Loading...
260084 WHITE - CITY CLERK CO1111C11 /�V's�� PINK - FINANCE BLUERY- MAYORTMENT GITY OF SAINT PATTL File NO. ,,�/ V ' Co ncil Reso tion Presentet�-By - �� Referred To Committee: Date Out of Committee By Date RESOLVED, That the City Couneil concurs in the action of the Purchasing Comonittee in the award of a contract on an emergency basis as a result of telephone quotationa to BOR-SON CON3TRUCTION COMPANY, INCORPORATED the lowest bidder for repair work on the existing sidewalk in front of Stem Hall o� 4th Stre�t where the underlying support for the sidewa� has deteriorated to auch aa extent im�nediate replacement is deemed necessary. The amount of contract is $3,540.00. The Corporation Gounsel is hereby directed to draft the proper form of contract and obtain the necessary performance and payment bonds. The proper City officials are hereby authorized to execute said contract on behalf of the City of Saint Paul. The work, as indicated above, is considered an emergency due to the fact th�t the concrete on the underside of the sidewalk has deteriorated and spalled off to depths of 1-1/2" to 3". The reinforcing bars are exposed and same of them have rusted away. It appears that a concrete topping was poured on the original sidewalk a few yeara ago which has added more dead load to the eCructural slab. This area of sidewalk is potenCially hazardoue under truck wheel loads and does not meet the 300 pound per equare foot live load required by the present building code. The Architects report indicstes that the walk is in danger of eminent collapse. Req"n 3309 Code: 2020-239 v��� 11/2/72/Smith/�k COUIVCILMEIV Yeas Nays Requested by Department of: Konopatzki � In Favor Civ;c Center Authoritq Levine Meredith � Against BY Sprafka Te�eaee� Mme.President Butler Adopted by Council: Date N�V g 1g72 For Approve by t rqe Certif' sed by Co cil ecretary B By " Approve or: Date �� _ Approve y mi ' n to Coun 1 gy By PU6L13HED N OV 1 � ��1 L . .WH17E "- CItY:�CLERK - ^• PiNK �.-- FINANCE COUIICll , LANARY -yDEPARTMENT - � B4UE =�.MAYOR �� GITY OF SAINT PALTL . ,�� ��� � �� _ ._ File N0. � ' Co ncil Reso tion � � Presented-By� �✓ /��� Referred To_ Committee: Date Out of Committee By Date RESOLVED, That the City Counc3.1 concurs in the action of the Pc�rchasing Committee in the award of a contract on an ennergency basis as a result of telephone quotations to BOR-SON CONSTRUCTION COI�'ANY, INCORPORATED the lowest bidder for repnir work on the existing sidewalk in front of Stem Hall on 4th Street where the underlying support for the sidewa� has deteriorated to such an extent immediate replacement is deemed necessary. The amount of contract is $3,540.00. The Corporation Counsel is hereby directed to draft the proper form of contract and obtain the necessary performance and payment bonds. The proper City officials are hereby authorized to execute said contract on behalf of the City of Saint Paul. The work, as indicated above, is considered an emergency due to the �act thet the concrete on the underside of the sidewalk has deteriorated and t apalled off to depths of 1-1/2" to 3". The reiaforcing bars are exposed and some of them have rusted away. It appears that a concrete topping was poured on the original sidewalk a few qears ago which has added more dead load to the structural slab. This area of sidewalk is potentially hazardous under truck wheel loads and does not meet the 300 pound per square foot live load required by the present building code. , The Arehitects report indicates that the walk is in danger of eminent collapse. Req'n 3309 Code: 2020-239 ��� 11/2/72/3mith/�k COUNCILMEN Requested by Department of: Yeas Nays Hunt �� Civic Center Authority Konopatzki e In Favor Levine Meredith � Against BY - Sprafka 'Te�ce^' ' Mme.President Butler N OV � 1972 For Approve by t rge Adopted by Council: Date _ Certif' sed by Co cil ecretary B � i� By Approve or: Date g�G Approve y mi ' n to Coun 1 BY BY �