01-1032City of St. Paul fl��� I 4� /1 i
t ! F I_
RESOLUTION RATIFYING ASSESSMENT
Amended
Voting
Ward
2
COUNC E N . � ��aa' �
J
By
File No. 189060PA
Assessment No.
In the matter of the assessment of benefits, cost and expenses for
the Operation of the Above Standard Street Lighting Systems from
October 1, 2000 to September 30, 2001 for the following area:
/ w��
Kellogg Boulevard from the skyway bridge to West Se�enth Street;
West Seventh Street from Kellogg Boulevard to ��t�Fifth Street;
and West Fifth Street from West Seventh Street to approximatelv
� 407 feet east of West Seventh Street.
Preliminary Order:
Final Order:
A public hearing having been had upon the assessment for the above
improvement, and said assessment having been further considered by the
Council, and having been considered finally satisfactory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects ratified.
RESOLVED FURTHER, That the said assessment be and it is hereby
determined to be payable in one equal installment as per Section 64.04 of
the Administrative Code.
Yeas Nays
✓�enanav
✓Blakey
✓Bostrom
✓Coleman
✓karris
1/Lantry
✓Reiter
Adopted by the Council: Date a,a�.'.1 aao�
Certified Passed by Council Secretary
By � _ ? � , �.
�
�_In Favor � ��
Mayor
� Against
O� -l0'� A
Public Hearin :10/03/Ol �
T.M.S./REAL ESTATE DIVISION Date: OS/16/Ol Green Sheet Number: 113086
DEPARI'MEN1'DIItECTOR CITYCOUNCII,
ontact Person and Ph e Number: � �
CITY ATTORNEY CtTY CLER6
Roxanna Flink-� 266-8859 BIIDGETDIltECPOR TECH.&MGT.SVGDIIL
>1
� MAYOR(ORASSLSfANT) 1 covxcu.RFC�suca
ust be on Council Agenda by: 09/OS/01
OTAL # OF SIGNAT[7RE PAGES 2 (CLIP ALL LOCA7TONS FOR SIGNATURE)
CTION REQUESTED:
etting date of public hearing to ratify the operating costs for above
standard street lighting project for Kellogg Boulevard, West Seventh Streat
d west Fifth Street from October 1, 2000 to September 30, 2001.
ile Nos. 189060PA Assessment No. 0115
COMMENDATIONS: APPROVE (A) OR RE.iECT (R) ggONAL SERVICE CONTRACTS MUST ANSWER 1'f� FOLLOWING:
. Has the persodfssm ever worked under a contraM for this deparhnent? YES NO
PLANNING COMMISSION A STAFF
. Has this persodFum ever been a City employee? YES NO
CIVII. SERVICE COM@IISSION
. Does this person/£vm possess a sldll not normally possessed by any YES NO
CIB COMNIITTEE ����ent City employee?
Explain all YES answers on a separate sheet and attach.
TIATING PROBLEM, ISSUE, OPPORTUNiTY (Who, WLat, Whea, Where, Why?):
ti�cation is necessary in order to begin collecting the operating costs for the above standard lighting project
DVANTAGES IF APPROVED:
.SdIII@ d3 BbOYH.
ISADVANTAGES IF APPROVED:
enefitted property owners will have charges payable via property taxes.
SSADVANTAGES IF NOT APPROVED:
he City would have to pay the costs.
TAL AMO[1N'P OF TRANSACTION: �y` $ 8 34 . O O COST/REVENUE BUDGETED (CIRCLE ONE) YES NO
INGSOURCE: CYldY'JHS Only ACTIVITYN[JMBER:
ANCIAL INFORMATION: (EXPLAIl�
�c� F�esea;ch Cen4a!
AU� 17 2001
z . �. .� �..�n.,,..a....__.
City of St. Paul
Real Estate Division
Dept. of Technology & Maaagement Serv
REPORT OF
OF
Amended
COUNCIL FILE NO
0, � ��� }
File No. 189060PA
Assessment No.
Voting
Ward In the matter of the assessment of benefits, cost and e;cpenses for the
2 Operation of the Above Standard Street Lighting Systems £rom October 1, 2000
to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seventh Street;
West Seventh Street from Kellogg Boulevard to West Fifth Street;
and West Fifth Street from West Seventh Street to apnroximatelv
z'`58 407 feet east of West Seventh Street.
Preliminary
Final Order approved
To the Council of tfie City of St. Paul
The Valuation and Assessment Engineer hereby reports to the Council the
following as a statement of the expenditures necessarily incurred for and in
connection with the making of the above improvement, viz:
Total operating costs
Engineering and Inspection
Valuation and Assessment Services
Administration Charge - Public Health
Re-Check Charge - Public Health
Abatement Service Charge
TOTAL EXPENDITURES
Charge To
I3et Assessment
$3,600.00
$
$ 234.00
$
$
$3.834.OQ
$3,83A.00
Said Valuation and Assessment Engineer further reports that he has assessed
and levied the total amount as above ascertained, to-wit: the sum of $3,834.00
upon each and every lot, part or parcel of land deemed benefitted by the said
improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; that the said assessment has been completed, and that
hereto attached, identified by the signature of the said Valuation and Assessment
Engineer, and made a part hereof, is the said assessment as completed by him, and
which is herewith submitted to the Council for such action thereon as may be
considered proper.
Dated � 9�0'� d 1 � " �2
�-v�V uation and Assessment Engineer
-u
� ���
1 :� II
� ■ �
_,
� (
�
�I I
F-
,
� - �.
� �.
��
.
i,� ,
�
�C
�
v
9
O � _
1- . �O
C "
9 � C
� U
0
3
p .._..
N
C
O
T
�
v
�
d
U
3 r -
` o
Z
m P
U
� O m
� �. U
U
O 5
a - �
� ��
�
��
• X
0�
�
� �\\\\ //\�\
��������� \\ !/Lll
..e.
o � r
�
��
l�l l�1 U
u n.+wn
�
ii S I 1 n
s+»
x d..w.
5 _ 5
o
Sw
y C
c
>. U a
O
J � —
JS ��
, ��
0
City of St. Paul
RE30LUTION RATIFYING ASSESSMENT
� 1-1o�a-
COUNCIL NO.
By
File No. 189060PA
Assessment No
Voting
Ward
2
In the matter of the assessment of benefits, cost and e enses for
the Operation of the Above Standard Street Lighting stems from
October 1, 2000 to September 30, 2001 for the fo11 ing area:
Kellogg Boulevard from the skyway bridge to West Sev th Street;
West Seventh Street from Kellogg Boulevard to East ifth Street;
and West F'ifth Street from West Seventh Street t 250 feet east
of West Seventh Street.
Preliminary Order:
Final Order:
A public hearing having been had u n the assessment for the above
improvement, and said assessment havi been further considered by the
Council, and having been considered fi lly satisfactory, therefore, be it
RESOLVED,That the said
respects ratified.
RESOLVED FURTHER, That
determined to be payable in ,
the Administrative Code.
be and the same is hereby in all
� said assessment be and it is hereby
equal installment as per Section 64.04 of
Adopted by the Council: Date
Yeas Nays
Benanav
Blakey
Bostrom
Coleman
Harris
Lantry
Reiter
f In Favor
Against
Certified Passed by Council Secretary
$Y.
Mayor
City of St. Paul
Real Estate Division
Dflpt. of Techaology & Maaagement Serv.
COUNCIL FILE N0.
O� -�o�-
REPORT OF COI�LETION OF ASSESSMEN'P File No. 189060PA
Assessment No. 0115
Voting
Ward In the matter of the assessment of benefits, cost and expe es for the
2 Operation of the Above Standard Street Lighting Systems fr October 1, 2000
to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seve Street;
West Seventh Street from Kellogg Boulevard to West F' th Street;
and West Fifth Street from West Seventh Street to 0 feet east
of West Seventh Street.
Preliminary
Final
To the Council of the City of St. Paul
The Valuation and Assessment E ineer hereby reports to the Council the
following as a statement of the exp ditures necessarily incurred for and in
connection with the making of the abo improvement, viz:
Total operating costs
Engineering and Inspectio
Valuation and Assessment ervices
Administration Charge - ublic Health
Re-Check Charge - Publ'c Health
Abatement Service Cha ge
TOTAL EXPIIVDITURES
Charge To
Net Assessment
$3,600.00
$ 234.00
$
$3 834.00
$3,834.00
Said Valuati and Assessment Engineer further reports that he has assessed
and levied the tota amount as above ascertained, to-wit: the sum of 53,834.00
upon each and ev y lot, part or parcel of land deemed benefitted by the said
improvement, and ' the case of each lot, part or parcel of land in accordance with
the benefits conf rred thereon; that the said assessment has been completed, and that
hereto attached identified by the signature of the said Valuation and Assessment
Engineer, and ade a part hereof, is the said assessment as completed by him, and
which is her ith submitted to the Council for such action thereon as may be
considered proper. �
Dated .�-/li,- �/ �o/ti-.,, .�z.
�alua ion and Assessment Engineer
� ��
�l`�Jf;�\t'1L
City of St. Paul
RESOLIITIOIQ APPROVING ASSESSMENT �ND
n1�1o�7-
COUN FIL O. ���933
B'' 3`1
FIBING TII+� OF I�IRING T�REON File No. 189060PA
Assessment No. 0115
Voting
Wards In the matter of the assessment of benefits, cost and e�enses for
2 the Operation of the Above Standard Street Lighting System from
October 1, 2000 to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seventh Street;
West Seventh Street from ICellogg Boulevard to West Fifth Street;
and West Fifth Street from West Seventh Street to 250 feet east
of West Seventh Street.
Preliminary Order: approved
Final Order: approved
The assessments of benefits, cost and expenses for and in connection
with the above impravement having been submitted to the Council having
considered same and founc2 the said assessment satis£actory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects approved.
RESOLVED FIIRTHER, That a public hearing be had on said assessment on
the 3rd dav of October. 2001, at the hour o� Five thirtv o'clock n m, in the
Council Cha�ber af the Court House and City Hall Building, in the City of St.
Panl; that the Valuation and Assessment Engineer give notice o£ said
meetings, as required by the Charter, stating in said notice the time and
place of hearing, the nature of the improvement, and the amaunt assessed
against the lot or lots of the particular owner to whom the notice is
directed.
COUNCILPERSON
Yeas Nays
✓Benanav
✓�Blakey
�ostrom
�oleman
�-Iarri s
�� ntry
✓Reiter
�_In Favor
� Against
Adopted bga the Council: Date��� lOO�
Certified Passed by the Council Secretary
' �
Mayor
City of St. Paul fl��� I 4� /1 i
t ! F I_
RESOLUTION RATIFYING ASSESSMENT
Amended
Voting
Ward
2
COUNC E N . � ��aa' �
J
By
File No. 189060PA
Assessment No.
In the matter of the assessment of benefits, cost and expenses for
the Operation of the Above Standard Street Lighting Systems from
October 1, 2000 to September 30, 2001 for the following area:
/ w��
Kellogg Boulevard from the skyway bridge to West Se�enth Street;
West Seventh Street from Kellogg Boulevard to ��t�Fifth Street;
and West Fifth Street from West Seventh Street to approximatelv
� 407 feet east of West Seventh Street.
Preliminary Order:
Final Order:
A public hearing having been had upon the assessment for the above
improvement, and said assessment having been further considered by the
Council, and having been considered finally satisfactory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects ratified.
RESOLVED FURTHER, That the said assessment be and it is hereby
determined to be payable in one equal installment as per Section 64.04 of
the Administrative Code.
Yeas Nays
✓�enanav
✓Blakey
✓Bostrom
✓Coleman
✓karris
1/Lantry
✓Reiter
Adopted by the Council: Date a,a�.'.1 aao�
Certified Passed by Council Secretary
By `\ \ _ � � �.�.�
�_In Favor � ��
Mayor
� Against
O� -l0'� A
Public Hearin :10/03/Ol �
T.M.S./REAL ESTATE DIVISION Date: OS/16/Ol Green Sheet Number: 113086
DEPARI'MEN1'DIItECTOR CITYCOUNCII,
ontact Person and Ph e Number: � �
CITY ATTORNEY CtTY CLER6
Roxanna Flink-� 266-8859 BIIDGETDIltECPOR TECH.&MGT.SVGDIIL
>1
� MAYOR(ORASSLSfANT) 1 covxcu.RFC�suca
ust be on Council Agenda by: 09/OS/01
OTAL # OF SIGNAT[7RE PAGES 2 (CLIP ALL LOCA7TONS FOR SIGNATURE)
CTION REQUESTED:
etting date of public hearing to ratify the operating costs for above
standard street lighting project for Kellogg Boulevard, West Seventh Streat
d west Fifth Street from October 1, 2000 to September 30, 2001.
ile Nos. 189060PA Assessment No. 0115
COMMENDATIONS: APPROVE (A) OR RE.iECT (R) ggONAL SERVICE CONTRACTS MUST ANSWER 1'f� FOLLOWING:
. Has the persodfssm ever worked under a contraM for this deparhnent? YES NO
PLANNING COMMISSION A STAFF
. Has this persodFum ever been a City employee? YES NO
CIVII. SERVICE COM@IISSION
. Does this person/£vm possess a sldll not normally possessed by any YES NO
CIB COMNIITTEE ����ent City employee?
Explain all YES answers on a separate sheet and attach.
TIATING PROBLEM, ISSUE, OPPORTUNiTY (Who, WLat, Whea, Where, Why?):
ti�cation is necessary in order to begin collecting the operating costs for the above standard lighting project
DVANTAGES IF APPROVED:
.SdIII@ d3 BbOYH.
ISADVANTAGES IF APPROVED:
enefitted property owners will have charges payable via property taxes.
SSADVANTAGES IF NOT APPROVED:
he City would have to pay the costs.
TAL AMO[1N'P OF TRANSACTION: �y` $ 8 34 . O O COST/REVENUE BUDGETED (CIRCLE ONE) YES NO
INGSOURCE: CYldY'JHS Only ACTIVITYN[JMBER:
ANCIAL INFORMATION: (EXPLAIl�
�c� F�esea;ch Cen4a!
AU� 17 2001
z . �. .� �..�n.,,..a....__.
City of St. Paul
Real Estate Division
Dept. of Technology & Maaagement Serv
REPORT OF
OF
Amended
COUNCIL FILE NO
0, � ��� }
File No. 189060PA
Assessment No.
Voting
Ward In the matter of the assessment of benefits, cost and e;cpenses for the
2 Operation of the Above Standard Street Lighting Systems £rom October 1, 2000
to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seventh Street;
West Seventh Street from Kellogg Boulevard to West Fifth Street;
and West Fifth Street from West Seventh Street to apnroximatelv
z'`58 407 feet east of West Seventh Street.
Preliminary
Final Order approved
To the Council of tfie City of St. Paul
The Valuation and Assessment Engineer hereby reports to the Council the
following as a statement of the expenditures necessarily incurred for and in
connection with the making of the above improvement, viz:
Total operating costs
Engineering and Inspection
Valuation and Assessment Services
Administration Charge - Public Health
Re-Check Charge - Public Health
Abatement Service Charge
TOTAL EXPENDITURES
Charge To
I3et Assessment
$3,600.00
$
$ 234.00
$
$
$3.834.OQ
$3,83A.00
Said Valuation and Assessment Engineer further reports that he has assessed
and levied the total amount as above ascertained, to-wit: the sum of $3,834.00
upon each and every lot, part or parcel of land deemed benefitted by the said
improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; that the said assessment has been completed, and that
hereto attached, identified by the signature of the said Valuation and Assessment
Engineer, and made a part hereof, is the said assessment as completed by him, and
which is herewith submitted to the Council for such action thereon as may be
considered proper.
Dated � 9�0'� d 1 � " �2
�-v�V uation and Assessment Engineer
-u
� ���
1 :� II
� ■ �
_,
� (
�
�I I
F-
,
� - �.
� �.
��
.
i,� ,
�
�C
�
v
9
O � _
1- . �O
C "
9 � C
� U
0
3
p .._..
N
C
O
T
�
v
�
d
U
3 r -
` o
Z
m P
U
� O m
� �. U
U
O 5
a - �
� ��
�
��
• X
0�
�
� �\\\\ //\�\
��������� \\ !/Lll
..e.
o � r
�
��
l�l l�1 U
u n.+wn
�
ii S I 1 n
s+»
x d..w.
5 _ 5
o
Sw
y C
c
>. U a
O
J � —
JS ��
, ��
0
City of St. Paul
RE30LUTION RATIFYING ASSESSMENT
� 1-1o�a-
COUNCIL NO.
By
File No. 189060PA
Assessment No
Voting
Ward
2
In the matter of the assessment of benefits, cost and e enses for
the Operation of the Above Standard Street Lighting stems from
October 1, 2000 to September 30, 2001 for the fo11 ing area:
Kellogg Boulevard from the skyway bridge to West Sev th Street;
West Seventh Street from Kellogg Boulevard to East ifth Street;
and West F'ifth Street from West Seventh Street t 250 feet east
of West Seventh Street.
Preliminary Order:
Final Order:
A public hearing having been had u n the assessment for the above
improvement, and said assessment havi been further considered by the
Council, and having been considered fi lly satisfactory, therefore, be it
RESOLVED,That the said
respects ratified.
RESOLVED FURTHER, That
determined to be payable in ,
the Administrative Code.
be and the same is hereby in all
� said assessment be and it is hereby
equal installment as per Section 64.04 of
Adopted by the Council: Date
Yeas Nays
Benanav
Blakey
Bostrom
Coleman
Harris
Lantry
Reiter
f In Favor
Against
Certified Passed by Council Secretary
$Y.
Mayor
City of St. Paul
Real Estate Division
Dflpt. of Techaology & Maaagement Serv.
COUNCIL FILE N0.
O� -�o�-
REPORT OF COI�LETION OF ASSESSMEN'P File No. 189060PA
Assessment No. 0115
Voting
Ward In the matter of the assessment of benefits, cost and expe es for the
2 Operation of the Above Standard Street Lighting Systems fr October 1, 2000
to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seve Street;
West Seventh Street from Kellogg Boulevard to West F' th Street;
and West Fifth Street from West Seventh Street to 0 feet east
of West Seventh Street.
Preliminary
Final
To the Council of the City of St. Paul
The Valuation and Assessment E ineer hereby reports to the Council the
following as a statement of the exp ditures necessarily incurred for and in
connection with the making of the abo improvement, viz:
Total operating costs
Engineering and Inspectio
Valuation and Assessment ervices
Administration Charge - ublic Health
Re-Check Charge - Publ'c Health
Abatement Service Cha ge
TOTAL EXPIIVDITURES
Charge To
Net Assessment
$3,600.00
$ 234.00
$
$3 834.00
$3,834.00
Said Valuati and Assessment Engineer further reports that he has assessed
and levied the tota amount as above ascertained, to-wit: the sum of 53,834.00
upon each and ev y lot, part or parcel of land deemed benefitted by the said
improvement, and ' the case of each lot, part or parcel of land in accordance with
the benefits conf rred thereon; that the said assessment has been completed, and that
hereto attached identified by the signature of the said Valuation and Assessment
Engineer, and ade a part hereof, is the said assessment as completed by him, and
which is her ith submitted to the Council for such action thereon as may be
considered proper. �
Dated .�-/li,- �/ �o/ti-.,, .�z.
�alua ion and Assessment Engineer
� ��
�l`�Jf;�\t'1L
City of St. Paul
RESOLIITIOIQ APPROVING ASSESSMENT �ND
n1�1o�7-
COUN FIL O. ���933
B'' 3`1
FIBING TII+� OF I�IRING T�REON File No. 189060PA
Assessment No. 0115
Voting
Wards In the matter of the assessment of benefits, cost and e�enses for
2 the Operation of the Above Standard Street Lighting System from
October 1, 2000 to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seventh Street;
West Seventh Street from ICellogg Boulevard to West Fifth Street;
and West Fifth Street from West Seventh Street to 250 feet east
of West Seventh Street.
Preliminary Order: approved
Final Order: approved
The assessments of benefits, cost and expenses for and in connection
with the above impravement having been submitted to the Council having
considered same and founc2 the said assessment satis£actory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects approved.
RESOLVED FIIRTHER, That a public hearing be had on said assessment on
the 3rd dav of October. 2001, at the hour o� Five thirtv o'clock n m, in the
Council Cha�ber af the Court House and City Hall Building, in the City of St.
Panl; that the Valuation and Assessment Engineer give notice o£ said
meetings, as required by the Charter, stating in said notice the time and
place of hearing, the nature of the improvement, and the amaunt assessed
against the lot or lots of the particular owner to whom the notice is
directed.
COUNCILPERSON
Yeas Nays
✓Benanav
✓�Blakey
�ostrom
�oleman
�-Iarri s
�� ntry
✓Reiter
�_In Favor
� Against
Adopted bga the Council: Date��� lOO�
Certified Passed by the Council Secretary
' �
Mayor
City of St. Paul fl��� I 4� /1 i
t ! F I_
RESOLUTION RATIFYING ASSESSMENT
Amended
Voting
Ward
2
COUNC E N . � ��aa' �
J
By
File No. 189060PA
Assessment No.
In the matter of the assessment of benefits, cost and expenses for
the Operation of the Above Standard Street Lighting Systems from
October 1, 2000 to September 30, 2001 for the following area:
/ w��
Kellogg Boulevard from the skyway bridge to West Se�enth Street;
West Seventh Street from Kellogg Boulevard to ��t�Fifth Street;
and West Fifth Street from West Seventh Street to approximatelv
� 407 feet east of West Seventh Street.
Preliminary Order:
Final Order:
A public hearing having been had upon the assessment for the above
improvement, and said assessment having been further considered by the
Council, and having been considered finally satisfactory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects ratified.
RESOLVED FURTHER, That the said assessment be and it is hereby
determined to be payable in one equal installment as per Section 64.04 of
the Administrative Code.
Yeas Nays
✓�enanav
✓Blakey
✓Bostrom
✓Coleman
✓karris
1/Lantry
✓Reiter
Adopted by the Council: Date a,a�.'.1 aao�
Certified Passed by Council Secretary
By `\ \ _ � � �.�.�
�_In Favor � ��
Mayor
� Against
O� -l0'� A
Public Hearin :10/03/Ol �
T.M.S./REAL ESTATE DIVISION Date: OS/16/Ol Green Sheet Number: 113086
DEPARI'MEN1'DIItECTOR CITYCOUNCII,
ontact Person and Ph e Number: � �
CITY ATTORNEY CtTY CLER6
Roxanna Flink-� 266-8859 BIIDGETDIltECPOR TECH.&MGT.SVGDIIL
>1
� MAYOR(ORASSLSfANT) 1 covxcu.RFC�suca
ust be on Council Agenda by: 09/OS/01
OTAL # OF SIGNAT[7RE PAGES 2 (CLIP ALL LOCA7TONS FOR SIGNATURE)
CTION REQUESTED:
etting date of public hearing to ratify the operating costs for above
standard street lighting project for Kellogg Boulevard, West Seventh Streat
d west Fifth Street from October 1, 2000 to September 30, 2001.
ile Nos. 189060PA Assessment No. 0115
COMMENDATIONS: APPROVE (A) OR RE.iECT (R) ggONAL SERVICE CONTRACTS MUST ANSWER 1'f� FOLLOWING:
. Has the persodfssm ever worked under a contraM for this deparhnent? YES NO
PLANNING COMMISSION A STAFF
. Has this persodFum ever been a City employee? YES NO
CIVII. SERVICE COM@IISSION
. Does this person/£vm possess a sldll not normally possessed by any YES NO
CIB COMNIITTEE ����ent City employee?
Explain all YES answers on a separate sheet and attach.
TIATING PROBLEM, ISSUE, OPPORTUNiTY (Who, WLat, Whea, Where, Why?):
ti�cation is necessary in order to begin collecting the operating costs for the above standard lighting project
DVANTAGES IF APPROVED:
.SdIII@ d3 BbOYH.
ISADVANTAGES IF APPROVED:
enefitted property owners will have charges payable via property taxes.
SSADVANTAGES IF NOT APPROVED:
he City would have to pay the costs.
TAL AMO[1N'P OF TRANSACTION: �y` $ 8 34 . O O COST/REVENUE BUDGETED (CIRCLE ONE) YES NO
INGSOURCE: CYldY'JHS Only ACTIVITYN[JMBER:
ANCIAL INFORMATION: (EXPLAIl�
�c� F�esea;ch Cen4a!
AU� 17 2001
z . �. .� �..�n.,,..a....__.
City of St. Paul
Real Estate Division
Dept. of Technology & Maaagement Serv
REPORT OF
OF
Amended
COUNCIL FILE NO
0, � ��� }
File No. 189060PA
Assessment No.
Voting
Ward In the matter of the assessment of benefits, cost and e;cpenses for the
2 Operation of the Above Standard Street Lighting Systems £rom October 1, 2000
to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seventh Street;
West Seventh Street from Kellogg Boulevard to West Fifth Street;
and West Fifth Street from West Seventh Street to apnroximatelv
z'`58 407 feet east of West Seventh Street.
Preliminary
Final Order approved
To the Council of tfie City of St. Paul
The Valuation and Assessment Engineer hereby reports to the Council the
following as a statement of the expenditures necessarily incurred for and in
connection with the making of the above improvement, viz:
Total operating costs
Engineering and Inspection
Valuation and Assessment Services
Administration Charge - Public Health
Re-Check Charge - Public Health
Abatement Service Charge
TOTAL EXPENDITURES
Charge To
I3et Assessment
$3,600.00
$
$ 234.00
$
$
$3.834.OQ
$3,83A.00
Said Valuation and Assessment Engineer further reports that he has assessed
and levied the total amount as above ascertained, to-wit: the sum of $3,834.00
upon each and every lot, part or parcel of land deemed benefitted by the said
improvement, and in the case of each lot, part or parcel of land in accordance with
the benefits conferred thereon; that the said assessment has been completed, and that
hereto attached, identified by the signature of the said Valuation and Assessment
Engineer, and made a part hereof, is the said assessment as completed by him, and
which is herewith submitted to the Council for such action thereon as may be
considered proper.
Dated � 9�0'� d 1 � " �2
�-v�V uation and Assessment Engineer
-u
� ���
1 :� II
� ■ �
_,
� (
�
�I I
F-
,
� - �.
� �.
��
.
i,� ,
�
�C
�
v
9
O � _
1- . �O
C "
9 � C
� U
0
3
p .._..
N
C
O
T
�
v
�
d
U
3 r -
` o
Z
m P
U
� O m
� �. U
U
O 5
a - �
� ��
�
��
• X
0�
�
� �\\\\ //\�\
��������� \\ !/Lll
..e.
o � r
�
��
l�l l�1 U
u n.+wn
�
ii S I 1 n
s+»
x d..w.
5 _ 5
o
Sw
y C
c
>. U a
O
J � —
JS ��
, ��
0
City of St. Paul
RE30LUTION RATIFYING ASSESSMENT
� 1-1o�a-
COUNCIL NO.
By
File No. 189060PA
Assessment No
Voting
Ward
2
In the matter of the assessment of benefits, cost and e enses for
the Operation of the Above Standard Street Lighting stems from
October 1, 2000 to September 30, 2001 for the fo11 ing area:
Kellogg Boulevard from the skyway bridge to West Sev th Street;
West Seventh Street from Kellogg Boulevard to East ifth Street;
and West F'ifth Street from West Seventh Street t 250 feet east
of West Seventh Street.
Preliminary Order:
Final Order:
A public hearing having been had u n the assessment for the above
improvement, and said assessment havi been further considered by the
Council, and having been considered fi lly satisfactory, therefore, be it
RESOLVED,That the said
respects ratified.
RESOLVED FURTHER, That
determined to be payable in ,
the Administrative Code.
be and the same is hereby in all
� said assessment be and it is hereby
equal installment as per Section 64.04 of
Adopted by the Council: Date
Yeas Nays
Benanav
Blakey
Bostrom
Coleman
Harris
Lantry
Reiter
f In Favor
Against
Certified Passed by Council Secretary
$Y.
Mayor
City of St. Paul
Real Estate Division
Dflpt. of Techaology & Maaagement Serv.
COUNCIL FILE N0.
O� -�o�-
REPORT OF COI�LETION OF ASSESSMEN'P File No. 189060PA
Assessment No. 0115
Voting
Ward In the matter of the assessment of benefits, cost and expe es for the
2 Operation of the Above Standard Street Lighting Systems fr October 1, 2000
to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seve Street;
West Seventh Street from Kellogg Boulevard to West F' th Street;
and West Fifth Street from West Seventh Street to 0 feet east
of West Seventh Street.
Preliminary
Final
To the Council of the City of St. Paul
The Valuation and Assessment E ineer hereby reports to the Council the
following as a statement of the exp ditures necessarily incurred for and in
connection with the making of the abo improvement, viz:
Total operating costs
Engineering and Inspectio
Valuation and Assessment ervices
Administration Charge - ublic Health
Re-Check Charge - Publ'c Health
Abatement Service Cha ge
TOTAL EXPIIVDITURES
Charge To
Net Assessment
$3,600.00
$ 234.00
$
$3 834.00
$3,834.00
Said Valuati and Assessment Engineer further reports that he has assessed
and levied the tota amount as above ascertained, to-wit: the sum of 53,834.00
upon each and ev y lot, part or parcel of land deemed benefitted by the said
improvement, and ' the case of each lot, part or parcel of land in accordance with
the benefits conf rred thereon; that the said assessment has been completed, and that
hereto attached identified by the signature of the said Valuation and Assessment
Engineer, and ade a part hereof, is the said assessment as completed by him, and
which is her ith submitted to the Council for such action thereon as may be
considered proper. �
Dated .�-/li,- �/ �o/ti-.,, .�z.
�alua ion and Assessment Engineer
� ��
�l`�Jf;�\t'1L
City of St. Paul
RESOLIITIOIQ APPROVING ASSESSMENT �ND
n1�1o�7-
COUN FIL O. ���933
B'' 3`1
FIBING TII+� OF I�IRING T�REON File No. 189060PA
Assessment No. 0115
Voting
Wards In the matter of the assessment of benefits, cost and e�enses for
2 the Operation of the Above Standard Street Lighting System from
October 1, 2000 to September 30, 2001 for the following area:
Kellogg Boulevard from the skyway bridge to West Seventh Street;
West Seventh Street from ICellogg Boulevard to West Fifth Street;
and West Fifth Street from West Seventh Street to 250 feet east
of West Seventh Street.
Preliminary Order: approved
Final Order: approved
The assessments of benefits, cost and expenses for and in connection
with the above impravement having been submitted to the Council having
considered same and founc2 the said assessment satis£actory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects approved.
RESOLVED FIIRTHER, That a public hearing be had on said assessment on
the 3rd dav of October. 2001, at the hour o� Five thirtv o'clock n m, in the
Council Cha�ber af the Court House and City Hall Building, in the City of St.
Panl; that the Valuation and Assessment Engineer give notice o£ said
meetings, as required by the Charter, stating in said notice the time and
place of hearing, the nature of the improvement, and the amaunt assessed
against the lot or lots of the particular owner to whom the notice is
directed.
COUNCILPERSON
Yeas Nays
✓Benanav
✓�Blakey
�ostrom
�oleman
�-Iarri s
�� ntry
✓Reiter
�_In Favor
� Against
Adopted bga the Council: Date��� lOO�
Certified Passed by the Council Secretary
' �
Mayor