WI�REAS, Additions which might prove to be necessary in the Improvement described
as Grading and Surfacing of CONCORD TERRACE-�971, formerly known as Comptroller's
Contract L-74�+9, City Pro�ect No. 71-P-0518 (with 5-1395), Ashbach Construction
Company, Contractor, have been provided for in the SpeciPications, and
WHEREAS, It has been found necessary to make the following Additions and Deductions
as per Administrative Order D-�+26, dated Maxch 7, 1973, for Contract Change
A�reement No. 1
As listed on attached sheet:
Total Additions to P-0518 $3106.50
Total Additions to S-1395 $3�80.80 �
Total Deductions fran 5-1395 2625.00
Total Additions to 5-1395 855•80
� TOTAL NET ADDITION TO COPTTRACT = $3962•30
and _ __ -
__..
WI�REAS, The total addition is $3962•30, and the Acting Director of Public Works
has agreed with the Contractor that the amount of $3962•30 is the correct sum to
be added to said contract, therefore be it
RESOLVED, That the City of St. Paul through its City Council approves the foregoing
addition made in accordance with the Specifications in the sum of $3962•30, said
amount to be added to the liunp sum consideration named in the contract, formerly
known as Comptroller's Contract L-7�+�+9, and which amount is to be financed from
Urban Renewal Bond Fund R-37-
COUIVCILMEN Requested by Department of:
Yeas Nays
Hunt � PUBLIC WORKS
Konopatzki In Favor
Levine �
�*�' Against BY
� Roed1-�r Joseph F. Koen , Constru ion Engineer `
Tedesco
Mme.President Butler
MAR � 61973 Form Approved by�ity ttorney
Adopted by Council: Date �
Certified sed by Council�S—ec�,retary Vr I��/ BY �
By 'U'
Approve Mayor• Date
� 2 O �9� Approv by Ma � o ouncil
By BY
�BUSHm MAR 2 41973
I ♦
. . . .... . ...._.. . ... ....._... ._ .......... . . ..... .. . .. .. .. . ... .. ... .. . .. . . .. .._._ . , .... .__......___ -.__�__ ,..___.
1 !
�11\�I��� �
Attachment to
ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEt�TT N0. 1
Grading and Surfacing of CONCORD TERRACE-1971, known as Contract L-7�+�►9, City Pro�ect
No. 71-P-o518 (with 71-s-1395) � Ashbach Construction Company, Contractor.
ADDITIONS
71-P-o518:
Construct Manhole, Type II 2 each @ $�+25.00 $850.00
F. & I. A & B Casting Assembly 3 each L� 50.00 150.00
Granulax Borrow 302 cu. yd. @ 3•25 981•5�
Reconstruct Manhole �+.5 lin. ft. C 50.00 225.00
Construct Concrete Steps liunp siun 09 0.00
Total Additions to P-0518 = $3106.50
71-5-1395:
Trench Excavation 60.0 cu. yd. @ $ 3.5� 210.00
Rock Excavation 60.8 cu. yd. @ 15.00 912.00
Concrete Block Masonry 1.25 cu. yd. @ 75.00 100.00
Construct Manhole, Type I 1 each @ k00.00 400.00
Construct Manhole, Type II 2 each @ 425.00 850.00
�Construct Manhole, Type IV 1 eacn @ 500.00 500.00
15" R.C.P. Sewer 52 lin. ft. C� 8.15 �+28.80
Connection at Manhole 'J' ltm�p siun 85.00
Total Additions to 5-1395 = 3�80.80
DEDUCTIONS
31-5-1395:
Construct Manhole, Type IV 2 each $500.00 1000.OQ
Construct Manhole, Type III 1 each � 750.00 750.00
Construct Manhole, Type III-S 1. each � 875•00 875.00
Total Deductions from S-1395 = 2625.00
Total Additions to 5-1395 = $55•$�
TOTAL NET ADDITION TO CONTRACT $3962•30
. �
_ __ _ _ _ _ __ d -�✓ � _ . _ _ .___,.___ ___ __
. . a �
Attachment to
ADMCNISTRATIVE ORDER for CONTRACT CHANGE AGREEP�FT N0. 1
Grading and Surfacing of CONCORD TERRACE-1971, known as Contract L-7�+�+9, City Pro�ect
T1o. 71-P-0518 (with 71-5-1395), Ashbach Construction Company, Contractor.
ADDITIONS
71-P-o518:
Construct Manhole, Type II 2 each C $425.00 $850.00
F. & I. A & B Casting Assembly 3 each C� 50.00 150.00
Granular Borrow 302 cu. yd. � 3.25 981•5�
Reconstruct Pdanhole �+.� 1in. ft. � 50.00 225.00
Construct Concrete Steps lwnp sum 09 0.00
Total Additions to P-o518 = $3106.50
71-5-1395:
Trench Excavation 60.0 cu. yd. @ $ 3.50 210.00
Rock Excavation 60.8 cu. yd. C� 15.00 912.00
Concrete Block Masonry 1.25 cu. yd. � 75.00 100.00
Construct Manhole, Type I 1 each � k00.00 �+00.00.
Construct Manhole, Type II 2 each C� �+25.00 850.00
Construct Manhole, Type IV 1 each @ 500.00 500.00
15" R.C.P. Sewer 52 lin. ft. C 8.15 �+28.80
Connection at Manhole 'J' liunp stun 85.00
Total Additions to 5-1395 = 3�80.80
DEDUCTIONS
71:-5-1395�
Construct Manhole, Type IV 2 each � $500.00 1000.00
Construct Manhole, Type III 1 each @ 750.00 750.00
Construct P�Ianhole, Type III-S 1 each � 875•00 875•00
Total Deductions from s-1395 = 2625.00
Total Additions to 5-1395 = $55•$�
TOTAL NET ADDITION TO CONTRACT $3962•30