WHEREAS, the City of Minneapolis is about to improve Emerald Street from I .S.g4
Frontage Road to University Avenue by grading, paving, constructing a bituminous
roadway, constructing concrete curb and gutter, storm water drainage facilities
and all other work necessa ry and incidental to said improvement. Project is
located within the corporate limits of both the City of St. Paul and the City of
Minneapolis. All work to be done in accordance with Plans, Specifications and
Special Provisions therefore designated as City of Minneapolis Elwell Project 2685,
which documents were approved by ����P�ul City Council on June 26, 1979 by
Resolution, Council File No. r . :�
NOW, THEREFORE, BE IT RESOLVED, that the proper city officers are authorized and
directed to execute, on behalf of the City of St. Paul , Construction Agreement
attached , between the City of St. Paul and the City of Minneapotis,
provTding for the disposition of costs incurred in the construction of said
project, Elwetl 2685, a copy of said agreement being attached hereto and incor-
porated herein by reference; and be it
FURTHER RESOLVED, that the constructfon and engineering costs incurred by the City
under the terms of said agreement shall be paid from P. I .R. Fund Code 60200, and
are estimated to be $82,754.17. Said fund shall be reimbursed from 1979 County
Aid funds. All costs shall be accounted for under Department of Public Works
Project No. P-0684, known as Emerald Street, from I .S. g4 Frontage Road to
University Avenue.
COU[VCILMEN Requested by Department of:
Yeas Nays �
� [n Favor
Hunt �
-�evi�e _ � __ Against BY — (DJD)
Maddox
Showaltez-�� �
Tedesco" JUN 2 6 19�9 Form Approved� y ity At ney
Adopted by Council: Date
C�rtified Pa_se y Co c.il . creCary BY t
�y _
t�p e by 1�lavor: Da � _ JUN 2 8 19�9 Approved by yor for Subm' sion to Council
BY � BY I=�������,
�8ustt�t3 JUL 7 1979
� '
.
: `�'�? �
� COOPERATIVE CONSTRUCTION AGREEMENT
THIS AGREEMENT, made and entered into this day of - ,
1979, by and between the CITY OF MINNEAPOLIS, a municipal corporation under the laws of the
State of Minnesota� hereinafter referred to as "Minneapolis", and the CITY OF SAINT PAUI, a
munlcipal coroporation under the laws of the State of Minnesota, hereinafter referred to as
"St. Paul".
WiTHNESSETH:
WHEREAS, Minneapolis and St. Paul for some time have been negotiating to bring about
the improvement of that portion of Emerald Street Southeast between a point approximately
��
0�0 feet Southerly of the Southerly line of Sharon Avenue Southeast and University Avenue
Southeast, a street of common boundary; and
WHEREAS, the improvement contemptates and includes grading, catch basins and leads�
concrete curb and gutter� bituminous surface, sidewalks and other related work; and
WHEREAS� Minneapolis is preparing plans and specifications for the abave described
improvement as part of a project known as Prospect Park Residential "Paving and labeled
as Elwell Project 2685; and
WHEREAS, the above described improvement lies within the corporate limits of Minneapolis
�d St. Paul ; and
WHEREAS, the Minneapolis City Engineer has on March 20, ig79� prepared an engineer's
estimate of the quantities and unit prices of materials and labor for the above described
improvement within the corporate limits of St. Paul in the sum of Eighty two thousand seven
hundred fifty four dollars and seventeen cents. A copy of said estimate (marked
Exhibit "A") is attached hereto and by this reference is made a part hereof; and
WHEREAS, it is contemplated that said work be carried out by the parties hereto under
the provisions of Minnesota Statutes Sec. 471 .59.
,.
. �
. -2-
•NOW, THEREFORE, IT IS HEREBY AGREED:
I .
St. Paui � by this Agreement, permits and authorizes Minneapolis to construct the above
mentioned street improvements and related work within the corporate limits of St. Paul with
Minneapolis' Day Labor Forces in accordance with the plans and specifications approved by
both parties.
II .
Minneapolis, by this Agreement, permits the storm water drainage from the catch basins
to be constructed at the Southeast corner of the intersection of Sharon Avenue Southeast
and Emerald Street Southeast, the Southeast corner of the intersection of Franklin Avenue
C1:1 '
��utheast and Emerald Street Southeast and the Northeast corner of the intersection of
Franklin Avenue Southeast and Emerald Street Southeast to drain into the Minneapolis storm
drain systgm until such a time when that particular part of the storm drain system is no
longer desirable or if the effluent from said catch basins is contaminated more than the
normal storm water runoff as determined by Minneapolis. Upon completion of the construction
of the above three mentioned catch basins and their leads into the Minneapolis storm drain
system and acceptance of the work by St. Paul , St. Paul shall maintain and keep in repair
said catch basins and leads.
� III .
All construction permits for said improvements required by either party for work in
its corporate limits by the second party are granted upon execution of this Agreement.
IV.
Both parties will make a good faith effort to coordinate and construct said improvements
within the 1979 construction season. If for a�y reason these improvements are or cannot be
constructed in the 1979 construction season� this Agreement will be void.
V.
All extra work orders or changes during the construction for said improvements shall
be subject to approval by both parties prior to construction.
. �
�i ; -3-
` VI .
, St. Paul will compensate Minneapolis for one-half of the roadway construction costs �
and for all other work performed by Minneapolis within the corporate limits of St. Paul as
set forth in Exhibit "A" quantities� the cost thereof being the amount of $82,754. 17. It
is understood that the above cost will be adjusted when actual costs are determined and
that St. Paul will compensate Minneapolis the entire total of actuat costs attributable
to the work to be performed under this Agreement. All records and costs pertaining to the
work to be performed under this Agreement sha11 be kept by Minneapolis and St. Paul in
� accordance with the established record keeping and accounting procedures developed by each
�'�ty. Upon completion of the work, Minneapolis will submit a payment request, payable in
full within sixty (60) days of billing date.
VII .
Maintenance and public safety wilt be the responsibility of the contractor during the
construction phase. After construction the maintenance and public sa�ety will be the
responsibility of the owner. Further, each party agrees to indemnify and save harmtess the
other party and their employees from any and all loss, damage, injury or liability of
every kind for the above defined periods.
� VIII .
It is further agreed that any and all employees of St. Paul and all other"persons
engaged by St. Paul in the performance of any work or services required, volunteered or
provided for herein to be performed by St. Paul shall not be considered emptoyees of
, Minneapolis� and that any and all claims that may arise under the Workmen's Compensation
Act of the State of Minnesota on behalf of said employees while so engaged� and any and
all ctaims made by any third parties as a consequence of any act or omission on the part of
a
sald employees while so engaged on any of the work or services provided to be rendered
herein shall in no way be the obligation or responsibility of Minneapolis. Also, any and
all employees of Minneapolis and all other persons engaged by Minneapolis in the performance
' �• .
of any work or services required, volunteered or provided for herein to be performed by
Minneapolis shall not be considered empioyees of St. Paul , and that any and all claims
that may arise underWorkmen' s Compensation Act of the State of Minnesota on behalf of
said employees while so engaged, and any and all claims made by any third parties as a
consequence of any act or omission on the part of said employees while so engaged on any
of the work or services provided to be rendered herein shall in no way be the obligation
or responsibility of St. Paul .
IX.
The provisions of Minnesota Statutes, Section 181 .59 and of any applicable local
�.
ordinance relating to Civil Rights and discrimination shall be considered a part of this
Agreement as if fully set forth herein.
IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be executed in
their behalf respectively by their proper officers thereunto duly authorized and have caused
their corporate seals to be hereunto affixed as of the day and year first above written.
Approved as to Legality: CITY OF MINNEAPOLIS
gy:
Mayor
� Ass�stant City Attorney
Attest:
City Clerk
Countersigned:
City Comptroller-Treasurer
Approved as to Form: CITY OF SAINT PAUL
By' By:
Assistant City Attorney Mayor
By:
Director,Department of Public Works
Countersigned:
Director,Department of Finance E Management Service