Loading...
259053 ' . . ' e .� . . �� _ .. , , �. .._ ;� .. 't 9Q53 i� FINAL ORDER co ciL �r.� rro � �. By In the Matter of _�-- ---- --- --- a-- —_ _ -- - ____ _____ __. ___ _ . �onst�uczing and r.econstructing sidewal.ks and by doing all other work which is necessary and incidental to complete �aid improvement, exc pt where it is determined that good and sufficient poured sidewalks now exist: � �" � Finance Preliminary Approved Description � File No. Order S9549 257328 February 8, 1�7? Victoria St. , west side frotn Monroe St. to ; ; the south app oximately 127 feet. ' 59569 257897 Apri.l 3, 1972 Chatsworth St. , east side from Juno Ave. to the South approximately 120 feet, � I 59570 257896 April 3, 1972 Milton St. , est side from Juno Ave. to i Randolph Ave. ', i S9571 257898 April 3, ��72 Milton St., ast side from Bayard Ave. to II ; the south ap roximately 225 feet. � �, S9594 %57979 Apri.l 7, 197?. Jefferson Av . , north side from Bay St. to i ° Vance St. i i ' S9603 y2S7955 April 7, 1972 Toronto St. , both sides from Jefferson Ave. ' to Grace St. , S9604 257949 April 7, 1972 Juno Ave. , outh side from Chatsworth St. � to the west line of Lot 5, Block 2, Cole's ; Rearrangeme t of Blocks 1 and 2 and Sub- division an Enlargement of Block 3,and �n I the north' s de of Juno Ave. from Chatsworth St. to the est line of Lot 18, Block 1, i Co1e's Rear angement. 59605 257956 Apr.iZ 7, 1972 Pleasant Av . , south side from Milton St. ' to Chatswor h St. ; � S9625 258123 April 17, 1972 Chatsworth St. , east side from W. Seventh St. to Otto Av . 258180 A ril 1.8 1972 Chatsworth St. , east side from Arms�rong Ave. 59645 p ► � to the Sou h approximately 120 feet. � to Grace S�. 59604 f� 257949 April 7, 1972 Juno Ave. , south side from Chatsworth St. � to the west line of Lot 5, Block 2, Cole`s Rearrange ent o£ Blocks 1 and 2 and Sub- division nd Enlargement of Block 3,and on , the north side of Juno Ave. from Chatsworth St. to th west line of Lot 18, Block 1, � Cole's Re rrangement. S9605 � 257956 A�ril 7, 1972 Pleasant Ive. , south side from Milton St. to Chatsw rth St. 59625 �� 258123 April 17, 1972 Chatswort St. , east side from W. Seven.th St. to Otto A+ve. , i S9645 �� � 258180 April 18, 19' 2 Chatswort� St. , east side from Armstrong Ave. to the Soluth approximately 120 feet. , r , � �, • .. . . . , • �- Dis t. No. 2 . ,; • rl.i E.S. Chatsworth St. - Juno Ave. s uth 120 ft. �+— ��� � ' OFFICE OF THE CONIMISSIONER OF P LIC WGRKS REPORT TO CONI�IISSI�NER OF INANCE ��� ���� ��,� s� � � � � � Anril 7rh_ 19 79 To the Commissioner of Finance of the City of St. Paul: The Commissi.oner of Public Works, having had under cons'deration the preliminary order of the Council known as Council File No. approved Anri1 �,-,�_19,�_ relative to uno is necessa and incidental to com lete said im rov and having investigated the matters and things referred to therein, hereby reports< `. �O 1. The estimated cost thereof is $�Per lin. f . f or standard sidewalk 5 fte �, ,�,3� 2 C� wide and $�� per lin. ft, for standard sidew lk 6 ft, wideo 2. A plan, profile or sketch of said improvement s hereto attached and made a part thereof. 3. Initiated by the Commissioner of Public Works g 4. Improvement is asked for upon petition � ����3�4�516 J���,� �� � �� � Q����O � � � P �.`� O� w ommi sioner of Public Works S .�4'"�Q�'�G� ,ti ���`p�\�p� �l��,L� t 0�6�� , w . . • Dist. No. 2 „� .. • . �I' • ' C- r � . � �� �� W.S. Milton St. - Juno Ave. �o Randolph Ave. OFFICE OF THE CqA�i�SISSIONER OF P LIC WGRKS REPORT TO COr1�1ISSI0NER OF F�NANCE � �� d � � � � April 7th. 19 72 To the Commissioner of Finance of the City of St, Paulc The Commissioner of Public Works, having had under cons�Cderation the preliminary order of the Council known as Council Fi1e No, 257896 �approved April 3rd. 19 72 relative to reconstructin the sidewalk on the west ide of Milton St. from Juno Ave. to Randol h Ave. and b doin all other work ich is necessa and inciden- tal to complete said improvement. � �— and having investigated the matters and things referred 'to therein, hereby reports: �6 0 1. The estimated cost thereof is $�-per lin. f . for standard sidewalk 5 ft, � ,� , 20 wide and $b�38 per 1 in o f t. f or s tandard s idew lk 6 f t. wide e 2. A plan, profile or sketch of said improvement 's hereto attached and made a part thereof. 3. Initiated by the Commissioner of Publie Works X 4. Improvement is asked for upon petition ����1516 i�18�9� �, O�,,J, o � ���t,� a � Q�- �J �Q N Commi one of Public Works c� P� V Q.�•��,� � � �c��!��° .�°� 5�,��� l�0��°�'��� . � � Y .�'� ' - • Dist. No. 2 . �\ �. ' E.S. Milton St. - Bayard Ave. sout�► 125 ft. 7 � OFFICE OF THE COA�I�IISSIONER OF P LIC WGRKS � � �� � � REPORT TO COMMISSIQNER OF 1�INANCE �� _��r�1 7rh_ 19 72 To the Commissioner of Finance of the City of St, Paul: The Commissioner of Public Works, having had under consideration the preliminary order of the Council known as Council File No. approved n,.il �,-�� 19�_ relative to Ave. to the south a roximatel 125 ft. and b doin all oth�r work which is necessary and incidental to com lete said im roveme t. and having investigated the matters and things referred to therein, hereby reportso /,G o 1. The estimated cost thereof is $�' per lin, f�. tor standard sidewalk 5 fte ��r 2 D wide and $� per 12n. ft. for standard sidew�lk 6 ft> wicleo 2. A plan, profile or sketch of said improvement �s hereto attached and made a part thereof. 3. Initiated by the Commissioner of Publie Works I X 4. Improvement is asked for upon petition � 0��,�21314 t5 rS��, �'� �� G�'� � Q,Q� ���� !� o issioner of Public Works �o ��G� pF N ti c�' ^FP�rNC,� ti� ���FOE6l9���'��� i � " `�` . . . Dist. No. 2 '� � � .'� � �,/ N.S. Jefferson Ave. - Bay St. to V nce St. � S � � �� // OFFICE OF THE COMMISSIONER OF P BLIC WGRKS REpORT TO COMNIISSIONER OF INANCE � � � �.. � -� 19 ��_ � `� A�ril l�th �,2 To the Commissioner of Finance of the City of 5t. Paul: The Commissioner of Public Works, having had under cons deration the preliminary order of the Council known as Council File No. 257979 approved April 7th. 19 72 relative to reconstructin the sidewalk on the north ide of Jefferson Ave. from Ba St. to Vance St. and b doin all other work which is necessa and incidental to com lete said im rovement. N.D.P. AREA and having investigated the matters and things referred to therein, hereby reports: � l,G o �� � 1. The estimated cost thereof is $��p r lin. f . far standard sidew .3�'.i-J? � 2 d C!rJ ���. ; �,-� � wide and $� per lin. ft. for standard sid _ . . 2. A plan, profile or sketch of said improvement s hereto attached and made a part thereof. 3. Initiated by the Coicunissioner of Public Works g ^ 4. Improvement is asked for upon petition ��h�611181g���,l� '� c'� � � � � '���o �� = aQQ` ��� ��t ,� o issioner of Pub ic Works o tv V rn 4� ''� tQ� �G ,L� r.:f ��^ ' < >, � �95� .., �O��.L �Z � � ! • -� � � � - Dist. No. 2 . • � � ��� B.S. Toronto St. - Jefferson Ave. to Grace St. � � �� �� OF�'ICE GF THE CONI��ISSIONER OF P LIC WGRKS / � REPORT TO COMMISSI�NER QF FINANCE � April 14th. 19�_ To the Commissioner of Finance of the City of St. Paul: The Commissioner of Public Works, having had under cons$,deration the preliminary order of the Council known as Council File No,_ 257955 approved April 7th. 1.972 relative to reconstructin the sidewalk on both sides of Tor n S Ave. to Grace St. and by doing all other work which s necessary and incidental to complete said improvement. N.D.P. AREA and having investigated the matters and things referred to therein, hereby reports: �� J•6 v �o ��. 1. The estirnated cost thereof is $�X�Xper lin. ft�. for . � � 3� a0 � wide and $�� per lin. ft. i�e�z }�� � c��e. 2. A plan, profile or sketch of said improvement 's hereto attached and made a � � part thereof. � 3. Initiated by the Commissioner of Public Works � 4. Im rovement is asked for u on etition �1iI r P P �. ��g��?�ZZ23���� s � � � ������ � N � �� �o�OC�� q amm �ioner of Public Works � � �Q �� � !�! `� ��� 68L9�� I r � ► , . - . Dist. No. 2 • �, ' $�K.�- � � S.S. Juno Ave. - Chatsworth St. to� W/L lot 5,° Cole's Re N.S. Juno Ave. - " " " � W�L l.Ot IH�v �� " blk�� QFFICE GF THE CONI�IISSIONER OF PI�BLIC WGRKS � s_ 9 � ° Y REPORT TO CONIr1ISSI0NER OF INANCE �' April 14tt�. 72 To the Commissioner of Finance of the City of St. Pault The Commissioner of Public Works, having had under consideration the preliminary order of the Council known as Council File No. 257949 approved April 7th. I9 72 relative to reconstructing the sidewalk on the sout side of Juno Ave. from BI k.2 Chatsworth St. to the west line of Lot S,°Cole's Re f Blk's 1 & 2 and Sub. & Enl. of Blk 3, and on the north side of Juno Ave. from Ch tsworth St. to the west line 8tk! C'o�� %��,� /3.ei�/�t a e� S�,.a �r �:���1 �3 of Lot 18, 6e�e� . and b doin all other work which is necessary and inc idental to com lete said m rovement. N.D.P. AREA and having investigated the matters and things referred to therein, hereby reports: I�6 0 �o ,A.� � .,,�'"�. 1. The estimated cost thereof is ��per lin. f�. for � 3 a o ,.�.,,� �, c .� V _ w�e and �K�rer lin, ft. f�r . 2. A plan, profile or sketch of said improvement �s hereto attached and made a� part thereof. 3. Initiated lay the Gommissioner of Public Wozks X � 4. Improvement is asked for upon petition _ � � 22324�SZS�j �� �ti�2 `��� o,ti 0 ��,, �� b � j O V � ssioner of Public Works � w � Q -� S Q �j;, � � �� .�15`�! ��� ��,q ��ll Ol 6��' � � � . Y • . Dist. No. 2 ' � � S.S. Pleasant Ave. - Milton St. to Chats�aorth St. OFFICE GF THE COri�1ISSI0NER OF P�BLIC WGRKS �S'- 9'� o� REPORT TO CONlMISSI(�NER �F INANCE Anril 14th_ 19 7� z To the Commissioner of Finance of the City of St. Paul: The Commissioner of Public Works, having had under consideration the preliminary order of the Council known as Council File No. approved �nril 7th_ 19�2_ relative to on St. to Chatsworth St. and by doin all other work whi h is necessa and incidental to complete said improvement. I N.B.P. AREA and having investigated the matters and things referredllto therein, hereby reports: �.� a ,; �e �`�a�� �� �"� 1. The estimated cost thereof is $� per lin. f . for . 5:-8 5 �.d 0 '` C: ';�IA� e� 'c,-».,`1� eo�.cts and $� per lin. ft. for . �� 2. A plan, profile or sketch of said improvement �,s hereto attached and made a part thereof. O I 3. Initiated by the Commissioner of Public Works l X � ' Improvement is asked for upon petition li k� �,�q�151617�8 T._ T.� � �.��'� 4 � ��c'p`' � �. PR � �� r i� �`CF� W 1� V N � OFpT £� � issioner of Public Wor s �s'��Nq�y F � II ���� I�0�6�'�� I I 1 � � � Dist. No. 2 �� � � 1�� E.S. Chatsworth St. - W. 7th. St. t Otto Ave. ✓ � ��� UFFICE OF THE COAI�IISSIONER OF PLjBLIC WGRKS REPORT TO COI��IISSZONER QF F�INANCE r_. ti �' ,�; : . ',,,�:. � � � � 19 Arril l�th. _,J2,_ To the Commissioner of Finance of the City of St. Pault The Commissioner of Public Works, having had under cons'deration the preliminary order of the Council known as Council File No. 1 approved ri 7t 19 6F 1_lt• _Z2__ relative to recons ructi id W. 7th. St. to Otto AVe. and b doin all other wor which is necessa and incidental to com lete said im rovement. � N.D.P. AREA and having investigated the matters and things referred to therein, hereby reports: >!r:99" J� 1. The estimated cQst thereof is � per lin. ft$. for standard sidewal'�L. �-grr-,���p �;O�•w� � wide and $�iX1� per 1 in, f t. f or s tandard s idew I lk 6 f t. caide. 2. A plan, profile or sketch of said improvement 's hereto attached and made a part thereof. 3. Initiated by the Commissioner of Public Works I g _ --�--,— 4. Improvement is asked for upon petition _ � mmissioner of Public Works � � � � . Dist. No. 2 Ir� � � � �. � - E.S. Chatsworth St. - Armstrong Ave. outh,120 ft. OFFICE GF THE CONIl�SISSICNER OF P LIC WGRKS �'_ �� r/�,. ti� \. REPORT TO COr1�iISSIONER OF INANCE � April 21st. 19 72 To the Commissioner of Finance of the City of St. Paul: The Commissioner of Public Works, having had under con ideration the preliminary order of the Council known as Council File No. 258180 approved April 18th19 72 xelative to reconstructin the sidewalk on the east s de of Chatsworth St. from Armstrong Ave. to the south a roximatel 120 ft. a b doin all other work which is necessa and incidental to com lete said i rovement. and having investigated the matters and things referred to therein, hereby reports: �:-�- �'� ° � 1,� 1. The estimated cost thereof is $I5X�X -ft. � �3 .30 (�ow�.�l � �.e-and $�SXX�Xp i ew t. wide. 2. A plan, profile or sketch of said improvement �s hereto attached and made a� part thereof. � 3. Initiated by the Commissioner ot �ublic Works X 4 ovement is asked for upon petition �X �V �I ���23242 ���,8�9 ti qPR� �°� � � ��� , � o e���E� ^� � �FPj� O� � ommissioner of Public Works N s� qN�E � !£� lt Ol6$L . . _ � - °�J ��s-� � • SUMMARY OF ENGINEERIPdG RECOMMEND�TION T— Tuesday, June 20, 1972 ADVISABIIITY AND OESIRABILITY� � 1 CONSTRUCT/RECONSTRUCT SIDEWALK MISS. RIVER BLVD. , north side from Cretin Ave. to Exeter Place. LAID OHER FROM 6/7/72. This order was initiated by the Commissioner of Public Works as public � � �ecessity on the basis of inspection of walk. \ This waik is old tite with tree heaves, brok n tile, high Joints, � U tripping hazards, water po�kets, holes in tile, missing tile, high longitudinal joints. The Engineering recommendation is for approv�l of the order. �-� COIdSTRUCT/RECONSTRUCT SIDEWALK CNATS4JORTH ST. , east side fran Armstrong Ave. to the sout approx�mate y 20 ft. This order was initiated by the Commissioner pf Pubiic Ilorks as public necessity on the basis of a petition with 1 signerlrepresenting 100� of � the assessable frontage and inspection of walk. d � This walk is old tile with broken tite, high �joints, tripping hazards, water pockets, holes ln tile, missing tile, high 1{�ngitudinal joints, offgrade, (� I✓and asphalt patches. I The Engineering recommendation is for approva of the order. y� 3 CONSTRUCT/RECONSTRUCT SIDE�JALK P1ILTOR! ST. , east s�de from Sayard Ave. to the south approximately 125 ft. This order was initiated by the Commissioner of Public Works as � public necessity on the basis of inspection of wal�C. 0 � I \ This walk is old tile with tree heaves, broke�h tile, high Joints, tripping hazards, water pockets, holes in tile, mi$sing tile, high � IV longitudinal joints. The Engineering recam�endation is for approva of the order. �� CONSTRUCT/RECO�JSTRUCT SIDEWALK JEFFERSON AVE. , no th side from Bay St. to Vance St. This order was initiated by the Commissioner f Public tJorks as public a necessity on the basis of a petition with 3 signer representing 38� of the � assessable frontage and inspection of walk. This walk is old tile with tree heaves, broke tile, high Joints, � tripping hazards, water pockets, holes in tite, hi h tongitudinal Joints. The Engineering recommendation is for app�oval of the order. . - -2- �- �, CONSTRUCTlRECONSTRUCT SIDEWALK TORQNTO ST. , bothlsides from Jefferson Ave. to Grace St. �� This order was initiated by the Commissioner of Public Works as public necessity on the basis of inspection of walk. 0 � This walk is old tile and poured concrete wi�h tree heaves , hroken � tile, high joints, tripping hazards, water pocket , holes in tile, missing (J tile, high longitudinal joints, offgrade, asphalt patches, disintegrated, cracked concrete panels , scaled and tipped panets. . The Engineering recommendation is for approv 1 ot the order. � `^rv�,,,,--� � t� CONSTRUCT/RECONSTRUCT SiDEWALK JUMO AVE. ,south side from Chatsworth St. to the west line of Lot 5, B1lc• 2, Cole's Rearr. of lks. 1 � 2, and Subd. and Enlargement of Blk. 3, and on the north side f Juno Ave. from Chatsworth St. to the west tine of lot lB, Blk. l , Cole's Re rr. G This order was initiated by the Commissioner of Public Works as public }—. necessity on the basis of inspection of walk. \\l This walk is old tile with broken tile, high joints, tripping hazards, � V water pockets, holes in tile, missing tile, high longitudinal joints. The Engineering recommendation is for approv 1 of the order. �s.� CO�dSTRUCT/RECONSTRUCT SIDEWALK PLEASANT AVE. , so th s+de from f�ilton St. to Chatswarth St. This order was initiated by the Commissioner of Public l�orks as public S necessity on the basis of 2 complai�ts and a petition with 12 signers representing E6 2/3� of the assessable frontage a d� inspection of waik. � � This walk is old tile and poured concrete with tree heaves , broken tile, high joints, tripping hazards, water pockets, holes in tile, missing tile, high longitudinal joints, offgrade, asphait patches, disintegrated, 7� v cracked concrete panels, scaled, tipped and settl d panels. The Engineering recommendation is for appro�al of the order. �z-� COldSTRUCT/RECONSTRUCT S I DEWpLK CHAT5��lORTH ST. , east s i de from dJ. 7th St. to Otto Ave. This order was initiated by the Commissiane�',of Pu61ic b�orks as public C f— necessity on the basis of 1 complaint and inspectlion of walk. This walk is old tile with broken tile, hig joints, tripping hazards, � J water pockets, holes in tile, missing tile, high longitudinal ,joints, offgrade, and asphait patcMes. The Engineering recanmendation is for appro ai of the order. � • , _3_ ,�� CONSTRUCT/RECOPJSTRUCT SIDEWALK RACE ST. , both s�des from Rogers St. to Chatsworth St. This order was initiated by the Commissione� of Public Works as public �� � necessity on the basis of inspection of walk. This walk is old tile with r e h � . t e eaves, bro en tile, high joints, �r�pping hazards, water pockets, holes in tile, issing tile, high � vlongitudinal joints, offgrade, and asphalt patch s. ' The Engineering recommendation is for approv 1 of the order. ��v CONSTRUCT/RECONSTRUCT SIDEWALK RACE ST. , east si e from May St. to Rogers St. I � This order was initiated by the Cor�nissioner of Publit Works as public necessity on the basis of 4 complaints and inspec ion of walk. � � � This walk is old tile with broken tile, high joints, tripping hazards, � water pockets, holes in tile, missing tile, high ongitudinal joints, V offgrade and asphalt patches. ' The Engineering recomnendation is for approv 1 of the order. �,p� CONSTRUCT/RECONSTRUCT SIDE4JALK VANCE ST. � east s de from Jefferson Ave. to tnterstate 35E. This order was initiated by the Commissioner of Public Works as public � necessity on the basis of inspection of walk. U ' This walk is old tile and poured con�rete wi�h tree heaves, broken �tile, high joints, tripping hazards, water pockets, holes in tile, high � longitudinal joints, offgrade, and asphalt patches�. �J The Engineering recommendat+on is for approvalll of the order. ,��:L CONSTRUCT/RECONSTRUCT SIDEWALK JEFFERSO�! AVE. , so�th side from Fulton St. to Clifton St. � This order was initiated by the Commissioner �f !'ublic Works as public � necessity on the basis of inspection of walk. U K�� This walk is oured concrete with hi h 'otntsl i i P g � tr pp ng hazards, water pockets, offgrade, asphalt patches, disintegrated, �cracked concrete panels, � � scaled and tipped panels. , The Engineering recommendation is for approva of the order. i -4- .�-� 3 COP�STRUCT/RECONSTRUCT SIDE!JALK CHATS�ORTH ST. , w st side from Tuscarora Ave. to Watson Ave. O This order was initiated by the Cortxnissioner of Public 4Jorks as public �"� necessity on the basis of 1 complaint and inspect on of walk. `� This walk is poured concrete with cracked to�crete panels, scaled, � tipped and settled panels. , The Engineering recommendation is for approv 1 of the order. +� �� CONSTRUCT/RECONSTRUCT SIDEWALK VECTORIA ST. , wes side from Juno Ave. to the S. approximate y 2 t. This order was initiated by the Cortrnissioner of Pubiic Works as public necessity on the basis of lnspection of walk. � This walk is old tile with tree heaves , brok n tile, high joints, �ripping hazards, water pockets, holes in tite, missing tile, high � I longitudinal joints. � The Engineering recommendation is fo� approv�l of the order. ,��5 CONSTRUCT/RECONSTRUCT SIDE4JALK ROGERS ST. , both sides from W. 7th St. to Middleton Ave. �-- This order was initiated by the Commissioner pf Public l�Jorks as public Inecessity on the basis of inspection of walk. I � � This walk is old tile with tree heaves, broke tile, high joints, �tripping hazards, water pockets, holes in tile, mi sing tile, high longitudinal joints , offgrade and asphalt patches. 1J The Engineering recommendation is for approva� of the order. �ib CONSTRUCT/RECOP�ISTRUCT SIDEWALK CHATSWORTN ST. , we�t side from Race St. to Otto A�e. I� This order was initiated by the Commissioner �f Public' Works as pubtic p�necessity on the basis of inspection of waik. � � This walk is old tile with broken ttie, high oints, tripping hazards, water pockets, holes in ti )e, missing tile, high 1 ngitudinal joints. The Engineering recommendation is for approva� of the order. _5_ �.�1, CONSTRUCt/RECOMSTRUCT SIDE4IALK MICHIGAN ST. , south side from Richmond St. to Colborne t. This order was initiated by the Commissioner of Public Works as public necessity on the basis of inspection of walk. G ~� This walk is oid tile and poured concrete wi h tree heaves, broken tile, � high joints, tripping hazards , water pockets, hol s in tile, missing tile, � high longitudinal joints, offgrade, and asphalt p tches, tipped panels. The Engineering recomrnendation is for approv�l of the order. ��g CONSTRUCT/RECONSTRUCT SiDE�lALK WEBSTER ST. , bot sides from Jefferson Ave. to Grace St. This order was initiated by the Commissioner of Public Works as public necessity on the basis of 5 complaints and inspec ion af walk, and a Spetition with 6 signers representing 4g.8� of the assessable frontage on east side. �� This walk is old tile and poured concrete wi�h tree heaves, broken tile, high joints, tripping hazards, water pockets, hol s in tile, missing tile, ') J high longitudinal jointsa offgrade, asphalt patch�s, disintegrated, cracked ( on rete anels scaled and ti ed anels. c c p , pp p The Engineering recommendation is for approv�l of the order. CO�STRUCT/RECONSTRUCT SIDE4JALK VICTORIA ST. , west side from Monroe St. '��y to the souxh approximately 127 ft. This order was initiated by the Gommissioner bf Public 4Jorks as pubiic necessity on the basis of a petition with i signer representing 100� of C the assessable frontage and inspection of walk. � This waik is old tile with tree heaves, broke tile, high joints, tripping hazards , water pockets , holes in tile, mi sing tile, high � U tongitudinat Joints. The Engineering recommendation is for approval of the order. COt�STRUCT/RECONSTRUCT SIDEWALK CHATSWORTH ST. , ea�t side from Juno Ave. �'�-0 to the south approximately 1Z0 ft. This order was initiated by the Commissioner ¢f Public bJorks as public � necessity on the basis of inspection of walk. I � This walk is old tile and poured concrete wit tree heaves, broken tile, high Joints , tripping hazards, water pockets , hole in tile, missing tile, � J high longitudinal joints. The Engineering recommendation is for approva� of the order. -6- I . ys CONSTRUCT/RECONSTRUCT SIDEWALK MILTOP� ST. , wes� side from Juno Ave. to 1-\ Rando p Ave. I This order was initiated by the Commissioner} of Pub) lc Works as publi� necessity on the basis of inspection of walk. I This walk is old tile and poured concrete wilth tree heaves , broken � tile, high joints , tr,ipping hazards, water pockets, holes in tile, missing r�tile, high longitudinal joints, offgrade, disinte rated, cracked concrete � � panels, scaled and tipped panels. The Engineering recommendation is for approv 1 of the order. Resp�ctfully submitted, Dani 1 J. Dunford Act i g D i rector of Pub 1 i c 'rJorks. DJ D/bp , aU�;ivt�ti ur� �L�riL ��uiv��L ��i�;�r �r�� . � , � June 20, 1972 ���" ,�► ' Harry E. Marshall, City C�erk .:I. PUBLIC HEARINGS SEE PUBLIC WORKS AGENDA Hearing to consider the advisability or desir bility of the correction or wrecking and removal of a structure at 66 University Ave. II. ORDINANCES Final Adoption - CF 258816 - An Administrativ� Ord. relating to *he Executive Branch of government; fixing pow�rs and duties of the office of the P�ayor and declaring this to e an emergency ordinar.r_•e. Third Reading - CF 259003 - Settling claim of Wm. L. Bachmann Third Reading - CF 259004 - Settling claim of John & Lorraine O'Connor Third Reading - CF 259005 - Settling claim of Arthur & Julia bladsen Third Reading - CF 259006 - Settling claim of Melvin & Flcrence Kramer Third Reading - CF 259007 - Settling claim of Julius & Pauline Vilz Third Reading - CF 259008 - Settling claim of Robert Eder � III. PETITIONS, APPLICATIONS, AND COMMUNICATIONS T THE COUNCIL A zoning appeal of Northwestern Bell Telephon Co. affectir.g property on the south side of Juliet between Fairvi w and Prior Aves. will be submitted. A nota:ce of hearing before the State Board of Health in the matter of the adoption of regulations amending th Public Health rierit System will be submitted. The annual report of the Human and Civil Righ s Department will be submitted. A copy of a resolution of the Ramsey County B ard will be submitted concurring in the request of t.he Welfare B ard and agreeing to fund the 197I deficit of the Welfare Depar ent in the amount of �1,558,055.23. (Copies will be attached to Councilman's Agendai A tentative agenda for the Metropolitan T�ans't Commission on Wed. , June 21, wili be submitted (Copies wil.l be attached to Councilman's Agenda) Minutes of the May 4 meeting of the Metropolitan Transit Commission will be submitted.