D00976• _ - c�cy cie�� _ - Fittance Dep[. _ - Dept_ Accounting (Civic Center) _ - Engineer (f3GA) - Contrac[or _ - Project Manager (CPMn No.� � � Date �—�n � CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATIVE ORDSR for CONTRACT CHANGE AGREEMENT NO. C4.16-A-2 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement descri6ed as�aint Paul Civic Center Expansion CP-4 Building Construction Mechanica] - Parking Ramp laiown as Contract L_Ciry Project No.015118 Metropolitan Mechanicat, is composed of the following: 1. Provide ramp drainage meter per Contractor Proposal (CF) $4.22. Reason: Code Requirement 2. Reroute mechanical at Minnesota Club dock per CP #413. Reason: Field Condition (In the way of elevator shaft). $3,549.00 2,121.00 Total $5,670.00 r1 \J ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in accordance with the specificauons in the sum of $ 5 670.00 , said amount to be added to the lump sum consideration nazned in the conuact, known as contract L-. r � �� . �. +•_• .•f � APP AS TO � c Assistant City Atrorney and wlrich amount is to be financed from: � � 19 �� Head City f Saint Paul (PED} /(/i'��ii'r�r.a'v arotuteor �T"t�U�G!'119I� Merropolitan Mechanical Contractor BY ���-�f'F �-�-e. � �-� / "" � (�%.�6 Administrarive Assistant to the Mayoc , ��� 3���� 7J �f, �� GREEN SHEE Nrt �� A � Q DEPAHTMEM DIflECTOR � CITV COUNCIL ��� NWiBEPFOfl �pTVATTORNEY GRYGLERK NOtlTNG O eUOGET DIRECCOR Q FIN. & MGT. SERVIC OIF. OROEti O MpyOR (OA ASSISTAIJn Q TOTAL # OF SIGNATURE PAGES ��2�� O r e� 4�'$ a y� r (CLIP ALL LOCATIONS FOR SIGNATURE) ti�.�-�'D ����ar�:c?�' -� C' C C rc K �Z�1SleYt � �h�� nq ta-rtt� J _PLiWN1NGCOMMI5510N _CIVILSERVICECOMMISSION _ CIB COMMITTEE _ _ StAFF _ _ DISTAIGTCAURT _ Sl1PPORT$ WHICM C�UNCIL O&IECTIVE? PERSONAL SERYICE CONTRACTS MUST ANSWER TXE FOLLOWING QUESTIQNS: t Has this person/Firm ever worNed untler a coMrac[ for Nis dapartment? YES NO 2. Has this person/flrtn ever been a ciry employee? YES NO 3. Does this personflirm possess a skill not normally possessetl by any curtent pity employee? YES NO Explatn alf yes anawe�s on separate sheet anQ attach to green aheet W�ffi, When. Whare,Why): 7�L1'L' V �L,.' JUL 12 199E ClTY CI�ERt� f07ALAMOUNTOFTRANSACTION $ a+ COST/REVENUE BUDGE7ED (CIRCLE ONE) YES NO °UNDIWG SOURCE � � �a- r `�� �+ ��`�� pCTNITY NUMBEH �f� - � `E'�-7 �o oq -b�3S '{�8osc� 1NANCIAL INFOfiFhAT10N: (EXPLAIN) �j j �p � �.LUu u • PROJECT: Saint Paul Civic Center Expansion Project Saint Paul, Minnesota CONTRACTOR Metropolitan Mechanical 7340 Washington Avenue South Eden Prairie, MN 55344 Original Contract Amount: $430,�00.00 CO No. C4.16-A-1 C4.16-A-2 Subtotal Deduct Add 45,432.00 5,670.00 �51.102A� DATEISSUED: CONTRACT NO,: CONTRACT TITLE: CONTRACT DATE: 12 June 1996 CP-4.16 Building Construction Mechanical 18 January 1996 Net Amount of Contract incfuding this Ghange Order: $4&1,102.Q0 L J � C� , �� A change in the scope of the work is requested as indicated below: �'LZ���I�-$ RECENED 1t is requested the compietion date be ( � extended, (} decreased, {��nchanged by cafendar days. The adjusted completion date will be 2. Description of the change: {Refer to drawings, specifications, addenda, if applicable}. Reference RFP No.: 4• 22 � FO NO.: Titie: Ramp drainage Meter 3. Basis of payment: (Check one� () Firm price for pertorming this change is g 3, 549 Adequate supporting details and information (Increased} ifledu�t� must be attached to allow Owner to evaluate. ) Time and material per contract, but not to exceed j Actual cost at completion of work I�� Submitted by: Metropolitan Mechanical Contractor:p} 4/17/96 C ��¢�'�(` � =°--d-c c.x-�—.�.�.-- oC"ntractorSignature E.A. Couser � FOR CPMI USE Action Recommended: (Check one) O Change wi(I not be made. Exp{ain: CPMI Job No.: 3225 �Proceed on the iolfowing basis: �s indicated a6ove, change and basis of payment is acceptab(e. i) Change is acceptable, basis of payment is not acceptable. {) Basis of payment shail be $ ( 1 The following modification is recommended: (} Change in completion date is accepted. (} Change is accepta6le with no change in price. (} Change is acceptable with no change in completion date. ( ) Other 2. Reasonfor Change: O Design Change (} Client Request ( 1 FlSI� CO.^.C�1tiOP. ( 1 Suggested by Contractor �esign Omission or Other texplain) �d� 3. 4s this a paR of the original contract scope? {) YES 0 4. Is Contractor's Estimate attached? �YES () NO 5. A1E consulted. �ES ( } NO Prepared by: CPMi) Approved by � HGA) Approved by (Owner� Date: � Date:_���` �/ Approved 6y; (Owner) Date: CPMI Inc., c/o Saint Paul Civic Center, I.A. 0'Shaughnessy Plaza, 743 West Fourth Sveet, Saint Paui, MN 55102-7299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- . . . _ ,�.. - __ -- —"_ _ .—_'" '_"'_"__ __--_- __ "___ .oar_0 7y ; . : ^.� R F' P 4 ZZ ---- --- -- — -------------- ----------- , A;• ;- o v , a? v : �'W;LSONJ(JNESCOMPAfIy a:Sn�COWn�:+nm ..,_ . _.. —�3Q:=' _ �— -- — — — , __$Rl' -- - --$3J-"''- _--- ,_1 �__qo7:�- ------ - 4 ' 07 � �Loo -- �14G��i ------ - � - So'._: � ' ; !I � , f ( i i i s I : ; ! f; . 11 !_I..=°!— I! ' _ ' _ �� i , i i� - .. -' '�Lc'!��J C� M � � CP-4 Building T Contract A change in the scope of the work is requested as indicated befow: It is requested the completion date be () extended, () decreased, {� unchanged by calendar days. The adjusted completion date will 6e � L 2. Description of the change: (Refer to drawings, specifications, addenda, if appficabie�. Reference RFP No.:4.13 ; Fp {yp.; 3. Basis of payment: (Check onel (� Firm price for performing this change is Adequate supporting detaits and information must be attached to allow Owner to evaluats. ( 1 Time and material per contract, but not to exceed i) Actual cost at completion of work � g 2,I21.00 Uncreasedl (Deducty Submitted by: Metropolitan Mechanical pate: 3J20/96 Contractor Con� Signature E.A. Couser ' FOR CPMI USE Actiort Recommended: (Check one� (� Change will not be made. Explain: 2. CPMI Job No.: 3225 �j�Q,Proceed on the fottowing basis: �' �s indicated above, change and basis of payment is accepta6le. ( 1 Change is acceptable, basis of payment is not acceptable. () Basis of payment shali be $ () The fio{lowing modification is recommended: () Change in completion date is accepted. () Cha�ge is acceptable with no change in price. () Change is acceptabie with no change in compietion date. ( 1 Other Reason for Change: ( i Design Change ( 1 Ctient Request ➢(.F,je[d Condition i? Suggested by Contractor �) Design Omission or Other (expiain) 3. Is this a part of the original contract scope? {) YES �NO 4. ls Contractor's Estimate attached? YES ( 1 NO 5. A/E consulted. YES f) NO Prepared by: CPMq Approved by HGA) Approved , Approved D ate:� Date:���� 5 Date: CPMI Inc., c/o Saint Paui Clvic Center, I.A. O'Shaughnessy Plaza, 743 West Fourth SveeL SainT Paul, MN 55702-t cc: Cfiris Hansen Niike Pederson Dick Zehring 3225- . /7�Nt 2.���� i-O.POSAC � �_ , `_ Prepared Initials I Oate �� �NILSpN JONES GOMPANY msoa Gowmnwnm � � MAOE M W 5 <. 1 9 � n