #4.57. Reason: Concrete underground-had to be cut for piping. 7. Increase height of piers per Request for Information #G141, PCO H9. Reason: Contractor suggestion. Total $(1,541.00) (3,042.00) 1,428.00 2,732.00 3,301.00 1,404.00 200.00 $4,482.00 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in accordance with the specifications in the sum of $ 4.482 00 . said amount to be added to the lump sum considerauon named in the cornxact, known as contract L-. 930-90300-0898-00000 Civic Center Expansion Fund. A�ED S u0 RM � As � t ty Attomey , Expansio Coor inati g Committee E i oozdi t g Committee Direct r o� c Center � ^� Architect f y ' L! 19� No. `= �AJ � I � f Date M.A. Mortenson (�� �d�� L�y�_ �!2 , �' / 19_ ad of Department of Finance pf �-f�� � 4?3 �9 �� �� Administrative Assistant to the Mayor � � s � I �111i � GREEN SHEET 39��� '� — INRIAt10ATE 9CES DIR. ;ONTA4TPERSON & PHONE � OEPAFITMENTDIRECiOR � CITYCOUNCIL � � a�g- - ASSION CITYATfORNEY �CflYCLEflK HE ON CAUNCIL AfiENDA 8Y (DATE) NUYBEB FOB O BUDGET DIFIECTOR � FIN. & MGT. SE ROUTING OROEq � MqYOR (Ofl ASSISTANT) f a��,� L�I TOTAL # OF SIGNATURE PAGES (CLIP ALL LOCATIONS FOR SIGNATURE) � CO �`� i � IC D iGTfON REQUESTED: � ` �� { ,� r S �.,� G�� � t �1- �Q � f `��'t'� "a.C�'�" �j4�TW EE (� l� � c4 �(' l� _S 8 Y� _ PLANNIN� CAMMISSION _ CIVIL SERVICE COMMISS _qBCAMMITfEE � �X-�t`s1S.L�r � _ STAFP � __ DISSfliCTCOUPT __ SUPFORTS WHICH CAUNCIL O&1ECTIVE? �4i a-`Y�c>c� (wrw. wn�. wiren. PERSONAI. SERVICE CONTRACTS MUST ANSWER iHE FOILOWING QUESTIONS: t Has this persoMirm ever worked undar a coMract for this tlapartment? YES NO 2. Has this pereon/Firtn ever been a city employee? YES NO 3. Does this perso�rm possess a skill not narmaily possessed by any current city employee? YES NO Explain all yes answers on seperate sheet antl attach Ro green sheet �'c����'��?�� ��� 3 t� 1996 �st�'a��'� �F�&`� R�CEI��E� JAN 9 1997 �rTY GLERK OISPAVANTAGES IF NOT APPROVED: ������ . __, k �; t�.• DEG 2�� 1°�6 .____ 'OTAL AMOUNT OFTRANSACTION $ ��g ��� COST/REVENUE BUDGESED (CBCLE ONE) YES NO UNDIiBGSOUflCE �� �a�f,�S � K� � — 'd��l Q�� �ZACTIVITYNUMBERQ 1 ��130�����^�g�lg"E�C�t�C�� NANGIAL INfOflInAT10N. (EXPlA1N) t ` �UfIP � - 7 ��;� :� � �� ' � ,r�orl�>>._� �.� �,.���;��.:� ��ol��.����;a;K: _ =;? � t�061 i I� I � -- _�- i ��c�ivFc ± �� Loach Bate stlorth Amc�rtc�a. l� 5 ���- i� g up � ' - - i -- �Pi�ll - i Tp: FROM: DATE: � RE: FA?C TRANSMlTTAL ��r`z `_�'q'� �I � �L� ��"$ � � n .� a.�, � • J�t�n c � �� �' `� �e ��C�, �/ FAX #_ �3z ��� f.� C_' C�.S�� �a-��Ls, � �-Gu� � yl�-1� NUMBER OF PAGES (ING�UDfNG THIS SFi�ET): _ j REMARKS � c ��3 , � � r � E� �- -�-- 1�-A � � Ct-' � t�. � - � a Lt.i Y''L � . � � � . 7 � � 706 Seconq qvQnve Sovtts •$��te � 739 •�uinneapolis. iKn��ot0 55apZ.3004 • b t z 33z_Sa77 • Fon bl z 3325657 ���� . �i� � i CONTRACT STATUS � r u PROJECT: Saint Pauf Civic Center Expansion Project Saint Paui, Minnesota CONTRACTOR M.A.Mortenson PO 8ox 710 Minneapoiis, MN 5544Q Original Contract Amount: PO # 015117 $33,973,000.00 PQ # 3&5,7�O.Q� O No. G4.01-� 1 C4.01-02 C4.D1-03 C4.01-04 C4.01-05 C4.01-06 C4.01-07 C4.01-OS C4.01-09 C4.01-10 Subtotaf Deduct Add 34,475.00 151, 969.00 29,684.00 10,193.00 24,598.00 86,610.00 (4,535.50) 29,410.�0 8,927.00 4,482.�0 00 $375 812.50 DATEISSUED: CONTRACT NO.: CONTRACT TITLE: CON7RACT DATE: 16 December 1996 CP-4.01 Building Construction Multiscope 18 January �996 Net Amount of Contract including this Change Order: $34,734,572.50 � REGEIVED OCT 0 8 1996 �.J � � ( { ts r� L C� Contractor Proposal No.: CP 4.30 Project: ST. PAUL GVIC CENTER GP.4 ';t_'.'U D A�>;i:�;, .. ,�.,. . _ Date: October 3, 1996 Contract No.: 4.Q1 A change in the scope of the work is requested as indicated below: 1, it is requested the compietion date be () extended, () decreased, () unchanged by cafendar days. The adjusted completion date wili be 2. Description ot the change: SRefer to drawings, specifications, addenda, if applicable). Reference RFP No.: 4.30 ; FO NO.: Titie: Delete Wilkins Embed Piates 3. Basis of payment: (Check one) � iX) Firm price for performing this change is S(1,5411 Adequate supporting details and information (fncreasedl (Deductl must be attached to allow Owner to evaluate. (� Time and material per contract, but not to exceed $ () Actual cost at completion of work & Submitted by: M. A. MORTENSON Oate: �bi 3� 9t_ Co ractor � � �e�` `� _ ' Contractor Signature --°° - - - FOR GPM! USE Action Recommended: (Check onel {) Change will not be made. Explain: CPMI Job No.: 3225 �roceed on the fiollowing basis: �.s indicated above, change and basis of payment is acceptable. () Change is acceptable, basis of payment is not acceptable. () Basis of payment shall be 5 () The following modification is recommended: ( S Change in completion date is accepted. (� Change is acceptable with no change in price. () Change is acceptabla with no change in completion date. ( j Other Reasonfor Change: `�'Design Change O Client Request ( 1 Field Condition i 1 Suggested by Contractor O Design Omission or Other (explain) 3. Is this a part of the originai contract scope? ( 1 YES �QNO 4. Is Contractor's Estimate attached? YES () NO 5. AJE consulted. ES ( 1 NO Prepared b���G.�P� (CPMI) Approved by HGA) � Approved by �wner) CPMi inc., cJo Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Foun cc: Chris Hansen Mike Pederson Dick Zehring Date: !" � Date; 3225- 2ss ��ii i . 10/3/96 St. Paul Civic Center Expansion Change Proposal Summary ST. PAUL CNIC CENTER EXPANSJON 3Q0 E.4GLE STREET JOB ID: 951042 SAINT PAUL, MN SSIO2 PK- 612/293-9154 FAX� 6RI293A557 Descrlption: 4.30 Title: Delete Wilkins Embed Plates Mortenson Labor. (See attached) Mortenson Materiai: (See attached) Mortenson Equipment (See attached) Associated Costs (Change Proposal) S Amount $ - $ - $ - 5 - General Conditions: $ - (Mortenson WoAc) SUBTOTAL M. A. Mortenson S - SUBCONTRACTORSNENDORS 1. LEJEUNE $ (7,541) • 2 $ _ 3. $ 4. $ ' 5. $ " 6. $ - 7. $ - 8. $ ' 9. $ - 10. $ - SUBTOTAL SubNend $ (1,545) M. A. Mnrtenson Company Eee: SubcontractorsNe�dors Fee 5°!0: M. A. Mortenson Work 15%: SUBTOTALFee Total Material & Equipment $ M. A. Mortenson Material & Equipment Tax: SUBTOTALTaz $ - $ - $ - 7% $ - $ - SUBTOTAL:M.A.Mortenson+SubNentl+Fee+Tax $ (1,541) BuiVder's Risk GCL Insu2nce Costs Payment 8 Perfortnance Bond � SU8T07AL f�urence & Sonds 0.9007 ($.72ffhousand) 0.0038 ($3.77lfhousand) 0.0050 ($4.9593fihousand) $ - $ - $ � $ - . TOTAL CHATlGE PROPOSAL E (1,541.00) Page 1 10iO3/96 THU 1J:01 FAX 612 861 2724 LEJEONE STEEL C0. (� 001 r,..�•6 � o � cc7�y7� r '10/03 ' 96 09 _ QO No , 302 01 l05 � 1. 1 I i i • MOA:l`F Thr 1"untn'ucei...r U��oni:arinn e TACSIMILE TRA13SMiS5IpN FURM DATF_� TO: nccober 3. ,s96 Scott Houdek 861-2724 I.eJcune Stee[ RE: S[. Faui Ci��c Cemer Fxpansion FROM: Hearher Jdnaen NUMSER OF SHEETS: 5 (lncluding tltis sheet} C� CUMMENTS: BUILDlNG DrvlStOn Minneepotie OHke 70Q LAeadow Lana hionh P.O- 80X 770 (SS+i40-0110) Mlnneapo@s, Minneso2a 55422-ae89 Tebphane:(6�2)522-2TOD ���� �0 d� �CT - _ � 4 ,,._ M.q. MoRrEnrs � RFP N4.30 dcteted SS embcx! platec at Wilki��c. CPMI re.qx�ndeci that your prnposal dae.v not itccfude a dcduct for thc pad eyes. Ple:a.ee review and respond ASAP to c)ase this iscue, C.aIi if you h<ivc any ques[ions. cc: File RFP #4.3iJ �o • 3-96 --------- 1�4'ttlfii2 � 4��.E'ne f� � � c'i5� @�`�'.2� �p, : �233.'1 S 'tt,� u,' 3"j gDrl� 2. So ���L52.� >�2 <fLEDlT' � U+eOR c�DtT tS sNO3^�� oN akArtG�E ESTtr.�{,4'f"� �� 1 S4i. uo> �- TaTAt R£�ttsED GNfi�tGF C�" MA'i� �k 'L'� / yI1lA. F�1-1 vP e�rl �v. cN�� Es'Ra� t1�'ICR- 4-�'4L- �fi MinneapoGs-Seanie•De�ver-CObtadoSpdngF•Milwaukee-CrandRapidsSanOiego�San franciscwFtonoWlu•los.4ngetes i ' Ilil �J j_/ �.' 1 \ L • 5 T E E L C O M P A N Y 1 t8 W. 60TH ST. � MINNEAPOLLS, NC4>5419 612J861-3321 612(861-2724 FAX Mr. Ron Schreiner To: Mortenson Construction 300 Eagle Street St. Paul MN SS102 ����o��� JUN - 3 1996 M.A. MORTENSON C0. E110 Proje�c St. Paul Civic Center St. Paul MN � Revised plans andfor sketches dated RFP #4.30• LeJeune NOC #22 We propose to fumish material and/or labor as indicated below for the described project subject to the general terms and condirions as included in the original contract, unless noted: DESCRIPT{ON OF CHANGE Eliminate 55 embedded plates shown on detail 4l3-1C. Modify details and layouts and recheck. Erection Included Change Estunate Amount ($1,283.00) Sales or Use Tax Included • Status of Change Complete _ _ o:\ceform Perfomiance Bond Included Schedule Change None Sincerel��� �`"'�cott ou e Project Manager CHANGE ESTlMATE Page 1 of 2 Change Estimate No. 22 Date 5/31/96 0 • � O � "!J � 3x 0 c - .:a x Z 0 O 0. £ � E .- w a �' y a � W o � 3� 0 � 0 'cf N "' "�C � � U c � � U = d R O `� v� H .� �� �� � o � � � • ,� a a �" o U � W W ° ha � � i. p � d (�7 x � L � P+ � O � v � ° o : c. � � V G w � �y � •J' L y: � .0 O U � � � y � x ,_., C p � O W v c A � � 4 y Y � � � � � A V � � G+ � u � .� � R � � L S �. � � y O � Y 3 � � z � C � y,. .O O r 'U �' U a N 3. Q o � ° �n � ^ o � N . � y � y o A . � C 3, a' � �c m � m � � � ooa���� � � � � � � � � 0 � o 0 ,,, c o0 �� � c o zs � � o � ss �v � � � O N N � I 69 c/f I . M ., o �n . h � � 'a �� v v � � c� � c � O " O � F � F � � � � � M M b O'J x � o� o� i v N N 'v9 W 'd9 V1 Ff! � � o � a � . .� G = � =Fv f.. o 'c � o O � V i m F 4 �t�J 1 � ` � � � � = x L � � E 'L' U REGEfVED OCT 0 8 1996 � MORTENSOH The Construction Organizarion Minneapoiis Ofiice 700 Meadow Lane North P.O. Boz 710 (55440-0710) Minneapolis, Minnesota 55422-489g 3 October1996 Susan Jones CPMI c j o Saint Paul Civic Center I. A. O'Shaughnessy Plaza 143 West Fourth Street St. Paul MN 55102-1299 Ke: Subject: • Dear Susan: ' Saint Paul Civic Center Expansion CP-4 Mortenson Project #951042 RequestforProposal#4.30 Delete Wilkins Embed Plates CPM! ����� BUl(AING OIVISION Teiephone: (612) 522-2100 Facsimile: (612) 5203430 In response to RFP #4.30 dated 16 May 1996, we are submitiing the following revised cost proposal. Enclosed aze copies of subcontracEor quotations and our price hreakdown. We are requesting a Change Order to decrease our Contract Amount by One Thottsand Five Hundred Foxty-One Dollars {-$1,541). Please let me know if you need additional information or clarification on the enclosed. If we are to proceed with this added work, please issue a contract change order. The amount quoted includes only the cost of the changes identified herein. Changes to the wntract noE specifically identified as revisions aze not included in this proposal and are excluded. Mortenson reserves the right to submit a proposal for addifional costs and time related to the impact of this change on unchanged work oc for the effect of this cl7azige in combination with other changes, Very truly yours, ��� Allen S. Troshinsky Assistant Project Manager encL Y-�0 �ile: RFP #4.30 CPMI Minneapolis•Seattle •Denver•Colorado Springs•Miiwaukee•Grand Rapids•San Diego•San Francisco•Honolulu•Los Angefes � r� ` ;1- _.-: �:�, ,lUL 3 4��� �0 l ! ! 1 � ,:.�,::. �.:.,.v�.�i+!!l,:�q.nw,a.� i a� n�.':`�.`-o1I�R96T6;.r v v:r. �_ (�-+'V{ � � Contractor Proposal No.: CP 4.37 Date: June 28. 1996 Project: ST. PAUL CIVIC CENTER CP.4 Contract No.: 4.01 A change in the scope of the work is requested as indicated below: 1. It is requested the completion date be ( y extended, ( f decreased, ( 1 unchanged by calendar days. The adjusted completion date wi(I be 2. Description of the change: (Refer to drawings, specifications, addenda, if applicable�. Reference RFP No.: 4.37 ; FO NO.: Title: Stair 13 Walls 3. Basis of payment: (Check one) (X) Firm price for performing this change is Adequate supporting detaiis and information must be attached to allow Owner to evaluate. () Time and material per contract, but not to exceed {) Actual cost at comp4etion of work Submitted by: FOR CPMI USE Action Recommended: (Check one} () Change will not be made. Explain: �Proceed on the following basis: () As indicated above, change and basis of payment is acceptable. () Change is acceptable, basis of payment is not acceptable. ( 1 Basis of payment shali 6e S () The following modification is recommended: ( 1 Change in completion date is accepted. ( M Change is acceptable with no change in price. ( 1 Change is acceptable with no change in completion date. ( f Other Reason for Change: �esign Change ( 1 Client Request ( I Field Condition i) Suggested by Contractor () Design Omission or Other (explain) , 3. Is this a part of the originaf contract scope? ( t YES �'S.j�O 4, ls Contractor's Estimate attached? �YES ( 1 NO 5. A!E consulted. �.YES 1) NO CPMI Jo6 No.: 3225 Date: �/'S'��� Date: Date: Approved by: (Owner) Date: CPM! Inc., c10 Saint Paul Civic Center, f.A. Q'Shaughnessy Plaza, 143 West FouRh Street, Saint Paul, MN 55�02-1299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- Prepared by: nG �� —•f� (CPMq .Approved by ` HGA) Approved by V' _ Owner) S (3 042! (lncreased) (Deductl Date: June 28, 1996 6/28/96 � St. Paul Civic Center Expansion Change Proposal ��i�� Summary ST. PAUL CIV/C CENTER EXPANS/ON SAINT PAUL, MN 55102 PH 612/293-9154 FAX.� 612/293-9557 Description: CP #4.37 Title: Stair 13 Walls Mortenson Labor: (Seeattached) Mortenson Materiai: (See attached) Mortenson Equipment (Seeattached) Associated Costs (Change Proposal) S Amount $ - $ - $ - $ - General Condftions: $ - (Mortenson Work) SUBTOTAL M. A. Mortenson $ - SUBCONTRACTORSNENDORS 1. Mufcahy inc. $ � 2. Wasche interiors $ 3. $ 4. $ 5. $ 6. $ (3,042) SUBTOTAL SubNend $ (3,042) SUBTOTAL Fee SUBTOTALTau M. A. Mortenson Company Fee: SubcontractorsNe�dors Fee 5°/a: M. A. MoRenson Work �5%: Total Materiaf 8� Eqvipment $ M. A. Mortenson Material & Equipment Tax: $ - $ - $ - 7% $ - SUBTOTAL:M.A.Mortenson+SubNend+Fee+Tau $ (3,042) t Builders Risk GCL tnsurance Costs Payment & Perfortnance Bond SUBTOTAL fnsurance & Bonds 0.0007 ($7Nhousand) $ - 0.0038 ($3.77JThousand) $ - 0.0050 ($4.9593/Thousand) S - . TOTAL CHANGE PROPOSAL S (3,�42) Page 1 u • . ������� To: Date: Project: Pricing: Description: � ����I . . 5232 N. GlEN6ROOK AVE. • DAKDA�E, MN 55128 PHONE: 170-5250 � M.A. Mortenson { u) � � � � � � D Attn: Ron Schreiner � 300 Eagle Street JUN 21 199fi St. Paul, MN 55102 June 19,1996 M.A. MORTENSON C0. St. Paul Ciyic Center Expansion CP-4, Job #951042 F.R.P. #4.37 Dated 6-b-96 Delete Wal1 Type "V2" at Stair 13 and Corridor 064 As Indicated 2��� WP2-tNC����B��G�j', jlrz k,�t[% ir;SUi,� vf�Po�- �tiY-t?1� Cost 5ummarv • Labor: Carpenter Foreman 8 Hours x$23.14 Carpenter 1 b Hours x$21.99 Taper Foreman Hours x $21.55 Taper 12 Hours x $20.55 Plaster Hours x $21.80 Tender Hours x $21.90 I,aborer Hours x $16.SQ Sub Total Labor 75% Burden on Labor 4% Escalarion on Labor After May '97 Total Labor • Materials: Studs: 2" Z Fulling =1,076 LF @$.175 Track: Insulation: 2" Extruded Foam 2,050 SF @$.460 Gypsum Boazd: 2,050 SF of 5/8" Gypsum Boazd @$.185 Taping: 2,050 SF Taping Supplies @$.025 Fasteners; Too1s & Equipment: Miscellaneous: ManiiftlScaffolding: Materials Sub Total 7% State & City TaY 10% Escalarion on Materials After January '97 1�% Escalation on Materiats After January'98 Total Materials $185.12 351.84 246.60 783.56 587.67 <�1,371.23> $188.30 443.00 379.25 51.25 1,561.80 iQ9.32 <$1,671.04> �.. �ill • • �J Page Two Labor & Material Cost O.H. & P @ IS% Bond Cost @ 1% Totat Quotation � Schednle Impact: _ $3,042.23 = Credit <$3,042.00> Please note that we cannot proceed with the above work unless notified in writing. Signed: _ Mark A. Peterson Project Manager /smn �1 � �. �� RgCEi�� JUL 3 j"°' The Constructtwt July 3, ]996 Ms. Susan 3ones 3a�5- �o�, � ���� � BUILDING DIVISION Minneapohs Office 700 Meadow Lane North P.O. Box 710 (55440-0710) Minneapolis, Mlnnesota 55422-489g Teiephone: (612) 522-2100 Facsimile: (612) 520-3430 CPMI:c% St. Paul Civic Center lA3 West 4th Street St. Paul, MN 55102-1299 RE: St. Paul Civic Center Expansion CP-4 Building Construction RFP 4.37: Stair 13 Walls Dear Susan: i We are submitting a cost proposal for the changes in work defined by Request For Proposa1437 dated 6 June 1996. We are requesting a Change Order to decrease our Contract Amount by Three Thousand Forty-Two Dollars (-$3,042.00) to perform the subject modification as identified in RFP 437. MoRenson reserves the right to submit a proposal for additional costs and time related to the impact of this change on unchanged work or the effect of this change in combination with other changes. Shouid you have any questions or comments, please contact me. Sincerely, c� Todd Schilling, Assistant Project ager cc: File: RFP 437 �n� C� Mi�neapolis•Seattle•Denves•CoioratloSprings•M�Iwaukee•GrandRap+ds•SanDiego•San Franasco•Honolulu•los Angeles RECEIVED SEP 6 1996 r� U • Contractor Propos Pro}ect: ST. PAUL CIVIC CENTER CP.4 �'P_O;S A-L. t�1161 � Date: Seotember 5, � 996 Contract No.: 4.01 A change in the scope of the work is requested as indicated below: 1. It is requested the completion date be ( 1 extended, ( 1 decreased, ( 1 unchanged by calendar days. The adjusted completion date will be 2, Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: 4.50 • FO NO.: Title: Arena Footinq 3. Basis of payment: (Check one) (X) Firm price for performing this change is S l.439 Adequate supporting details and information (Increased) (Deduct) must 6e attached to allow Owner to evaluate. () Time and material per contract, but not to exceed S () Actual cost at compietion of work S Submitted by: M. A. MORTENS�N Date: Contractor �Q4��— ��a'�� Contractor Signature FOR CPMI USE Action Recommended: (Check onel CPMI Job No.: 3225 () Change wili not be made. Explain: �Proceed on the following 6asis: (} As indicated above, change and basis of payment is acceptable. �'Change is acceptable, basis of payment is not acceptable. �Basis of payment shall be S��j CoST OF T�iNC� () The following modificatio� is recommended: (2.�pd�p �J'p . D� (} Change in completion date is accepted. rj� () Change is acceptable with no change in price. (� Change is acceptabie with no change in completion date. ( 1 Other 2, Reasonfor Change: () Design Change ( 1 Client Request �Field Condition (� Suggested by Contractor (! Design Omission or Other (explain� 3. fs this a part of the original contract scope? 1) YES �10 4. Is Contractor's Estimate attached? ES () NO 5. A(E consulted. ES () NO Prepared by: � (CPM1) Approved by I � . „� / (HGA� • Approved by_� Approved by: CPMi lnc., c/o Saint Pau1 cc: Chris Hansen m� �/ /6GU�.c� . � Date: �P��� Date: 1.A. O'Shaughnessy Plaza, 743 West Fourth Street, Saint Pauf, MN 55102-1299 Mike Pederson Dick Zehring 3225- • C� . � 1�QIIII 9/5/96 St. Paul Civic Center Expans+on Summary Change Proposaf ���� S�T C�lVTC CENTER EXPANosOo:9��oaz ��� SAINTPAUL. MN .iJl02 PH� 6/1/Z939154 FAX� 611/193-955i C.P. No. 4.50 Title: Arena Footing Mortenson Labor. (See attached) Mortenson Material: (See attached) Mortenson Equipment, (See attached) Associated Costs (Change Proposap 3 Amount 5 158 $ 51 $ - $ - General Conditions: $ ' (Mortenson Work) SUBTOTAL M.A.Mortenson S 21� $ �- 4�',�� 5��7 � $ - $ _ $ _ $ - SUBTOTAL SubNend 8 �' I r „� M. A. MoAenson Company Fee: Subwntractors/Vendors Fee 5°/ : M. A. Modenson Work 15%: SUBTOTALfee SUBTOTALTaz Total Materlal & Equipment $ M. A. Mortenson Material & Equipment Tax: $ 56 $ 3I 51 7% $ 4 $ 4 SUBTOTAL:M.A.MOrtenson+SubNend+Fee+Tax $ �)�-` 5 l 6uildets Risk GCL Insurance Costs Payment & Performance Bond SUBTOTAI Insurance & Bonds 0.0007 ($.72(�housand) 0.0038 ($3.771Thousand) 0.0050 ($4.9593fihousand) $ � $ 5 $ 7 $ 73 . TOTALCHANGEPROPOSAL 5 1 ,�--_ n f �/ � � I�� Page 1 � �r-_"`Y`_�-- SUBCONTRAC70RSNENDORS � i . O n J n a «, Q N b Q �L : t a J t � h P Q � N C. � c J O � 2 d °-' da � N m ui � �I��t � a � �, �, �o �� J m � t�O � O � tn r ,,, � Z q rn ° ° o ° o ° o � W N O O O O O O a O J� N � O o 0 o O 1/ fD T O O O O O O O W A N O O O O O a ° LL o K Q 5W� a o o a o00 Y Z F (V 0 p O O O U j O � m 0 � w u °' i o' o ° o ° o ° o 0 a � o 0 0 0 0 a . 0 N Q U � W � O � Z n oi � p o 0 0 0 gFo �Z Wo� �, o � m�� f0 (� t� M 1`� m � r T � oJ � O�i �� � � O K m � 3 � o m W a � W i LL � � W O � m W � m g � m � ti S c U] m m 9 c N m*' � � J � W o �� � `p 0 r [!1 ff1 4� g p m J � F�- tL �� N N rn m a . MaYI ST PAUL CMC CENTER IXPANSlON �i��i 300 Fi(GGE STREET JOS [D- 95 (042 SAINT PAUL, MN 551 D2 PH: 6!2/293-9/54 FAX: 612/293-9557 C.P. No. 4.50 Reference: Date: 8/26/96 • • Materia( (luantity Unit Unit Cost Total Measure 5000 psl wncrete 0.5 cy 52.73 26 37 Formwo�es/Anchors 7 Is 25 25 00 0 00 0.00 0.00 0.00 0.00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal 57.37 Page 1 uQ%05/9G 16:2i F.�k 612 i70 3413 DiDLCAHP INC. • � -- � ������� .� r, 5232 N. G[.ENBROOK AVE. • OAiCOALE. MN 55128 PNONE: 7705250 T' M_A. Mortenson Athz= Ron Schresner 300 Eagle S�eet St. Paul, MN 55102 Aate: Project- @7nui:�oo5 �� � f � . � � a u , � � ..�� ��`.f Q i�tti� � � � � � � c Q Z � � n � O p p� 12_F.P. #4.50 a�v�s� Descripriun: VJall revisions as par 2R and 3R(A.400 adds approximately 314 sq.ft- type B3 partition 3fo�..�a,� o �p� {-ws.s�=28 Cost SummarV: • Labor CarpenterForeman 8 Hours-x$23.14 = $135.1� Carpenter 8 �-Iours x $2L99 = 175-9— Taper Foreman 6 f�ours x$21_55 = 12930 Taper Hours s $20,55 = Plaster Hours x $21.80 = ��d� Hours x �21.90 = Iaborer 3 Hours x$16.�0 = 49-56 Sub Total Labor '3-30A6 St. Paul Civic Center Eacpansion CP-4, Job #951042 7j°!o Burden on Labor 4% Escalation on Labox After May `97 Total Labor • Materials: ��� ' Studs: �8�'1•n- Ft 3 5/3"-20 Ga Studs @:295 'Z'rack: 95 Lri Pt 3 5I8"-20 Ga S�'ds��a5, -285 Insulation: g p,� Gypsum�oard:� Sq. Ft 5J8" Denshzeld B 'Zaping q. Ft. Taping Supplzes Fasteners�Sq- Ft. Sczews, Pin ad Tools & Equipment: Miscellaneous: ManIIf4lScaffalding: Materials Sub Total � � � 7% State & City Ta.e � o �� _ / — @ -77� _ @ - ° 10% Escalarion on Materials After January'97 = ]0% Escalation on Materials After January '98 = Tota1 Materials - 59.84 404.38 N!A $944_72 $g�9'j� 7ff. `' 27.07 ��--}8� Z23'�° � ` ��- '}4:3d � ` �.�A 1 g: �° ae�-�'s 36h.'� .�. � sr N1A N/A $j39�z�9,�` ��8�3 ' Oa/65/9& • 1 16:?3 F-LS 612 770 141& MULC:IHY INt7. M.A. ivlortenson Page Two Labor & Materiai Cost O.H_ & P � 1�% $ona cost � i�i� roc�i Quar�noa • _ J �� • Schednle Impact: Adds 1 l7ay �o}iii s �J _ � 2� 3-$�� �"_ = r /�Q � $?8&:3 `�'Ot� °' • = f � ZZ $.1�$�- �� � � — �sas:ee- � �" 1599 °° /'� �`? ����s*� Please note that we cax�zzoi proceed with the above work unfass notified in ovtiting. .S'Lgtlt,'(�: ladg � J7/19/193F �/:55 � July 19, 1996 ���r�od�� JUL 19 1996 M.A. MORTENSON C0. Mr. A17en Troshinsky M. A. Mortenson Company 300 Eagle Street St_ Paul, MN 55102 Via Fax: 612-293-9557 Re: St. Paul Givic Center - Raquest for Informatian 6-273 Dear Alien_ i P�GE 51 l.l.J✓ � 1 � 1 � 0 � � According to tfie bailooned portion of the drawing, Women`5 118 will have one toilet compartment sta11 deleted. Men`s 116 may have some compartment widths reduced, but will sti11 have the same number of stal'!s. This would result in a deduct of $424 fpr deleting the stall in Women's iiS_ Allen, please let me know if this is to be implemented and I will have your shop drawings for this area revised. I wil7 need to know what the new wall-ta-wa11 dimensions are to be. � 5incere7y, ��� Liz Timmons General Manager 653'L5E5�28 I�:;TIUfJ;:L SFECIi;LTIE:, .1. �l ATIONAL SPECIALTIES, INC. � `� / � � a SO �� �� � l P-O- 6GX 74&4 • COLUMSIA, SOUCH CAROtriVA 29202 •(803) 256-9686 - FAX (803) 256-7688 t�rllf �� • • LJ aN-SRRCTOR'S PROPQSAt Contractor Proposal No.: FO# 4.54 Date: October 21, 1996 Project: ST. PAUL CiV{C CENTER CP.4 Contrect Na.: 4.Q1 A change in the scope of the work is requested as indicated below: 3. tt is requested the compfetion date be 1 l extended, ( 1 decreased, O unchanged by calendar days. The adjusted completion date will be Description of the change: (Refer to drawings, specifications, addenda, if applicablei. Reierence RFP No.: ; FO No.: 4.54 ; PCO No.: Title: Rebuild steps at Volume Services entrance Bas+s of payment: (Check onel (X) Firm price for performing this change is S 2,732.0� Adequate supporting details and information (increased) (Deduct) must be attached to allow Owner to evaluate. () Time and material per contract, but not to exceed S () Actual cost at completion of work S Submitted by: M. A. MORTENSON Date: October 21, 1996 Co rac � `,..� ' �. Contractor Signature FOR CPMI USE Action Recommended: (Check one) () Change will not be made. Explain: CPMI Job No.: 3225 �Proceed on the foflowing basis: � s indicated above, change and basis of paymeni is acceptabfe. ( 1 Change is acceptable, basis of payment is not acceptable. ( 1 6asis of payment shall 6e S () The following modification is recommended: O Change in completion date is accepted. ( 1 Change is acceptable with no change in price. () Change is acceptabfe with no change in compietion date. ( ) Other Reasonfor Change: ( 1 Design Change ( 1 Client Request �ield Condition 1 1 Suggested by Contractor S) Design Omiss�on or Other (explain� 3. Is this a part of the original contract scope? () ES �NO 4. Is Contractor's Estimate attached? �.YES ( 1 NO 5. A/E consuited. �GES ( ) NO ! Prepared by: CPMI) Approved by n.�� fHGA) Approved by�� (�il�•7� _ _ (Ownerl ��,� _ Date:� �' � — '�/ �O Date• Approved by: iOwner) Date: CPMI Inc., c(o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- 10/21 t96 • St. Paul Civic Center Expansion �� �� � Change Proposal ST. PAUL CIVIC CENTER EXPANSION SAlN1�PAUl, Mh' S5/02 PH: 612293-9154 FAX� 6l2/293-9557 Description: FO#4.54 TRIe: Rebuild: Mortenson Labor: (See attached) Mortenson Material: (See attached) Mortenson Equipment (See attached) Associated Costs (Change Proposap at Volume Services entrance $ Amount $ 1.903 $ 322 y 20 $ - General Conditions: � - (MOrtenson Work) SUBTOTAI M. A. Mortenson S 2.246 SUSCONTRACTORSNENDORS 1. Sowfes $ � 2. $ 3. $ 4. $ 5. $ F. $ 96 70. SUBTOTALSubNend $ 96 ' M. A. Mortenson Company Fee: SubcontradorsNendors Fee 5°l : M. A. Mortenson Work 15%: $ 5 $ 337 $ 342 SUBTOTAL Fee . Total Material & Equipment $ 322 M. A. Mortenson Material & Equipment Tax: 7% $ 23 SUBTOTAL Tax $ 23 SUBTOTAL:M.A.MoRenson+SubNend+Fee+Tax $ 2,706 Buildefs Risk 0.0007 ($.72/Thousand) $ 2 GCL i�surance Costs 0.0038 ($3.77/Thousand) $ 10 Payment & Perfortnance Bond 0.0050 ($4.9593ffhousand) $ 13 � SUBTOTAL Insu2nce & Bonds $ 26 TOTALCHANGEPROPOSAL E 2,732 Page 1 � • O � J ` I h h Q M a N N b � � : i S � � L � h a M a N b 4 � O LL V O � Z a w o� m 0 � 0 1�1111 � � � ¢� om � �o � J m � � ag �� F- O F F» K W � � Z o 0 0 0 0 0 � W ^ N O O O O O a . 00 � LL � N � y�� ? o 0 0 0 0 0 O W � N O O O O O LL n' � 2' Q W J G W a a o 0 0 0 0 Y Z � N o 0 0 0 0 0 U K O N O O O O O � � m � Z W cf m m N o00 W =�n � N r m n�o cn � rio v � Z O � N V O h O O�i LL � � 111 W N � � Z A � p O O O O O p] W O O O O O s �o �Z ��� � � � � �a� m�� m � � ^ �o� g oo < �am � 0 m � 3 � � � � s z w �- �p p Z j @ m Z a ' W m d' d' N � � m J J ' � O d � � Q = ¢ d' @ J N W o �� � IL N N @ N� QS m IL O d U 3 m o � ,� N5� N � (6 a • • • � 'i � ' � Ir ..•. I :r, . ..• C.P. No. FO#4.54 Reference: Date: 1o/2t/96 � Maf'I +�oi��� S7. PAUL CIVIC CENTER IXPANSION 300EAGLESTREET f061D:951042 SAlNTPAUL,MV SS/02 PH. 6/2/293-9/54 F�AX- 672l293-9557 Page 1 • �� T7te Cartmuctian Oigar�aa C.P. No. FO#4.54 Reference: Date: 70l21/96 • C� Eqpt Air compressor Air hose Jack hammers (2 for 2 days) ST. PAUL CfVIC CENTER EXPANSlON ��s�i 300 E.fGLE STREET 106 1D- 9i 1042 SAMT PAUL, MN SSl01 PH� 6I2/293Al54 FAX: 6!1/293-9557 U/M QTY. UNIT EQPT. day 2 5.61 day 2 0.00 day 4 2.30 EQPT. � �� m � TOTAL EQUlPMENT 20 42 Page 1 lM�[ORt`EHSOH The Construction Organizatia:�' �,Q�t� �'�`�� WORK AUTHORI T N `/' `� 19s- �60 �?��I � I� � 111. A. MORTENSON COMPANY y/� P.O. Box 710 ■ Minneapolis, Minnesota 55440 ■ 612/522-2100 � , �/ 9`'i�� 6/ Job Number �/�G��' Job Name �f/ ��!� /��Yt'� ��/i'i-�; : .°� Date �y�f'`_b Authorized Subcontractor _ __ Address y�✓/ j�-f, Detailed description of work: �j/tt /�/:.:,, �";� F L f �6 s� � �'ar� �i�1� s��%i �: ;=�.� {� � � r`o� ii�=��' G�6�� f /��Sors ; �/�rr= - ..�, ,��,s �� c�����-f�� s��i�= � '-_- �-=�� , Materiais used -- type and quantity (attach delivery tickets): � �/Z l��!-�.�i C; �E�-- • /f�.c� /fosG- a - ����G �l/�h�'/n �G� . � -��y� Equipment used in performance of work and length of time used: Labor hours for performing work: L��o��z __���s C�-> �,h,sh� �s —/G -�oor�s L-r°�" /�'� — 0��. O� � � Z R�fMlalM = �ignature of owner or represent e �"'�-b Signature of subcontractor representative Signature of M. A. Mortenson Company representative �.0 1�0..� = ��cl�C c� l� T Complete in triplicffie - white to oftice - canary t��owner or sub - pink job site file � � F�4� �001�11 E..H. SOWLES COMPANY 2893 BryantAvenue South Minneapolis, MN 55408 Date SEPT25 ,199 � � � � � ��� Number of pages including cov et SEP 2 6 �qqF ���.A. M�^��'��;jN CO To: ALLEN TROSHiNSKY Phone • Fax Phone CC: ❑ Urgent ❑ For your review From: DAN SOWLES Phone 612-872-4656 Fax Phone 6'12-872-6824 ❑ Reply ASAP ❑ Please comment DEAR ALLEN, PLEASE ISSUE A CHANGE ORDER FOR TNE FOI.LOWING. 1) OtSR F{ELD WORK ORDER # 46645,( R.F.P.# 4.5j 2.5 HOURS AT 63.75=$159.00 2)OUR FIELD WORK ORDER # 46644, ( F0, 4.54) 1.5 HOURS AT 63.75= $96.00 3)OUR F{ELD WORK ORDER # 46643, (R.F.P. # 4.2) 3 HOURS AT $66.24= $ 199.00 6 HOUF2S AT $63.75= $382.00 SUB TOTAL $582.00 4) OUR FIELD WORK ORDER # 46631, (R.F.P. 4.40) 5) OUR FiELD WORK ORDER # 46636, ( f.o. # 4.41) 8 HOURS AT $63.75= $510.00 7 HOURS AT $ 66.75= $467.�0 7 HOURS AT $ 63.75= 446.00 SUS TOTAL $ 913.00 � 6) OUR FlELD WORK ORDER # 46632, ( F.O. # F4-38) 3 HOURS AT $63.75 $ 191.00 THANK YOU VERY MUCH, DAN SOWLES • C� • : ���}� �� F � +-- `-` J l� i� — '-+ CONT Contractor Proposal No.: F4.03 Project: St. Paul Civic Center CP.4 S P R O P O S-A L A change in the scope of the work is requested as indicated below: 1. Ii is requested the compVetion date be O extended, ( 1 decreased, (X) unchanged by calendar days. The adjusted completion date will be 2. Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: ; FO NO.: ; PCO NO.: 9 Title: RFI #G-147: Increase Hei ht of Piers. 3. Basis of payment: (Check onel (X) Firm price for performing this change is 5 371 .00 Adequate supporting details and information (Increased) (Deduct) must be attached to allow Owner to evaluate. ( � Time and material per contract, but not to exceed $ () Actual cost at completion of work $ Action Recommended: lCheck one) (} Change wifl not be made. Explain: 2. �0011 i l [ �_" ' CPMI Joh No.: 3225 �roceed on the following basis: ( a As indicated above, change and basis of payment is acceptable. '�Change is acceptabie, basis of payment is not acceptabie. 'p{ Basis of payment shall be 5�, L'�Oh��``�`c`^ � �� O The {olbwing moditication is recommended: �i��`s5Uq5 — KD�a./aY � O Change in completion date is accepted. �-�,yQ� a y ,dJ ��y�,y�� ( � Change is acceptable with no change in price. () Change is acceptable with no change in completion date. ( ) Other Reasonfor Change: () Design Change () Client Request (} Field Condition �Suggested by Contractor () Design Omission or Other (explain) 3. ls this a part of the original contract scope? ( 1 YES 4. Is Contractor's Estimate attached? ES 5. A!E consulted. ES �Prepared by: / CPMI) Approved by HGA) Approved by � (Owner) CPMI inc., c/o Sairrc Paul Civic Center, I.A. u'Snaugnnessy naza, i4o vvesi rou,i cc: Chris Hanse� Mike Pederson Dick Zehring �NO (�NO (�NO Date: 24June1996 Contract No.: 4.01 Date: �Z'�� z' �° Date: pate:_ RaYe: StceeT, Saint Paul, A 3225- Submitted by: M.A• MORTENSOfV Date: Contracto� � 6/24/96 - � ��w� • St. Paut Civic Center Expansion �`° `" I �� � Summary Change Proposal D� ST. PAUL ClVIC CENTER EXPANS(ON 300 fifGGE STREET JOB ID: 951042 SAlNT PAUL, M.�' S5102 PH 612/293-915+ FiLY.�612/193-9SSi PROPOSED CHANGE ORDER PROPOSAL Description: PCO S9 Title: RPI kG-141:Increase Height of Piers MoRenson (.abor. (See attached) Mortenson Material: (See attached) Mortenson Equipment (See attached) Aseociated Costs (Change Proposaq � Amount S - S - S - 5 - General Conditions: S - (Mortenson Work) _ SUSTOTAL M. A. Mortenson $ SUBCONTRACTORSNENDORS 1, AmbassadorSteel YI $ 5 $ $ 5 $ zoo t50 10. SUBTOTALSUbNend $ 350 M. A. Mortenson Company Fee: Subcontractors/Vendors Fee 5°fa: M. A. Mortenson Work 15°h: $ 18 S - $ 18 SUBTOTALFee • Total Maferial & Equipment $ - M. A. Mortenson Material & Equipment Tax: 7% 5 - SUBTOTALTaz $ SUBTOTAL: M. A. Martenson + SubNend + Fee + Ta�c S 368 Builder's Risk 0.0007 ($.72(fhousand) 5 � GCl Insurance Costs 0.0038 ($3.77/Thousand) S � � Payment & Performance Bond 0.0050 ($4.9593fihousand) 5 2 SUBTOTAL Insurance 8 Bonds `� 3 TOTAL PROPOSED CAHNGE ORDERPROPOSAL S 371 Page 1 � - -. _ --- — �..� �� s�,c.3r.r;�v� _ .,• - —_(-�-- _' : ' - ; _K4 iT , � u.q e:i'-i' •`�. ' .��f � � 1 1- ' J �, i } .. �:���'�£y� . � l =i.. � r - .l`7:+sc _ '' . _ T'� '.� �t. `wt �tt.'�� � 1 '� � _ � U O .s ^ r, � • .e � - ; <>' 2 - " I I{ 411 � � r . t � V D ��Ll�(`/�� �.:/ _- °� � •� O O - ' : _ - � ^`\�, � ;a - - . D � v : I07 North Soeond Streel • MinneapoLz, AAN SSe07 (672) 338 �9�29 � FAX�(672) 338-780� � `� 1996 = - � � . -- R 5 � Q ;: � . - ' . - � P MoR�tE�s�NG� _ .;' MA . PROPOSAL TO: M•A- Mortonson DATE: 4/1/96 - , JOB N[iMBER: zs9soss _ _ .- ___..�:� :...........:-.:--_..- - • .�_�.�._ - - -. . � � St.��Paul, MN 55102 ]�_ St. Paul�Civic Center LOCA 1 IOtv: St. Pdul, MN CHANGE PROPOSAL NO. lo THTS CHANGE: �Aaa "$337:00_;Plus ,Taz DESC��?�ION OF PROPOSAL REOliEST � :.�iR:E''°T:TAG�41,.. , =----`�_ ---='---� _ LOWERED FOOTING A`P B.4-2 �7 - INCREASES HEIGHT,_OF 30" - � .._.. .: : • . . : � :..::.........: :.... ... . .;.,., - � �:- ,- . , --. - . .-: �:.. _�._ . ... _ .. . ADD .4 TON REILQFQRCING STEEL ...............LIJMP SUM $187.00+tdx ADD 3 HOURS REDETAILING AT $50.00/hr =....._�........$1 TOTAL $337.00+tax 200 // � ABOVE WORK WILL NOT PROCEED DNTIL WE RECEIVE A WRITTEN CHANGE ORDER TO OUR CONTACi NOTr.: PLEASE CONFItiM THIS PROPUSAL BY SiGNING ONE COYY AI�D St£'I1RtN[NG ST TO OUR OFeiCE. AN ACKNOWL.BDGED COPY WILL SE RETC�RNED TO YUli FOR 1'OLR FILES. ACCEPT�v: BY. . .._ . - _ - . - AUTHORIZED SiGNATURE. • -. _._ _. -"T`ifiL.�: � • . , .- . �-. . . _.. ; ._ ..-: _ -�:..:DATE:.;: :...- _,__ -: :- _ . . . :.�-- z� _ A . y �,� ' - � � ` r � � y - . TAU£ riAPPtNES: AMBASSADOR STEEL Milu'l�'EAPOLIS SALES OFFICE . BYI./�cn�/i.a� l `(AZPGI /.�a� "-.: Thomas T. Chegaris� . I r�,�: c- s Repr a��_ntat+c+ �;�, -x-. � � _, - - U.REIAT�ONSH�PWITHG -. � '��_ �-�`. .. .� .. . '�" __ _•._.4__. .c.._' _ F_ �'��RPR=�@��6�X02 _53f?t"� _61287z68z4 .." :. :.......:: .:.. - <.:�sc'=� '._� _ _ _ , _ . . . .. -- "—"`'—c. _- _ ' _ _ . — - .�s.,�"- ' . -_ :. , ; : �:,.i-'�':., — _ _ ' +�- — - _ - �Y.�Y�A11i ✓ i _ -' _ - ." tl�liytf f w�-�� . �;�����#�. _ � , .; ` '-:r. : °'S" Pa3e,i _ ��� 1- -- - ..'.. ��� ; c _ _ :� : �� '�f :-�=ix-:._�-.r�l=' _ - - �..�. "� �� � � F_ ��. .{ i �i�=5 - 'i �: y._�'.; [tr :A�; � x � '. � .� _ __ ___ ___. _ - . _. / d _ ... _ -_ , __ �-�. Bid l:?ate � �le3 p /9 � _ _Bid Time { = � a � f`" PrOjecL•" 4t� Paul Civia Center Project Location; _ St. Paui, Minnesata ___ Geaeral: Contractor: M.A_ Mortenson Comnanv -� 1 1 .�-` P_ lil - �� - _ LH.$ovAes Company �_ - 2$f3lff�Yar1C t�V6nUe South'' M�++ngdpoGs, MN 55408-272< -:�I t -- �.- . sf?_8�2_6826�FAX, Sitlin95 " 4p6-QS8-4367 466-2L8$330(FAX) Spo e 50� 22-912t 509-921-5584 (FAX) � Addzess: ��• "�`"t-- ��• PhoneNumber. 293-91�4' . . �, Faac Number: 293-9557 � � I Bidder5 I�Iame: ' �M o /s ! . t h <tI= °• - , � . • Off:ce: . . ` ; _ Minn.eapofis L '-' BiIiin,,rs ❑ Spokane ' ❑ I Note:� : This proposai is for labor only plus equipment(s)hool(s) necessary £or the installation/erection of the tabuJate3 � work below. # � I L���ll� �'Request for change order �Add ��2 • .�� J�RFI ��7'/ QSI, CI ' Q Deduct � `_ � _ -- ,..-.;.:-:. .. , :.,,;-.. . .:,:_._ . °-� �.-� -=-„ :- - � .__.. .. y ...s .� r ' ' a""#�` �� n� _ =x , .- _ -'_ _ � _- : x- -- c�,�, - s = --., - `__ ' F_�s �..�.t':a'_�_�_.`•.._�c___ _ - � _'�.�,. _ . _ __ _ _ . _ _ .._ � �� t�,�F_D Contractor Proposal COf1T{{l�-CTOR'S PROP AL Contract No.: 4.01 A change in the scope of the work is requested as indicated below: It is requested the completion date be () ext"ended, () decreased, lj() unchanged by calendar days. The adjusted completion date will be f� • 2. Description of the change: (Refer to drawings, specifications, addenda, if applicablel. Reference RFP No.: ; FO No.: 4.57 ; PCO No.: Title: Sawcut concrete bv B 5(3 1 3. Basis of payment: (Check one) (X) Firm price for performing this change is S 1,538.00 Adequate supporting details and information (Increased) (Deduct) must be attached to allow Owner to evafuate. () Time and material per contract, but not to exceed S () Actual cost at completion o� work S Submitted by: M. A. MORTENSON Date: December 9, 7996 Co tract ����� �-�- Contractor Signature FOR CPMI USE Action Recommended: lCheck onel CPMI Job No.: 3225 () Change will not be made. Explain: � Proceed on the following basis: ( 1 As indicated above, change and basis of payment is acceptable. 1C( Change is acceptable, basis of payment is not acceptable. � � �Basis of payment shall be $�j� (�� ��a �(,U,OL�s� (/� { ) The following modification is recommended: � � �"'" "'" �„� () Change in completion date is accepted. � () Change is acceptable with no change in price. () Change is acceptable with no change in completion date. ( 1 Other Reason for Change: () Design Change () Client Request ield Condition O Suggested by Contractor O Design Omis ion or Other (explainj • 3. Is this a part of the original contract scope? O YES �[JVO 4. Is Contractor's Estimate attacfied? YES O fd0 5. A/E consulted. YES () NO Prepared by: C� � CPMI) Approved by �u�� (HGAI Approved by (i�V (Ownerl ��flll � � Date:�f Z'[Z��(✓ Date: Approved by: (Owner) Date: CPMI Inc., c/o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- 12/9/96 • St. Paul Civic Center Expansion ��� 1 � Summary Change Proposal ST. PAUL ClVIC CENTER EXPANSION 300EdGLESTREET JOBID: SAI.\"TPAUL.:NN �5102 PK 612/393-9154 FAX: 612/393-9557 Description: FO#4.57 Title: Sawcut concrete by 6.5/3.1 Mortenson Labor (See attached) Mortenson Matenal: (See attached) Mortenson Equipment (See attached) Associatetl Costs (Change Proposal) $ Amount 5 - $ S $ 1,325 General Conditions $ - (Mortenson Work) SUBTOTAL M. A. Mortenson $ 1,325 SUBCONTRACTORSNENDORS i. $ • 2. $ _ 3. $ 4. $ - 5. $ - 6. $ - 7. $ - 8. $ - 9. $ - 10. $ - SUBTOTALSubNend $ - M. A. MoRenson Company Fee: �_,_ SubcontrectorsNendors Fee 5%__ , $ - ��j ` M. A. Mortenson Work 15°fo $ 19 SUBTOTALFee S "�99 Tota1 Materia{ & Equipment $ - M. A. Mortenson Material 8 Equipment Tax: 7% $ - SUBT07ALTax S - SUBTOTAL: M. A. Mortenson + SubNend + Fee + Tax S .�,5<"'4'� �? f� Builder's Risk GCL Insurance Costs Payment & Pertormance Bond SUBTOTAL Insurencs & Bonds 9.0007 ($.72lThousand) $ 0.0038 ($3.77/Thousand) $ 0.0050 ($4.9593/Thousand) $ 1 � i8"' S .8" � �' • TOTAL CHANGE PROPOSAL S { f �O¢ Page 1 �...�-_« _ 'ENDABILLTY E(lUIPMENT�(lUALITY-` "-��' I � JACC011NTING KNOWIEDGE � SAFEfY � 612) 557„0820 Plymouth, MN 55441-3910 � INVOICE ,_-�'� - 029075 ,... , . ��:; -.. � <=��=�`� �tAMORTE tirsvoice ���`_ M.A. Mortenson Company oATE 09/30/96 '�=` . 700 Meadow Lane N. � �os ��' IOCATION '� Minneapolis MN 55440 Civic Center „ Fieldorder 4.57 - �:: � OUROROE0.N0. SALESMAN TERMS DATEOAD'cBED � Thank You '`� Wall Saw 1:,• 70' Of Existing Footing 26" Deep 6 y�foS m'°� ._� T _ . ��v� �'.._ -- �t ^J.�V:3 � t QS,� '� SU3::,3 ..a `i4.� �L M FnYlT2:.1 CvS7G.ic �" � + �.--�-�--°• �--^':�� ; :-- i ? ' i. ; _.__ �. �-'. �,� S� F� ,_ � J9 � ✓_ , c� 6 ,,;_ , o _�: c a�., �<, � O-� Y ,: .� _•�:-. :. =$ =y �_3� $1,325.00 �� t � ��J�i , ? .��.M.. >�,e..�,W>� Subtotal Sales Tax Labor Equip Rpr Freight Amount Due 51,325.00 5.00 $.00 $.00 51,325.00 Tax Identification No. 41-1295923 Discreoe�+aes �eaardMl yout bAI musl be resolved vnthin 10 Oays. 3i2J -��; � • The Construction Organimtion 09 December 1996 ��� {I DIVISION Minneapolis Office 7�0 Meadow Lane North PO. Box 710 (55440-0770) Minneapolis, M�nnesota 55422-4899 Telephone: (612) 522-2700 Facsimile: (672) 520-3430 SusanJones CPMI c/ o Saint Paul Civic Center I. A. O'Shaughnessy P1aza 143 West Fourth Street St. Paul MN 55102-1299 Re: Subject: . Dear Susan: � Saint Paul Civic Center Expansion CP-4 Mortenson Project #951042 FO#4.57 - Sawcut Concrete by B.5/3.1 In accordance with Field Order 4.57 dated 24 September 1996, which directed Mortenson to sawcut existing concrete by gridlines S.5/31, we quote the sum of One Thousand Five Hundxed Thirty-Bight Dollars (+$1,538.00) for the added work. Enclosed is our price breakdown. Please let me know if you need additional informarion or clarification on the enclosed. Please issue a contract change order. The amount quoted includes only the cost of the changes identified herein. Changes to the contract not specifically identified as revisions axe not included in this proposal and are excluded. Mortenson zeserves the right to submit a proposal for addirional costs and time related to the impact of this change on unchanged woxk oi far the effect of this change in combination with other changes. Very truly yours, ��k � � � Allen S. Troshizvsky Assistant Project Manager fIle: CPMI E� FO# 4.57 ti=i.rliirp DEC 1 0 19?S Minneapol�s•Seattle •Denver•Colorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•Honolulu•los Angeles � 1 �IELD ORDER Date .—/L .� Job l Customer Address . �Nsow«s L... DESCRIPTION OF SERVICES PERFORMEU (Labor classiticat�on and num6er of hours for each) :quipment by type and hours, and/or materials usedl .��� ' � � � � � 2813 Bryant Avenue South Minneapolis. MN 55408-2179 (69 21 872-4fi56 [6121 872-6824 (FAX] n w � u E�UIPMENT AND TOOLS: �17�W L�7 8y 1— WHITE 2— YELLOW 3— PINK � r� Job No. ��� � Order No. w � HOt1RS I RATE Customer By TH/S NUMBER MUST N O 4 6 6 4 4 APPEAR ON lNVQIGE F - � � If► � H s ow �ES 28� 3 Bryant Avenue South F1ELD ORDER 6121872-4 5655408-2179 ` � (612] 872-6824 (FAX] Date / Jab �._ � ti/ If� �� �/( Joh Na �1� O ; Customer �L!,C�` �6�fiP�S <� � l w n P Order No. ; Address � �� r DESCRIPTION OF SERVICES PERFORMED ' [Wbor classification and fxtmber of hours for each] µOURS RATE (Equipment by type and hours, and/or materials usedl i f t LABOR i �_W � W {�' 4 � C�r`�" C C� .S - - .. � /� �.1 cr �a � � w � � � -F �.., l Uh GcC � P�v ` � t,� f� . ..� EQUIPMENT AND TOOLS: E ..- - � --- '�" - C` � ,,,y (� �U K�„ � 2 �Q'FM�VM = � No..�S - zs � iH�i0�1 fS ' � � � Customer k" BY . • � aY ' . �, _ K ' � 1— WHITE 2— YE�LOW 3— PINK TH/S NUMBER MUST NO �a 6 6/�" /� � APPEAR ONINVOICE � ! . . ... . - . �. .. _ .., - � - "� �-- - 4; ° - , � 09/18;96 16:G5 �612 ?9& 5417 CpMI SPCC' -.,-. �3i gITE �ooi �l..Jl/ I � � I • � - �: c.�e-:. PR0.IECT_ �5a�nt Pauf Civic Cenzer F�cpansion CP-4 Building ConsYrttction OWNER: Saini Pauf Civic CereCt�r Au�orry 1_.4_ o'Sha ' a 14 �' S (�a� �, MN 55 -1299 O � V 0, 1 9g6 ro: nR rc'�,S`on 3Q��g1eSEr ?�C1C�� Sa7nt P���5102 A�j�, ea 7rosfiinsky ��--� � � r�_u.r�-r�: .. .:_ F[ELD ORDER NO_= 6ATEtS$uEU: GPM[PROJECTlVO_- GOiV7Rl�GT NQ�, C011tTRAC7"= F4.54 18 Sepiem6er 199fi 3225 CP-4 A 1 Muttiscope You are hereby dzrectea to execute promptly tfiis �ield Order which interprets the Contracc Documenis or orders minor changes in the WarK without chdnge in ConifeCt Sutn and Contraci Time. If you consider a change in ConVact Sum or Contract Time is required, ptease SubmR your itemizetl p�oposal to CPMI immediatety and before proceeding with the work_ DESCRiPllO1V. 1 Remove and rebu�d steps ai Volume Services entrance to acquire positive drainage away from 6uilding, � • PtOTES; T. 2. 3_ MAM wilt 6e compensaied for this work on a t7me and material basis_ Tmasheets are to 6e tumed in tn CPMI Qn a DAILY basis_ Sieps io be s�maar zo exisE�❑g- �roP �antlFng i t/2° from sOUth to north fOr dr8inage- 4_ Reason: Owner requesi - Votume Services ATt'ACHMENT3: G�4� ��S�L�Q.�'7 John Sietien Project Manager cc: Cfiris Hansen Mesropoti2an n�raMfSyYfiDOO.mc t il�il'ERhIAT10NAL, FNG Dick Zehring Mike Petlerson Gephart Bloomington 3225 • � 3aas -q-d4-��; �. ���) � MORi'EHSOH The Consvuc�iort Organilation 21 Octobex1996 BUILDING DIVISION Minneapolis Office 700 Meadow Lane North P.O. Box 71 D(55440-07 t 0) Minneapolis, Minnesota 55422-4899 Telephone: (612) 522-2100 Facsimile: (612) 520-3430 Susanjones CPMI c/o Saint Paul Civic Center L A. O'Shaughnessy Plaza 143 West Fourth Street St. Paul MN 551�2-1249 Re: Subject: • Dear Susan: • Saint Paul Civic Center Expansion CP-4 Mortenson Project #951042 Pield Order# 4.54 - Rebuild Steps @ Volume Services Entrance In response to FO# 4.54 regazding the rebuilding of existing concrete steps at the Volume Services entrance, we quote the sum of Two Thousand Seven Hundred Thirty-tcvo Dollars {+$z,732.00) for the added wozk. Enclosed aze copies of aux subcontractoc s cost and our price breakdown. Please let me know if you need additional information or clarification on the enclosed. Please issue a contract change order. The amount quoted includes only the cost of the changes identified herein. Changes to the contract not specifically identified as revisions are not included in this proposal and aze excluded. Mortenson reserves the right to submit a proposal for additional costs and time related to the impact of this change on unchanged work or for the effect of this change in combination with otheT changes. Very truly yours, � � ��.�+ � Allen S. Troshinsky Assistant Project Manager file: CPMI FO# 454 Minneapolis•Seattle•Denver•GoloradoSprings•Milwaukee•Grand Rapids•San Diego•San Francisco•Honolulu•LOS Angeles ��i� ii �7�M 5 • u C O N T R A C T Q R' S P R O Contractor Proposal No.: PCO# 64 Project: ST. PAUL CIVIC CENTER CP.4 O S A L Date: November 8, 1996 Contract No.: 4.01 A change in the scope of the work is requested as indicated below: 1 2 3. It is requested the completion date be ( 1 extended, () decreased,�unchanged by calendar days. The adjusted completion date wili be Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: ; FO No.: ; PCO No.: 64 _1 Title: Add closure oanels at elevator 11 12 machine room Basis of payment: (Check one) (X) Firm price for performing this cfiange is S 3,301.00 Adequate supporting details and information (lncreased) (Deduct) must be attached to aflow Owner to evaluate. O Time and material per contract, but not to exceed S ( 1 Actual cost at completion of work $ Submitted by: M. A. MORTENSON Date: November 8. 1996 Contractor c. �� � �._�---` Contractor Signature FOR CPMI tSSE 1. Action Recommended: (Check one) O Change will not be made. Explain: 2. CPMI Job No.: 3225 YI Pro ee on the following basis: �� As indicated above, change and basis of payment is acceptable. () Cha�ge is acceptable, basis of payment is not acceptable. () Basis of payment shall be $ () The following modification is recommended: ( 1 Change in completion date is accepted. ( 1 Change is acceptable with no change in price. () Change is acceptable with no change in completion date. ( ) Other Reason for Change: 1) Design Change ( 1 Cfient Request �Field Condition ( i Suggested by Contractor O Design Om sion or Other (explain) 3. Is this a part of the original contract scope? () YES �NO 4. Is Contractor's Estimate attached? YES 1) NO 5. A/E consulted. YES () NO Date: � �� Date: /O ����is Date: � . � Prepared h X�pproved • Approved Approved by: (Ownerl D CPMI ina, c/o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 WesT Fourth Street, Saint Paul, MN 551 �2-1 Zyy cc: Chris Hansen Mike Pederson Dick Zehring 3225- • • • 11/8/96 VW � � I I St Paul Civic Center Expansion Summary Change Proposal ST. PAUL CIVIC CENTER EXPANSION 300E,-IGLESTREET 106ID_ SA/.VTPd(,4 �f.l' 7�/02 PH 61'493-97= � Fi,l" 6RR93-955% Descnption: PCO#64 Title: Add Closure Panels at Eievator 17, 12 Machine Room 5 Amount MoRenson Labor: S (See attached) Modenson Material: � - (See attached) Mortenson Equipment $ (See attached) Associated Costs � (Change Proposal) General Conditions: � - (MOrtenson Work) SUBTOTAL M.A.MORenson $ - SUBCONTR4CTORS/VENDORS 7 MN Elevator C� $ $ $ $ $ $ 3,114 9. 70. SUBTOTALSubNend $ 3,114 SUBTOTALFee M. A. Mortenson Company Fee: SubcontractorsNendors Fee 5 M. A. Mortenson Work 15%: $ 156 $ - $ 156 Total Material & Equipment $ - M. A. Mortenson Materiat & Equ�pmenf Tax: 7% $ - SUBTOTALTax $ - SUBTOTAL: M. A. Mortenson + SubNend + Fee + Tax $ 3,270 Builder's Risk 0.0007 ($.72lThousand) $ Z GGL Insurance Costs 0.0038 ($377lihousand) $ 72 Payment & Pertormance Bond 0 0050 ($4 9593/Thousand) $ �6 � SUBTOTAL Insurance 8 Bonds $ 31 \ TOTAI CHANGE PROPOSAL $ 3,30'1 Page 1 J / ----- "� � �:��} '� � `r M EI . =r :�� ;:�� : � - ���a � . '�;,.: • �-- o 1 6ox 443OMank oLMtvAT�O �NC. .�'�l _ ../ ,✓ 'J, �' �j; Ph (507) 24�r3060 • Fax (507) 245-3275 , � '`f j���, ��,;� 7 a; " � =; �c , �'�„ , CHANGE ORDER REQUEST ' ��. TO: M.A. MORTENSON COMPANY DATE: ATTN AL REICHOW 300 EAGLE STREET ST PAUL MN 55120 JOB NAME: ' St. Paul Civic Center Expansion Project - Elev. 11 & 12 JOB #• DESCRIPTION OF REQUEST 10-31-96 TR-128 & TR-129 Minnesota Elevator Inc. is requesting a change order for the St. Paul Civic Center Expansion Project, Elevators • number 11 and 12, at the suggestion of the City of St. Paul Elevator Inspection Department. This request would be for the installation of divider walls between the etevator equipment room and the elevator hoistway. These divider walls will be constructed of sheet metal material, painted and installed in accordance with AI3SI A17.1, Rule IOO.Ia. The walls will be consh�ucted with a access! inspection doo fo the p urpose o f i nspecting/ servicing of the off set drive sheave and suspension ropes. The total net sum of the change order request is $3,009.50. The break down of this request is as follows: MATERIALS ................. 5 405.00 TAX (6.5%J . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $26.32 FRE(GHT........ _ ............... ...... ......... .535.00 LABOR ........... 82,2 IS% MARK-U ........... 8402.06 PERMITFEES .................... 831.28 TOTAL $3,113.74 So that we may proceed with this work in a time m w e ask that you give your prompt attention to this cha order request. • SIGNED: �n._ �„� Ron Romnes Project Manager ocn�n n r,...r.�,.�... ?�?5- �� � `�., I I � 1 C� MOR'tENSOH The Cnnrtrun+o�r Orqa�+i_utiva � 081VovemUer 1996 BUILDING DIVISION Minneapolis Office 700 Meatlow Lane North P.o sox �io (ssaao-o�io) Minneapolis, Minnesota 55422-4899 Telephone� (612) 522-2100 Facsimile: (612) 520-3430 SusanJones CPML c/ o Saint Paul Civic Center I. A. O'Shaughnessy Plaza 143 West Fourth Street St Paul MN 55102-1299 Re: Subject: • Dear Susan: Saint Paul Civic Center Expansion CP-4 Mortenson Project #951042 PCO# 64 - Add Closure PaneLs at Elevaror 11,12 Machine Room In response to a request from the Elevator Inspectar and Elevator Consultant during their recent site visit to add closure panels between the machine room and hoistway at Elevators 11 and 12, we quote the sum of Three Thousand Three Hundred One Dollars (+$3,301.00) for the added work. Enclosed are copies of subcontractor quotations and oux price breakdown. Please let me know if you need additional information or clarification on the enclosed. If we are to proceed with this added work, please issue a contract change order. The amount quoted incIudes ottly the cost of the changes identified herein. Changes Eo the con[ract not specifically identified as revisions are not included in this proposal and are excluded. Mortenson reseroes the right to submit a proposal for additional costs and time related to the impact of this change on unchanged work or for the effect of this change in combination with other changes. Very truly yours, � � ` Allen S. Troshuvsky Assistant Project Manager �s • file: CPMI PCO# 64 Minneapolis•Seattie •Denver•Colorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•Honolulu •Los Angeles