D00978\J
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
Ciry Clerk
Pinance Dept.
DepL Accounting (Civic Center)
Engineer (HGAj
_ - Contractor
_ - Projec[ Manager (CPMn
CITY OF SAINT PAUL - OFFIC& OF THE MAYOR
ADMINIS'I`RATIVE dRDER
for
CONTRACT CHANCsE AGREEMENT NO. C4A1-A-3
•
as Saint Paul Civic Center Expansion. CP-4 Building Construction Multiscope - Pazking Ramp
known as Contract L- City Pro}ect NoA15117 M.A. Mortenson, is composed of the following:
I.
2.
� �� .
. � �I.
Totat
$5,371.00
9,543.00
2,369.00
$17,253.00
ORDERED, That the Ciry of Saini Paui, through its Mayor, approves ffie foregoing additions made in accordance with the
specifications in the sum of $�7 283.00 . said amount to be added to the lump sum consideration named in the
contract, known as contract L-.
D�3%
�� 147-76009�9�-68050
A YED AS T�FO
�
Assistant Ciry Attorney
r, .
and which amount is to be financed from:
�—� 19�
M A Mortenson
utrac[oi ,
� � �((.�..'�iY
� -
Administrative Assistant to the Mayor
Arclritect
Provide gas heat until permanent system in place.
Reason: Size of gas main in existing building not ab(e to be used.
Main in Fourth Street accessed instead.
Post-tensioned tendons at construc[ion joints per CP k4.25.
Reason: S[ructuraL requirement.
Provide waterproofmg (a� Minnesota Club tunnel roof per Contractor Proposal (CP) SJ4.26.
Reason: Waterproofing required and not included in Base Bid documents.
.
,
J
�
��'� �- S� ASSIGN ,
NUYBERFOR
�'�� 3g��v
GREEN SHEET
INITIALlpATE wmavoare
DEPAqTMENTDIRECTOR CffYCAUNCIL
CRYATTORNEY CITYCLERK
BUOGET DIRECTOR FIN. G MGT. SEflVICES DIR.
MAVOA (Ofi ASSISTAii� �
TOTAL # OF SIGNASURE PAGES (CLIP ALl LOCATIONS FOfl SIGNATURE)
1CTON REQUESTED: �
CG��� t���( ��-�o.� �l�r�ns€�1 -�r CG Cr:�ars;�� ���r�n� ta�
o�
_ CVVILSEAVICECOMMISSION
__ CIB COMMITTEE _ _
__ $TAFF
__ OISTRICTCOURT _ _
SUPPOATS WHIGH CAUNCiL O&IECTYJE?
(WYro.
PERSONAL SERVICE CONTRACTS MUS7ANSWER THE FOLLOWING QUESTIONS:
7. Has this personrfirm ever worketl under a contrac[ for Nis depar4nent?
YES NO
2. Has this person}firm ever been a ciry employee?
YES NO
3. Does this persontlirm possess a skill not normaf{y possessetl by any curtent Ciry employee?
YES NO
Explaln ail ye6 answers on seperate sheet antl ettaeh to green sheet
�?ECEIVED
JUL 12 1996
ClTY CL�Rt�
� c6
T07AL AMOUNT OF TRANSACTION $ L��a �� " COSLREVENUE BUDGETED (CIpCLE ONE) YES NO
FUNOIWGSOURCE CC `'�'��\�l �a\ pCTIVI7YNUMBER elo-t'�`��7(000Q -D`t39-Io8'o50
FINANCIAL INFOR�viATION: (EXPLAIN) � �� e
V
•
•
PROJECT: Saint Paul Civic Center
Expansion Projeet
Saini Pauf, Minnesota
CONTRACTOR M.A. Mortenson
PO Box 7�0
Minneapolis, MN 55440
Original Contract Amount: $4,397,09o.00
C No. Deduct
C4.01-A-1
C4.01-A-2
C4.01-A-3
Subtotal
Add
199,979_00
30, 353.00
17,283.00
$247.615 00
DATEISSUED:
CONTRACT NO.:
CONTRACT 71TLE:
CONTRACT DATE:
1'I June �996
CP-�1.01
Building Construction
Multiscope
18 January 1996
Net Amount of Contract
including this Change Order: $4,644,705.00
.
�
!!� ,
MORTENSOH
The Constniction Organization'
1 ��rr� I
32ZS 4-04. �'
�. � � .
APR 19 19SE
. �
.s..
CORPORATE OFFICES
P.O. Box 710
Minneapolis, Minnesota 55440-0710
19 Apri11996
700 Meadow Lane North
Minneapolis, Minnesota 55422-4899
Telephone� {6t2) 522-2100
Facsimile: (612) 287-5430
Ms. Susan Jones
CPMI
143 West Fourth Street
St. Paul MN 55102-1299
RE: St. Paul Civic Center Expansion
CP-4 Package/MAM Job #951042
Proposed Change Order No. 5
•
•
Dear Susan:
We are submitting a cost proposal for the following changes in work as described in the attached
Proposed Change Order.
We are requesting a Change Oxder to increase our Contract Amount by Five Thousand Three
Hundred Seventy-One Dollars ($5,371.00) to per£orm the subject modification indicated herein.
Please be advised that these costs aze oniy for those items direcfly related to this condition. Any
chaxges for heaters or labor required for enclosure activities are covered under oux base bid.
Should you have any questions, please call.
Sincerely,
��� ( y�
Todd Schill'vtg
Assistant Project Manager
enc.
cc: PCO No. 5
<
Minneapolis•Seattle•Denver•Colorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•HOnolulu•LOS Angeles
' M.A. MORTENSON COMPAI3Y �`"' ��v
•
Proposed Change Qrder #��OQ5
TEMPORARY GAS SUPPLY
Project: ST PAUL CIVIC CENTER EXPANSION
CITY OF SAINT PAUL
In Reference To /CPMI /
e
Started:
Job: 951042
April 19, 1996
Required :
Completed:
DUE TQ THE ORIGINAL CONNECTION POINT INDICATED FOR GAS LOCATION IN THE CONTRACT
DOCUMEI3T5 BEING INADEQ(3ATE, TEA'IPORARY PROPAI3E STORAGE TANKS WERE UTILIZED FOR
TEMPORARY HEAT:
•
INSTALLATION OF TANKS & CONNECTIONS: $ 372.00
PROPANE BOUGHT & USED IN THESE TANKS: $4298.00
SUBTOTAL: $4670.00
MAM 150: $ 701.00
TOTAL ADD: $5371.00
Cost: $ 5371.00
�u11 �
� ���,�' � ��/�
3igned: `� .�?.������1.��
BY: �—
Date: � � r /�
' . f �yjJl t':e;.ifi �`._ I� V
Y:. � _
� WORK ORDER / INVOICE MAR 111996 �,o. wo = 21292
• «Y� Thermoyas Compa�ry
CUS70MER ACCOUNT n I� I�'� I�' I�� I; I�I NEW ACCOUNT
;
i
NAME iS1 i- 1"l �G�} ' � �-s'�
ADDRESS � =, � % � - ' � - �`'' "`
_ .�, __ . >r � �.
�. Yvl : '�L�P,�NT <-lr S f!_,
� KF �
�� .I
WC�
WK�
DATE RECENED J - � ^ — :'�
^ j -�:
CITY ==-� STAT , � - ZIP > -��u DATE PROMISED ' - !
_ r , A .
�ti n r � �
ADDRE S � 5 �' `' ��� �1 � t V t : �e-vt�� ORDER REC'D. 8Y �""—�- �'� ' =
PHONE: (
INSTALL� UNLOCK ❑ ��� _�—
LOCK SERIAL TANK� _ v, % IN � u.
REMOVE ❑ LOCK ❑ NON PAY ❑ NUMBERb � � SIZE "��'� TANK = '� ��%
/ METER d CYL. �/ REVENUE
METER # ���`� READING /`�� SIZF fY� CLASS ��. ROUTF
� REQUEST
� r1 �-�-�.��ti.ls2�' '�' - 1 C:CJ� �ctl4Gt,� "1'�-,v.� K.S �
_ . . , i . .. S .
�MEDY
CREDIT MEMO �
DATE SERVICE � TIME �=;
WORK PERFORMED ^' '� /�' COMPLETED SERVICEMAN # J� SYSTEM CHECK YES � NO C
C I
A
F.-i`�/ � � 4 V
FAGTOR - FILE NO ROIITE
APPRO :NEXT
DEIIV'cF �¢
PREVIOUS SALE NO. CODE METER
� �
k ^ N . ".J
J �
.�. G li .- � �� `� '
•
I
�
Date _
I
�� Sol�io.
f
AGCress
i
I
i
1
!
i
�
' GYLS. OUT CYLS IN D.D TO BE ADDED �
` 1
46 IN TANK BEFp4E AFTEA D.D. TOTAL TO DATE �
� , , NEXT O.D. DATE '
� TERMS: Due and payable upo� receipt of invoice. Yau i
may deduct $ if paid within ten dsys. �
4 _ Ga{s. Reading - Start r
f . Gals. Reading - Finish � 3 � • J/
� - - Sales Seque�ce Number '
4 � Price per Galfon - cents ,
� . � Product Cost .
Tax
� ToWi Pric•-
' __ rcz�t -- - . —
t SALE NO. METER REA�ING-FINISH �
- .... �e�a3:fi's'9 'Y .d`isi:�"�`�x�' " {
i
. �'�"� s : '�4� � �1S �S� i
C��' �j 5>.r.i.Z �
VENDOR# �J:ti.C.�..._ �
9s.� _ � ;
J069 SU8Jt,6 � :
--� ��i _, M � i '� � a `�
PM_ IT� rncTrnn� �y�_ � �-
c
•
FAGTOR FIlENO . ROYTE �`
APPRC =NEXT
�ELIVEr _iTE �
PREVIOUS SALE NO. CO�E METER READING START
_ l , i
� �1 . - ' i
� _ '. �
'I / —�
� � �� - � .� j
YOUR SALE N�. METER READING-FINISH {
s�+i«�-yx�^sG+ '-'+' 4:t 1
s, so.;.. �>....�s�c:.5 t ag'3. '�:.^_� *�
Hery.2i2'czst RO.3c: 1;E ; �d �
���:� f
VEfJDOR 11 �� � s JRi<L i,.�:.� ; a t<, c�?Z
5/ tE _ `,
.r s sus �oe s�� . �
PAy�j�gi/ � � -3 ? c7.'' �� +
Date 59 -- `
1
� _ APPROVAL �
sola to
AEEress Sr-l.�:i S'!
! S° i� �
REC' HY . / ACCT. BAL.
//�(G'��'!'`l�?{,cy,<��[''�.i"/ -2���_
PflODUCT i �UANSITY PA10E AMOUNT
T6ermogas GNbnsf.tM1Oma<tn�Y
Cqnect¢Qto W Oegrees Fel�renMtt
"<o:. '57.�
'' � rr ;L, t "'
„
�� �
��r-.,-
CYIS. OUT CYlS. IN D D. TO BE ADDED
% IN TANK BEFORE AfTEA D D TOTAI TO OATE
NEXT D.D. DATE
TERMS: Due and payable upon rece+pt of invoice. You
m a y d e d u c t $ i f p a i d w i t hi n t e n d a ys.
Gals. Reading - Start �
Gals. Reading - Finish n �� �,
Sales Sequence Number �
Price per Ga14on - cents
Product Cost
Tax
Total Price
�G201 � �
W� � U
�C�OF ��ENO. POU1E
� �� 1
j 'NEXTi � � . . _
:h ,.1F
EVIOUS SALENO. EODE METER READMG START
— —. ' i _ . .� _ '--
^ r.�:. �.
� �': ". � t1t�a�.';`i;jG.:"'+ vG.�39sy}.^
� J
�� �.� �. Hvey. 2'•2 C�st P.O. Box 1i$
:.;; ., C'�.a _':.a
(f
: v" (� �. `'-
,' " '
,� ' �� ` a . ; ? ��.�
Date � � i �
Sawto %,y � , ' � : "G�' , �! �
/ ' -� /'_ . j i;
ACaress � m / f �� �/�,� r-+'�r � ��`-�
C y �i/7 — ' � '��`✓ � V � ��
REC'D.B� � -• /� ,y 1 f ;/ ACCT�BPL , ^ [, �
' iJ , r 7_ �,r�//l:.p,s _.i '� i li:� �
� PRODUCT QUANTITY PRICE AMOUNT
i � � . '
. 2'6ermoyas a.��,�sn�o�����y .C. - �
, l %�,
4 Cortec4C b 60 �egrees FahRnM1ei�
I
i �_. '. -�-� _ _
>;; - t� 1 cn
� � � . `,;..
�;s
; :; _
, --' ,,�;.�
)� CYLS. OUT , CYLS. / IN D D TO BE A�DED
{ „ tit' J ,
� 4b IN TANK BEFOAE AFTEft d ' D.D 707AL i0 DATE
j �T �• �' NEXT D O. DATE
TERMS: Due and payable upon_receipt of invoice. Y
may desluct � if paid :vith�n *wn day
Gals. Reading - Start �
Gals. Reading - Fi�ish � �4
0�
Sales Sequence Number
Price per Gallon - cents
Produet Cost
Tax
� Tota� P= ^
TG ^
�,
��
�
FACTOR FlLE NO. ROOTE
qPPflO. NEXT
OELNEh ..CE _
� -- -'
_ j i
� � �
4 READING START '
. �.
� �1 _� J � ��
Hwv. 212 ��<_.t F_C�cx�298
VENDOR# C;_�.,�a�4:",<_...,, �
9�°�a c� : ;.._-
JOB# SUBJO_ -..
�.-- � �M
Pn y r�nn cosrcvae Yc + ? ; � .;�.
2'2.. 19_ � .
, Lg ......_..
' Sob to -
{ })E$`Ny! OL..'!�
� �ress
� �� 5T Qf.t� �
PEC'D.BY ACCT.BAL.
PpO�UCT QUANTITY PRICE AMOUNT
T6ermoyas cenonsamome�iwiry
CorreEtea b 60 Dtgrees Fanrenheic a_ --
� �u,� ,-�} i93�oo
� .=��-� s� `�'"`z'�i- I< 47�i.
t
f , i i • _s�
� � /!. '�s� l�: ;�'� ' :�153•a2
1 i �,
CYLS OUT CY45y�N � D.D.TOBEAD�ED
, %IN TANK BEFOflE � AFTER 0.� TOTAL TO DATE
% � NEXT D.O. OATE
� TERMS: Due 2nd payable upon receipt of invoice. �'Qu
,
may deduct $ if paid within ien days.
��� Gals. Reading - Start _
Ga{s. fleading - finish -�� q l�
Sales Sequence Number � J ,
Price per Gallon - Cents
Product Cost
. Tax
Total Price
rc.zm ' . - - -
� i
FILENO ROUiE
�� / : '
VENDOR � '� �- =•�
S/O _ _
Si3
. o , -, _ . a.7
i�� ,
„�; J . �� � , � �
% ;� �_I L7�% �.�� 1 f `3 �- =
�.� � � . ._. _ :.
Date 19 ��
/� '� �
� :%i �i / ✓ '!�/ �^ N.✓'r/'J
Sold to ,
�' i
✓ hC � ' .... f
AtlEtesS /
.^J � �//
J J ' -i �r� >.. v
G . -
�fiEC'D. BY ' � [' ACCT. BAL.
: i,' �� i i' t- : '�.�,C a,• n %i4 e', ;°.
PflODUCT QUANTITY PRICE AMWN?
IQS GallonsAUrometlwliy
co�eaearosoceyree:ranre�nen "_ , -
n. .� — �r
7_ !/2� � /l.;.i Y i\" - _,
: O'_ C
�';;" � ` � �7 .?'�1''
_ki �� I �; `~"
r %s'
Y
CYLS. OUT J� CYLS. IN � 0.0. W 9E ADDEO
°Po IN TANK BEFOPE AFTER D.D. TOTAL TO DATE
NEXT 0 � OATE
TERMS: Due and payable upon receipt of invoice. �a'-
may dsduct $ if paid witi�in tert day:
Gais. Reading - Start /� c�
Ga1s. Reading - Finish �� (� •P
Sales Sequence Number
Price per Gallon - cents
ProduCt Cost
Tax
Total Price
TG201
PACTOR FilENO. ROUTE
�
APPRO. :NEXT
OEi;VEh .Tc
a = - r� . _
YOIIR SA1 F N!t —
11NG STAAT �
i
� �
�, ,
�.
c.�c _ .._�____�,__ _'_'__^'__'>
� HNry. 2;2 ;as? -A. �ex 1�8 ��
C^�s':a ..�. 5;"'2 :�°
..�:o..L
(a" - 1 ! - ' '
� ���;n�
Oata ?'�� `19 °� .
Soiam M.A. MoC'rC+s�..i
Aatl�ess c ��z'+�+�
Sr
PpODUCT QUANTRY PAICE AMOUM
6ermaqcs wuo�sa�om�u��ro
Ce wIM ta 6p 0.gr¢es FehrenM1elt
' `�:
- 3SU 2y.`.SJ
, :::�"r: - .. • 1°. �(e
��g
FACTOR FILENO ROUJE
APPRC :NEXT
DELIVE�. ..7E
.' _ � y .
,;
_. I .,_
.1��.. ,' 'Yj..`=_=i :.Tt_��.-~�c:. _.
�I ..," .,, YJ . C - iit� j _i
C�-- ..^ , T
i . �� ' .1' ..� e 5 c
i •
I � � � � � 9 �
, ., ;
I � i Date � �� 19��'
; : som ro hf.A � lN.t t£.�a.✓
I
, � ..--- . ���.r..,.r
ST ,`��-� L
1 :
� ' PFODUCT
'I/tEtm09af Gananaemomanoaity
' , cv�reuea w W oeqrees raerenxeR
i ,
i ',,
d cz,c s s'
QUANTITY PRICE AMOUNT
�� l. "a
�i � ��' ' . �� �
� � �
/ ,f` 4 �
v��(/�! `�- f'�.t'�c-' � � '; C� � i.s°.��.
J �JS
� � CYIS. OUT CVLS. IN D D. i0 BE ADDED
CYI.S. �UT } GYLS, lN 0 0. TO BE AOOED � '
4b IN TANK BEFORE ' ARER � D.D. TOTAL TO DATE °'a �N TANK BEFORE AFTER O.D TOTAL TO DATE
, NEXT D.D. DATE
NEXT O.D. DATE ' V �
yp� ; TERMS: Due and payable upon,receipt of inyoice. `
TERMS: �ue and paya6le upon receipt of invoice. may ::d��st S �� pG:n �.�!'s,^.� ten d�;=
may deduci � if �a:c uvith:n 2en c�ays. ��
� Gals. Reading - Start � Gals. Reading - Start
Gals. Reading - Finish -- � � i Gals. Reading - Finish �, ��
Sales Sequence Number i i Sales Sequence Number �
/� � Price per Gation - cents
Priee per Galion - cents �!'� � �
Product Cost +�� " i i Product Cost
Tax � � : Tax
' Total '`fce
, 7otal Price � � � rczo�
TP20] � � -- ' -
.
��
•
�
Febmary 28, 1996
Mr. Ron Schreiner
M.A. Mortenson
P.o. aoX �lo
Minneapolis, Minnesota 55440
Re: S� P¢ul Civic Center Expansion
Ternporary Heat
Deaz Ron:
�a
��
�
��� �
�
��^,�1i������
�E�.y
- �gy�
� - :,
:v�.F.. ivtivr����s�� �Q
This is verificafion for your record, regarding the temporary eas situadon found on the above referenced
Yr"J�±
It appears the connecfion point indicated for gas locafion in the addendum issued is not adeqaate For temparary
heat capacity required. The capacity has 6een detemuned by Temporary Heat, Inc. With respect to the azea
being heated.
We have investigated alone Nith NSP (NL*. Bob Foley) an aiternate location with more capacity, �n�hieh has
been found at the east edge of the jobsite as further described.
There. appears to be an eacisfing medium pressure gas service locatecl aUor near the end of West Feurtl', Stre?t,
• which is a dead end sireet at the east chain link f��ir,e on the prasent jobsite. The eacisSin� gas se*vice 9s burir,c
in the street and can be extended to a location determined inside the fenced area which would be inside the
construction limiu with a temporary meter with barricades. (See attached site plan showing exis�ng gas
layout)
According to NSP, the gas providEr, there would not be a chazge for this temporary service extension.
We have applied for permit at the City of St. Paul and told NSP to proceed with this locauon.
It is our understanding the cost of the fuel for temporary heat is paid for by the owner ir. this case.
Jlncereiy,
- -t`i
E.A, Couser
Project Manager
EAC/mms
cc: Susan 7ones, CPMI
C�
�6�.�
�
METROPOLITAN MECAANICAL CONTRACTORS, INC.
7340 Washington Avenue South • Eden Prairie, Min�esota 55344-3582 • Phone: (612) 941-7010 • Fax: (6L) 941-9118
�� �18
�-
• -- �'���K�. �G�N
a - ioco �� T���
1n�11z<.l�f�-� Z�z���r�
- C�c� 2( Z�S ��t'!� � P� bC
-- �cio 3/_ { _ �q_!o_ 3 o c
3� 1 ��l � C � �'O �- _. _ �o�� �`k�- (a - lc�
- 3 �9 1 �11� Q �G �� -
,
— -- 3� 11 �350 � 1� � ���
- - - 3 �__I_I 8 C� C�
- -- -- ? _ (.�50
-- ----- _- - - - -
- ���ti rmo � ce�. _ _ e� _ T.�,n..� Ga.o ��C--�!'P - -
: __ s
- - - u 3�/�
- - -
rl
�� - - -
- -- -- --- ------ - � �
_ g �_ � il �� - ��
-Wt`�' — -
-- --- --- ----- -- ----- --- - -- � - -
-- -
----- ---- _ - - -----
�
MORT�NSOH
The Construction Organization 0
P.O. Box 7�0
Minneapolis, Minnesota 55440-0710
.
�
Apri13Q 1996
Ms. Susan Jones
CPMI:c10 St. Paul Civic Center
143 West 4th Street
St. Paul, MN 551�2-1299
11 '
CORPORATE OFFIGES
700 Meadow Lane North
Minneapolis, Minnesota 55422-4899
Teiepho�e: (6�2) 5222100
Facsimiie: (612) 287-5430
RE: St. Paul Civic Center Expansion
CP-4 Building Construction
RFP 4.25(FO 4.02: Post-Tensioned tendons at conshvction joints.
Dear Susan:
We are submitting a cost proposal for the changes in work defined by Request For Proposa14.25
dated 24 April 1996.
We are requesting a Change Order to increase our Contract Amount by Nine Thousand Five
Hundred Forry-Three Dollazs ($9,543.00) to perform the subject modification as identified in
RFP 4.25. This cost also includes any costs associated with Fietd Order 4.02.
Mortenson reserves the right to submit a proposal for additionai costs and time related to the
impact of this change on unchanged work or the effect of this change in combanation with other
changes.
Should you have any questions or comments, please contact me.
Sincerely,
�i _
Todd Schillin Assistant�ana er
S� J g
cc: File: IZFP 4.25/FO 4.02
RECEII/ED
APt2 3 0 19�`
. ��
��
Minneapolis•Seattle •OenverCoforado SpringsMilwaukee•Grantl RapidsSan �iego•San Francisco•Honolulu•LOS Angeles
'�1�" :
�
Contractor Proposal No.: CP 4.25
Project: ST. PAUL CIVIC CENTER CP.4
R O-P O S-A-L_ -
Contract No.
A change in the scope of the work is requested as indicated below:
M Z
�
It is requested the completion date be () extended, () decreased, (X) unchanged by
calendar days. The adjusted completion date will be N/A
�
2. Description of the change: (Refer to drawings, specifications, addenda, if applicable).
Reference RFP No.: 4.25 : FO NO.:
Title: Post tensioned tendons at construction joints
3. Basis of payment: (Check onel
(X� Firm price for performing this change is $ 9.543
Adequate supporting details and information (Increased) (Deduct)
must be attached to allow Owner to evaluate.
( � Time and material per contract, but not to exceed 4
() Actual cost at completion of work S
Submitted by: M. A. MORTENSON ,� Date: Aoril 29. 1996
,e�traete
Cont ctor Signature
FOR CPMI USE
Action Recommended: ICheck one)
t) Change will not be made. Explain:
CPMI Job No.: 3225
Ji.) Pro ee on the following basis:
�� As indicated above, change and basis of payment is acceptable.
() Change is acceptable, basis of payment is not acceptable.
() Basis of payment shall be S
() The following modification is recommended:
() Change in completion date is accepted.
() Change is acceptable with no change in price.
() Change is acceptable with no change in completion date.
( ) Other
Reason for Change:
O Design Change O Client Request �Field Condition
() Suggested by Contractor () Design Omission or Other (explain)
3. Is this a part of the original contract scope? () YES �'NO
4. Is Contractor's Estimate attached? ES () NO
5. A/E consulted. YES () NO
Prepared by: �_" CPMp
Approved by HGA)
Date:.����
Date: ���
• Approved by fOwner) Date:
Approved by: (Owner) Date:
CPMI Inc., c!o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299
cc: Chris Hansen Mike Pederson Dick Zehring 3225-
Ei� i
• AQ�IT[Q_NAL- [N.PQ"RMATEQ-IU-_ _
Contractor Proposal No.: CP 4.25 Date: Aprif 29. 1996
Project: ST. PAUL CiViC CENTER CP.4 Contract No.: 4.01
1. Descriptio� ofi the change: (Refer to drawings, specifications, addenda, if applicable).
Reference RFP No.: 4.25 • FO NO.:
Title: Post-tensioned tendons at construction joints
The following information is being presented to assist you in your evaluation of the pricing of the
afore meMioned Contractor Proposal. Please Contact us if you have any further questions.
The following items are cost issues considered in the pricing of CP 4.25:
Addition of approximately 5.03 tons of reinforcing steel.
•
•
C�
•
•
4i29796 St Paul Civic Center Expansion �� !� Summary
Change Proposal
� � ST, PAUL C/V/C CENTER IXPANS/ON
300 EAGLE STREET 70B ID: 951042
��� SAIN1'PAUL, MN 55102
PH:6121293-9754 FAX:612/293-9557
Description: CP 425
Title: Post Tensioned Tendons at Construction Joints S Amount
Mortenson Labor.
(See attached)
Mortenson Materiaf:
(See attached)
Mortenson Equipment
(See attached)
Associated Costs
(Change Proposal)
$ -
3 -
$ -
$ -
General Conditions: $ -
(Mortenson Work)
SUBTOTAL M.A.Mortenson $ -
SUBCONTRACTORSNENDORS
1. AMBASSADOR
G�
$
$
$
$
$
$
4,799
4,204
10.
SUSTOTAL SubNend $ 9,003
SUBTOTALFee
M. A. Mortenson Company Fee:
SubcontraCOrsNendors Fee 5%:
M. A. Mortenson Work 15°/a:
$ 450
$ -
$ 450
TotaV Material & Equipment $ -
M. A. Mortenson MateriaV & Equipment Tax: 7 $ -
SUSTOTALTax $ -
SUBTOTAL:M.A.4Aortenson+SubNend+Fee+Tax $ 9,453
Builder's Risk
GCL Insurance CosYs
Payment 8 Pe�fortnance Bond
SUBTOTAL Insurance & Bonds
0.0007 ($.72ffhousand)
�.0038 ($3.77/Thousand)
0.0050 ($4.9593lfhousand)
$ 7
$ 36
$ 47
$ 89
TOTAL CHANGE PROPOSAL $ 9,543
Page 1
• RPR 29 '9E 16=40aM 6122"726324
� �.
� HSOWtE�
8371 pROPOSAZ.
�'�)q ( �
X'age 1 of I
I
Bid Datc: �9� —�`� —`'�� Bid Time: �: O o p M
1
.l"roject: St PauI Crvic Center �
Froject T.acalion:
Getterai Contractor:
Address: �7"r /�u C��/J,
Sidder$ Name:
P.1i1
�.H. Sowies Compan�
28T3 BryaM Aven�s South
T.linneapolis. MN 55408-2724
MirulE3{7pIi5
s�z-a�2-asss
s,2-s�2-sS2�cFAx�
Biltl ,
aos-`�4s•ass�
4p6-248-8330(FAX}
Spokane
50�922-9121
5�&32�-598a {FA�
Phone Nwnber: 293-9I54
k'ax Number: 293-95>7
• (}ffice: ivlinneapolis � Eillv�s ❑ Spokane ❑
Note: T'his proposal is far tabor only pfus equipment(s)/tool(s) necessary for the znstallation/erection of t11e tabulated
work 8elow.
�RFP # • �� ❑ ltx'T CI SI
�Itequest £or c}�ange arder CJ
�Add�¢Zp�•.J'� L7Deduct �
For: .t�CVCdQa..e �n �sa• � Y" �J"""�'�tiT7" @'.� ..,�� �oCf � �{sk ,j 0.3 ta/'�S
— -- -c
�-/ i �` a 3 '�
�� � 3 j� �
. �
�J
_( 835•Sbl�.
�,,��,, �� �/�-
z �� �,�
�
���� �
m
�� p'�-� i �
•
PROI'OSA1. Rf:Qt�E�i'
"j�O: M.A. Mortonson DA��I=° 4/12/96 {QrSNUI�SBE�R= z595033
300 Eagle St.
St. Paul, MN 55102
fZL: St. Paul Civic Center
ATT_ Todd Shilling LGCA � tON�= St. Paul, MN
CHANGF PROPOSAL NO.' i�
T"riiS CHANGE: Aaa $4485.00 P1us Tax
LJ
� �� � KK
�� t�
a � �
��) �� (�1�' f�0>�� CJJ� � ° �
- -'�----
n�C�) �� � ; O,
i0i tionR Svcond Sroe! • Minneapolis, MN SSt�• -(6'.2) 33E-1q25 - F:.X (6:21 333 ��Oi
P il t t'� DESCRIPTION OF PROP6SAL REOtiEST
PLEASE ADD TO OUR CONTRACT ADDITIONAL P/T BACK-UP BARS AND ACCESSORIES PER
CPM 1 LETTER FROM JOHN STELTEN TO TODD SHTLLING.
ADD 5.03 TONS EPDXY COATED REBARS, ASSESSORIES, ADDZTIONAL DETAILING &
ADDITIONAL FREIGAT LI3MP SUM $4485.00+tax.
PART OF THIS MATERIAL IS REQUIRED ON SOB SITE APRIL 18, 1996.
THE ABOVE WORK WILL NOT PROCEED UNSIL WE RECEIVE A WRITTEN CHANGE ORDER TO
OUR CONTRACT.
�35b,�1'( � fi,r.sQ -�rQr�
��` �r+ w� �,� a�--
NOl E Pt.EASE CO^11-1R�1'RiIS PROPOSAL BY SIGNINU Oi�'£. C Pl' ANU RETliK.�i�'G IT
Tp pUR OFFiCi: AN ACKNOW�EDGED COPY' 1'vtit. F3E "" TO Y
}'„�;R Fii.GS � /
�/�, 5 ��,�, z �7?9 , s,o.� r = ��'�/ �-�
ACLtY i E',i�- ������ ¢Ta �it2U� �y _ �
AsSAUVx S i �:EL —
NfiN1vEAPOLiS SALES OF( iCE �
�
BY _
At�"TH021ZG.I� SIG�41'URE.
1 I I �,� _- - - ---�-
3'Y �IG�2.�'� _ l. ��? . ��.
Thomas T. Chegaris�
I I� L.E __ Sales _Represen�ative
DAT � ., ----- - -
DATE:�_L� �— - - - -
TflUE HAPPlNESS DEPENDS UPON A PEFSONAL RE(ATIONSNIP W ITH GOD
�N 67 "3F, 62=?�PM 612�72E�24
� /
`G O M P A M �i
CWANC_E__Q_RDER fiiD _PR�POSAL
pape i of _? ___
SM Date= Sune7fh.t996_ ___.. _. __
a�ol.au r�: St. Paul Civic Center CP --_
aroj. Lxanon: st�saa,,,,Min„esots -- -- ---
c��, canr M_ A_ Mortenson Co�any ___
G.C. Aatlress: 7001Aaaaovr Lar�e Nnnn ___. --
Minneapolls, NGnr�ta 6b422-oeas _ __'
,aua�ao�: He ather Jensen _ __ _
BWdeYe NBtt�a: Sittron K 14Tarry_a _ .._ ' ` _ " .
�� l � U
Phone: e+a-zs»+sa
FBX; � 642-2s3-966�
�Q�: This Pnce propo8sl is tor Labor Onty inctudirg ^�5a�' EANDmant/Tools fa fne ErecUonAnstalratlon
of Me Scnpe M`�� as tabWafad ln fhe C�NGE OftDER �CUMENT(s) �� ��•
• EtE u� E$T fQr GJiANS'F QROEBJ�_QCU..1id�NT•
RFP #4.2b ADDfDEDUCT $A,204.36_��+v s� v�
SCQPE o# WQRK:
p�prlplkion
Concre� Aaf�rtorci� Steai:
Posb 7ensionS�:
$(ry�(y�l5teal Framing:
Miac. Metal Pa6r�cadons:
CJ
Addad a tolat ot 2,362,Qcs of i14- Re�ar ha�ns. (Q 66 Loptions (� 30 pc?_ __
.._'�__ ""____'_ ".._. _. _ _
per mannour[ID S� 4� pe+MH. which artlo to Sa,202.38_ .. .__ .
F.1i1
LH. SovAes Company
2$73 Bryant Avenue �otM
Minneapolis, MN 55408-2124
M(nnea{�olis
612$72-Afi56
652-872-6824{PAX)
BiAings
406-248-4361
406-2A8-B330(FAX)
Spokane
509-922-9
5p9-927-5984 {FAX)
�
�
Mk^1
,
•
•
6122939557
���
7973 Broadway Stmr,t NE � Mmnaapolis, Mtnr�e:,��ta 5"snt3 � 61'c6?3-tY3C1'L • FAX 612 6?3-3923
M. A. Mortenson Company
Attn: Todd 5hi11 it�g
300 �agl� Street
Saint. Paul, MN 55102
May 23, 1996
RF;: Saint Paul Civi_c CenY.cr
K F P 4.25
Ambassador Steel Chang� Propos�i
#12 Dated 4/12/96
OS/23 '96 13:Sb N0.765 02/12
r ��
�� .. m
MA' �
�
��'a',J��
Be1ow is a list of additional reiriforr.ing bars and accessories
that have already beEn ship�c:d to the jaY> site;
24 - #i5x21-U
24 - #Sx16-5
24 - #Sx15-0
72 - #Sx13-6
36 - NSx13-0
30 - #Sx12-0
48 - #5x11-b
36 - #Sx9-5
30 - #Sx8-D
Subtot.al we5.,yht
= 4�374 lbs.
1,350 - #9x6-5 bent: @ 5,7g9 lbs.
Total weight. = 1�,763 lbs./ 5,08 tons
nll the ab�ve reinforciny steel is epr�xy co�ted,
Wc. also supplied 7,150 ].in_ ft, 1" slah bolsters epoxy coat.ed
and had 3 hours of add�tional detailiaig whtch was requir�d.
There w�s an addit.ional fr�ight. ch�rge of $16Q,OQ included
�n our p�ice because part ot this materi.al had to shiF7 without
any oLner material. The slab sY.ee2 alrc�ady was on the job site,
k�e estim�ted 10,056 lbs„ or 5_p3 ton:;, epoxy coat_ed reinforcing
st��cl per Eax memo from Keith Kolacia on 4/10/96 t.o our dcatailer.,
Scott Thr;ien.
Keit.h Kol�cia's memo st.atzs:
"Ylea,e proce�:d with th� additiUnal
ramp per our discussion on 4/10/96,
. that we would 6e safe for additional
the amounL af /{4 and i{5 at the 51ab
attache.d memo £rom CPM."
reinforcinq at the parking
It shUU1d be safe t.o assume
rc:infor�ing if we double
ends. Please refer to the
Ambassador Steel's actual shipped we>iyht fos RFP 9,25 was 70,163
lbs. or 5.08 tons epoxy c:oated reinforcing steel,
i"fiUE FiAPPINESS 6EPFNGS UP(�N A FERSQNnI R( L,A) t(]NSI IfP W4�� H c�c�n
MaM b122939557 U5/23 'yb �5:7b N0./65 USl1G
. Q � ���
� o �.��,, � o /� �� o 0
. �� � N �� JlO __ V
��� �) �� � �
7�13 BruarJway Slreet NE • M�nneapolis, Minne�ota 5541? - 5�2 6?3-;�3G� • FAX ut'L-623-:5923
Page Two
we faxed you a copy of aur change proposa] 12 on 4/12f96 and
sent the vriginal copy by mail on 4/12J96.
On 5/21J�3h, Todd Shilling frvm M.A. Mortenson Company celled
�ne sayzng CPMI said that there should not be this amount of
tonnage. ir, RFP 4.25.
Zf CPMI is going to question t.he tonn7ge nn our chanqe proposal,
please do so in a reasonabl�. amount of t.ime bcfore any materia7.
is ship�ed to the job site.
Yn the future, Ambassador Ste�L will not �hip any maC.erial for
change proposals unt.il they have been approved hy CPMI and we
}�ave a signed ch�nge c�rdcr to our cantract with M, A. Mortcnson.
SJ.ncerety,
�BASSADOR STE L CORPORATION
. �.��.,.�.�.� �, �,.` �
Tom Chr-�garis ��
C�
TRUE FiAPPINESS UEPENnS UFON a PCRSONAL IiFI ATIONSHiP W1TH GOU
MP.M
6122939557
05/23 '9b 13:56 N0.7b5 04/�2
f r,ioi . SF'i 'x-r�.•i c.c& ticnt f Tt.r o�r� Gld"=1 it-�.1:'U ' F'�tl
.,... �„«.,,.»� v�, ,� �� ,,,.,� ,,.,. �- l �
•
�rvur� srAr�a
RS :......._.�� ,..�
� �� EIR { 'ra:....�
irp C;�iilf Tittr� (ytiil (��ili[ r `�( �r y
1-0t Wfxt rm�rfh SL-ect �` ���-�
S,in� Pxut, AfN 5 itD1•42 t9
ir a.tiry9 ttK: _-.1��...._
(::C)MM.Li�'iC'A'I'I[)i�' V1�IttF;C:A7`ION
1):ite 4n)/96
T�� Todd Schilfi�g. }.�S.A Monc:ison
S�rum ]oha� Stc(Irn, C['R41
it r tiqi�lt Ptu�I ('ie�iC Center - l ��r ni Parki��� n,,,n�
•
� A/1PIf2N17�s AV� C*>]]'JCI98I1(tij{4 Uf {h�],Zy HUA haA idcntilted soma Additfonnl rnbnr whicb !fi nCe.rSed
i�� thh T'1' S1:�Uc �n� wij{ be i6sU1ng n{21%�, Si�ecc; ihe i'irai Rt:�b is ache.�luted to br puureci tomorrotiv
�,f nx1 i� tv ���imcx{ietely itcc,cr„r.ii wiih tlsc ndding c�f thc rchRr as tJiyct��:se�d �vrlh )�c]A. It fs Aut
unders(tincJl��g thCro is tuxtc�iNi Ori sitB fOt rl!(�J1t1 fl W1li�:It CN{i IlC FWITISUEd fC Sri
u,�1,�i �u not dc;i�cy lom��r�n�v's pc�w. '�•1AAt is ta kc�c�� track t�fthe additio�tat tobdr pn n tifttr. aod
rnati•iiAt ti�st:'tc tind no(tf� ('F �tii7 , cho� �Ii� woik is chmplrte f�� thia icvel.
c. t'hrii, i Ian:�ru, SPt:t•
lvli4.e.1'c<lcra��n, 1•(G.�1
S�i�an .1c�nce, C.'CAf1
Paut Asp, liC3i1
,11.25-404.2
��
— -. .. ........_ .- - — — -- -
--'---- 04/il/9G 06:i0 TX/RX N0.13G3 P.Ot)t �
M�M 6122939557 05/23 '96 13:57 N0.765 05112
Fr:�n . �P7 SFr�;ce5 Sroct Tt,r3c:� �1.� ..�� .,'t7 phi
yr,�.ii l`�' B.�KUF . i �.�i�..n�� � � ,� -- ,.��:a�i �_t C� -�,.,
r;i.=.,, t�z r...�uUT i PP• fiC3 zs - 5 ; i i:
:;ti.�.r i•`r E..�KUr � 2r-[ica si- ac:.�t �.�a
I.�.F YT 6AHUY � l Y'f�-hC4 SR d -- ---.
.' izr.�,t
. .. ...._ � -----•--•-_,... ,.,.......,.._....,_._..... ��....,__._. . � �---...._._..,.-.. a,r,�:� f;
+ � 1 �� ' ������ --- --' -
Tiq Co�,�� turny L7rnn�Cpifey�:•:
F'.�CSI?�(A_F. TR 1��7Ri�f
m:7wt5T FEuICN
A4 P�cl(bl: Qf(CO
��}i �rltl.l�h : : d9q n �::9
t I 1)I�k - il. L:: I L�1
b1n.P�V:�V�i Ebfu�aiL:td.ii-::
T�"=yf���tl lut?li??-.i�l-0
�\19�lll..f !ul'�.?:��.M1:(J
Dafi�:T�/d<�E�,
JaG:,_+1� :•rav2._..__._..
•
�
•
I:ODi7'.4IJy:
nr��;,v��ror+:
.a� �.__.�_.
.r�cb�� __�/ _'_"._'__�,._.
F',t.l' NUhllp',Ct; �3�— x,N�.p
k.k:: !��?$..�k.....�L[�E"_ �.°�....!�'!�°_..-••_-_-_..
F124r�: �
..�.Irl7i!_�t�.,._____._...... �-----
COR�j�l&VT5:
�,..
..._ �'�' _ �
. .._.. �._ �! �g,�� �. t_���'��,L� ,�� 1,7 �_��E An�, r•ro.�.t4 ---_
.._.�..__�11�f�?��^_ I'"�� f3*�t+��r.� ^�AMA YtR.�G�`JS..._.
_ S' ya
t��t_� :�r�
__—,.�:C_..f_���L'F___�tL•17:_.. !^?:6'-...�a!_��k�_L�tc_�S.�fa_�a..{Juv�ti�s.,.Fr_
----�8'r"v!�"t�,��--•�.��.� �1��_I�,2Ylf4Ji' �If�iSfrto�.,i�•�.*'��d�",cY
- ��_��_�a s. �A�eL 1 R.�_._.P�._4lfY._$.aF�,•4_S&_ r„G _�g7r'��c!Y.�f'_..._.
fAEnrV fa0in CP^'� �
'iutnt�er o! p;y ;cs tn,;fuding. itur i:4ver thecr. �Z. 11 yuU <Jq nol krntivf� all , i
c f t iese
j�:i;�C:i, �I�C:u'<CC�qldCl
_ at (6l2) SZ:=;100 u.. saon a; )+USif�}�(�,
���1�711C }'oU.
�+�nn� ,�pc�,� -:� � Lonvi� � Get{f(itfu � A�.Iu]V4yo �rnn� ( ;yL'�tl6 • vA0 F!g({USLP • IIO�1J. iJ , - l;u �npwno
MRM
__. f � _—.
�
6122939557
OS/23 '96 13:57 N0.765 06/12
�_ 6 �.
�� � � --� � ; �
� ilI f? (! .. � •. }
i t .. , � -. ,
i -, i4.�+�� �i)�'t?zr=:�,�ltu �(.c??!_�' � _?%`?','`'(._?:',
�, -. _ _ _ : � �, ,
�,. ;,,r;.JCC�1��t.); :r �} �`.,) l� r)
rJ� ,�JOr,� 5x. i:rod tv1�.^.nnapnlie MY :ScU: :fi'.. } ty_•yy ) AS :b.t• l�Y �'�lC;
����t��'t��ii�l. F;t.(2f
- e 4/12/46 f(7t1 Nlih�l(il R: ?��
� t) c M.A- Mort.nnaon L�/� f l
300 Eagle St.
ut. Paul, MN 55102 IZ�: St. Pau� CiViC rEntCr
AT7'. Todd ShilJi.ng �,(kq"j'(Q�1;= St. Paul, MN
fJ�iANGF. PROPGtinI. h+� ) _ 12
THt$CHAN�IF, nad saaas.00 p?��s max
. _,.
: �F ��
.� ��
�
D.��S:�lPS:L4hS�F t �SL4k1LSES2UE5
PI.EA6E AT.IU TD OUR CON'SRACT Af�OITSCYNA� P/1' tlACK—UP AARS ANn ACC£;SSORIP•. PER
CPM 1 7,ETT�R FROM SORN STL*LTEN TO 'TO�D 5HI4LI2IG.
ADD 5-03 MOtiS E40Xy COATED AEHARS, ASSSS30RIES i,ADDY'i'YONA2, DETATI,TNG 6
ADDITIONAI. FREIGIM' LUMP SL7M 54485.6n+t8x.
pAgT bF THZS MATERIAI. 1S REQUIRF.D Oti JOR SItiE AE91i� 18, 1995-
�ygy� p,yQpg Wc1AK WILL NOT PROCEED �3'LZT. � RECEIV� A Wl�ITTF,N CHANGL�' ORDER TO
OtSR CONTRACm'
?"i�)�� E. Pf.F.nS� C:CI;JFIkM ftllS Pf2UP(JSA1- BY $ICiNINtJ CJNt. t t){'�t '��I� 1ZEl�li(L�Ih+C+ {'.
i"O OUR OPI� i(.'i. �.`� ACkNUVJL.13DC.iEO i,qPY W'SLL i'Sf' Ri.l :;itNF.D CCl `��l)t FUit
Y01:14 }'H.f'.`.i
ACC..F.I' C!:.I:r
l5 �Y __
, �!'i Itlt�ti7f " , ��:^: 1
1 1 I �.t' ._ . .
• r>n r; :
AMI3ASS/�U�.iR � (':GL
MI1vN(=API)i i> 5/�LF� (iE l it l.
( J '
F3Y `'��.r�....-�- � �
-- .�._ . . l
Thnmas T. ChC�aris ;J
I
� f� j.11 3a1Ed R�(±IQ9antd� �`�C
i�,arf-. ��-j��:�_1lL - -
i'a�,ir 11APpIN�b'.£� C)�Vk.NDS UFY]N A F'ER:s"CINM Fitt /i� l.`.JN;JI1tP Wi I t� GOO
•
��
•
MAM
0
6122939557
��� �
1913 Brpadway Stre�t NE • Mmnzapol�s, Miiznes'oia 5541:i - 612-F?_3-U3D2 • FAX 612-ti23-3923
M. A. Mortenson Company
Attn: Todd Shilling
300 Eaglc Street
St_ Paul, MN 5510Z
May 23, 1996
RE: St. Paul Civic Center
P.R. 4.14 & P.P_ 4,74R
Ambassador Steel Change Yroposal
#7 dated 3/4/96; Revised 4/8/96
Belnw is a list of additional reinforcinq bars and - accessozies
of' which most have already shippud to the jc�b site.
2¢ - #5x31-4
54 - #5x30-0
3 - /}5x28-6
24 - #Sx27-4
� - #5x24-4
Subtotal weight = 3,323 lbs.
1,274 -#6x11-6 �M bars bent @ 22,006 ibs.
All of the �bove rc�inforcing steel is epoxy coated. 7'hE. toY.a1
weight is 25,329 lbs, or 12.GG tans. �mV�a:>:,ador Ste�:1's estimated
weight for this �rea was 25,440 1bs. nr 12,72 actual tons and
quoted 12.75 tons, We alsc� shipped 975 pcs. 4 1J4" high chaiss
epoxy coatecl.
For added and deJeted uncoatcd reinforc.ing bars, see the attached
(2 pages) take? off list by our c:stimator.
Add 6,750 lbs.
Delete 2,181 lbs.
4,579 lbs, or 2,29 tans
We also addea to this PR 4.14 aJl the dowel revisions made on
our shop drawing A1 that. was sent in for approval.
See the atCached copy of a portion of our shop drawing A1 with
the engineer's changes.
Add 862 lk�s_ #8
2 �12Q lbs, N7
2,982 lbs_
Deduct 1,460 lbs.
1,522 lbs. or .75 ton total add
Seven hours of redetailing wa� adc3ed at �50.00 i�r making all
the above changes_
05J23 '96 13:57 N0.765 U(!�2
TRUE HAPPINESS DEPENDS UPON A PERSONf�L R�LATIONSHIP W1TN GoD
M�M
6122939557 OS/23 '96 13:58 N0.7b5 08112
� �
•
1913 Broadway Strcet NE • Minneapolis, tdinnr�;ola 55413 •(i12-U23�C:�02 • FAX 61"L-6'23-3923
Page Two
RFP 4.14R changE�d some column dowels from #7 back to #6_ However,
some of the #7 dowels were already on the job site. Wc revised
our proposal Tequest of 3J14J96 on 4/8/96 to reflect this change,
We deleted .15 ton (actual weight was 31y lbs,) from our original
proposal request, we c�nnot give credit fvr material that has
alr2ady shipped.
Todd Shilling from M.A. Mortens�n Company called me on 5/23/96
saying CPMI said that there should not be this arnount of tonnage,
If CPMI is going to question the tonnage an our change prpposal,
please do so in a reasonable amvunt of tim� before any material
is shipped to the joh site,
In the future, Ambassador Steel will not ship any material for
change proposals until tFtey have been agprc�ved by CFMI az3d we
have a siyned change order t.o our contract with M.A. Mortenson
Company.
• Sincerely,
�MB�SSADO�STEEL„CORPORATION
��.M �� JJ .
��- � • �`���
Tom Chegaris �"
v
C �
J
TFUE HAPPINE&S D�PENUS UPUN A pERSUNAI RELAI'IONSNIF WITH GOU
� MAM
�__�•�-�--
—' `.A�
� 2� �r � ;
- � �
� �
Za f' i�
_�
�.�-�
/6 h
;zl z.�
� X. B 6
�
t
vy
05123 '96 13:58 N0.7b5 09/12
� w- r}?'_� sttect _� vi" - L�f'st.Tt�. w.
._ . �_- -' _'�-� _ '"— _-- . -�
N_�Vj'_3`-N�;11Y�' I> .J ' IGIfT ili'�hll)IT,'�
— { - -- '�� ' �-- _ --
, i � . . .�
-- } -
; i
- �. r= ¢_ i _ }__i_____ _
, � �
;�1 7� �-c�i,� i t
--- — � � �
,
�—
�l
� �
uNG
L f3�
Sti --fl
�
7
//
0
;�
� �i '
_ _ ! _ .
-- —. 4 - o �
---.._.�_—._. --
� __ ,��G _- _ ._ - �� - - - -
�,1���.:� -_ �:__ __... __ - ---� --- --_ -
_:--- - -- - - �� �_�-__-- - -- - �._-�� �- - _ _.. -_-_ - --=
- --- -__ _- - - -_�- .__� - -
-_.�__ -_.:�__- -_- _--- - - - �. Ra1v n •rorn r. _ _.
d 1J21yG1:t,N 56b1 S:7 . F , F{d . �IN �Nlllf�? 9;¢16 154 �l'1 171i'1NIL; !'del : IJUTIi
MAM
.`��+n
`R � �
•' ` —..�
,.����. -"'
557 05/23 '96 13:59 N0.7b5 10J12
--------- -- --- — --=_�_ - --_:�_— - --
— -- "'"_�ay-.—.3`hs;7xr, t,tc}r TlE
-'- - - - I ---�— -- .
I
-- -- +-- — -
� —� ` -- -� S
-- -- � - T - t � - — — t -� G --O
t �� ¢4 '
���- - /o , I � ---
�------- i -- —
��j �_ /� � --o �3
� I I I � /Z �f G as
r..s ac
/,� sc �0 3 --a
G' ee 3 � C=-�/
��
��.iii
��%1
'Z,
'�-x
3--0
� �4
.�= 9
�:
----- � � _�
� ---- --- ----,._- -- — - —t— -'Z
�—. � ' � - —� - -- -----� _ -- = - -
— �-- _--�— -- _ � -
a — - - � - ----- ----- -
:�. -� _�-T��._�_ ._ -. _�---=1:-J.:_- - �-��_._: =.��e�:.�-t-�_
_ ,=- :
__.
--:.- ____�`._-_--.�-- �--- - cRarrn'1ur � :
— -- - -- P� � 76"0
',1 w��,^,v� �,c, �aF,F,c _�: r,�W ".-- _ : n�y �NnH�i ~ ?�nt �.I9 ��ina�S �vn : wn,�j
MAM 6122939557 OS/23 '9b 14:00 N0.765 11l�"L
T �,
! F
• � [
1
���� . _. . I i�
j
� �
x
.� � ��
; ro O
„
��, �
� �
�
� ."
r�
° o
� •�
� �
• �•"YS`ti \
\
i \�4 V 1 � �
a� a f
.. �
�
V
�
��
S
\
ti
C> •.��
T �(�M
n at �i
rf „_ � �
�r1��
���; �:
�
���
:���
< <:
b
a
�.
�
A
c
�
, �����
4 �
��� f�E�fl l7� n h :� n r)v� i �
� 6'� J1�m �4- 4 I id N �. .-t¢ i�• i
� ' ! � (7 i b �
�'" (� L1 r i n .3 � (n �
�a � t� i
<) , [_
a �
i .. .. .. .. .. .. .. .. .. .. _ .. . . .. .. .. . .. z • �
�a i
� �
> .. , <] �
........................."'__ _' " .
� ' +/. u�l � i
�, � �, A� « a ��, � � ;
j , ; �: ,
.,, >>� ,������:K. ;
'1. �
�\ 1�, � �
>> � �� tn � �.� ,
r r r.it�y ... r �.3 `
�� �` �� i rr t A�pr� m�B ro cn a a, s ��� i
y � ��'', j!; � w ic fs wsw w y �w a a ; in �
() � �� �. i"ri ��� 0� � m m rn l+� �� +q � ta � �`'
}) `�` �e� Ti i:A .� p .�' .L { , � . .
�� . �� �:�. E,• r. � .l, ;tvni�
li L) � r g1 X t w `� :ec ;
� ��� �11 �� � �� t. , ny�
�`.� � � � '1 M r �. i.9'l. �
i4, . �nl ` �.�. �5� af , ;', r.. � �r.� ,
°�� � �'� '� b.�m Q� m \ m o� �o, � �cn i
a a a• n x� a y s�.�n �
� e � m in a ur� a n a,r, p a i�o x� �
� � � � ic.s �
�' � i �n�� i
�. � �+�ct>�
��� ���., � � Y �
� � �
� � ��
� � �
rf � � Ci �
� � h�
� � nt �
� � C1 t
�: � � t' �
f : � i G1 �
. r .. .. .. .. .. .. .. .. .. . � ,
. �� � � eq �
1 t �7 �
\.` �+1 � .. ,. �, » . .. . . . .. f ,
� n 'c, � ,
1 � hy ',D 'jf 1 i
� F � � �2 �' n o o � :
� .p b G G C i
X: C� r �U �6 RS t
U
7 i � 1 'u
�'�` ;tt ; �� b d b i M i
x x a; � x �
� ��� �. c- r � �r �
�l E� i re co rn v, ta �:u �
iz �
� • m �m w, � �
�� � 't � �
�: �'' � ! n n � � �
i H H �3 i �
� � Yf ID ,. „�.. ,. a i
. .. .. .. .. .. .. .. .. .. . .. .. .. ..
�1
�'
;s
�
�`
*•
��. _ ...�---�-,
����
.
� a ,-
_�_._-- ,
\ � � \�.�`�\ �,
\.<
.\
4',
��`
�
�°.
p�
'j,
(`.
�1
.l .
���
:`
�i
I
,,
,,,
�,
:�
F
i,
�-
��.
<<
�.
iP�J G�c'n?-LCv-< ty u.+t�.e4 i ] 1� �-�g b�:� �;• »S 1JS
�
1
� �-?"� ,
:` "�
�. ,
i I
«��,,�
MHM
. �'"
�
P,A. �.14
ADD 12.75 TONS EPJOXY COATE➢ RETNY>pRCTNG BARS AND
3.25 R'pN5 UNCOATED A�2NFURCiNG I;AftS: LUMP SUM..._..•.-..•-$1Z,700.60 E't.[],5 TAX
ADTj 7 AOURS RL'DETAILING A'T $,O-�Q/TipIIR ....................$ 350.Q0 YLL'u TAX
TOTAL $13.OSU.QO PL178 TItX
P.(Z A-.14R D£DUL'J".IS �d�.� TRUJ'"' 4.f4- �7!•
4IBI96 i2$`lqO° P,.vs Ta�`
PROYt)S.A1. KN'Qii�S"1
Rr'wsrf� '����qb
��'1' M. A. HORTENSON CP UA?'E: 3/± '�/96 JOB tJ[IMf3[R, �s�so3a
300 EAG:.E ST
S'1' YAUL, i4N 55102 K�: ST PAUL CIVIC CIdNTER
AT%. I�C11= y,J L/ 1 [fq L(1(�A1�LQIv' RT PAU7. MP7
z�r3-A�s4
r`A y 2 g3- �557 c_ t�r\NC;� PROPC�SnL. NO. �
Tr�tSC7inNGE. xon sis,nsn.00 rLas T.4X
b� S�1�TPTFO�f�S2F. PSiUNU�.A3. 3tF;OLJF ST
•
REVI$LD
j�10T�: PL(:AST CUNE'IRM ll-IiS I'ftUt'OSAL 13Y SIGNINCi UNk�. C:CJNY ANll R4:'I'URNINIi 17
TO f)UR Oi�7�1L'E.. AN At:KNOWLk.CX:FI) Ci�f'Y Ii�II.S. BE RF.i"U.KAiES7 TCT YOii I�OR
ti'pllR F3LG5
nC.CEYT E:i=i
i3 Y
6122939557
05/23 '96 14:00 N0.765 12112
~ — J.�-�-� 6 G V
� --�14� � �. - r� ��-� ��. �
n �t)lt�)`„ ;��1(l�:;o�i�.'_<,�'>ti(�,�(�°�'�;
C�cC� C?) ��; f icJ> c�,"_ r�t,?>
/01 Nc�yh Swn�d $4rue1 • M,nnnapnlr. A^.h i5t[S� •!bi?} 3JH.:9�9 - FAX (6i?j 33K ]!If�7
AlJ'fI�OR17.l=1> $IGNA�CUKt
S��t.e
i�nT;_ _ _ _._
,4MBASSADQR ST�L::L
{�1:NN1.AP("ll.1S $ALES UFT=?L'
� �� . .
� � �'M
i3 .� _..� .-----� �----- / �"..�-
TFICtI�5A.5 T CHGGARIS U
�t t I�I,E.� SALES I2EE$.G$E�aLT_B='LLY1:-.
��� - r�-.: ._ 3 f 14 �9h.- — -
IHU;-IiAPP�NES�:UFf'L�:l15UY'UNAPERSOI+I/U I';EUIYIUNSHIYWIftiGGG
•
SJ
�
:�
• NOTES:
1.
2.
3.
•
CPMI
OWNER:
REQUE$T FOR PROPOSAL
Saint Paul Civic Center Expansion PROPOSAL REQUEST NO.:
CP-4 Building Construction HGA REFERENCE NO.:
DATEISSUED:
Saint Paul Civ+c Center Authority
l.A. O'Shaughnessy Plaza CPMI PROJECT NO.:
143 West Fourth Street
Saint Paul, MN 55102-1299
!i• ,
4.25
24 April 1996
3225
CONTRACT NO.: CP-4.01
TO: MA Mortenson CONTRACT: Multiscope
300 Eagle Street CONTRACT DATE: '18 January 1996
Saint Paul, MN 55102
Attn.: Todd Schifling
Please submit an itemized quotation for changes in the Contract Sum andJor Time incidental to proposed
modifications to the Contract Documents described herein. Division of responsibility shall be consistent
with the Contract Documents or as specifically enumerated below.
THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK D E S C R IB E D H E R EIN.
DESCRIPTION:
Post-tensioned tendons at construction joints.
Please revise per HGA's RFP 4.25 dated 18 April 1996.
Cost of Field Order 4.02 should be included with this proposal.
Reason: Design Change.
ATTACHMENTS:
1. HGA RFP 4.25 dated, 18 April 1996.
2. Detail4(3-76
Submit response in form of standard Contractor's Proposal referencing this document immediately. If
response is not received within 15 working days from date issued, a� order may be issued directing you
to proceed with the above described work at no cost and no time change.
COST, PLANNING AND MANAGEMENT INTERNATIONAL, INC.
��.� L'. Jo-�-d Q�
Susan Campbell Jones
Pro}ect Manager
cc: Chris Hansen Mike Pederson Frank Berg Dick Zehring
Metropolitan Gephart 3225-404.6
CPMI, INC., c/o Saint Paul Civic Center, I. A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299
�
REOUEST FOR PROPOSAL
HAMMEL GREEN AND ABRAHAMSOl�, INC.,
ARCHTTECTS AND ENGINEERS
PROJECT: SAINI' PAUL CIVIC CENTER
EXPANSTON
PAGE 1 OF 1
18 April 1996
HGA Commission Number 769.003.00
OWNER:
Type Contract: CP-4
C �
CONSTR.
MANAGER
SAIN'P PAUL CIVIC CENTER AUTHORITY Contractor Project No.:
CPMI, I23C.
cJo Saint Paul Civic Center
I. A. O'ShaughnessyPlaza
143 West Fourth Street
Saint Paul, Minnesota 55102-1299
(Susan 7ones)
RECEIVED 3 �'���� r ' 3 �
APR 19 :,: ,�PNO.a2s� L�
.��tt
DATE:
COPY TO:
S. 70NES, CPMI
T.ANDERSON
P. ASP
T.CARLSON
M. PEDERS023
T. TANGEDAI�,
Please provide a cost breakdown in accordance with the Coniract Documents and a Sunmiary for the change described herein and on the
attachments (iF any) listed.
This is not an authorization to proceed with the work described herein uriless and until approved by the Owner. On approval, this change
wili be included in a ChanRe Order, which will provide the fotmal Contract chanqe.
DESCRIPTION OF THE WORK:
Structural
Modify detail 4/3-7B such that it also applies at the stressing edge of banded
post-tensioned tendons at constsuction joints.
The modification amounts to adding #4 hairpin bars at 6" o.c. and 3#5 top and bottom
bars over the specified width at each location. At each of Levels P2, P3, P4 and PS
there are 14 locations where this modification appiies, for a total of 56 locations
over the height of the parking ramQ.
Attachments: Detail4/3-7B
Requested By: Engineer
• COMNIENTS:
%�
f' �—
rfp4.25.1a
ol
al
-. n {
-6" I. SEE PLAN
3
&
��
v
0
a
�
r--
�
�
�
0
,. a
BONDED
�12"OC
� a
F (TO LOWER) I
�� �
UNIFORM TENDONS
4'—g'OC MAX ,
I
BANDED TENDONS i
a
:
�
-� � (TOP U
6 � 12 O(
MAX URVATURE
REINF
o�
�w
m
�_
m
o�o
� N3
z o
z
� -' m
o�
�
oo?
z �` _ >-
m�33
���2 TENDONS LOCATEi
� DIRECTLY OVEft COL
� �
-� #4 T�ES � 6"OC THUS: �, 3 =�
J �-
3
w � 3'-0"
� 2 TENDONS AT SLAB EDGE
� PARALLEL TO UNIFORM
� TENDONS
0
_
�
� PLAN DETAIL AT EXTERIOFi
q � o � o /a 1207 HAR4qt PJ.f£ Ai 3l16
� 1'1 �nn�aaus, umNFSOU sstw
� �m .xc� r9s5
� T� ATT1T 801 SECQVO AVFM![ 9A7E 501 �
f1 � f�� SEATIL� MA9NlGfIXt _ 98104 W4M. NQ�
a
'169FJm3fDO
�
3.2
4 OPP
�'-0� BONDED REINF TO BE
4 ' UNIFORMLY DISTRIBUTED
� WITHIN BAND WiDTH, EA
, i WAY h
SAINT PAUL CIVIC CENTER �
EXPANSION .
SAINT PAUL, MINNESOTA 3 _ '� �
•
MORTENSOi�[
The Corrsvuctiorr Org¢nization
3n���o¢�
RECEfVED ��r� � �
NiAY ' $
CPNlI
CORPORATE OFFICES
P.O. Box 770
Minneapolis, Minnesota 55440-0770
r
U
May 24, 1996
Ms. Susan Jones
CPMI:clo St. Paul Civic Center
143 West 4th Street
St. Paul, MN 55102-1299
RE: St. Paul Civic Center fixpansion
CP-4 Building Construction
RFP 4.26: MN Club Waterproofing
Dear Susan:
700 Meadow �ane North
Minneapolis, Minnesota 55422-4899
7elephone: (612) 522-2t00
Facsimife: (612)287-5430
We are submitting a cost proposa] for the changes in work defined by Request For Proposa14.26
dated 24 April 1996.
We are requesting a Change Order to increase our Contract Amount by Two Thousand Three
Hundred Sixty-Nine Doflars ($2,369.00) to perform the subject modification as identified in RFP
4.26.
Mortenson reserves the right to submit a proposal for additional costs and time related to the
impact of this change on unchanged work or the effect of this change in combination with other
changes.
Should you have any questions or comments, please contact me.
Sincerely,
�� ,
Todd Schilling, Assistant Project M ager
cc: File: RFP 4.26
.
Minneapolis•Seattie •Denver•Colorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•HOnolulu•LOS Angeles
{
•
•
Contrector Proposal No.: CP 4.26
Project: ST. PAUL CIVIC CENTER CP.4
�Q�S
�� �
Contract No.: 4.0'1
A change in the scope of the work is requested as indicated befow:
It is requested the compleYion date be {) extended, ( 1 decreased, (X1 unchanged by
calendar days. The adjusted completion date wilf be N!A
2. Descsiption of the change: {Refer to drawings, specifications, addenda, if applicablel.
Refierence RFP No.: 4.26 ; FO NO.:
Title: Minnesota Club Waterproofinq
3. Basis of payment: (Check one)
(X) Firm price for performing this change is 52,369
Adequate supporting details and information (Increased) iDeduct)
must be attached to alfow Owner to evaluate.
() Time and materiai per contract, but not to exceed 5
( � Actual cost at completion of work $
Submitted by: M. A. MORTENSON Date: Mav 24, 1996
Contractor
Contractor Signature
FOR CPMI USE
Action Recommended: (Check one)
() Change wili not be made. Expiain:
2.
CPMI Job No.: 3225
�Proceed on the following basis:
`�As indicated above, change and basis of payment is acceptable.
() Change is acceptable, basis of payment is not acceptabie.
�) Basis of payment shalf be S
( � The following modification is recommended:
() Change in completion date is accepted.
O Change is acceptable with no change in price.
() Change is acceptable with no change in completion date.
( � Other
Reason for Change:
� Design Change O Client / Request O Field Condition
) Suggested by Contractor '�9, Omission or Other (exp4ain)
3. Is this a paR of the originai contract scope? ( 1 YES `�NO
4. Is Comractor's Estimate attached? ES �( ) NO
5. A/E consulted. YES () NO
Prepared by: CPMI)
Approved 6y HGA)
. Approved by.
Owner)
Date:_�
Date:
Date:
Approved by: (Owrnerl Date:
CPMI Inc., c/o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299
cc: Chris Hansen Mike Pederson Dick Zehring 3225-
R
� R � �
5t24l96
�
Description: 4.26
TiUe: MINNESOTA CLUB WATERPROOFING
SAINT PAUL, MN 55102
PH.� 612/293-9/54 Fi1X. 612/293-9557
•
Mortenson Labor.
(See attached)
Mortenson Material:
(See attached)
Mortenson Equipment
(See attached)
Associated Costs
(Change Proposap
S Amount
5 -
$ -
$ -
$ -
General CondRions: $ �
(MoAenson Work)
SUBTOTAL M.A.Mortenson $ -
SUBCONTRACTORSIVENDORS
1. KREMER & DAVIS, INC.
$
$
$
$
$
$
2,235
1 V.
SUBTOTALSubNend S 2,235
St. Paul Civic Center Expansion Summary
Change Proposal � � �
ST. PAUL C!V!C CENTER FJCPANSlON
M. A. Mortenson Company Fee:
SubcontractorsNendors Fee 5°{0:
M. A. Mortenson Work 15%:
SUBTOTALFee
SUBTOTALTaz
Total Material 8 Equipment $
M. A. Mortenson Material 8 Equipment Tax:
$ �52
$ -
$ 112
7% $ -
$ -
SUBTOTAL:M.A.Mortenson+SubNend+Fee+Tax $ 2,347
0.0007 ($.7Nhousand)
0.0038 ($3.77(fhousand)
0.0050 ($4.9593/Thousand)
$ 2
$ 9
$ 52
$ 22
Buildets Risk
GCL fnsurarke Costs
Payment & Perfortnance Sond
SUBTOTAL Insurance 8 Bonds
�
TOTAL CHANGE PROPOSAL S 2,369
Page 1
� ' 05/23/96 14_04 $812 7�8 5485
�Y � � . .
♦
� KREMER & DAVIS, INC.
• P.O. BpX 21037
3800 JEFFERaON STREET N.E.
MWNEAPOLIS, E,IN SSt2t
(6121788-5835
MAY 23, }996
MORTENSON
CSVIC CENTER
ATTN: TODD
RE: REP 4_26
To FURNISH AND APPLY RUgBERIZED ASpHALT SHEET MEM9RANE
WA?'ERP1200FING ANYJ PROTECTION BOARD 20 TUNNEL T4p,
AND OVER EDGE 8"
.
RREMER & DAVIS
�jpo2
LCJ� 1 �� WA7FRPROQt7NG CWYTJLtCTORS
3941Cf Yo(S
.
$ 2,235_00
�1705� = � �i����d�
(
��xt) r�iz4� �z�t(�t�x�z��
��
� C�Z�- s�
�E�2= Ie2 ��Xo75-
�� 5�
�loo s� D � �
,
>, �
I�B�
�,�
�3 54
.
Yours very auly,
KREMER & �AViS, INC�
��.�,,.. ��
Michael L, Pratt