WI�REAS, Additions which might prove to be necessary in the Improvement described as
the Improvement of Streets, Alleys and Sidewa.lks in the SUNINIIT-UNIVERSITY RENEWAL ARF,A,
formerly knoWn as Comptroller's Contract L-7248-�+, City Pro�ect No. 71-G-1933, Alexander
Construction Compaqy, Inc., Contractor, have been provided for in the Specifications,
and
WxEREAS, It has been found necessary to make the following Additions as per
Acfininistrative Order D-398� �ted January 25, 1973, for Contract Change Agreement
No. 1
ADDIT�ONS: �
As per attached sheet $Sa677•99
and
WI�REAS, The total addition is $5,677.99, and the Acting Director of Public Works has
agreed with the Contractor that the amount of $5,677.99 is the correct swu to be added
to said contract, therefore be it
RESOLVED, That the City of St. Paul through its City Council approves the foregoing
addition made in accordance �rith the Specifications in the sum of $5,677.99, said
amount to be added to the l�m►p stm� consideration named in the contract, formerly
known as Comptroller's Contract L-7248-4, and which amount is to be financed from
Urban Renewal Bond Funds.
COUIVCILMEN
Yeas Nays Requested by Department of:
Hunt �bl ya
Konopatzki In Favor
Levine 1 / - '-
Meredith " Against BY
Sprafka
Tedesco q Joseph F. Koen — Constru ion Division - -
Mme.President Butler JAN N 0 �913 �
Form A ed by City Att ey
Adopted by Council: Date
t
Certifi Pa ed by C il ary
By
Appro by Ma r: Date Approve y May • Submission to ouncil
gy By
PUBUSHEU FFB 3 �97�
.�
�
c
Attachment to
ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT N0. 1
�V��'S�
Tmprovement of ,Streets, Alleys and Sidewa7.ks in the SUNA�IT-UNIVERSITY RENEWAL AREA,
known as Contract L-7248-1+, City Pro,ject No. 71-G-1933, Alexander Construction
Compa�y, Inc. , Contractor.
ADDITIOftS
A. F•,�rnish and place topsoil in boulevaxd areas
�+08 cu. yds. topsoil @ $ �+.50 $1,836.00
B. Construct Type II manhole at the intersection <
of Iglehart and Victoria
Type II Manhole C $�+25.00 �+25.00
C. Furnish & install cast iron pipe for a catch
basin lead (additional cost per ft. _ $2.50)
23 lin. ft. C.I.P, @ $ 2.5� 57.5�
D. Construct bituminous blvds. at various locations
at property owners request �
5�599 sq. �t. � $ 0.42 2,351•5$
E. Construct manhole opening in sidewalk as per
St. Paul Std. Drg. No. 1301
7 each @ $ 75.00 525�:a0
F. Remove old light standaxd base
2 each @ $ 6.00 12.00
G. Labor & equipment to excavate unsuitable material
from subgrade on Milton Street between Fu1Zer and
Aurora (based on Force Account records).
lump stun 388.�+2
H. �,abor & equipment to reset curb & gutter forms on
Victoria St. between Aurora and University (based
on Force Account records�.
lump sum 38.24
I. Labor & equipment to slope yard at 1036 W. Central
(based on Force Account records).
lump swn �+�.25
TOTAL CONTRACT CHANGE AGREEMENT N0. 1 $5�677•99
� s
� DEPABTI�IT OF PIIH�LIC WORKS
CIT? OF ST. PAUL, MINNESOTA
l�i0 AOIITII� SLIP
INITIAIS CIRCIILATE
DATS FIL�
; INF+Ox—
� MATION
, � � HO'i'E AIID
BEPIIRN
�� P� C011—
VESSATI N
� �� ��� r+o8 �s�- -
; x�ro�
,IAN 29 1973
CORPgRflT��E�i� �puNSEl.
�ROM DiATE
% - � �
P
_ FORM 1��'9 7�
�
. �� C���
Attachment to .
ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT N0. 1
Improvement of Streets, Alleys and SidewaTks in the SUNffuIIIT-UNIVERSITY RENEWAL AREA,
known as Contract L-721+8-�+, City Pro3ect No. 71-G-1933, Alexander Construction
Compar�, Znc., Contractor.
ADDITIORS
A. Furnish and place topsoil in boulevaxd axeas
�+08 cu. yds. topsoil @ $ �+.50 $1,836.00
B. Construct Type II manhole at the intersectioa .
of Iglehart and Victoria
Type II Manhole @ $�+25.00 �+25.00
C. Furnish & install cast iron pipe for a catch
basin lead (additional cost per ft. _ $2.50)
23 lin. ft. C.I.P. @ $ 2.50 57.5�
D. Construct bituminous blvds. at various locations
at property owners request �
5�599 sq. ft. @ $ 0.�+2 2,351•5$
E. Construct manhole opening in sidewalk as per
St. Paul Std. Drg. No. 1301
7 each C $ 75.00 525:00
F. Remove old light standaxd base
2 each @ � 6.00 12.00
G. Labor & equipment �o excavate unsuitable materisl
from subgrade on Milton Street between Fu11er and
Aurora (based on Force Account records)e
lump sum 388.�+2
H. Labor & equipment to reset curb & gutter forms on
Victoria St. between Aurora and University (based
on Force Account records).
lump sum 38.24
I. Labor & equipment to slope yaxd at 1036 W. Central
(based on Force Account records).
ltunp sum . �+�+.2 5
TOTAL CONTRACT CHANGE AGREEMENT N0. 1 $5�677•99