02-322City of St. Paul 0 R 1 G I NA L
RESOLIITION APPROVING ASSE55MSNT AND
COUNCIL FI Y Np. Qa••3.�J�
By / r� .�/' ---�
�
FI%ING TIME OF HBARING THBR80N File No_ 18964C �_
Assessment No._0299
Voting
Ward In the matter of the assessment of benefits, cost, and expenses for the
3 installation of storm sewer service connections, if requested by the property
owner, with the Highland Parkway Pinehurst Avenue Storm Sewer Connection Project.
Preliminary Order: 02-0281 approved: 4/ 3/2002
Final Order . approved: 4/24/2002
The assessment of benefits, cost and expenses for and in connection with the
above improvement having been submitted to the Council, and the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOi,VED, That the said assessment be and the same is hereby in all respects
approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on the 22th
day of Mav, 2002 at the hour of 5:30 o'clock P.M., in the Council Chamber of the
Court House and City Hall Building, in the City of St. Paul; that the Valuation and
Assessment Engineer give notice of said meetings, as required by the Charter, stating
in said notice the time and place of hearing, the nature of the improvement, and the
amount assessed against the lot or lots of the particular owner to whom the notice
is directed.
Adopted by the Date: `�� �,� a _� Q �
�
Yea Nays
�Benanav
�Blakey
�/ Bostrom
r / Coleman
� Harris
�i Lantry
7 Reiter
Certified Passes by Council Secretary
� In �ASaY BY
p Agains
f�'�f��7
,1�. �
:� ,
:>
T.M.S./REAL ESTATE DM5ION
meac� earson .na rhone s�mba::
Glean Picha 266-8851
:ast be on Coonril Agenda by: Aprit 24, ZOp2
os[ be in Cooncil Research Office
. ............ c.:ae_. . .
Date: March 21 , 2002 Gxeen Sheet Nnmber: 111935
EPARTMEHT DIRELTOR 2 ITY COUNCIL
ITY ATTORBEY ITY CLERR
n�� ���ra
1
' OF SIGNAT[3RE PAGES (CLIP ALL LOCATIONS FOR SIGNATURF�
xe2uESrEn: Settiug date of public hearing of the ratification of assessments for the HIGIiLAND
WAY AND PINEHURST AVENUE STORM SEWER CONNECTION PROJECT.
"—' �-' ERSONAL SERVICE CONTRACfS MUST ANSWER THE FOLLOWING: .
. Has the person/Tirm ever worked under a rnntracc for t6is depar[ment? YES NO
A s'"vr
. Sas t6is perwoJSrm ever beee a C'dy employee? YES NO
CI�'dSERVICECOM11OS5ION PUb1iCHlelt6
Does this persoNfirm possess a sltilt not aormatly possessed by soy YES NO
� ro � current City employee?
— v.neeBldp.
Ezplain all YES aoswers on a separate s6eet and attach.
�TING PROBLEht, ISSUE, OPPORTUNITy (W6o, Wpay When, Where, Why?)
1CShOII IS ECCQSS3Ty III OI'(ICC t0 bCFID COI�BCY9119 accpccmrnfc fn haFn n�v fnr *i�o n...Oe..s -'�
CAGES IF APPROVED:
as above.
APPROVED:
rty owners have
NOT APPROVED;
not
AMOUNT OF TR.4NSACTION:
� {���`�h C%o.,4ss(
Af'� £� � ���
via
with
COST/REVENUE BUDGEiED (CII2CLE ONE) YES NO
Assessments Oniy
souecE: ASSESSMENTS A�'�
_ .. _. NUMBER:
be notified
and
��
City of St. Paul 0 R 1 G I NA L
RESOLIITION APPROVING ASSE55MSNT AND
COUNCIL FI Y Np. Qa••3.�J�
By / r� .�/' ---�
�
FI%ING TIME OF HBARING THBR80N File No_ 18964C �_
Assessment No._0299
Voting
Ward In the matter of the assessment of benefits, cost, and expenses for the
3 installation of storm sewer service connections, if requested by the property
owner, with the Highland Parkway Pinehurst Avenue Storm Sewer Connection Project.
Preliminary Order: 02-0281 approved: 4/ 3/2002
Final Order . approved: 4/24/2002
The assessment of benefits, cost and expenses for and in connection with the
above improvement having been submitted to the Council, and the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOi,VED, That the said assessment be and the same is hereby in all respects
approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on the 22th
day of Mav, 2002 at the hour of 5:30 o'clock P.M., in the Council Chamber of the
Court House and City Hall Building, in the City of St. Paul; that the Valuation and
Assessment Engineer give notice of said meetings, as required by the Charter, stating
in said notice the time and place of hearing, the nature of the improvement, and the
amount assessed against the lot or lots of the particular owner to whom the notice
is directed.
Adopted by the Date: `�� �,� a _� Q �
�
Yea Nays
�Benanav
�Blakey
�/ Bostrom
r / Coleman
� Harris
�i Lantry
7 Reiter
Certified Passes by Council Secretary
� In �ASaY BY
p Agains
f�'�f��7
,1�. �
:� ,
:>
T.M.S./REAL ESTATE DM5ION
meac� earson .na rhone s�mba::
Glean Picha 266-8851
:ast be on Coonril Agenda by: Aprit 24, ZOp2
os[ be in Cooncil Research Office
. ............ c.:ae_. . .
Date: March 21 , 2002 Gxeen Sheet Nnmber: 111935
EPARTMEHT DIRELTOR 2 ITY COUNCIL
ITY ATTORBEY ITY CLERR
n�� ���ra
1
' OF SIGNAT[3RE PAGES (CLIP ALL LOCATIONS FOR SIGNATURF�
xe2uESrEn: Settiug date of public hearing of the ratification of assessments for the HIGIiLAND
WAY AND PINEHURST AVENUE STORM SEWER CONNECTION PROJECT.
"—' �-' ERSONAL SERVICE CONTRACfS MUST ANSWER THE FOLLOWING: .
. Has the person/Tirm ever worked under a rnntracc for t6is depar[ment? YES NO
A s'"vr
. Sas t6is perwoJSrm ever beee a C'dy employee? YES NO
CI�'dSERVICECOM11OS5ION PUb1iCHlelt6
Does this persoNfirm possess a sltilt not aormatly possessed by soy YES NO
� ro � current City employee?
— v.neeBldp.
Ezplain all YES aoswers on a separate s6eet and attach.
�TING PROBLEht, ISSUE, OPPORTUNITy (W6o, Wpay When, Where, Why?)
1CShOII IS ECCQSS3Ty III OI'(ICC t0 bCFID COI�BCY9119 accpccmrnfc fn haFn n�v fnr *i�o n...Oe..s -'�
CAGES IF APPROVED:
as above.
APPROVED:
rty owners have
NOT APPROVED;
not
AMOUNT OF TR.4NSACTION:
� {���`�h C%o.,4ss(
Af'� £� � ���
via
with
COST/REVENUE BUDGEiED (CII2CLE ONE) YES NO
Assessments Oniy
souecE: ASSESSMENTS A�'�
_ .. _. NUMBER:
be notified
and
��