96-1539 .. `J �'1Y l. � � .. � . �
CITY OF ST. P�t}L FILE . 1 G " I S 3 9 ��
�
>
F�AI�I. OIiDER BY � '':
1�0. 18839
W4I]�i6 A�RD 3
Ia th� Matter oi esaesaments for the N�arganjEdgcumbe Aree Street Paving snd Lightii7g
Project, including concrete aurba and gutter�, bitliminoua aurface roadway�, can�rete
drivewey aprons, a lantern style lighting system, end other wark incidentel ta the
paving and lighting w�rk to be da1� an:
Bordner Avenue _ Cleveland to Return Court
Calette Flace lrbrgen to Worcester
Edgcumbe Road Fairview to Davern
Edgcumbe RoadtWestbound Side Ox�ly) Davern to Sn ling
Edgcumbe Road 3nelling to Montreal
Itasca Avenue Cleveland to Return ourt
Magoffin Av�nue Cleveland to Ratur Gourt
Morgan Avenue Cleveland to Ret n Court
Margan Avenue Colette Flace t Worcester
Morgan Avenue Edqcwnbe to D ern
�Quirnia Avenue 5aint Paul e to Edgcumbe
Ramlow Plaae Cleveland Fteturn Gaurt
�Return Court Itasca t Field Avenue
*Shelby Place Edgc Rd to cul-de-�ac
sunnyslope Lar�e Edgc Rd to cul-de-sac
Thure Avenue Clev and to Return Gourt
Warcester Avenu� Cl� eland tc� R�turn Cc,urt
Worce'ter Avenue G ette ta 3aint Paul Avenue
*To be paved at lea� than � andard width. Will be
assessed at a reduced rat .
,R �,.�,,�.M.
�,y� .T,�r �,: � �:� . . �
♦� �� ���d'R�.�}' �' . � .
: ". �� . ..,4 � ��" . .
� �� �� ' � �R G - 1 S3q �
CIZ7 O�' S?�::FaRTI' ' � N .
� � � �� —
F�L �R'�' ' , HY �'3
. '--...�__
� ` �'=T.t 1�0. 18834
= VO'!'IN6 11� �
�t
�
�
In t.h� Matter �'4f aesesementa for the Margan/Edgcumbe ,Area Street Paving and Lighting
;Project, including �oncrete curb� and guttera, bitliminaua aut'face roadwaya, concreta
driveway aprons, e lantern style lighting sy8te�, and ot2�er work incidentel to the
paving and liqhtinq w�rk to be done an:
Bordner Avenue Cleveland to�$eturn Court
Ca2ette Place M�rgan to Warcester
Ed�aumbe Road Fairview to Davern �
' Edgcumbe Road(Westbound 31de anly) Davern to S� ling
Edgcumbe Road 3nelling to Mantreal
Itasca Avenue Cleveland �o Return urt
Magoffin Avenue Cleveland to Retur Caurt
�' Margan Avenue Cleveland to Ret n Gourt
Morgan Avenue j Colette P].ace t Worcester
t�orqan Avenue Edgcumbe to ern
�Quirnie Avenue Saint Pau1 e ta Edgcumbe
Ramlow Place Cleveland Return Caurt
*Return Caurt Itssca t Field Avenue'
*3helby Plece Edqc Rd to cul-de-�ac
_ sunnyslape Lene Edgc Rc] to cul-de-aac
Thure Avenue Clev and tca Return Co�rt �
' ` Worcester Avenu� Cl el�. �,o t•,R� �'i �rt '
Warce�ter Avenue �C e�te ti'o'�Siii��aul 'Avenue
�To be paved at le�� thnn a andard width. Will be
asaessed at a reduced ra .
�
i
�.
�^
�� — � J� I
under Preliminary Order � �o '" `�_ appraved `�
The Council of the City of 3aint Paul haS conducted a pu ic hearing upon the
above impravement, due notice thereaf having been given as escribed by the City
Charter; and
WHEREAS, The Cauncil ha� heard all per�ona, objec ian� and reaommendatian�
pertsirxing to ssid propased impravement snd has fully considered the same; now,
th�refare, be it
RESOLVED, Thet the Council of the City of Saint aul does h�reby orler thst the
above-de�cribed improvement be made, rand the proper ity officer� are hereby directed
and authorized to proceed with the improvement; and it
F'tJRTHER RESOLVED, That upan the completio of said improvement, the praper City
afficera �hall CAIC131Lt�9 all expen�e� incurre therein and ahall reg�rt the �ame ta
trie �.ity Cauncil in accr�rdsnce with Chapter 1 af the City Cherter.
COUNCILPERSONS Adc,pte� by Cc,uncil: D�t�
Y��� Nays
�la��y Certified Fass�d by CGUncil secretery
Bo�trom
Guerin
Harria ln F or By
Meggrd
Rettman in�t
Thune
Mayar
'} y�'y�'�p!R�cwF,.r�......,.. �. ..:."w�,g�/^�r.a..". . . � �
�-'� . ,_�I t�..: � �.�'.i � .
_�. . . ..�, � a�� ,'� � *�i
/ ' ,
; �1�
. . M1 I . � � � � + � �V�
I ��~ �
I . . ,. � `1 -.��j����� �
�
�
L
under Preliminary Order 1 b " ,� � � approved � . 1 `�
The Council of the City af Saint Paul haa cor��ucted a pu�lic hearing upvn the
ebove in►pravement, due notice thereaf having been given as escribed by the City
Charter; and �
WI�RF�A3, The Council ha� heard all per�on�, obje ian� and reaommendr�tiana
pertaining to said prapased improvement snd 2�as fully considered the same; now,
therefore, be it
RE30LVED� ThBt the Council of the City of seint aul doee hereby order t2�at the
above-de�cribed improvement be made, and the proper ity offi�er� are hereby direated
end eutharized to proceed with the improvement; an be it
' P'URTHER RESOLVED, That upon the campletio of said in►prowement, the proper City
officer� �hall calaulate all exgen�ea inaurre t�erein and ahall report the �ame to
the City Council in acca.rdance with Chapter 1 af the City Charter.
CpUNCILPFRSO�ts Adapted by Co�no�il: Date
Yean Naya . . . �
Blakey Certified Fsas�d..by Council secretgry
` Bo�trom
Guerin
Harria ln F or By " '
Megard � _
Rettman in�t
Thune
Mayor
�
� . � � _ � s ��
SUMMARY OF ENGINEERING RECOMMENDATIONS
Morgan/Edgcumbe RSP (Area 85)
City Project No. 97-P-8101 .
Report Prepared - 8-21-96
Report Revised - 8-27-96
Public Hearing - 12-11-96 �
PROJECT .
Construction of concrete curb and gutter, new bituminous surfaced roadways,
concrete driveway aprons, boulevard sodding, tree planting, water and sewer
service connections and reconnections, sanitary sewer repairs, and installation
of a lantern style lighting system in the area called Morgan/Edgcumbe RSP
Pro,�ect (Area 85), generally bounded by Cleveland Avenue on the west,
Magoffin Avenue on the north, Davern Street on the east, and Worcester
Avenue on the south (see attached map).
EXISTING CONDITIONS
The majority of the streets within the project area are oiled streets. Edgcumbe
Road is an older paved street. Some of the oiled streets have entire blocks or
sections of concrete curb. The oiled street surfaces are in fair to poor
condition. The majority of the e�cisting street lighting within the project area is
NSP wood pole lighting on the oiled streets, with bent straw type lighting on
Edgcumbe Road.
PROPOSED IIV�ROVEMENTS
Improve the following older paved streets by the construction of concrete curb
and gutter, new bituminous surfaced roadway, concrete driveway aprons,
boulevard sodding, and a lantern style street lighting system. (The proposed
street widths are shown in parenthesis J
EDGCLJMBE ROAD - S. FAIRVIEW AVENUE TO HILL'POP LANE (40')
EDGCUMBE ROAD - HILLT�OP LANE'PO DAVERN STREET (82'DIVIDED ROADWA�
EDGCUMBE ROAD - DAVERN STREET'PO SNELLING AVENUE (20'.WESTBOUND SIDE
ONL�
EDGCUMBE ROAD - SNELLING AVENUE TO ST. DENNIS ROAD (82'DIVIDED
ROADWA�
EDGCUMBE ROAD - LOWER ST. DENrTIS ROAD T'O MONTREAL (40')
On Edgcumbe Road between S. Fairview and Hilltop, the north half of the
street was reconstructed recently, with curb and gutter, as part of a sewer
separation pro�ect. That part of the roadway is still in good condit�on and
should not be replaced. The south half of the street, however is in poor
condition and will be replaced as part of this pro�ect. The north half will be
milled so that the wearing course will be placed over the full width of the
street. The lantern style street lights will be added to both sides of the roadway
at this time. The assessment rate for the north half of the street will be based
1
�l(. - ts3�
on the cost to mill and overlay that side of the street, as those property owners
were not assessed when the paving was done before.
Improve the following oiled streets by the construction of concrete curb and
gutter, new bituminous surfaced roadway, concrete driveway aprons, boulevard
sodding, and a lantern style street�lighting system. (The proposed street widths
are shown in parenthesis.) . �
MAGOFFIN AVENUE- CLEVELAND AVENUE TO RET[JRN COURT (30')
THURE AVENUE - CLEVELAND AVENUE TO RET[JRN COURT (30')
TT'ASCA AVENUE - CLEVELAND AVENUE TO RE'TURN COURT (30')
BORDNER AVENUE - CLEVELAND AVENUE'PO RETiJRN COURT (30')
RAMLOW PLACE - CLEVELAND AVENUE TO RET[JRN COURT (30')
MORGAN AVENUE - CLEVELAND AVENUE TO RETURN COURT (30')
MORGAN AVENUE - COLETTE PLACE'PO WORCESTER AVENUE (32')
MORGAN AVENUE - EDGCUMBE ROAD TO DAVERN STREET (32')
WORCESTER AVENUE - CLEVELAND AVENUE T�O RETCTRN COURT (30')
WORCESTER AVENUE - COLETTE PLACE'PO ST: PAUL AVENUE (32')
RET[JRN COLJKf - TTASCA AVENUE T�O FIELD AVENUE (26'-28')
COLETTE PLACE - MORGAN AVENUE 1�0 WORCESTER AVENUE (32')
gUIRNIA AVENUE - ST: PAUL AVENUE TO EDGCUMBE ROAD (24')
SUNNYSLOPE LANE - EDGCUMBE ROAD TO CUL DE SAC (30')
SHELBY PIACE -EDGCUMBE ROAD'PO CUL DE SAC (26'-28')
Add a lantern style street lighting system on the following paved street to
complete the neighborhood lighting system.
FIELD AVENUE- PRIOR AVENUE TO CUL DE SAC
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve
existing oiled and older paved residential streets.
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality
to the neighborhood. The newly rebuilt roadways will restore drivability in the
neighborhood, and continue the City's efforts to improve the street system in
Saint Paul. Street oiling will be eliminated. Lantern style lighting will
enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normal problems associated with construction such as noise, dust and general
disruption will be present.
EFFECTS ON TREES :
The alignment of the curbs will be selected to minimize the loss of trees. New
trees will be planted as part of the boulevard restoration.
2 .
. � (; ---l 5 � °1
TIME SCHEDULE
The project will begin in the spring of 1997 and will be completed by late fall of
1997. There will be further restrictions on the amount of time work is done on
individual segments of streets.
COST ESTIMATE �
Street Paving . $ 1.470,560 �
Lignt�ng . � soo,000
Miscellaneous • $ 147.056
PROJF.CT TOTAL $2�217,616
ESTIMATED FINANCING
1997 CIB $ 1.699,505
Assessments $ 518.111
PROJECT TOTAL $2�217�616
The assessment rates for the street paving and light�ng are:
$23.83 per ASSESSABLE FOOT for the street paving on residential streets
$2.55 per ASSESSABLE FOOT for the street paving on the north half of
Edgcumbe Road between Fairview and Hilltop
$4.21 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
SOURCE OF ADDITIONAL INFORMATION
For additional information contact the Project Engineer, Lisa Falk, at 266-
6117.
SUNIINIARY AND REC011rIIV�NDATION
The Department of Public Works feels that this is a necessary and worthwhile
project, and the Engineering Recommendation is for approval of the pro,�ect
and financing.
Respectfully submitted,
Stacy Becker
Director of Public Works '
lf
3
��,_\S3`�
� � y
g ° �. c
� �d w °' >+
ti� r$ � O ; O
� ° a a .H
,a Q C9 E a�i
� A 3NS O � � �"" � G�
C
O J W � Cf C.
m J � �
� N � � atf
� � � ' � �
C� Z p� C
� M � j c r
s '' � Za a �
0
`' • � oaw
N ,^
E����� d � �
� — �
.
O � � N
E�N�'
St�� �
. <
� �
�
LOwER
•15 Na3nv4
'�' ` � `a
<
W Z N �
W g '1� � � F
C �p,S 3tl SdP'I�/N
� t 'Nl dOlT11F1 v $ v N ,
_ � � ' s
r b
��nio� � �
n �a3
vroa � "' —
� < � �e'�t''¢� � 0 �'�
W �
� � �E �R� � �
� � ��
J � � •
CJ�
'3�v 0 ��. � �:
ON / �OE.�S � �'
�� a
� �
� • 2i0�1d
� il0lad 'S �/ �� o �
�� � �
�v � 3�Y7d
� 3113'IOJ
,o/ �
. � �i
� i < < � _ "
� * �
< g � � � �' � � � �
�" � i � � � � I 1 �� �
0
r---� . � a,�v-t�� •s � SyQ�
�,�s`�
• M +
r) � .�i ��,�� � �i � -�s �3�
l.= I t � � � � •�: �i ��
CITY OF ST. PAUL COUNCIL FILE O
�- 1318'' �7
PRELIMINARY ORDER gy
FII.� N4. 18834
VOTING WARD 3
In thn Mattar of assesgments for the Morgen/Edgcumbe Area Stre�t Paving and Lighting
Pr�ject, inclu.dinq concrete curbs and gutters, bitliminc�us surface roadway�, concrete
driveway aprons, a lantern style lighting system, gnd ather work incidentel to the
paving and liqhtinq work to be done on:
Bordner Avenue Cleveland to Return Court
Colette Flace Mc+rgan to Worcester
Edqcumbe Road F�eirview to Davern
Edgcumbe Road(Westbound Side only) Davern t� 5nelling
Edgcumbe Road Snelling to Montrenl
Itasca Avenue Cleveland to Return Court
Magoffin Avenue Cleveland to Return Court
Morgan Avenue Cleveland to Return Court
" Morgan Rvenue Colette Flace to Worcester
Morqan Avenue Edgcumbe to L�avern
*�uirnia Avenue Saint Paul Ave to Edgcumbe
Ramlc,w Place Cleveland to Return Court
�Return Court Itasca to Field Avenue
*Shelby Flace Edgaumbe Rd to cul-de-�aa
Suhnyslope Lane Edgcumbe Rd tC cul-de-sac
Thure Avenue Cleveland to Return Court
Worc�ster Avenue Cleveland ta Return Court
Worceater Avenue Colette to Saint Paul Avenue
*To be paved at leas th�n atandard width. Will be
assess�d at a reduc�d rete.
��L _�s�� _ 31 �'
C� � � � � �! ��: �_ � � I
The Council of the City of Saint Paul having received the re�ort of the Mayar
upon the above improvement, and having considered said report, hereby resolves:
1. Thet the said report and the same is Y�ereUy appraved with no
alternatives, and that the e�timated co�t thereof ia $2, 217, 616
financed by 1997 Capitel Improvement Bonds $1, 699�505 and Assessm�nts
$518, 111.
2. That a public hearing be had on said imprc�vement cn the 11th day af
De h 199f at q:30 o'clock P.M., in the Council Chambers of the City
-- Hall end Court House Building in the City of Saint Paul.
3. That notice af said public heering be given to the persc�ns and in the
manner provided by the Charter, stuting the time and place of hearing,
the nsture af the improvement and the total cost thereof as estimated.
COUNCILPERSUN3
Adopted by c:ouncil: Date �`�Q�
Yeas � Neys �
✓ B�akey
i/Bostrom Certified Passed T�y Council Secretary
�y.e r in
✓Harris � In F'evor By '
�gard
Rettman-- ��p�,yJ..� �Against
i/'l�hune t Mayor
(�bser.�--
��� C1TY °�s Saint Paul Cit Council �
k ; . : . . y . .
� - � � Public Hearing Notice _`S��
�� iiii�l Ei�ii = • • ��o
� hr Public Improvement Construction
�ea,
OWNER OR TAXPAYER COUNCIL DISTRICT #3
. PLANNING COUNCIL �15
..................
FILE # <:1$$34:::><::;:<::<::::<::;:;;:;:<;:
PROPERTY ADDRESS
PARCEL ID
PROPERTY TAX DESCRIPTION
THE TIME: WEDNESDAY, DECEMBER 11TH, 1996, AT 4:30 P.M.
PUBLIC PLACE: City Council Chambers, 3rd Floor City Hall-Court House
HEARING Written or oral statements by any owner will be considered by
the Council at this hearing. ,
PURPOSE To consider approval of the proposed project as foliows: ��
MORGAN/EDGCUMBE AREA PAVING AND LIGHTIN4 PROJECT
ESTIMATED If the City Council approves the pro ject� all or part of the
ASSESSMENT cost will be assessed against the benefitted properties. The
INFORMATION ESTIMATED assessment for the above property is
NOTE: THIS IS NOT A BILLI
Please see PAYMENT INFORMATION on the reverse side
of this notice.
ESTIMATED ��'
���� "'t! r �a �.aP ,,.r.
`�! r!'k s
ASSESSMENT
CALCULATION i<.� �' � ;:; e�d��
. .. .. .... ., ..,. . ..._. .._P,'r«Ciw�:.M;
CONTINUED ON REVERSE SIDE NOTIFICATION DATE: ��/22/96
SHOULD THE COUNCIL APPROVE THIS PROJECT, ,
YOUR ASSESSMENT WILL BE COLLECTED ACCORDING TO THE FOLLOWING PROCEDURE!
PAYMENT When the construction, which will begin some time after approval of the project, has
INFORMATION been completed or substantially completed, you will be notified of another public
hearing, which will occur either in the same year as the construction or the year
following the construction. This public hearing is called "RATIFICATION OF
ASSESSMEN'I'S", at which time the City Council will consider the approval of the
assessments for the project.
You will receive more information at the time of the Ratification of Assessments
public hearing concerning the number of years the assessment will run and the
interest rate.
A few days after the Ratification of Assessments, you will receive an invoice. You
will then have the opportunity to pay all or part of your assessment within 30 days
without interest. Any remaining balances will be collected with your property taxes
over a period of 1 to 20 years. Partial payments of $40.00 or more will be accepted
at any time.
DEFERRED Persons 65 and older or retired by virtue of a permanent and total disability may
PAYMENTS qualify for deferred payment of special assessments. If it would be a hardship and
you homestead the property, you may apply for deferred payment following approval
of the Ratification of Assessments by the City Council.
This plan will defer payment, it will not forgive the payment. During the deferral
period interest will continue to accrue.
For more information on deferments, please call 266-8858.
CONNECTIONS If the project is for a storm sewer and/or street paving, you may request new
connections for storm sewer, sanitary sewer or water main. As installation at a later
date will be more expensive, we suggest you consider installation of these connections
at this time for vacant properties.
Also, if you have a connection that is faulty, broken or deteriorated, you may have it
repaired during construction of the project. The Public Works Department will notify
you if your connection needs repair.
New connections and repaired connections will be assessed.
INFORMATION For the benefit of those who will be unable to attend the hearings, Cablevision will
carry the program live on Channel 18 at the scheduled time shown on the reverse
side of this notice.
QUESTIONS Please call 266-8850 for questiorts about assessments. For.questions regarding
construction, please see the enclosed sheet.
NOTTCE SENT BY THE REAL ESTATE DIVISION
DEPARTMENT OF FINANCE AND MANAGEMENT SERVICES
ROOM 140 CITY HALLrCOURT HOUSE
SAINT PAUL, MINNESOTA 55102