1 4VHERF,AS, the adopted Capital Budget for 2002 includes two changes from the CIB reeommended budget totaling
2 $4SQ000 that will result in $ 24Q000 in Public Works street maintenance operating funds, and $240,000 in Public
3 Works sewer operating funds to be channeled to eapital projects
4
S WHEREAS, one of these changes is the addition of RE-1700750 "xndoor Saint Paul Farmex's Market' shown as funded with
6 with $240,000 "CIB Prior Yr Balance', wnich will remove $185,555 CIB financing from C98-2S151 `Phalen WeUand
7 Restoration Phase 2", and $51,445 from C95-2F015 "Sewer Maintenance Building Modification' with no available
8 replacement funding available escept for sewer service operating innds,
9
10 <VHEREAS, the other change is the replacement of $24Q000 CIB funding for $240,000 `Othei" funding for SU-1700755
ll"W abasha Bridge Shortfall", the first payment of a 5 year no interest loan from MnDOT, with nc available replacement
12 funding available except for street maintenance operating funds,
13
14 WFiEREAS, after considerable reseazch and negotiations by Public Works staffthe Army Corps of Engineers became
15 convinced Saint Paul had been overchazged for numerous construcHon and eserow items for the construction of the
16' Floodwall on the South side of the Mississippi River, and has mfunded "y605,539.58 to the City of Saint Paul,
17
18
19
`lQ
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3S
39
40
WHEREAS, the $605,539.58 has been deposited in C94-2CO33 `5t Paul Fload Control Project'
WHEREAS, all Public Works documented costs associated with the floodwall have been recovered,
WHEREAS, 68 0("�411,766.9ll of the original money paid to the Corps of Engineers from Saint Paul fcr the Floodwall
came from CIB funds and 32% ($193,772.67) came from TLF fvnds for the FloudwaR,
R'7�REAS, the South end oFthe Wabasha Bridge fs incorporated into the Floodwall,
iVOW THEREFORE BE IT RESOLVED, the 2002 Capital Budget be changed to refleet the $24Q000 "Othei" funding For
2002 be replaced with $193,7�2.67 (previously TIF for the Floodwa5l), and $46,227.33 (previously CIB for the F`loodwall)
from C942CO33 `St Paul Flood Control Project",
BE IT FURTFIER RESOLVED, the 2002 Capital Budget be changed to reflect the $24Q000 "CIB Prior Yr Ba7ance' shown
as financing for RE-1700780 "indoor Saint Paui Fazmer's Mazket" be changed to $24Q000 (previously CIB for the
Floodwall) from C942CO33 "St Passl Flood Control Project",
BE IT FINALLY RESOLVED, $125,539.55 (previowsly CIB for the FloodwalD be transferred to CIB Contingency,
THEREFORE BE IT RESOLVED, by the Council of the City of Saint Paul, upon recommendation of the Mayor and advice
of the Long Range Capital Improvement Budget Committee, that $605,539.55 is available for appropriation in the 2002
Capital Improvement Budgets, as heretofore adopted and amended by tlus Council, be hereby further amended in
the Improvement Budgets, in the follovring partieulazs:
���1G����.�.
41 FIATANCII3G PLAI��
42 Wabasha Bridge ShortFall
43 CO2-2R036
44
45 CIB
46 CIB Floodwall
47 TIF
4S Other
49
50
51 SPENDING PLAN
52 Wabasha Bridge Shortfall
53 CO2-2R036
54
55 Construction
56
57
58 FINANCING PLAN
59 Indoor Farmer's Mazket
60 CO2-7R�05
61
62 CIB
63 CIB Prior Yr
64 CIB Floodwall
65
66
67 SPENDING PLAN
68 Indoor Farmer's Mazket
69 CO2-7R005
70
71 Canstructwn
72
73
74 FINANCING PLAN
75 St Paul Flood Control
76 C94-2CO33
77
78 CIB
79 CIB
80 TIF
81 TIF
82 SSF
S3
84
85 SPENDING PLAN
86 St Paul Flood Control
S7 C94-2CO33
SS
89 Construction
90
91
92 FINANCINGPLAN
93 CO2-OT107
94 CIB Contingency
95
96 CTE
97
Current Amended
Budget ChazyQes Budget
140,000.00 140,000.00
46,227.33 46,227.33
0.00 193,772.67 193,772.67
240,ODO.OD -240,000.00 D.00
38�,��D.�Q O.UO 380,000.��
380,000.00 0.00 380,000.00
380,000.00 0.00 380,000.00
195,000.00 195,000.00
240,000.00 -240,000.00 0.00
240,000.00 240,000.00
435,000.00 0.00 435,000.00
435,Q00.00 �.00 435,000.00
435,000.00 0.00 435,000.00
1,139,650.00 411,766.91 1,551,416.91
-411,766.91 -411,766.91
193,7'72.67 193,772.67
-193,772.67 -193,772.67
772.49 772.49
1,14Q422.49 0.00 1,140,422.49
1,140,422.49 0.00 1,140,422.49
1,140,422.49 0.00 1,140,422.49
0.00 125,539.58 125,539.58
0.00 125,539.58 125,539.58
2
0�-3`�1°
�RsGl�l �,�.
98 SPENDING PLAN
99 CA2-OT107
S00 CIB Contingency
101
1D2 Construction
1�3
'f6� 9t. II�snl Lomg'� `�1�'+�a' 2mptaoean�f
� �pMittee received this request on
�datd �� � �d recommQadffi
.�
_ �.!1�,,,--� ��-_- 5�- .
� y .... MY�
Current Amended
Budget CLanges Bssdget
0.00 125,539.08 125,539-58
0.�0 125,539.58 125,539.58
oz.-7`�c
, .
,
:. .,,
.irr •
,
Y— � - - Il Nays
�
� II (I �
Requested by Department of: '
E u lic Works 1-28-02
By:
2- S � OZ
Approval Recommended by Office of
Financi rvic s Direc r:
Adopted by Councii:
Date �, `�_°��} �-Oq�BY�
Adoption Certified by Council Secretary
�
App�
�
Form Approved by City Attomey:
oi-a�lo
�eriw � m�iv uvrr�wworn.i� nm inu wmu
Public Works ��zs�aoo2 GREEN T �o. 106314
CAMACTPER^�N&PHONE INITAt/DAiE
� � CITYCdUNCIL
Ed Warn - 266-6142 q❑CITV A7TORNEV 0 cm c�K
MUST 8E ON COUNCIL AGENDA BY (DpTE) 3❑&IOGEi DIflECTOR O FlNANCEACCOUMI�NG -�;�-;-}--
OMAYOR(ORASSI5fANn Y�f EdWa�NDIticRupert V ('
POTALAOFSIGNATUREPAGES (CLIPALLLOCATIONSFORSIGNA7llR� �SEMORMGR,_ I�DEPARTMENTACGI�UNT
ACTIONRE�UESTED ` - r f4dt
Approvai of attached Council Resolution amending the financing and spending plans of the Wa ortfall, Indoor Farmer's
Market, Saint Paul F7oodwall and the CIB Contingency projects.
n?t%3 �
�.�� �- � ��:,�v �
AECOMMENDATONS:Apprwe (A) orRejec[ (A)
PLANNINGCOMMISSION CMLSERVICECOMMISSION
� GYB WMMITtEE _
� STAFF _
_DISTRICTCOUNIXL _
SUPPORTS WHICHCOUNCILOBJECTIVE�
PERSONAI SERYICE CAMRACTS MUST ANSWER THE FOLLOWING QUESTIONS:
t. Hasttd5persoNfirmeverworkedUnquaWM2ctfOrlhiStlepartrneM%
YES NO
2. Has fhis perSONfirtn ever been a ciry,emplayee?_ - �
YES NO ' '3� �.. , -
3. Does ihis person/firtn possess a sltill iro[ rrortnally possessetl by any current ciry employee%
YES NO
Expfain all yes a�Wers on separete sheet af W attach to green shee�
�
INI7fATING PA08LEM, iSSUE, OPPORTUNIN (WHO, WHAS, WHEN, WHERE, WHV)'
The adopted Capital Budget for 2002 includes two changes from the CIB recommended budget totaling $480,000 that will result in $240,000
in Public Works street maintenance operating funds, and $240,000 in sewer operaang funds to be channeled to capitai projects. One of these
changes is, the addition of RE-1700780 "Indoor Saint Paul Farmer's MarkeP' shown as funded with $240,000 "CIB Prior Yr Balance", which
will remove $188,555 CIB financing from C98-25151 "Phalen Wetiand Restoration Phase 2", and $51,445 from C95-2F015 "Sewer
Maintenance Building Modification" with no available replacement funding available except for sewer service operating funds. The other
'change is the repiacement of $240,000 CIB funding for $240,000 "Other" funding for SU-1700785 "Wabasha Bridge Shortfall", the first
payment of a 5 year no interest loan from MnDOT, with no available replacement funding available except for street maintenance operating
funds. Neither the Sewer nor the Street Maintenance operating fund budgets reflect these expenditures.
After considerable reseazch and negotiations by Public Works staff the Army Corps of Engineers became convinced Saint Paul had been
overchazged for numerous construcrion and escrow items for the construction of the Floodwall on the South side of the Mississippi River, and
has refunded $605,539.58 to the City of Saint Paul. The $605,539.58 has been deposited in C94-2CO33 "St Panl Flood Control Project" and
all Public Works documented costs associated with the floodwall have been recovered.
68% ($411,766.91) of the original money paid to the Corps of Engineers from Saint Paul for the Floodwall came from C7B funds and 32%
($193,772.67) came from TIF fund for tne Floodwall. The South end of the Wabasha Bridge is part of the Floodwall, therefore, Public
Works xecommends the 2002 Capital Budget 6e changed to reflecf the $24Q,OOQ "Other" funding for 2002 be replaced with $193,772.67 --
(previously TIF for the Floodwall), and $46,227.33 (previously CIB for the Floodwall) from C94-2CO33 "St Paul Flood Control l'roject"
Furthermore, Public Works recommends the 2002 Capital Budget be changed to reflect the $240,000 "CIB Prior Yr Salance" shown as
financing for RE-1700780 "Indoor Saint Pau] Farmer's Mazket" be changed to $24Q000 (previously CIB for the Floodwal]) from C94-2CO33
"St Paut Flood Controi Project" Finally, Public Works recommends $125,534.58 (previously CIB for the Floodwall) be transfeired to CIB
AOVqNTAGE54FAPPpAVED:
Monies refunded by the Cotp of Engineers will be used to fund ttte Wabasha Bridge Shortfall instead of using operating funds. The Indoor
Farmer's mazket will be funded without using prior approved CIB funding that is needed for other projects. Finally, there will be a surplus
added to the CIB Contingency to be used on other projects. ""'—'
D�SADVAMAGES �F APPROVED
None.
Sewer and Street maintenance operating fund budgets will have to be reopened to create and approve the use of these operating funds for
capitat budget expenditures.
TOTAL AMOUNT OFTRANSACTION S 605.539 58 C0.ST/REVENUE BUDGETED (qRCLE ONE) yEg no
FUNUING SOURCE C'-omg of Bner CiR S[ & Sewer M[ce Funds ACTIVI7Y NUMBER CO2-2R036, CO2-7R005, C94-2CO33 CO2-01'107
FINANCIALINFORMATION: (EXPWN)
�p������,�
Presented By
Referred To
Council File k OZ- .��'}�
Green Sheet # 106314
M1fVNESOTA
a6
Committee: Date
1 4VHERF,AS, the adopted Capital Budget for 2002 includes two changes from the CIB reeommended budget totaling
2 $4SQ000 that will result in $ 24Q000 in Public Works street maintenance operating funds, and $240,000 in Public
3 Works sewer operating funds to be channeled to eapital projects
4
S WHEREAS, one of these changes is the addition of RE-1700750 "xndoor Saint Paul Farmex's Market' shown as funded with
6 with $240,000 "CIB Prior Yr Balance', wnich will remove $185,555 CIB financing from C98-2S151 `Phalen WeUand
7 Restoration Phase 2", and $51,445 from C95-2F015 "Sewer Maintenance Building Modification' with no available
8 replacement funding available escept for sewer service operating innds,
9
10 <VHEREAS, the other change is the replacement of $24Q000 CIB funding for $240,000 `Othei" funding for SU-1700755
ll"W abasha Bridge Shortfall", the first payment of a 5 year no interest loan from MnDOT, with nc available replacement
12 funding available except for street maintenance operating funds,
13
14 WFiEREAS, after considerable reseazch and negotiations by Public Works staffthe Army Corps of Engineers became
15 convinced Saint Paul had been overchazged for numerous construcHon and eserow items for the construction of the
16' Floodwall on the South side of the Mississippi River, and has mfunded "y605,539.58 to the City of Saint Paul,
17
18
19
`lQ
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3S
39
40
WHEREAS, the $605,539.58 has been deposited in C94-2CO33 `5t Paul Fload Control Project'
WHEREAS, all Public Works documented costs associated with the floodwall have been recovered,
WHEREAS, 68 0("�411,766.9ll of the original money paid to the Corps of Engineers from Saint Paul fcr the Floodwall
came from CIB funds and 32% ($193,772.67) came from TLF fvnds for the FloudwaR,
R'7�REAS, the South end oFthe Wabasha Bridge fs incorporated into the Floodwall,
iVOW THEREFORE BE IT RESOLVED, the 2002 Capital Budget be changed to refleet the $24Q000 "Othei" funding For
2002 be replaced with $193,7�2.67 (previously TIF for the Floodwa5l), and $46,227.33 (previously CIB for the F`loodwall)
from C942CO33 `St Paul Flood Control Project",
BE IT FURTFIER RESOLVED, the 2002 Capital Budget be changed to reflect the $24Q000 "CIB Prior Yr Ba7ance' shown
as financing for RE-1700780 "indoor Saint Paui Fazmer's Mazket" be changed to $24Q000 (previously CIB for the
Floodwall) from C942CO33 "St Passl Flood Control Project",
BE IT FINALLY RESOLVED, $125,539.55 (previowsly CIB for the FloodwalD be transferred to CIB Contingency,
THEREFORE BE IT RESOLVED, by the Council of the City of Saint Paul, upon recommendation of the Mayor and advice
of the Long Range Capital Improvement Budget Committee, that $605,539.55 is available for appropriation in the 2002
Capital Improvement Budgets, as heretofore adopted and amended by tlus Council, be hereby further amended in
the Improvement Budgets, in the follovring partieulazs:
���1G����.�.
41 FIATANCII3G PLAI��
42 Wabasha Bridge ShortFall
43 CO2-2R036
44
45 CIB
46 CIB Floodwall
47 TIF
4S Other
49
50
51 SPENDING PLAN
52 Wabasha Bridge Shortfall
53 CO2-2R036
54
55 Construction
56
57
58 FINANCING PLAN
59 Indoor Farmer's Mazket
60 CO2-7R�05
61
62 CIB
63 CIB Prior Yr
64 CIB Floodwall
65
66
67 SPENDING PLAN
68 Indoor Farmer's Mazket
69 CO2-7R005
70
71 Canstructwn
72
73
74 FINANCING PLAN
75 St Paul Flood Control
76 C94-2CO33
77
78 CIB
79 CIB
80 TIF
81 TIF
82 SSF
S3
84
85 SPENDING PLAN
86 St Paul Flood Control
S7 C94-2CO33
SS
89 Construction
90
91
92 FINANCINGPLAN
93 CO2-OT107
94 CIB Contingency
95
96 CTE
97
Current Amended
Budget ChazyQes Budget
140,000.00 140,000.00
46,227.33 46,227.33
0.00 193,772.67 193,772.67
240,ODO.OD -240,000.00 D.00
38�,��D.�Q O.UO 380,000.��
380,000.00 0.00 380,000.00
380,000.00 0.00 380,000.00
195,000.00 195,000.00
240,000.00 -240,000.00 0.00
240,000.00 240,000.00
435,000.00 0.00 435,000.00
435,Q00.00 �.00 435,000.00
435,000.00 0.00 435,000.00
1,139,650.00 411,766.91 1,551,416.91
-411,766.91 -411,766.91
193,7'72.67 193,772.67
-193,772.67 -193,772.67
772.49 772.49
1,14Q422.49 0.00 1,140,422.49
1,140,422.49 0.00 1,140,422.49
1,140,422.49 0.00 1,140,422.49
0.00 125,539.58 125,539.58
0.00 125,539.58 125,539.58
2
0�-3`�1°
�RsGl�l �,�.
98 SPENDING PLAN
99 CA2-OT107
S00 CIB Contingency
101
1D2 Construction
1�3
'f6� 9t. II�snl Lomg'� `�1�'+�a' 2mptaoean�f
� �pMittee received this request on
�datd �� � �d recommQadffi
.�
_ �.!1�,,,--� ��-_- 5�- .
� y .... MY�
Current Amended
Budget CLanges Bssdget
0.00 125,539.08 125,539-58
0.�0 125,539.58 125,539.58
oz.-7`�c
, .
,
:. .,,
.irr •
,
Y— � - - Il Nays
�
� II (I �
Requested by Department of: '
E u lic Works 1-28-02
By:
2- S � OZ
Approval Recommended by Office of
Financi rvic s Direc r:
Adopted by Councii:
Date �, `�_°��} �-Oq�BY�
Adoption Certified by Council Secretary
�
App�
�
Form Approved by City Attomey:
oi-a�lo
�eriw � m�iv uvrr�wworn.i� nm inu wmu
Public Works ��zs�aoo2 GREEN T �o. 106314
CAMACTPER^�N&PHONE INITAt/DAiE
� � CITYCdUNCIL
Ed Warn - 266-6142 q❑CITV A7TORNEV 0 cm c�K
MUST 8E ON COUNCIL AGENDA BY (DpTE) 3❑&IOGEi DIflECTOR O FlNANCEACCOUMI�NG -�;�-;-}--
OMAYOR(ORASSI5fANn Y�f EdWa�NDIticRupert V ('
POTALAOFSIGNATUREPAGES (CLIPALLLOCATIONSFORSIGNA7llR� �SEMORMGR,_ I�DEPARTMENTACGI�UNT
ACTIONRE�UESTED ` - r f4dt
Approvai of attached Council Resolution amending the financing and spending plans of the Wa ortfall, Indoor Farmer's
Market, Saint Paul F7oodwall and the CIB Contingency projects.
n?t%3 �
�.�� �- � ��:,�v �
AECOMMENDATONS:Apprwe (A) orRejec[ (A)
PLANNINGCOMMISSION CMLSERVICECOMMISSION
� GYB WMMITtEE _
� STAFF _
_DISTRICTCOUNIXL _
SUPPORTS WHICHCOUNCILOBJECTIVE�
PERSONAI SERYICE CAMRACTS MUST ANSWER THE FOLLOWING QUESTIONS:
t. Hasttd5persoNfirmeverworkedUnquaWM2ctfOrlhiStlepartrneM%
YES NO
2. Has fhis perSONfirtn ever been a ciry,emplayee?_ - �
YES NO ' '3� �.. , -
3. Does ihis person/firtn possess a sltill iro[ rrortnally possessetl by any current ciry employee%
YES NO
Expfain all yes a�Wers on separete sheet af W attach to green shee�
�
INI7fATING PA08LEM, iSSUE, OPPORTUNIN (WHO, WHAS, WHEN, WHERE, WHV)'
The adopted Capital Budget for 2002 includes two changes from the CIB recommended budget totaling $480,000 that will result in $240,000
in Public Works street maintenance operating funds, and $240,000 in sewer operaang funds to be channeled to capitai projects. One of these
changes is, the addition of RE-1700780 "Indoor Saint Paul Farmer's MarkeP' shown as funded with $240,000 "CIB Prior Yr Balance", which
will remove $188,555 CIB financing from C98-25151 "Phalen Wetiand Restoration Phase 2", and $51,445 from C95-2F015 "Sewer
Maintenance Building Modification" with no available replacement funding available except for sewer service operating funds. The other
'change is the repiacement of $240,000 CIB funding for $240,000 "Other" funding for SU-1700785 "Wabasha Bridge Shortfall", the first
payment of a 5 year no interest loan from MnDOT, with no available replacement funding available except for street maintenance operating
funds. Neither the Sewer nor the Street Maintenance operating fund budgets reflect these expenditures.
After considerable reseazch and negotiations by Public Works staff the Army Corps of Engineers became convinced Saint Paul had been
overchazged for numerous construcrion and escrow items for the construction of the Floodwall on the South side of the Mississippi River, and
has refunded $605,539.58 to the City of Saint Paul. The $605,539.58 has been deposited in C94-2CO33 "St Panl Flood Control Project" and
all Public Works documented costs associated with the floodwall have been recovered.
68% ($411,766.91) of the original money paid to the Corps of Engineers from Saint Paul for the Floodwall came from C7B funds and 32%
($193,772.67) came from TIF fund for tne Floodwall. The South end of the Wabasha Bridge is part of the Floodwall, therefore, Public
Works xecommends the 2002 Capital Budget 6e changed to reflecf the $24Q,OOQ "Other" funding for 2002 be replaced with $193,772.67 --
(previously TIF for the Floodwall), and $46,227.33 (previously CIB for the Floodwall) from C94-2CO33 "St Paul Flood Control l'roject"
Furthermore, Public Works recommends the 2002 Capital Budget be changed to reflect the $240,000 "CIB Prior Yr Salance" shown as
financing for RE-1700780 "Indoor Saint Pau] Farmer's Mazket" be changed to $24Q000 (previously CIB for the Floodwal]) from C94-2CO33
"St Paut Flood Controi Project" Finally, Public Works recommends $125,534.58 (previously CIB for the Floodwall) be transfeired to CIB
AOVqNTAGE54FAPPpAVED:
Monies refunded by the Cotp of Engineers will be used to fund ttte Wabasha Bridge Shortfall instead of using operating funds. The Indoor
Farmer's mazket will be funded without using prior approved CIB funding that is needed for other projects. Finally, there will be a surplus
added to the CIB Contingency to be used on other projects. ""'—'
D�SADVAMAGES �F APPROVED
None.
Sewer and Street maintenance operating fund budgets will have to be reopened to create and approve the use of these operating funds for
capitat budget expenditures.
TOTAL AMOUNT OFTRANSACTION S 605.539 58 C0.ST/REVENUE BUDGETED (qRCLE ONE) yEg no
FUNUING SOURCE C'-omg of Bner CiR S[ & Sewer M[ce Funds ACTIVI7Y NUMBER CO2-2R036, CO2-7R005, C94-2CO33 CO2-01'107
FINANCIALINFORMATION: (EXPWN)