CONTRACT CHANGE AGREEMENT NO. P3. 1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
•
as Saint Paul Civic Center Expansion CP-3 Temporarv Facilities
known as Contract L Ciry Project NoA14440 Frerichs Construction Company Contractor, is composed of
the following:
1. Change conduit size between switchgear & substations per Contractor Proposal (CP) flC327.
Reason: Clearance conflicts.
2. Add motorized damper in Emergency Generator Room per CP #C3.35 (HGA RFP #34).
Reason: Prevent cold air from ente�ing coom.
3. Insulate rain water leader C� Arena Lobby per Construction Change Directive (CCD) #C3.17.
Reason: Field condition
4. Additional outlets @ Box Officer per CCD #C333.
Reason: Needed for wmputer equipment
Total
$(813.00)
3,304.00
682.00
171.00
$3,344.00
ORDERED, That the City of Saim Paul, through its Mayor, approves the foregoing additions made in accordance with the
specifications in the sum of $ 3.344.00 . said amount to be added to the lump sum consideration named in the
contract, known as contract L-.
930-90300-0898-00000 Civic Center Expansion Fund.
APP D �F �
c
Assistant � mey
Expansi n Coor ' t g ommittee
Committee
.
Direccor
Architect
and which amount is to be fmanced from:
1� 19 '7�
19
� ' '� 19 �`S�
� � �
� �i ✓ �
Frerichs Construction Companv
Contrac[or �
By �'I�'� GP'1.� � �!
of Fiy,ance . � D/
Assistant to the Mayor
�� ° ._
,
`( DEPARTMENT/OFFICE/CDUI
�� ,
� C,� J � C_-
� CONTAGT PERSON & PHON
C _ _ �
��
- St{ D �j nssicx �
NUYBERFOR
�� �
GREEN SHEET N° 3 d 9 0 5
INR�ATE INITIAVDATE
DEPARTMENTDIRECTOfl �CITVCOUNqL
C17Y ATTOflNEV � CITY CLERK
8llDGEC DIRECI'OR �IN. 8 MGi SERV � p�O .
MAYOF (OR ASSISfANn � G� rrEt�3c'�C
TOTAL # OF SIGNATURE PAGES (CLIP ALL LOCATIONS FOR SIGNATURE) 6 ° '� --�
_^2 9x.Ddh5i6(
\CfION RE�UESTED: 1
C}e,�st occ � l� �C' Con�4-r �c,�- �4'Ewewfl �i'�,: i c�'LS .:�.��+i?t c- C�n'F�
�1�� 09 1�96
o�
, PUINNING COMMISSION _ (
_ CIB COMMITTEE � _
_ STAFF ._ _
_ DI$TFICTCAURT _ _
SUPPOR7S WHICH COUNCiL O&IEGSIVE?
PEiiSONAL SERVICE CONTHACTS MUST ANSWER TiiE FO�L aIfEST10N3:
7. Has this person/firm ever worked untler a+,�C_o �
YES NO
2. Has this person/firm ever been a ciry employeel
YES NO
3. Does this person/firm possess a skill not normally possessed by any curtent city employee?
YES NO
Explain all yes answero on separate sheet and attech to green sheet
Whan. Where. Why):
�..�tis �(lFCtisSar� � co��ra��. S�� Gti�4 occ�Ef�Or z���a� �
IF
RECEIt1E�
JAN 2 51996
�l�Y GLER4�
RECE�VEn
�lAN O$ 1996
�,�TY pTSORNEY
S
O TAL AMOUNT OFTRANSACTION $ 33 � `� • bo COST/REVENUE BUDGETED (CIpCLE ONE) �Y�� NO
(� �\ ` dT /� '- c �
FUNDIWG SOURCE S�"-�� �-��-5 1'�l: -'C�= � ACTIVITY NUhtBER 11� - G3C �'�rE300 ^O SS ��� b
FINANCIAL INFOqMATION: (EXPLAIN) � y , �
VV
�' g3I
•
•
GONTRACT STAFUS
PROJECT: Saint Paul Civic Center
Expansion Project
Saint Paul, Minnesota
CONTRACTOR Frerich's Construction Company
1410 Energy Park Drive Suite 4
Saint Paul, MN 55108
OriginalContractAmount: $ 1,480,000.00
CO f3o.
C3.1
C3.2
C3.3
C3.4
C3.5
C3.6
C3.7
C3.8
C3.9
C3.10
C3.11
Total
Deduct Add
19,697.00
11,303.5�
97,951.00
18,814.00
11,563.00
21,450.00
18,417.00
24,209.00
23, 270.00
14,894.00
3.344.00
00 $ 264.912.50
DATE ISSUED:
CONTRACT NO.:
CONTRACT TITLE:
CONTRACT DATE:
14 December 1995
CP-3
Temporary Facilities
1 May 1995
Net Amount of Contract
including this Change Order: $1,744,972.50
•
•
•
I�$3l
CONTRACTOFt'S PROPOSAL
("f�M L
- _;�:;���p��i
Contractor Proposal No.: Date: � �) - � �.;
- �'� �.;.,�
Project: St. Paul Civic Center Contract No. C�� j
A change in the scope of the work is requested as indicated below:
1. It is requested the completion date be E�7}extended,
( )decreased, ( )unchanged by _calendar days. The
adjusted completion date will be
2. Description of the change: (Refer to drawings, specifications,
addenda, if applicable). (Reference RFP No.: (;"1 I, CCD
No. , FO No. .)
3. Basis of payment (check one) �
(�Firm price for performing this change. .$� (, L� (' �,� )
Adequate supporting details and informa*_ion (_Increased� Dec�t�ct)
must be attached to allow Owner to evaluate.
()Time and material per contract, but not to exceed $
()Actual cost at completion of work $
(�
/� r Gfi _
Submitted by: f ;( ( '( � ^ L� ' \ (F�'1 C-( Date: ��' �) -<<! `)
Contracto
/ / �l i '( ✓/ q j � i , �'''
l
Contractor Sign a� `
-------------------------- — -
FOR CPMI USE
1. Action recommended: (Check one) CPMI Job No. 3225
() Change will not be made: Explain:
�6, Proceed on the following basis:
r� �L/t As indicated above, change and basis of payment is
Y" acceptable.
� Change is acceptable, basis of payment is not acceptable.
( )Basis of payment shall by $
() The following modification is recommended:
() Change in completion date is accepted.
•
() Change is acceptable with no change in price.
() Change is ac�eptable wit� ::c cha.^.ge in completion date.
2. Reason for Change:
�, Design Change O Client Request O Field Condition
() Suggested by Contractor () Design Omission or Other (explain)
scope? ( ) Yes ,� No
(�.Yes ( ) No
��, Yes ( ) No
Date: /2 -�2
Date:
Date:
Approved by: _� O Owner Date:
_____----=----------------------------------------------- g
cc: Chris Hansen Bake Baker Mike Pederson Dick Zehrin
Eriks Ludins
PAITP S-5 ST_ PAUL CIVZC CENTER EXPANSION
3. Is this a part of original contractor
4. Ss Contractor's Estimate attached?
5. A/E consulted. /�
Prepared by:�L�ti — CPMZ
r
Approved by: � �� �. HGA
� `i��
Approved by: � �__�Owner
� � ��� �+ �
�
•
3
�
�
�
!
`
�
�
�
�
�
.�
�
.l
��31
EiH[AKUOWH S1{L[T
CONTRACTOIi"S PHOPOSAL
SAINi PAUL CIVIC CLNTER EXPANSION
lp�SpH, [Jti�l F(i1AL G. IQUIPMLNI
Glli[l.T Et�1PL0YEL= LAE30H
f.'fl+l EfiIALS & �nUlf'tv1EN7 INCORPOSlATCD
TOTP,L LA(3 & MATERIAL & C-QUIPMENT
15°� FCE
}pfA� LACiOR, MATLHIl�I, L-QUIP.. & F[[
JU�II.Vl���
J ��J ���[I
101 AL °U(iCOtdTf+ACTOIIS & FLE
0711Cfi COt�7S
ri+nv��_ � SUOSISILNCC
hq;, � �Ii1ALS & LnU1PMCl47 NOT INCOHPOftA
ItCfll ALS
Tl�i:CS
PL(itv1ll � & LICLtJSL f�LES
U11LIIlLS, FUCL, 1 NCILIIICS AT SIlE
IPICIDCf�1TAL EXPCNSES
�o��o � irasuf��NCt �novisioias
TOTAL OTFiC(1 COSTS
TO7AL 01 CHANGE Pf10POSAL
Y
S_
S
S
J
C
J __—
J
5
5
5
J
$
S
<
J�_--�_
I�i i��L 3.�z��
Y
����� � C � �
�C.( � C;��
Y _.__ --�'_'
��-������
i�nc� s c
� sniNr rnu� avic ccNTt it czrnNSU��+ �
11'���95 16::5 F.il lil°. -18�1 ^_2d&
•
-�EL�CT�t�C
Tp, E=rer�chs Canstruct�ou Co.
1410 Euergy Parl Dr. �#1
St. Paul, MN 55108
�iTTN. Marv [iotck
R�: SC. Paul Civic Ccnlcr
GGPfI:�P.T LLECTFIC ���� PJuu_�OUI
DATL-: Augusc 10, 199�
7he following are coiU ior RFP No, C3.27:
1. M�C�rial Co:[ (lncludt T'sx uE 79i)� . . . . . . . . . . . . .. .... . . . . . . . . . . . . . . ... . ..
?. Lsbor: -3.9 Hrs Ca S 4457/Hr ..... ...................... ...... .... ..... ..
3. Furomen: Hn L,: S /Hr ................................. .. .... . .. . . ..... ..
( -F. General Foreman: Hrs Zv S !Hr . .. .. ... . .... .. . . .... . . . . . .. . . . . .. . . . .... ..
5. t)vcrtimc (1' }C ReguSar Ra[z): tirs (a S 1Hr ...............
d. Oveaimc (2 X Rcgular Ratz): Hrs � S/Hr ........... .... ...... ............
�
7. Projeet �lanabemenc: �(rs a $!Hr ..........................................
S. Labor [nzfliciency: Xiot LabOr (Line #2) ...................................
4. l.o5t Timc: Hrs �: S lFlr ..................................................
10. Field Dzsisn/Drafciny: Hrs C��/Hr ........................................
i l. As Buil[ Drawings: .l Hrs u� S4o.98/Hr ... ... ...... .... . . . . . . . . . . .. . . .. . . . .
1?. Dzlivery:l Hrs C'$30JHr .................................................
li. Ckan up: Hrs cr$/Hr ....................................................
1�. 'fzsting: Hrs C S/Hr .......................................... ....
1�. Warranty: �"r, of b(acerial �k Labur (Linzs #i �Yc 2) ...... ......... ... ... .......
I n. Parkinb: DaysC+�$!D'ay ...................................................
1!. Uryegc, Handling Chsrge, Miscellaneous : ....... ...........................
I 1�. Tcm pornry Wiring : .... ...................... ..........................
1
� 4'). Largc Tool .� Eqinpmcnt Rental :.................. .
� 20. Siunll 7uo1� .4 C.�uau�nslilc�: 5f, uf Labu� (Liuc N2) ................. ..... ....
.,�..� i,.�.,.., o.,.d c� o_..i u�......,...tr� <S�in . Ir.�o� eue nnnn-
PACE 1 OF 2
= 5 -591
= 3 - � 1 S'
_ g
= g
� $
— g
- �
_ g
= D
= 3
= 35
_ � 3Q
� g
= g
_ �
= 5
= 5
= S
_ �
_ 5
•
•
•
11-uti�95 iti:'_h F.�S G1� -t&1 22-k8
GEPfi.iRT ELEC1'hIC ���� GJUU's c�U�
P.�GE ' t�F '
`_1 Tra�ol Timc :... .. ......................... .......... ................. _ '�
„ \G'.i.;clncrcn.c: Hr.,:;rDiHr ....... ......�---. .. ... ................ = j
':. Lim�t.d �4'ark.,pace.lntcr�uplion�: �o o{ L,,t�or (L�nc 8"') .......... = S
'�_ Stura�: Trailcrs :.......................................................... — S
�i G.�s l Oil : ...................................... ............. — 3
'_'G. U ulity C�sc .................'------�----�----............................ = 5
'_Z [n.urance : ............................................................... _ $
'_2+. SubC��1[reCti :............................................................. = �
=�). SubSI�II:R(:1 :: .............................................................. = S
3U. Telephooe/Fax tviachinc : .................................................. = b
31. D uiu�.tcrX ..-•-•---....--'--' ..............'-" --- -..............-- -� . _ �
3?. Sa(ety� 3 �, o( Labor (l.int #2) .. .... .... ................. ..... . ... .... .. = 5
33. P�rmits d'cln5pcction : ..................................................... = 5
.i�. [nla c,t on Relen[ion : ................................................... . = S
3i. Painling & Palching :..........................�� -�---._...........---.... = S
1h. Subtotal :........................... . � • ....................... ..... _ $ -774
37. O verhzad:-5 � oC Subtotal(Line #3ti) ...................................... = 5-39
3�, ProEic
�� of (Lines #36 and 37) ................................................... _ �
39. L nit Pricz�: .......... ......................... _ $
...........................
-10. Subto[al:(Tota(of Lines #36,37,38,6:39) .................................. _ $
-I1. Hond:io ................................................................. _ $
42. Total Th[s Change: (Total of Lines #40 & 41) ............................... _ $-8i3
-i,t. ,�'1'ime rxtensian of U llays wU t3e Required.
�+. This Quotutiort ii Vnlid Un[il S days For Wri[[en Acceptance.
4�. Should [his C.O. Re�uest b� acceptable, an auchorized s+gnature o( [hc Archictct. O wucr,
Comtruction Manager or Ganeral Con[rxctor is rcquircd [o procccd until a wriutn chanac or�cr is
�cctivcd. Sf a CGtti�nl c{�dngc ��dci i> not �caivcd 6y , wu�k dcac�i�cd �L.�vc shatl stop.
ACCEf'CA.�ICE ,�
— (`i��RlPR<)PCXva��T ^I�.
11-u�-95 1ti:25 F�S 61? 181 22�8 GEPH�RT ELECTkIC d Ou�-u�J
�(�J
�t I �
.-•�yust 10, t995 ESTItJ�ATE 1VORKSHEET 11 :30:53
Job Da�cription: CIVIC CENTER - RFP C3.27
Estimata Number: CCC3-27E
Est�mator Namo . LARRY
Page Name/l.ocation: ALL
Estimate Page: t ofi 1
Lt•1 PHr�SE DBit MATERIAL DESCRI°TSON Qll' PRICE U T-PftICE LAEOft l� T-LP,BG;
__ ° _---------------------------------------- °_ _----� ------------ °-------------------
1 O F 6" GRS C.NDUTT -90.G0 978.00 C -880.20 22.00 C -19.E0
2 0 F EL 90 -4.0� 831�.00 C -332.68 0,50 E -2.00
3 Q F COUP -10.00 7765.00 C -176.50 E
q p F 1" GRS CONDUIT 90.00 fi23.00 C 560.70 77.00 C 15.�0
S 0 F EL 90 4.00 4590.00 C 183.60 0.40 E 1.60
0 0 F CK7UI' tU.UU y"L�i.UU G 92•80 E
--------------------------------------------------_ --------------------
------------------------------------------------------� �--
PAGE Multiplier = 1.00 TOTAL -55..._8 -4.90
.
�
�
•,j
C
D ELr- 4-7:, TIt7r� M. : 1�4� �.�'..... --...,
����
"��(�3 i F _ e �
�-rZ ( `1 , o 0 3� �v
.
0
�acsimite Caver �he
�4
� o : Terry Tangedahl
Of: HGA
Phone: 337-4100
Fax� 332-9013
�
�
Susan Jo
Campany: crivn
Phane: 298-5409
�
�
i
pa��: �2/1195
Pages inctuding this
COVer page: $
Re: Saint Pauf Civic Center
Comments:
fs this what you expected?
�� � 1 L� i 5 e�}<. :
cc. 3225?322 '—'� ��` � �`��� �
0
�����
s�� �,-z� R�� , � M,,��,� �,,� � �.
� �!
�,� �
�
�� ,
_�
REQUEST FOR PROPOSAL
PROJECT: Saint Paul Civic Center Expansion P�OPOSAL RF.QUEST NO.:
CP-3 Temporary Facilities
OWNER: Saint Paul Civic Center Authority
t.A. Q'Shaughnessy Plaza
143 West Fourth Street
Saint Paul, MN 55102-1299
DATE �SSlIED:
� �
21 July 1995
3225
CPMI PROJECT NO.:
CONTRACT NO.: CP-3
TO: Frerichs Construction CONTRACT: Temporary Facilities
Marv Kotek CONTRACT DATE: 1 May 1995
7410 Energy Park �rive Suite 4
Saint Paul, MN 55108
Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed
modifications to the Contract Documents described herein. Division of responsibility shall be consistent
with the Contract Documents or as specifically enumerated below.
THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.
DESCRIPTION:
4" Rigid Conduit.
•
NOTES:
1. Change from 6" Rigid Conduit to 4" Rigid Conduit between S&C Switchgear and substations.
ATTACHMENTS:
Frerichs' Request for Information E-21.
u
Submit response in form of standard Contractor's Proposal referencing this document immediately. If
response is not received within 15 working days from date issued, an order may be issued directing you
to proceed with the above described work at no cost and no time change.
MANAGEMENT
�
Susan C.Jo s
Project Manager
INC.
cc: Chris Hansen Bake Baker Dick Zehring
Mike Pederson Ed Fiskewold 3225-403.6
CPMI, INC., c/o Saint Paul Civic Cente�, I. A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paui, MN 55102-1299
•
�
�
�
07/14/93 09:07 �FAX 012 l84 ::43
R � � U
PROJECT:
awNER;
TO:
Sei�t Peul Cwic Canter Expans�on
Saint Paul CivjC Cantr,� Authority
.�. . . s,e ;?, .
^ F - �
�002
REQUEST fbR IAIFORMATIOhI NQ.: �'� � J
CPMI PRO.l�CT Nb.;
CaN7RACTbR:
CONTRAGT:
REFetzeNc�; _ •
3225
r�� ��—•-�--F.:a�i�.v �..i t.`t` t�=+�a�1 � /�"'a� �. {�s;
�T l� ��A77�$�-�' 'T�' CafAN�'�- �h`� �.. �1G�rry c�c,atac.
',�:7 l� X fZ1l.�1 � C��1bu /7"' �� 7 ��. � � �-Gf .��/ �.fr��_�
7t�/A-l.�ta ���'.t�, 7� �Gl��-77c�,�S . �-�?�1.��7
rz� r.�u� � c�k°�c� ��1�-� &�� �v�- tl�
�G�C.� - `� �c t��- �`i c.�� i� �„ � � u�`�
y" c�al r" t�A� ��N1o� 7tl�4•� �'�r�.4-� ��'� �' ��
���y l�f� ��fl� �'l a��.. ��.-{�}z�,
w�.'. r 7"7�-�- G���J�iyt J�-77��1.
sY:
R�P4Ys "`! F-F l� /S Yi`t'�"���'I���',
'� GPor'I :Z' �5 u lG
CPML Ina.,
co: Chrie Hansen
I.A. 0'Shauqhnezsy
Eriks Ludirts
{'� ��s�
- i �- 9s"
�'���� T CR.�-,o �7-
�6$Cc
14S Waft fourch Streat,_Sa1nt Paut,
3226-
102-7 299
7 FOR lNE�RMATSO�1
Naither the above quegtian nqr the reapective repty w(ll change contractual oi��iga�tons ln any way. i! you
considef a.change In;aoritract sum or contract c;me fs raquired, piaase supmit qqur.fCemized proposai co
CP�!(f imm8di�tCfy,Eni��6af6rQ ereee9tlino_yvjYl�(be work ln eu�sCan. ,.. _
_�,-,-,��. ��/ � • �� � �
CONTRACTOR' S PROPOSAL � � �
. Contractor Proposal No.: Date: ��-� - `T�� "-
Project: St. Paul Civic Center Contract No.�. � ?
�V U �r ! ! =� �= �
•
C �
J
A change in the scope of the work is requested as indicated below:
1. It is requested the completion
( )decreased, ( )unchanged by
adjusted completion date will
date be ( )extended,
calendar days. The
be _
2. Description of the change: (Refer to drawings, specifications,
addenda, if applicable). (Reference RFP No.:�_. CCD
No. , FO No. . ) I�YIO'�Oi'�Z9�. [�qn.OP.Y
� _.
3. Basis of payment (check one)
(� Firm price for performing this change. .$ 3)�- �
Adequate supporting details and information (_Increased_ Deduct)
must be attached to allow Owner to evaluate.
()Time and material per contract, but not to exceed $
()Actual cost at completion of work $
Submitted by: � ) aius ��,� � �rn� /( Date: � � � i `�i � /
Contractor
{,f j
�/L G ..�/ t'�%F� 4
Contrac� tor Signature
----------------------------- CPMI USE
1. Action recommended: (Check one) CPMI Job No. 3225
() Change will not be made: Explain:
� Proceed on the following basis:
� As indicated above, change and basis of payment is
acceptable.
() Change is acceptable, basis of payment is not acceptable.
( )Basis of payment shall by $
() The following modification is recommended:
() Change in completion date is accepted.
() Change is acceptable with no change in price.
() Change is acceptable with no change in completion date.
2. Reason for Change:
�a� Design Change ��Client Request () Field Condition
() Suggested by Contractor () Design Omission or Other (explain)
3. Is this a part of original contractor scope? () Yes ,�G�, No
4. Is Contractor's Estimate attached? (� Yes () No
5. A/E consulted. �j.�,. Yes j) No
Prepared by: py �`--�/��� CPMI Date • /2' ����
Approved by: ' HGA Date:
Approved by: � Owner Date: _ la � S 9 S
Approved by: Owner Date:
_____________________________________________________________
----
cc: Chris Hansen Bake Baker Mike Pederson Dick Zehring
Eriks Ludins
Page 5-5 ST. PAUL CIVIC CENTER E%PANSION
�L
�$3 i
BREAKDOWN SHEET
CONTRACTOR'SPROPOSAL
SAINT PAUL CIVIC CENTER EXPANSION
LA60R, MATERIAL & EQUIPMENT
OIRECT EMPLOYEE LABOR
MATERIALS & EQUIPMENT INCORPORA7ED
TOTAL LAB & MATERIAL & EQUIPMENT
15% FEE
TOTAL LABOR, MATERIAL, EQUIP., & FEE
SUBCONTRACTORS
5% FEF
TOTALSUBCONTRACTORS &FEE
OTHER COSTS
TRAVEL & SUBSISTENCE
MATERIALS & EQUIPMENT N07 INCORPORATED
RENTALS
TAXES
PERMITS & �ICENSE FEES
UTILITIES, FUEL, FACIl1TIES AT SITE
INCIDENTAL EXPENSES
BOND & INSURANCE PROVISIONS
TOTAL OTH[R COSTS
TOTALOFCHANGEPROPOSAL
S
S
S
S 31�i7
S � 5
S
5
5
S
S
S
S
5
����� � � �� �
69
s 3 3C'�
S
$ 3;�
PAGE 5-fi
SAIN7 PAUL CIVIC CENT[R EXPANSION
GENERAL E5T1MA7E FORM
. FRERICHS
CONSTRUC7'ION COMPANY
�os �--' -�
I.00ATION
ARCN.—[N6R
6UOJCCT � � � � � �
` ITEM
_ " ^J-1: L-L�.. ___' _'.__"
----.��� � �-___
OUAMr1(�
t�3g3 (
ESTIMATE No
aHEET No. OF
ESTIMATOR -
SONOSMAN
DATL
'_— __�
—' _..___ "_' __ ` _ __' _ _ ___.. . _ _. _ . -
mn� Gnr�r[e �tou� [snr��ie „ Ter�� [�nrwr�o
L�ww ' M�rc��w� tu� cow�uei
- T'r`_ �'� _ F -_ i_x_' - r'T_ _ . r�l=.._"_' ' _... ._.
_ __
_ _... _. _
, i : �
: ' ii ! � ' � � '
t
___'._ __' '�."�.._ �..i- .... _. _. . _"" _ __._..._
� . { �
- - --- -- » - :. _}_ � :___ _ ____:... - t' ( - - -
_
��� ._._.._ ..:1_._�_y_..�_.�._ . ._ ^... . .__ .
i : � [ '
-�---�'._ �_� :
! � � i ' �
�
�
1 � �
� �
� '..� . J. ._}
i � � I
. � '_ I `"'
1 �
-�- ---
�..
;:
, �
�
� ;. ;-
� i
�
a. _'�T�. _ _"_
i
i �
Y_ _'.l._}�- .�- __-__
' ;I
i �i ; ; " __"
--� :_� __�..
- -----
t _ _ _ :;
.L....I_�.. __.N-� _ - ".
i {� T
y' � - N -i- �-�-� '
1�
� �---!
� l : � � ' 1
I :
1
.L ....�-- .�..' . . __...
� :
"+- ._.' -_—
,
;
�-__+- ; ----
t ,
,
; i -
-�--} � --
�
� �i
.. O C T- 2 6- 9 S T H U 1 6 7 S 3 D O G D Y P1 E C H A N I C A L � P_ 6 1
LW���
��..°;,, .�� ���., ,-.
����������
_ -- __.__- _:_-----__- --------.--------_-__- -- _ _ _-
F��:(;��ft,(�)(`,[1� �l�t(� (612j 487-?G65 ----� ----- 520 FRONT� FlVFI�Ue'.
�ax 487-2637 ST PnUL MN ;.i s 7
October 26, 1995
\J
Frerichs Construction Company
1410 Energy Park Drive
Suite 4
St. Paul, MN 55108
Attec:tion: Marv Kotek
Re: St. Paul Civic Center
Dear Marv:
Liste:d below is pricing for PR# C3.35 reqardiny the motorized
damper for 5-26.
Matezial $1,260.00
Labor. $ 64�.00
Tax $ 88.20
15� Profit and overhead $ 298.23
5� Doody profit and overhead 114.32
Total sum of $2,400.75
•
Zf you have any questions, please do not hesitate to call me.
Vcry truly yours,
Doody Mechanical, inc.
`�-��, ���,
Timoth�J. Daly
F.stimator/Project Manager
T7DJgp
MECHANICAi CON
'_ _ ' " -" ' ' __ ___�"'""_'_ = CUMMERCIM.' INUUSTFlIA� • IrdSTITliT10NAL --- _ "—" -'" _"—_-_"___" ' ' _ _"_ -._"
�
lU/al/95 15:39 F,L� 612 48� 2248 GEPHdRT ELECTRIC � 001/004
���
�� ���� �
EL.E�TRfG
FAX TRANSMITTAL
aarE:
ATTENTION:
COMPANY:
REPERENCE:
FROM:
,
:r �
I� � �►
� � �" .•+ �► '
r.� �l�+I��
NuMBER OF PAGES (INCLUDING COVER SHEET): �
MESSAGE:
f �� � �ir.[� -�1 . � L r
�
3600 LABORE ROAD, ST.PAUL, MiNNESOTA 55170
(6t2)484-4400 � FAX (612)484-2248 �_
1U��1;95 15:�0 F.9% 612 A8� 2248 GEPHaRT ELECTRIC �002;OOd
G�pf�iA�tY
E L�CTRIC
TO:
Attri: ���� `���
Re: �/�
A
� v �
Ddte: �I �^ � ��'
1.
2.
3.
4.
'a11 w A� / e�C�a p st�e� g�o� �h$nqg prder/Propoeal Requeat # u t� �� b
—s='i-�K+�--�-- Page 1 aE 2
Ma,texial Cost (Iaclude Tax o£ �{�) . . . , , , , � �(� �_
Labor , �.,_ � $�.Z`�_�/Hr . . . _ . . . . . . =�G- d
Foreman �Hra c� $� . . . . . . . . . . -
Genexal Poxaman Rra c� $ /Hr. . . . . . . �
5. Overtime: 1 1/2 x Reg. &ate �Hra O$ JHr ..
6. Overtime: 2 x Reg. Ratie �Hra � $ /gr . , . .
7. Project a3anagement Hre � $ /�r . . . . , . _
8. Labor InefEiciency �a of Labar (Line #2) . . . _
��.
^--��
�_
9. Lost Tim� �ra Q $ /Hr, , , , , , , , , . � ^�
10.
11.
12.
i�.
ih.
15.
is.
17_
18.
19.
20.
Field Design/Arafting Hrs � $ /gr. ,
As Built Drawings e�� Hrs c� �� ...
Delivery �grs � $�fEir , . _ , , , , ,
Clean up Hra r� $ /Hr . . . . . . . .
, _ '�"-
. m ��
. - 3v
..--�-
Teatfng Hra � $ /Hr . . . . . . . . . . _ �._-
Warranty �a o£ Ma�erinl & I,abor (Liue #1 & 2) . . A �""°••
Parking Days � $ /Day . . . . . . . . . . - --�"'°"`°^�..
Dxyage, Handling Charge, Miacallaneous. . . . . . . - ""� ""�
T wiring . . . . . . . . . . . . . . . . . . - _
Large Tool & Equipment Rental . . . . . . . . . . . °'"""�"�
Small Tools & Conaumablea �� of Labor (I,ine #2} „=
3600 LaBore Roed, St. Paul. Minneaota 557�0 • (612) 48d-4800
•
•
•
10-31;95 15:40 F�1X 612 48� 2248
21,
22.
23.
24.
25.
2fi.
27.
28.
29.
30.
3I.
32.
33.
34.
35.
36.
37.
38.
39.
4d.
41.
42.
43.
49.
4S.
GEPKART ELECTRIC � $
�
�joos:oo�
Traval Time . . . . . . . . . . . • • - . . . . . . - t "1 �
Wage Increase Holxrs � $ /Hx . . . . . "�"1
Limited VPorkspace,2nterrupt3ona_`k af LaboY-L1ne #2 = '"-""'
Storgge 2'railers . . . . . . . . . . . . . . . . . . _ ^�
Oa8 & 0�,1 . . . . . . . . . . . . . . . . . . . . . '�"'
IItility Cost . . . . . . . . . . . . . . . . . . . . + "'•�""
--- -1 _
Ineurance. . . . . . . . . . . . . . . . . . . . . _ -
subeontr • • • • - • • • - - . . . . . . . . . _ �`'�
S ubeiatenoe . . . . . . . . . . . . . . . . . . . . _ -�
Telephone/Fax Machine . . . . . . . . . . . . . . . � �"`�'""
Dumpatera . . . . . . . . . . . . . . . . . . . . . � � _
.-�-�
3afety 4•k of Labor iLiae #2?. . . . . . . . . . . . +
Permits aad Inspactioa. . . . . . . . . • • • - - - _ ��
In�ereaC ori Re�eritiori . . . . . . . . . . . . . . . _ .^
Painting aad Pat,ching . . . . . . . . . . . . . . . _ ��
S ubtotal. . . . . . . . . . . . . . . . . . . . . _�! .�
Oveshead�� of Subtotal {L1ne #36} , . , , . , A �
Profit � af (Total of Lines #36,37). . . . . . . _ ��""
U nit Prlcea . . . . . . . . . . . . . . . . . . . . 9
Sub�otsl (Tatal of Liiaea #36,37,38,39}. . . . . . . _
Sond � . . . . . . . . . . . . . . . . . . . . . �
-..-��
Total This Ch�nge (TCtal af L�,rieB #40,�}ly . . . . . _ �
A Time Extens3on of Daye �Pill 8e Required
Tb1a Quotah.ion is Valid IIntil Por �4xitteu Acceptance.
Should this C.O. Reque$t ba naeeptable� an authorized signature oE
tha Architect, Owner, eonstruction Mnn�.ges or deneral ContraeCor
is FCQi1SFHGt to pXOCead un�il a rvrittan chaage ordar is recelved.
If a�osmn7. change order ia nat recaived by , work
deacribed above ahall arop.
Da
Accept�ance
Title
Change Order/Propasal
Regueat #
%31-95 15:41 FdS 612 484 22�8 GEP KAR: ELECTRI @]OOi%00�
� ��� •
�ET 1
Octcber 31, 1995 ESTIMAT_E WORICSiiEET 15:19:�7
JOH: S?'. PAUL CIVIC CENPr^� ESTZMATE: OCT3195.SE7
LOCATION: UNIT S26 EST?Mi,TOR: LILRRY PAGE 1 OP 1
LN DB#k MATERIAI, DESCl2IPTION QTY PRiC� U T-PRICE T,.ASOR U T-LABOR
DDDDDDDDDDDpDDJDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDc7D17DDP�DDDDDDDDDDDDDDD
1 PROVZDE WIRING FOR DAMPER FOTt UNIT 826.
2 F 0 COlv'NECTIONS AT J-BOX 1.00 S.00E 5.00 0.50E 0.50
3 3078 FL-1/2 FLEX STEEL 12.00 25.00C 3.�0 1.�OC �.12
4 3110 FL-1I2 FLEX 90 CONN 2.00 1.o0E 3_20 9.00C O.1S
5 309? FZ-1/2 FLEX ST CON3r' 2.00 0.95E 1.90 8.00C 0.16
6 5i2 $IJ-J./2 PLASTIC BUS.'�iING 4.00 0.09E 0.36 4.00C O.i6
7 3866 HA-1/2 MIIVERALLAC 2.00 25.00C 0.30 31.2QC 0.62
8 8188 WC-THFiN-STRA #12 60.D6 54.30M 3.26 7_SOM fl.§5
9 7950 TR-240/�80-120 CNPRL TFM 1.00 125.OQE i25.00 3.00E 3.00
7.0 F 0 �RANSr MOUNTING 1.00 1�.00E 10.00 0.508 0.50
11 7fi10 ST-MANiTAL FRHP 3POL� 1.00 36.06E 36.06 1.00E 1.00
12 F 0 CONNECTSON TO DAMPER 1.00 5.00E 5.00 O.5�E 0.50
P' 1 h f t 9A 1"9 � 1 M� A�! h A1
PAGE Multiplier = 1.00 TOTAL = 193.OS 7.19
•
•
l\VV 1� ilJ 1111 1J'VV
•�
��i .
��z �:
TIh9[:
a:t�r��T�on:
COMPANY:
VVVLI/ VtI11LV
„«, „�, �,� ��, ���,
�ooD�
MECHANICAL, INC.
520 Front Avenue ■ St. Paul, Minnesota 55117
FACSIMILE C�VER SH£ET
- � 1-. i�_ y s ---- ------
3 � o o _- --- -- ---- -----
-._�u�—_��cs - ------- -
G f� m � -------
FROM: _ --� '"„�`- �ft!_,� -
106 NAh9E: ---cST �_.._��v[. C�v_�.c.. G�wr�
• NUMBER OF PAGES INCLUllING COVER SHEGT: �--- •—
3225 - 323
�� �
REMARKS- -----S-U�; . _._..---------�.. ------- -
-- - - ���f o/%u�i .../� .-- f �� c� �'ffao./s- ------
_'_ "% "e�/a� ___.�h�TOf�!-2�� e 7���'''� _ _ _ ��,1tF.� "_
----�t�i /�vY
•
_- -- — .... -
��'^'r'' —.__.. _
IF YOU HAVE 'i"T2�UBI.E RECENING, PLEASB CALL <bI2? �7-1061
OUR FAX NTT[v��R TS: (6i2) 487-2637
.^.. _.._..__..-------- -.--__.�_._MEG1iANTCAL CON'i'RACTOI2S ._.__� �._._._......_......—
;•,, �, .�„� , - � !� •
``��., ��`
�;'� '� . � w
y � A
� � • �
�'_6 • ♦
•
� `� � 7
, �"� `►''�``. � -
` �r�1 ���E
� ~ � y �� ��,��'' � �
�.� � +���'''�'��`,�� /�, . .
L*I ��: `'�'t T•�.: �_ I
�,� `"'=�=�''�..,�/,r� �
��`=♦.�`
� : • j ,�,�..�� �
�t ' '��;J
I � . - ���; f �� �� .
, ,� �
. � �► ..
:
_ , ,�
� � ��► #� l �
.��.�� � ♦
� ,,•�''�
� . � .�`
- ,�`• �
. - ; :. . �' _
� y '` •
• `
wl ���
1
M� �
� .�
t �� �
rt '
. ,� �`
•- t
L � �• �
. _
.
. .
� ,� �
r �
. e'r'
� � j � • •
. �
. \
",`
♦ .�
w • � • . �
� •
M � ►
�
• � +.
' � ' r
� � ` .f
.
w �
� •
, � ,
� � �
J
:. �...�t� ' /���►+�: � �
.-
, ,
�
�
��
��
�
?
, .
��
1�
6
�f ��
�� � �
•
•
CPMI
OWNER:
R:-E:t317-EST FDR PR_O
Saint Paul Civic Center Expansion PROPOSAL REQUEST NO.:
CP-3 Temporary Facilities HGA REFERENCE NO.:
DATEISSUED:
Saint Paul Civic Center Authority
t.A. O'Shaughnessy Plaza CPMI PROJECT NO.:
143 West Fourth Street
Saint Paul, MN 55102-1299
TO: Frerichs Construction
Marv Kotek
1410 Energy Park Drive Suite 4
Sai Paul, MN 55108
CONTRACT NO.:
CON7RACT:
CON7RACT DATE:
C3.35
34
5 October 1995
3225
CP-3
Temporary Facifities
1 May 1995
Please submit an itemized quotation for changes in the Contract Sum and/or i ime �ncidentai to proposea
modifications to the Contract Documents described herein. Division of �esponsibility shal4 be consistent
with the Contract Documents or as specifically enumerated below.
THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.
DESCRIPTION:
1. Motorized Damper 5-26
NOTES:
1. Provide motorized discharge damper per HGA's Request for P�oposal (RFP) #34, dated 4 October
1995.
2. Reason: Keep cold air out.
ATTACHMENTS:
1. HGA Request for Proposal Number 34 dated 4 October 1995.
Submit response in form of standard Contractor's Proposal referencing this document immediately. If
response is noi received within t5 working days from date issued, an order may be issued directing you
to pro with the above described work at no cost and no time change.
MANAGEMENl
•
�-��-, C
Susan C.Jones
Project Manager
Jcy-rce,�
cc: Chris Hansen Sake Baker Dick Zehring
Mike Pederson Ed Fiskewold 3225-403.6
CPMI, INC., c/o Saint Paul Civic Center, i. A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55102-1299
'� . - - �� f
O C T- 4- 9 S W E D 9- 2 8
•
RF(ITTFST FnR PROPS?SAL
HAMMEL GREEN ANri ABRAHANIS4N, II�TC., ARCFII'T�CTS AND ENCINEERS
Q - 6 2
R�P I30. 34
PAGE I OF 1
PROJECT: SAINT PAUL CIVIC CEN'�ER DATE: � October 1995
EXPAi3SIdN
HGA Commission Number 7b4.003.00
Q�'VNER SAINf PAUL CIVIC CENTER AVTHORITY Contractar Project No.:
'I'ype Cantract: CP-3
•
CONTRACTOR: F�RICHS CONS'TRUCTION COMPANY COPY TU:
1410 Energy Park Drive, Suite 4 S. 70NES, CPMi
St. Paut, Minnesota 55108
Plcasc provide s cost breakdown in accordana with the Contract Documcnts end a Summnry For the change deseribed herein and o� the
attachments (if any) listed
'Thia is not an aufhorizntion to rnoce¢d With 1he wofk desca'ibed here'u1 Unl�s and wttil aPproved by the Otc77er, Qn epproval, this chAnge
n�sc�urTTOrr o� � woxzc:
Mechaaical
Refer to sheet M173
Provide inotorized discharge damper on dischzrge side o£supply fan 5-26.
Dampec shall open whenever 5-26 is an, and c�ose whenever 5-26 is off.
Attachmentss None
Reqaested Ey: CYwner
• COMMENTS:
rfp34.ta
A/E /��� �ir �'d ��
��31 � ��� 3
CONTRACTOR'S PROPOSAL
•
•
Contractor Proposal No.: Date: I�`., Y�) .
Project: St. Paul Civic Center Contract No. -
A change in the scope of the work is requested as indicated below:
1. It is requested the completion date be ()extended,
( )decreased, ( )unchanged by _calendar days. The
adjusted completion date will be
� t l `"� .J
2. Description of the change: (Refer to drawings, specifications,
addenda, if applicable). (Reference RFP No.: , CCD
No . `� , ( "7 , SO No . . )
(NSs►�.(at� Ra�in Wa�t�,e�.�.+j
3. Basis of payment (check one)
()Firm price for performing this change. .$
Adequate supporting details and information (�Increased_ Deduct)
must be attached to allow Owner to evaluate.
()Time and material per contract, but not to exceed $
(�Actual cost at completion of work $ `Y .. �C; �/
Submitted by: � }t%_�.f `L1 � ��✓( Date: � �- �• �' `>
Contractor e
l�'r� �M ` �����-�'-
Contrac or 5ignature
_� -----------------------y--- FOR CPMI USE
1. Action recommended: (Check one) CPMI Job No. 3225
() Change will not be made: Explain:
2
Y�1t Proceed on the following basis:
l`�Q As indicated above, change and basis of payment is
accep�able.
() Change is acceptable, basis of payment is not acceptable.
( )Basis of payment shall by $
() The following modification is recommended:
(} Change in completion date is accepted.
() Change is acceptable with no change in price.
() Change is acceptable with no change in completion date.
Reason for Change:
() Design Change Client Request () Field Condition
() Suggested by Contra tor () Design Omission or Other (explain}
3. Is this a part of original contractor
4. Is Contractor's Estimate attached?
5. A/E consulted.
Prepared by:�s--- CPMI
Approved by: .� HGA
• Approved by: l�'" Owner
G'
scope? ( ) Yes ,��C No
�¢ Yes ( ) No
� Yes ( ) No
Date • ���95
Date: _ _
Date:
Approved by: � Owner Date:
__________________________________________________________________ g
cc: Chris Hansen Bake Baker Mike Pederson Dick Zehrin
Eriks Ludins
Page 5-5 ST. PAUL CIVIC CENTER EXPANSION
,.
�
�� �� ���� �
• [3REAKDOWN SHEET
CONTRACTOR'S PPOPOSAL
SAINT PAUL CIVIC C[NTER EXPAN5
LAC30R, MATERIAL & EQUIPMENT
DI(ZECT [MPLOYEE LABOR
MAT[f�IALS & EQUIPMENT INCORPOflAT[D
TOTAL LA6 & MATERIAL & EQUIPMENT
15% F[E
TOTAL LABOR, MATEfliAL, EQUIP., & FEE
SUS3CONTRACTOftS
5% FEE
TOTALSUOCONTRACTOHS &FEE
OTN[R COSTS
TRAVEL & SU4SISTENCE
MATERIALS & EQUIPMENT NOT INCORPORATED
RENTALS
TAX[5
PERMITS & UCENS[ FEES
UTILITIES, FU[L, `ACIL4T4ES A7 SITE
INCIDLNTAL EXPENSES
F30N0 & INSURANCE PflOVISIONS
70TAL OTHER COSTS
%.�,�'_C"C
� �-�i C C'
5 -
S
,j �! 3 L'�-'
5 �``'��,�'�"
$
5 ----- - `
S
S
S
S
S
S
S
S
c
-� �
� � ^ � ��
S
$_
s - ' yZ'
70TAL OF CHANG[ PROPOSAL
PAGL 5 G
SAINT PAUL CiVIC CCNTER [XPANSION
i� �
WORK ORDER N� 2 � 6$
eriChs Construction Co.
410 Energy Park Drive, Sude #4
St. Paul, Minnesota 55708
Phone:612-644-5063
Frerichs Construction
r"' S/ -�� G -'T
/ i
-• i '�i
WORK ORDER REPORT:
JOB NAME
BILL TO
WORK ORDERED SY GG1� C 3���
OF WORK: -�N S c�LA %�� \� �! �'L� �� (`�i� 1 ��f /� .--��
�/]/-= n fA .� k� r,.�.. v r� �\ -� 7 �`7
MAN DATE HOURS JIAlY- S�Ait' -M0tlR6- MAN OATE FiOURS MAN DATE HOURS
`J X �J - SS, � `
��
��. __. �:. .,, t .r ii7 r : tt`�
ou�wrm
•
MATEflIAL � COST � � E7(T. � QUAMT'
"„ n �.�..
f IIAf I
<'� 1 ��� /�� �, q J
�� V' �0� I
�/
J08 NO.
REPORT DA7E �` �Z - / S
MATERIAL
APPROVE� BY:
COS7 � EXT.
CONSTRUCTION
CHANGE
� DIRECTIVE
A!A DOCUMF_NT G714
OWNER �7
ARCH[TSCT �7
CONTRACTOR �J
FIELD �7
OTHER �7
�DJI
�IPdI
(6+Stru<[�ons On retrrse>tde TbtS doCUmcm! rep7uCeS.lIA IXKrmu++( G 3 Ca+.+(nK/�an Change AutqpnzGtrwe )
PROJECT:
(name, address)
TO CONTRACTOR.
(name, address)
Saint Paul Civic Center
143 West 4th Street
Saint Paui, MN 55102
Frerichs Construction
1410 Energy Park Drive, Suite 4
Saint Paul, MN 55108
You are hereby direcred co make che following change(s) in [his Coneracc
�IRECTIVE NO-
DATE.
ARCHtTECT'S PRO)ECT NO
CCD-C3.17
16 August 1995
CONTRACT DnTE � May 7995
CONTRAC'C FOR� CP-3 Temporary Facihties
insulate and paint the relocated RWL in the Arena Iobby to match the temporary walis.
Reason: Field Condition
�
PROPOSED ADJUSTMENTS
1 The proposed buis of adjustment to the Concraa Sum or Guazanteed Maximum Price �s-
❑ Lump Sum (increase) (decrcue) of
❑ Unit Prite of
2. The Conerac[ Time �s proposed ta{be.adjusted}(rert�ain unchanged). The proposed adjustmen[, if any, is (an inerease of Q
dzys) (a decrease of Q days).
D as provided in Subparagraph 73.6 of AIA Doeumene A201, 1987 edieion.
❑ as follows:
•
W hen signed by ihe Owner and Architect and received by the Contractor, this document
becomes effec[ive IMMEDIATELY u a Cons[mction Change Directive (CCDJ, and the
Con[racror shall proceed wifi che change(s) described above.
Hammel Green Abrahamson, 4nc. Saint Paul Civic Center Authority
ARCHITECT OWNER
1201 Harmon Place 143 West 4th Street
Address Address
t�Ainaeapafis�At�5h9,3 SaiaY a���,i Mt� 55102
BY
DATE
P3f
BY
DATE
Signamre by the Contractor indicates ehe Con-
[raaor's agreement with [he proposed adNS[�
menu in Concraa Sum and Conmtt Time xt
forfi in thu� Constmcnon Change Direaive
Frerichs Construction
CONTRnCTOR
1410 Enerqy Park Drive Suite 4
Address
$81ALP ��� � SF'I(1R
BY
DATE
i ` CAUTION: You should sign an original AIA document which has this caut(o� printed in red.
An original assures that changes wiil not be obscured as may occur when documents are reproduced.
AIN DOCl1MENT G714 • CONSTROCTION CHANGE DIRECTIVE • 19A] EDI7ION • AIA •�O 1987 • THE
AMERICAN INSTITUTE OF ARCHITECtS. I735 NEW YORK AYENUE, N.W., WASHINGTON, D C 2000Ci
G714S987
��63� I�M `� �
CONTRACTOR'S PROPOSAL
• Contractor Proposal No.: Date: ,
Project: St. Paul Civic Center Contract No. ` ��"
A change in the scope of the work is requested as indicated below:
1. It is requested the completion date be ()extended,
( )decreased, ( )unchanged by _calendar days. The
adjusted completion date will be
2. Description of the change: (Refer to drawings, specifications,
addenda, if applicable). (Reference RFP No.: , CCD
No. "�. 3�, FO No. .)
ACpir�� our�5 c? t�oX o�cE
3. Basis of payment (check one)
()Firm price for performing this change. .$
Adequate supporting details and information (�Increased_ Deduct)
must be attached to allow Owner to evaluate.
()Time and material per contract, but not to exceed $ �
(-,�)Actual cost at completion of work $ `"" J
c �
Submitted by: �,i7.F r� I.� �� � �;-, � Date • � /- (� - �r' �
Contractor ��
�'�(��� �,�Y 7 _
Contractor Signature
• ______________________________________________________________________
FOR CPMI USE
1. Action recommended: (Check one) CPMI 3ob No. 3225
() Change will not be made: Explain:
� Proceed on the following basis:
() As indicated above, change and basis of payment is
acceptable.
�� Change is acceptable, basis of payment is not acceptable.
�.Basis of payment sha11 by $�'T( ( �' �g. - } - �AygL�CtME
() The following modification is recommended: Np-r p,��Ep
() Change in completion date is accepted. Co�ttauaie. was
() Change is acceptable with no change in price. oNSirgrHA�rAA�
() Change is acceptable with no change in completion date.�,
2. Reason for Change: woRk
() Design Change () Client Request �.Field Condition
() Suggested by Contractor () Design Omission or Other (explain)
3. Is this a part of original contractor scope? () Yes �� No
4. Is Contractor's Estimate attached? �Q,Yes () No
5. A/E consulted. `�l Yes () No
Prepared by: _ - _- CPMI Date:�/�/Z�9S
�
Approved by: �HGA Date:
� Approved by: n� �� � _ _Owner Date•
Approved by:it'` �t C Owner Date:
------=---=------------------------------------------------------ g
cc: Chris Hansen Bake Baker Mike Pederson Dick Zehrin
Eriks Ludins
Page 5-5 ST. PAUL CIVIC CENTER EXPANSION
i�3 I
�
BREAKDOWN StiEET
CONTRAC70R"SPROP
SAINT PAUI CIVIC C[NTER EXPANSION
LACSOft, MATERIAL 8 EQUIPMENT
1 pIR[CT EMPLOYEE LABOR
MATEflIALS & EQUIPMENT INCORPOftA7ED
� TOTAL LAB & MA7ERIAL & EQUIPMENT
15 FEE
� TOTAL LABOR, MATERfAt, EQUfP., & FEE
�
i
�
�
.�
�
.�
r�
�
.�
SU(3CONTftACTORS
5°10 FE�
TOTA� SUOCONTftACTOHS & FEE
OTN[(i COSTS
TRAVC & SU6S4STENCE
MATERIALS & [QUIPM[NT NOT INCORPORATED
RE
TAXCS
p[RMiTS & LICENSE FEES
UT4LIT4ES, FULL, FACIUTILS AT SITE
INCIDC-N7F�L EXPENSES
pONO & INSURANCE PROVISVONS
T07AL 07HCR COSTS
707AL O� CHANGE PROPOSAL
�
5 �--
S
$ ��_'
C�� C' 3 �3_�
S
S ��`"„ �103 �
5 � v l
0
&
$
5
S
S
S
S
S
,_,_.�.
S � , ( ° C,
1��'
J �-»- . �'
y, � , i�
$�`' L
��,�
pAGE 5 G
T SAINT PAUL C1VEC C£N7ER EXPANSION
lU/25/95 1�:58 F-LX 612 484 22�8 GEP��RT ELECTRIC � 002/00�
�������
�L�CTRIC
T�: Rrericha Cona txucticn Co.
�� �
ATTN; Marv Xotek DATE: October 24, 1995
RE: St. 2au1 cin�c Center
The following are costs for CCD I3o. C3.33: pAGE 1 OF 2
1
2
3
C�
Ny
6.
7.
8.
9.
10.
li.
].2 .
13.
14,
15
lb
i�
18
19
20
Material Cost (Include Tax of 6.5�): . . . . . .
Labor: 2.58 Hrs C� S 44.57/FIr . . . . . . . . . .
�'oreman: 2.58 FIrs � S Z•�1/xr . . . . . . . . .
General Foreman: Hrs � S /Kr . . . . . . . . .
Overtime {1" X Regular Rate): Ars @ S/Hr ...
Overtime (2 X Regular Rate): Hrs Q$/Hr ...
Praject Management: Hrs � $/Hr . . . . . - • -
Labor Tnefficiency: � of Labor (Line #2) • • • -
Lost Time: Hrs Q S jHr . . . . . . . . . . . .
Fie�d Design/DratCing: Hrs � $/Hr . . . . . . •
As Bt�ilt Drawing5: Hrs e $/Hr . . . . - . . •
nelivery: Hrs � $/Hr . . . - - - • • • - - •
Clean up: xrs r� $/Hr . . . . . . . . . . . .
Testing: Hrs o $/Hr . . . . . . . . . . . . .
Warranty: � of Material & Labox (Lines #1 & 2)
parking: Aays @ $1Day . . . - . - • • • • - •
Dxyage, Handling Charge, Miscellaneous: . . -
Temporary Wiring: • - - • • • • • • • • • • •
I�arge Tool & Equipment Rental: . . . . . . . .
Small Tools & Consumables: � of Labor (Line #2)
0
$ 20
$ 115
$ �
$
$
$
$
$
�
$
$
$
S
$
$
S
$
S
$
$
LaBora Aoed, St. Paul, Mlnneaota 55710 . (812) 484-d900
•
•
10%25%95 1�1:58 F.�.l' 812 =484 22�8 GEPH�RT ELECTRI
21. Travel Time: . _
1�ooa:�o�
PAGE 2 dF 2
- $ � j �
22. Wage Increase: Hrs � $/xr . . . . . . . - - - • • _ $
23. Limited Workspace, Interruption�: °s of Labor (Line #2) $_
24. Storage Trailers : . . . . . . . . . . . . � - � • _ $
25. Gas & Oil : . . . . . . . . . . . . . . . . . . . . _ $
26. Utility CoBt: . - • . • � • - � - - • � - - ' ' ' - $
27 . znsurance - - - - - - - - - - - - - - - • - . . . . _ $
28. Subcontracts: . . . . - • - - - . . . . . . . . . _ �
29. Subsistence: . . • - • • • - - - - � • - • � � ' ' � $
30. Telephone/Fax Machine: . . . . _ . . • . - • • • • _ $
31. Dumpsters : . . . . . . . . . . . . . . . . . . . . _ $
32. Safety: 4� of �abor tLine #2) - • - - • • • - • • - $
33. Permits & Inspection: . . . . . . _ . - � - - - • ° �
34. Ynterest on Retention: • • • • • • • • - • � � � - $
35. Painting & Patching: _ . . - • • • - • • - � - - � - $
36. Subtotal : . . . . . . . . . . . . . . . . . . . . _ �.k69� ('�2.
37. Overriead: 15� of Subtotal tLine #36) . . - - - • _ $ 24 �'��
38. Psofit: _ $
� of (Lines #36 and 37) • - - - • � • • • • • • -
39 _ IInit PriCe6 : . . . . . . . . . . . . . . . . . . . _ $
40. Subtotal: (Tota1 of Lines #3b, 37, 38, & 39� ••• � $
41 . Bond : � . . . . . . . . . . . . . . . . . . . . � _ $
42. Tota1 This Criange: (Total of Lines #§0 & 41} ... _ $?��'�� 3
43. A Time Extension of 0 Days Will Be Required.
�4. This Quotation is Valid Until 0 For Written Acceptanee.
45. Should this C.O. Request be aCCeptable, an authorized signature of
the Architect, fl�er, Construction Manager or General Contractor is
required to praceed until a written change order is received. If a
formal change order is not received by , work described above shall
stop.
ACCEPTANCE
CXANGE ORDER/PROPOSAL REtlUEST N0.
•
10/25/95 19:59 F�1S 612 484 2248
•
SHEL•T 1
Occo6er 25, 1945
GEPFLaRT ELECTRIC
ESTIHATE WORi{SHPET
,TOb Description: CIVIC CENTEFZ CCD C3.33
Estimata Number: CCDC3-33
Estimator Uame : L�RRY
Page Name/Location: ALL
Estimate Page: 1 of 1
i:
LN PF3ASE DB# MATERI�4L DESCRIPTION QTY PRIC'L iJ T-PRICE
•
1
2
3
�
5
6
7
S
9
70
11
�oo�t; oo�
13:3g:2�
LABOR il T-LABOl
0 P MOVE R�CEPTACLE 5' 1.00 5.00 L• 5.40 0.75 E 0.7:
� F 190Q BOX 1.00 11�.00 C 1.15 35.OQ C 0.3°
0 P RS OOVER-ftECLF'TACLE 2.00 98.00 C 0.95 15.00 C 0.1
0 F ANCHOR 2.00 15.00 C 0.30 E
0 F 20A I7CIYLEX RECEPTACLE 1.00 6.00 E b-00 20.00 C 0.3i
1 1843 EM-1/2 FMI'-CONDUIT 10.60 1�.6� C 1.>6 3."75 C 0.3:
1 2000 EM-i/2 SET SCP.EW �NDI 2.C10 33.00 C 0.66 6.00 C 0.1
1 �12 HU-1/2 PLASTIC BUSHTN 2.00 0.10 E 0.20 4.0a C 0.0:
1 3fi66 Hrt-112 MTI�ES2ALLAC 1.00 16.70 C O.17 5.00 C 0.0
3 81$8 WC-T7�IN-STRA #12 20.00 56.00 M 1.12 5.25 M 0.1
0 F CCT TERMSNATION @ PNL 1.00 2.00 E 2.00 O.�fl £ 0.4
__�
PAGE Muttiplier c 1.O� TOTAI. = 19.1� �•
•
u
CONSTRUCTION o.�NER �o ��)
CHANGE "R`"`TE`T �
CONTRnCTOR �7
DIRECTIVE FIELD �
A/A DOCUMENT G774 OTH£R �] CPMI
(Irestructlons on recelse si6e. Tbu donsment repfaces A/A Lbcumen( G�13. Conrnuction Change Au[borrzatron J
PROJECT:
(name, address)
TO CONTRACTOR:
(name, address)
Saint Paul Civic Center
143 West 4th Street
Saint Paui, MN 55102
Frerichs Construction
1410 Energy Park Drive, Suite 4
Saint Paul, MN 55108
You are hereby directed to make the following change(s) in this Contracc:
Move one dupiex outiet and supply an additional duplex outlet at the North Box Ofifice as requested by the Owner.
•
Reason: Owner Request
PROPOSED AWUSTMENTS
t. The proposed basu of adjustment ro the Concraa Sum or Guaranteed Maximum Price is:
❑ Lump Sum (increase) (decrease) of
❑ Unic Price of
D as provided in Subparagraph �3.6 oi AIA Docvmrnt A201, 1987 edition.
Time and Material. Turn in timesheets daily. NTE $350.00
❑ as follows:
u
2. The Contract Time is propOSed [o'(6e"a�usTe"7c j(remain unchanged). The proposed adjusemen[, if any, is (an increase of �
days) (a decrease of � days).
W hen signed by che Owner and Archirec[ and received by [he Contrattor, this documen[
becomes effec[ive IMMEDIATELY u a Cons[ruc[ion Change Direc[ive (CCD), and the
Contractor shall proceed w¢h the change(s) dexribed above.
Hammel Green Abrahamson, Inc.
ARCHITECT
1201 Harmon Place
address
Minneapolis, MN 55403
��
Saint Paul Civic CenterAuthority
� 14��Nest 4th Street
Address
Saint Pau4, MN 55102
BY �Y: _ �� _
G (�
DATE ` `� � � DATE I� ��C�� `L ti
� G3�
DIRECTivE NO: CCp-C3.33
DATE: 17 October 1995
ARCHI'CECT'S PROJECT NO:
CONTRACT DATE: � M2y 1995
CONTRnCT FOR:CP Temporary Facilities
S�gnamre by �he Con[acror indicates [he Con-
tractor's agreement with [he proposed adjust-
mencs m Con[ract Sum and Con[raa T�me set
for[h m this Construaion Change Dvectrve.
Frerichs Construction
CON?RACTOR
1410 Energy Park Drive, Suite 4
Address
Saint Paul, MN 55108
BY � ° �-C�n.. �"`� �,� 1.
DATE L� C� l�` � �L �
� � CAUTION: You should sign an original AIA document which has this caution printed in red.
An original assures that changes will not be obscured as may occur when documents are reproduced.
AIADOCUMEMG774•CONSiRUCTIONCHANGEDIRECTIVE�198�EDITION•AlA •0
AMERIGN INSiITOTE OF ARCHITECTS, 1�35 NEW YORK AVFJdUE, N W, WASHINGTON, D.0 2000C
G7141987