00-864Council File RESOLUTiON Green Sheet CITY OF 5AINT PAUL, MINNESOTA Presented By Referred To Committee:Date 1 , WHEREAS, the Department of Public Works has opened bids for the Wamer Road 1Yai1 Eatension project, and 2 3 WHEREAS, this work was adopted by City Coundl Resolution 97-1530, known as Log #SU-5597084, and WHEREAS, the bids eaceeded the engineets estimate by $415,568.48, and 7 8 9 10 11 ia 13 14 15 16 17 18 19 20 21 22 23 2f1 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 l4'f�REAS, the Federal Grant will cover SO% ofthe in¢eased construction costs, with the City needing W cover the remai�ung 20% plus engineering wsts, so TfIEREFORE BE TT RESOLVED, by the Covncil oFthe City of Saint Paul, upon recommendation of the Mayor and advice of the Long Range Capital Improvement Budget Committee, that $415,568.48 is available for appropriation in the 2000 Capital Improvement Budgets, as heretofore adopted and amended by this Council, be hereby further amended in the 7mprovement Budgets, in the follouwg particulazs: BE TT FURTI-IER RESOLVED, that it is the intent of the Council to restore a similar amount of local fonding match to the Como Avenue Bike Lanes Project (C99-2SOS6). The Council �^^=na< that the 2002 CIB Budget include the local match funding for the Como Avenue Bike Lanes Project. �>�E.t-� S Current Amended Budget Change Budget FINANCING PLAN W azner Rd Trail E�tension C98-2S024 FED GRANT PIA CIB SPENDING PLAN Warner Rd Trail Eatension C98-2S024 Construction Engineering & Inspection FINANCING PLAN Como Ave Bike Lanes C99-2S086 e� o -- �� y 106260. 836,000.00 247,403.82 583,403.52 100,412 S8 100,412.85 210,000.00 67,751.75 277,751.75 546,000.00 415,56S.4S 961,56845 420,000.00 359,254.78 779,254.75 126,000.00 56,313.70 182,313.70 546,000.00 415,568.48 961,568.48 FED GRT 420,000.00 -420,000.00 0 00 CIB 88,000.00 -67,751.78 20,24822 Contributions 82,000.00 -82,000.00 0.00 590,000.00 -569,751.75 20,24522 SPENDING PLAN Como Ave Bike Lanes C99-2SOS6 Construction 494,000.00 -494,000.00 0.00 Engineering & Inspection 96,000.00 -75,751.78 20,248.22 590,000.00 -569,751.78 20,245 22 po•�Gy 55 FAIANCING PLAN 56 COiINTYAIDPART.PROG 57 C96-2T§SO 5S 59 PLA 60 61 62 SPENDING PLAN 63 COUNTY AID PART. PROG 84 C96-2T480 65 66 Construction 67 68 69 FINANCING PLAN 70 COUNTYAID PART. PROG 71 C97-2T481 72 73 P7A 74 75 76 SPENDING PLAN 77 COUNTY AID PART. PROG 7S C97-2T481 79 SO Construction si $774.52 -412.88 5,361.94 5,774.82 112.SS 8,361.94 8,774.82 -412.88 $361.94 8,774.52 -412.58 8,361.94 ioo,aoo.00 -ioo,000.ao o.00 100,000.00 -100,000 00 0.00 ioo,000.00 -ioo,000.00 o.00 ioo,000.00 -ioq000.00 o.oa Approved by: Director of Pinancial Services Requested by Department of: Adopted by Council: EJW��ab Public Works 9�2oino / �By�:� f Form Approved by ty A ey Date � �fjz' Adoption Certified by Council Secretary By: Appr By: By: Approved by Mayor for Submission to Council By: DEPARTMEM/OFFICFICOUNCIL DATEINITATED GREEN SHEET No. 106260 Public Works 9l8/2000 Fd Wazn-266-6142 & Lisa Falk 26Cr6117 MUST BE ON COUNCILAGENDA BY (DNTE) TOTAL # OF SIGNATURE PAGES ACTONREOUESiED NISMeER FOR R01iSING �fFlNANGALSERVICES�IR. � IS 10 FINANGIALSERY/ACCTG ❑ MAYOR(OR ASSISTANn ❑ Ed Wam /S L� ❑ lisa Falk dR �� O� � ❑ Dick Ruoert �• \.� ! D 1 � CDUNC�L nss�c� � �1G�9.i GITY ATTORNEV (,YTY CLERK (CLIP ALL LOCATIONS FOR SIGNATURE) Approval of attached Council Resolution amending the financing and spending plans of the Wamer Rd Trail Extension project by transferring CIB funds from the Como Ave Bike Lane,PIA funds from the County Aid Participation program and adding Federa] Grant funding. � RECOMMENDATIONS.ApprOVe (A) or RBlect (Rl PII�NNING CAMMISSION CIB COMMITTEE CIVIL SERVICE COMMISSION A Staff CONTRACTS MUST ANSWER 7HE FOLLOWING �UESTIONS: 1. Has this persoNfrtm ever worKed untler a contract for this tlepartment? YES NO 2 Has this persoNfirm ever 6een a ciry employee? YES NO 3. Does ihis personliirm possess a skill not normalry posseased by am curteM dy emptoyee� YES NO vendor? 4. Isihis INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT, WHEN, WHERE. WHY) '"' "" The last four bids opened by Public Works have been higher than estimated. This trend, apparently resulting from the tight labor market and the rising fuel prices, is being experienced by o[her Public Works agencies. MnDOT advised us that rebidding of projects recendy has resulted in even higher bids for the same work. We have been unable to meet the federal requirements to construct the Como Bike Lane project as submit'rd. We are therefore recommen�'ing hansfer of ffie remaining CIB funds from that project to help cover the Wamer Rd T Extension sho fall., leaving enough to:cover preliminary engineering costs necessary to prepare anot�{ier A key link in the City's bike and pedestrian infrastructure along the Mississippi River is improved, replacing an exispng facility in very poor condiuon. We have been assured by MnDOT that the Federal shaze of 80% for construction will sull apply to the increased construction costs. DISADVAMAGES iF APPROVED� Funding available in the County Aid Pazticipation program will not be available for other projects on County roads. DISADYAMAGES IF NOT APPftOVED The Warner Rd Trail Extension project will not be consffucted and Saint Paul will lose the allocated federal funds. fOTAL AMOUNT OF TPANSACTION $ -254,596.15 COST/REVENUE BUDGETED (CIfiCLE ONE) YES � FUNDMG SOURCE Fed Git, COIlhibu[ions, CIB &. PIA ACTIVITY NUMBER C98-2S0?A, C99-2S086, C96-2T480 & C97-2T481 FINpNCIPL lNFORMATION (E%PLAIN) DEPARTNSENT OF PUBLIC WORKS O O�`` Thomas J. Eggum. Director CITY OF SAINT PAUL Norm Calemars, Mayor � Mayor Norm Coleman City Council Members Larry Lueth. Constructiors Ersgineer 25 W. Pourth Street 900 Ciry Hall Anrsex Telepitone: 65/-266-6080 Saint Paul, MN 55102-1660 Facsimile: 651-292-6315 FROM: Tom Eggum �' . � �E�/.�� DATE: September 18, 2000 SUBJECT: Green Sheet # 106260 Warner Road Trail Extension In response to the CIB Committee's recommendation regarding the attached Council Resolution (green sheet # 106260), Public Works requests that the Council adopt the original resofution. The original resolution consolidates funds to allow Public Works to award the contract to the low bidder, and to colfect engineering fees based on this actual bid. The Department has expended a substantial amount of design effort in this project already, and the inspection work wiil add significantly to the costs ior the department. It is normaily the practice of the department to defer to the recommendation of the CIB committee. In this case, the Department respectfully requests that you approve the resolution which transfers the funds to pay for the additional engineering, as welf as the additional construction costs. The additional design efforts were primarily due to administrative items. Federal projects are generally more time consuming, and much time was spent securing permits and easements from the Department of fVatural Resources and the Corps of Engineers. Also, the design work was more complicated because of the need to cantilever the trail out over the Mississippi River tor a portion of its length. Time is of the essence in the award of this project. There is an intermediate construction deadline of December 31, 2000, to aliow for completion of a portion of the project before a required construction easement expires. As we get farther and farther into the fall, weather is always a concern. For these reasons, we ask the Council to act on this resolution as soon as possible. I appreciate your consideration of this request. If there are any questions regarding the project, please contact Lisa Falk, Project Engineer, at 266-6117. TJE/if Responsive Services • Quatity Facilities • Employee Pride � oa. ►t �f CITY OF SAINT PAUL LONG-RANGE CAPITAL IMPROVEMENT BUDGET COMMITTEE OFFICE OF FINANCIAL SERVICES 160 City Hall, Saint Paul, Minnesota 55102 651-266-8800 Norm Coleman Mayo� September 15, 2000 TO: Mayor Norm Coleman City Council Members FROM: Eric Willems, CIB Executive Secreta�!�/ ��VU�""� RE: Green Sheet # 106260 Wamer Road Trail Extension The CIB Committee reviewed the attached Council Resolution (green sheet # 106260 ) on September 14, 2000. The ClB Committee recommends the following amendment to the resolution as part of the approval by the Mayor and City Council. The CIB Committee is making the following recommendation because the project as originally adopted included funds to cover engineering costs for the project. The amendment is: 1) that the proposed budget amendment to add additionai funds to the Warner Road Trail Extension project should be for construction costs only, and 2) that Public Works should idenrify the amounC of additional engineering costs proposed to be added to the project so that those costs can be removed from the budget amendment. The CIB Committee thanks the Mayor and City Council for their considerarion of the above recommendarions. G:\Shazed�B udgedDEPTS\CIB\W PF1LESlRESOLVf I�GS# 106260.wpd Council File RESOLUTiON Green Sheet CITY OF 5AINT PAUL, MINNESOTA Presented By Referred To Committee:Date 1 , WHEREAS, the Department of Public Works has opened bids for the Wamer Road 1Yai1 Eatension project, and 2 3 WHEREAS, this work was adopted by City Coundl Resolution 97-1530, known as Log #SU-5597084, and WHEREAS, the bids eaceeded the engineets estimate by $415,568.48, and 7 8 9 10 11 ia 13 14 15 16 17 18 19 20 21 22 23 2f1 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 l4'f�REAS, the Federal Grant will cover SO% ofthe in¢eased construction costs, with the City needing W cover the remai�ung 20% plus engineering wsts, so TfIEREFORE BE TT RESOLVED, by the Covncil oFthe City of Saint Paul, upon recommendation of the Mayor and advice of the Long Range Capital Improvement Budget Committee, that $415,568.48 is available for appropriation in the 2000 Capital Improvement Budgets, as heretofore adopted and amended by this Council, be hereby further amended in the 7mprovement Budgets, in the follouwg particulazs: BE TT FURTI-IER RESOLVED, that it is the intent of the Council to restore a similar amount of local fonding match to the Como Avenue Bike Lanes Project (C99-2SOS6). The Council �^^=na< that the 2002 CIB Budget include the local match funding for the Como Avenue Bike Lanes Project. �>�E.t-� S Current Amended Budget Change Budget FINANCING PLAN W azner Rd Trail E�tension C98-2S024 FED GRANT PIA CIB SPENDING PLAN Warner Rd Trail Eatension C98-2S024 Construction Engineering & Inspection FINANCING PLAN Como Ave Bike Lanes C99-2S086 e� o -- �� y 106260. 836,000.00 247,403.82 583,403.52 100,412 S8 100,412.85 210,000.00 67,751.75 277,751.75 546,000.00 415,56S.4S 961,56845 420,000.00 359,254.78 779,254.75 126,000.00 56,313.70 182,313.70 546,000.00 415,568.48 961,568.48 FED GRT 420,000.00 -420,000.00 0 00 CIB 88,000.00 -67,751.78 20,24822 Contributions 82,000.00 -82,000.00 0.00 590,000.00 -569,751.75 20,24522 SPENDING PLAN Como Ave Bike Lanes C99-2SOS6 Construction 494,000.00 -494,000.00 0.00 Engineering & Inspection 96,000.00 -75,751.78 20,248.22 590,000.00 -569,751.78 20,245 22 po•�Gy 55 FAIANCING PLAN 56 COiINTYAIDPART.PROG 57 C96-2T§SO 5S 59 PLA 60 61 62 SPENDING PLAN 63 COUNTY AID PART. PROG 84 C96-2T480 65 66 Construction 67 68 69 FINANCING PLAN 70 COUNTYAID PART. PROG 71 C97-2T481 72 73 P7A 74 75 76 SPENDING PLAN 77 COUNTY AID PART. PROG 7S C97-2T481 79 SO Construction si $774.52 -412.88 5,361.94 5,774.82 112.SS 8,361.94 8,774.82 -412.88 $361.94 8,774.52 -412.58 8,361.94 ioo,aoo.00 -ioo,000.ao o.00 100,000.00 -100,000 00 0.00 ioo,000.00 -ioo,000.00 o.00 ioo,000.00 -ioq000.00 o.oa Approved by: Director of Pinancial Services Requested by Department of: Adopted by Council: EJW��ab Public Works 9�2oino / �By�:� f Form Approved by ty A ey Date � �fjz' Adoption Certified by Council Secretary By: Appr By: By: Approved by Mayor for Submission to Council By: DEPARTMEM/OFFICFICOUNCIL DATEINITATED GREEN SHEET No. 106260 Public Works 9l8/2000 Fd Wazn-266-6142 & Lisa Falk 26Cr6117 MUST BE ON COUNCILAGENDA BY (DNTE) TOTAL # OF SIGNATURE PAGES ACTONREOUESiED NISMeER FOR R01iSING �fFlNANGALSERVICES�IR. � IS 10 FINANGIALSERY/ACCTG ❑ MAYOR(OR ASSISTANn ❑ Ed Wam /S L� ❑ lisa Falk dR �� O� � ❑ Dick Ruoert �• \.� ! D 1 � CDUNC�L nss�c� � �1G�9.i GITY ATTORNEV (,YTY CLERK (CLIP ALL LOCATIONS FOR SIGNATURE) Approval of attached Council Resolution amending the financing and spending plans of the Wamer Rd Trail Extension project by transferring CIB funds from the Como Ave Bike Lane,PIA funds from the County Aid Participation program and adding Federa] Grant funding. � RECOMMENDATIONS.ApprOVe (A) or RBlect (Rl PII�NNING CAMMISSION CIB COMMITTEE CIVIL SERVICE COMMISSION A Staff CONTRACTS MUST ANSWER 7HE FOLLOWING �UESTIONS: 1. Has this persoNfrtm ever worKed untler a contract for this tlepartment? YES NO 2 Has this persoNfirm ever 6een a ciry employee? YES NO 3. Does ihis personliirm possess a skill not normalry posseased by am curteM dy emptoyee� YES NO vendor? 4. Isihis INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT, WHEN, WHERE. WHY) '"' "" The last four bids opened by Public Works have been higher than estimated. This trend, apparently resulting from the tight labor market and the rising fuel prices, is being experienced by o[her Public Works agencies. MnDOT advised us that rebidding of projects recendy has resulted in even higher bids for the same work. We have been unable to meet the federal requirements to construct the Como Bike Lane project as submit'rd. We are therefore recommen�'ing hansfer of ffie remaining CIB funds from that project to help cover the Wamer Rd T Extension sho fall., leaving enough to:cover preliminary engineering costs necessary to prepare anot�{ier A key link in the City's bike and pedestrian infrastructure along the Mississippi River is improved, replacing an exispng facility in very poor condiuon. We have been assured by MnDOT that the Federal shaze of 80% for construction will sull apply to the increased construction costs. DISADVAMAGES iF APPROVED� Funding available in the County Aid Pazticipation program will not be available for other projects on County roads. DISADYAMAGES IF NOT APPftOVED The Warner Rd Trail Extension project will not be consffucted and Saint Paul will lose the allocated federal funds. fOTAL AMOUNT OF TPANSACTION $ -254,596.15 COST/REVENUE BUDGETED (CIfiCLE ONE) YES � FUNDMG SOURCE Fed Git, COIlhibu[ions, CIB &. PIA ACTIVITY NUMBER C98-2S0?A, C99-2S086, C96-2T480 & C97-2T481 FINpNCIPL lNFORMATION (E%PLAIN) DEPARTNSENT OF PUBLIC WORKS O O�`` Thomas J. Eggum. Director CITY OF SAINT PAUL Norm Calemars, Mayor � Mayor Norm Coleman City Council Members Larry Lueth. Constructiors Ersgineer 25 W. Pourth Street 900 Ciry Hall Anrsex Telepitone: 65/-266-6080 Saint Paul, MN 55102-1660 Facsimile: 651-292-6315 FROM: Tom Eggum �' . � �E�/.�� DATE: September 18, 2000 SUBJECT: Green Sheet # 106260 Warner Road Trail Extension In response to the CIB Committee's recommendation regarding the attached Council Resolution (green sheet # 106260), Public Works requests that the Council adopt the original resofution. The original resolution consolidates funds to allow Public Works to award the contract to the low bidder, and to colfect engineering fees based on this actual bid. The Department has expended a substantial amount of design effort in this project already, and the inspection work wiil add significantly to the costs ior the department. It is normaily the practice of the department to defer to the recommendation of the CIB committee. In this case, the Department respectfully requests that you approve the resolution which transfers the funds to pay for the additional engineering, as welf as the additional construction costs. The additional design efforts were primarily due to administrative items. Federal projects are generally more time consuming, and much time was spent securing permits and easements from the Department of fVatural Resources and the Corps of Engineers. Also, the design work was more complicated because of the need to cantilever the trail out over the Mississippi River tor a portion of its length. Time is of the essence in the award of this project. There is an intermediate construction deadline of December 31, 2000, to aliow for completion of a portion of the project before a required construction easement expires. As we get farther and farther into the fall, weather is always a concern. For these reasons, we ask the Council to act on this resolution as soon as possible. I appreciate your consideration of this request. If there are any questions regarding the project, please contact Lisa Falk, Project Engineer, at 266-6117. TJE/if Responsive Services • Quatity Facilities • Employee Pride � oa. ►t �f CITY OF SAINT PAUL LONG-RANGE CAPITAL IMPROVEMENT BUDGET COMMITTEE OFFICE OF FINANCIAL SERVICES 160 City Hall, Saint Paul, Minnesota 55102 651-266-8800 Norm Coleman Mayo� September 15, 2000 TO: Mayor Norm Coleman City Council Members FROM: Eric Willems, CIB Executive Secreta�!�/ ��VU�""� RE: Green Sheet # 106260 Wamer Road Trail Extension The CIB Committee reviewed the attached Council Resolution (green sheet # 106260 ) on September 14, 2000. The ClB Committee recommends the following amendment to the resolution as part of the approval by the Mayor and City Council. The CIB Committee is making the following recommendation because the project as originally adopted included funds to cover engineering costs for the project. The amendment is: 1) that the proposed budget amendment to add additionai funds to the Warner Road Trail Extension project should be for construction costs only, and 2) that Public Works should idenrify the amounC of additional engineering costs proposed to be added to the project so that those costs can be removed from the budget amendment. The CIB Committee thanks the Mayor and City Council for their considerarion of the above recommendarions. G:\Shazed�B udgedDEPTS\CIB\W PF1LESlRESOLVf I�GS# 106260.wpd Council File RESOLUTiON Green Sheet CITY OF 5AINT PAUL, MINNESOTA Presented By Referred To Committee:Date 1 , WHEREAS, the Department of Public Works has opened bids for the Wamer Road 1Yai1 Eatension project, and 2 3 WHEREAS, this work was adopted by City Coundl Resolution 97-1530, known as Log #SU-5597084, and WHEREAS, the bids eaceeded the engineets estimate by $415,568.48, and 7 8 9 10 11 ia 13 14 15 16 17 18 19 20 21 22 23 2f1 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 l4'f�REAS, the Federal Grant will cover SO% ofthe in¢eased construction costs, with the City needing W cover the remai�ung 20% plus engineering wsts, so TfIEREFORE BE TT RESOLVED, by the Covncil oFthe City of Saint Paul, upon recommendation of the Mayor and advice of the Long Range Capital Improvement Budget Committee, that $415,568.48 is available for appropriation in the 2000 Capital Improvement Budgets, as heretofore adopted and amended by this Council, be hereby further amended in the 7mprovement Budgets, in the follouwg particulazs: BE TT FURTI-IER RESOLVED, that it is the intent of the Council to restore a similar amount of local fonding match to the Como Avenue Bike Lanes Project (C99-2SOS6). The Council �^^=na< that the 2002 CIB Budget include the local match funding for the Como Avenue Bike Lanes Project. �>�E.t-� S Current Amended Budget Change Budget FINANCING PLAN W azner Rd Trail E�tension C98-2S024 FED GRANT PIA CIB SPENDING PLAN Warner Rd Trail Eatension C98-2S024 Construction Engineering & Inspection FINANCING PLAN Como Ave Bike Lanes C99-2S086 e� o -- �� y 106260. 836,000.00 247,403.82 583,403.52 100,412 S8 100,412.85 210,000.00 67,751.75 277,751.75 546,000.00 415,56S.4S 961,56845 420,000.00 359,254.78 779,254.75 126,000.00 56,313.70 182,313.70 546,000.00 415,568.48 961,568.48 FED GRT 420,000.00 -420,000.00 0 00 CIB 88,000.00 -67,751.78 20,24822 Contributions 82,000.00 -82,000.00 0.00 590,000.00 -569,751.75 20,24522 SPENDING PLAN Como Ave Bike Lanes C99-2SOS6 Construction 494,000.00 -494,000.00 0.00 Engineering & Inspection 96,000.00 -75,751.78 20,248.22 590,000.00 -569,751.78 20,245 22 po•�Gy 55 FAIANCING PLAN 56 COiINTYAIDPART.PROG 57 C96-2T§SO 5S 59 PLA 60 61 62 SPENDING PLAN 63 COUNTY AID PART. PROG 84 C96-2T480 65 66 Construction 67 68 69 FINANCING PLAN 70 COUNTYAID PART. PROG 71 C97-2T481 72 73 P7A 74 75 76 SPENDING PLAN 77 COUNTY AID PART. PROG 7S C97-2T481 79 SO Construction si $774.52 -412.88 5,361.94 5,774.82 112.SS 8,361.94 8,774.82 -412.88 $361.94 8,774.52 -412.58 8,361.94 ioo,aoo.00 -ioo,000.ao o.00 100,000.00 -100,000 00 0.00 ioo,000.00 -ioo,000.00 o.00 ioo,000.00 -ioq000.00 o.oa Approved by: Director of Pinancial Services Requested by Department of: Adopted by Council: EJW��ab Public Works 9�2oino / �By�:� f Form Approved by ty A ey Date � �fjz' Adoption Certified by Council Secretary By: Appr By: By: Approved by Mayor for Submission to Council By: DEPARTMEM/OFFICFICOUNCIL DATEINITATED GREEN SHEET No. 106260 Public Works 9l8/2000 Fd Wazn-266-6142 & Lisa Falk 26Cr6117 MUST BE ON COUNCILAGENDA BY (DNTE) TOTAL # OF SIGNATURE PAGES ACTONREOUESiED NISMeER FOR R01iSING �fFlNANGALSERVICES�IR. � IS 10 FINANGIALSERY/ACCTG ❑ MAYOR(OR ASSISTANn ❑ Ed Wam /S L� ❑ lisa Falk dR �� O� � ❑ Dick Ruoert �• \.� ! D 1 � CDUNC�L nss�c� � �1G�9.i GITY ATTORNEV (,YTY CLERK (CLIP ALL LOCATIONS FOR SIGNATURE) Approval of attached Council Resolution amending the financing and spending plans of the Wamer Rd Trail Extension project by transferring CIB funds from the Como Ave Bike Lane,PIA funds from the County Aid Participation program and adding Federa] Grant funding. � RECOMMENDATIONS.ApprOVe (A) or RBlect (Rl PII�NNING CAMMISSION CIB COMMITTEE CIVIL SERVICE COMMISSION A Staff CONTRACTS MUST ANSWER 7HE FOLLOWING �UESTIONS: 1. Has this persoNfrtm ever worKed untler a contract for this tlepartment? YES NO 2 Has this persoNfirm ever 6een a ciry employee? YES NO 3. Does ihis personliirm possess a skill not normalry posseased by am curteM dy emptoyee� YES NO vendor? 4. Isihis INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT, WHEN, WHERE. WHY) '"' "" The last four bids opened by Public Works have been higher than estimated. This trend, apparently resulting from the tight labor market and the rising fuel prices, is being experienced by o[her Public Works agencies. MnDOT advised us that rebidding of projects recendy has resulted in even higher bids for the same work. We have been unable to meet the federal requirements to construct the Como Bike Lane project as submit'rd. We are therefore recommen�'ing hansfer of ffie remaining CIB funds from that project to help cover the Wamer Rd T Extension sho fall., leaving enough to:cover preliminary engineering costs necessary to prepare anot�{ier A key link in the City's bike and pedestrian infrastructure along the Mississippi River is improved, replacing an exispng facility in very poor condiuon. We have been assured by MnDOT that the Federal shaze of 80% for construction will sull apply to the increased construction costs. DISADVAMAGES iF APPROVED� Funding available in the County Aid Pazticipation program will not be available for other projects on County roads. DISADYAMAGES IF NOT APPftOVED The Warner Rd Trail Extension project will not be consffucted and Saint Paul will lose the allocated federal funds. fOTAL AMOUNT OF TPANSACTION $ -254,596.15 COST/REVENUE BUDGETED (CIfiCLE ONE) YES � FUNDMG SOURCE Fed Git, COIlhibu[ions, CIB &. PIA ACTIVITY NUMBER C98-2S0?A, C99-2S086, C96-2T480 & C97-2T481 FINpNCIPL lNFORMATION (E%PLAIN) DEPARTNSENT OF PUBLIC WORKS O O�`` Thomas J. Eggum. Director CITY OF SAINT PAUL Norm Calemars, Mayor � Mayor Norm Coleman City Council Members Larry Lueth. Constructiors Ersgineer 25 W. Pourth Street 900 Ciry Hall Anrsex Telepitone: 65/-266-6080 Saint Paul, MN 55102-1660 Facsimile: 651-292-6315 FROM: Tom Eggum �' . � �E�/.�� DATE: September 18, 2000 SUBJECT: Green Sheet # 106260 Warner Road Trail Extension In response to the CIB Committee's recommendation regarding the attached Council Resolution (green sheet # 106260), Public Works requests that the Council adopt the original resofution. The original resolution consolidates funds to allow Public Works to award the contract to the low bidder, and to colfect engineering fees based on this actual bid. The Department has expended a substantial amount of design effort in this project already, and the inspection work wiil add significantly to the costs ior the department. It is normaily the practice of the department to defer to the recommendation of the CIB committee. In this case, the Department respectfully requests that you approve the resolution which transfers the funds to pay for the additional engineering, as welf as the additional construction costs. The additional design efforts were primarily due to administrative items. Federal projects are generally more time consuming, and much time was spent securing permits and easements from the Department of fVatural Resources and the Corps of Engineers. Also, the design work was more complicated because of the need to cantilever the trail out over the Mississippi River tor a portion of its length. Time is of the essence in the award of this project. There is an intermediate construction deadline of December 31, 2000, to aliow for completion of a portion of the project before a required construction easement expires. As we get farther and farther into the fall, weather is always a concern. For these reasons, we ask the Council to act on this resolution as soon as possible. I appreciate your consideration of this request. If there are any questions regarding the project, please contact Lisa Falk, Project Engineer, at 266-6117. TJE/if Responsive Services • Quatity Facilities • Employee Pride � oa. ►t �f CITY OF SAINT PAUL LONG-RANGE CAPITAL IMPROVEMENT BUDGET COMMITTEE OFFICE OF FINANCIAL SERVICES 160 City Hall, Saint Paul, Minnesota 55102 651-266-8800 Norm Coleman Mayo� September 15, 2000 TO: Mayor Norm Coleman City Council Members FROM: Eric Willems, CIB Executive Secreta�!�/ ��VU�""� RE: Green Sheet # 106260 Wamer Road Trail Extension The CIB Committee reviewed the attached Council Resolution (green sheet # 106260 ) on September 14, 2000. The ClB Committee recommends the following amendment to the resolution as part of the approval by the Mayor and City Council. The CIB Committee is making the following recommendation because the project as originally adopted included funds to cover engineering costs for the project. The amendment is: 1) that the proposed budget amendment to add additionai funds to the Warner Road Trail Extension project should be for construction costs only, and 2) that Public Works should idenrify the amounC of additional engineering costs proposed to be added to the project so that those costs can be removed from the budget amendment. The CIB Committee thanks the Mayor and City Council for their considerarion of the above recommendarions. G:\Shazed�B udgedDEPTS\CIB\W PF1LESlRESOLVf I�GS# 106260.wpd