272840 �����0
CITY OF ST.PAUL COU FILE NO.�
PRELIMINARY ORDER
By
File No. 18027
In the Matter of improving Summit Avenue from Mississippi River Boulevard
to 330 feet east of Snelling Avenue in Districts 13 & 14 under the
Minnesota State Ai�d Program, by overlaying the bitumiaous raodways
(service lanes are not included) with a new surface of asphalt over a
recyeled bituminous base, curb replacement as required at various
locations, refurbish the existing ornamental street lighting system,
and all other work necessary and incidental to said improvement.
unden;�}t�y[���E�tiirh�cxx�c�cxxxx approved
The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and
having considered said report, hereby resolves:
1. That the said rep ort and the same is hereby ap roved with no alternatives, and that the estimated cost thereof
is $ 454,000.00 .Funded-MSA$2t35,�00-CIB $154,000-PIA $15,000
2. That a public hearing be had on said improvement on the 22nd day of MgY, 1979 , at
10:00 o'clock a.m.,in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the
time and place of hearing,the nature of the improvement and the total cost thereof as estimated.
COUNCILMEN Adopted by the Council: Date A� 2 4 1979
Yeas Nays
Certif' P sed by Co cil ret y � 2 7 19�9
���t��� �� In Favor �
�
. f�i�.�t Q ,.�„=_..
Against
�'��'�� � Mayor
l�J;�;�-��;)�
�:;;:����walter
7��e s c a l�VSl,1SKED A� 5 ���9