Loading...
00-5OR(G(NAL Presented By: Page 1 of 3 ly Referzed To: �J � Committee: Date , z 3 a 5 6 � a s io » iz 13 ia is �s n �a is zo zi zz 23 za zs zs z� za zs 30 31 32 33 � 35 36 37 38 39 ao ai az aa � as 46 47 as as so si sz � sa WHEREAS, estimates for the Rice/Arlington Field Lighting project were originally made in 1997; and WHEREAS, several bids for the Rice/Arlington Field Lighting project were recently received that reflect current construction costs which are $112,000 over the current appropriation; and WHEREAS, additional work must be completed at Harriet Island Park in order to meet current electrical code requirements; and WHEREAS, the Mayor, pursuant to sec. 10.07.4 of the charter of the City of Saint Paul, recommends transferring $362,000 of unencumbered appropriations to the 1998 Rice/Arlington Field Lighting project and the 1999 Harriet Island Park Reconstruction project; and THEREFORE BE IT RESOLVED, by the Council of the City of Saint Paul, upon recommendation of the Mayor and advice of the Long Range Capital improvement Budget Committee, that the 1996-1999 Capital Improvement Budgets, as heretofore adopted and amended by this Council, be hereby further amended in the following particulars: Current Budget FINANCING PLAN: Como Park Sewer Separation C96-3T110 CIB - 1996 SPENDING PLAN: Como Park Sewer Separation C96-3T110 � Improvements of Land Architect Fee Capitalized - Land FINANCING PLAN: Crosby Farm Path System Resurfacing C97-3P009 CIB - 1997 SPENDING PLAN: Crosby Farm Path System Resurfacing C97-3P009 Improvements of Land Architect Fee Capitalized - Land 196,000.00 196,000.00 147,000.00 49,000.00 196,000.00 200,000.00 200,000.00 177,000.00 23,000.00 200.000.00 Counci�Fi�e # O� � 5 Green Sheet# 104304 Amended Change Budget (25,000.00) 171,000.00 (25,000.00) 171,000.00 �2s,000.00) �zz,000.00 0.00 49,000.00 (25,000.00) 171,000.00 (142,858.84) 57,141.16 (142,558.84) 57,141.16 (130,705.39) 46,294.61 (12,153.45) 10,846.55 (142,858.841 57,141.16 o�;GINAL Presented By: RESOLUTION CITY OF SAINT PAUL, MINNESO7A CouncilFile # 00 - 5 Green Sheet # 1D4304 Referzed To: Committee: Date 55 56 57 � 59 60 si 62 63 64 65 66 67 68 ss �o �i �z 73 �a �s �s n �a �s ao e� sz 83 aa 85 86 87 88 89 so 91 92 93 sa ss 96 s� sa ss iao �o� �oz 103 704 105 106 107 108 Page 2 of 3 FINANCING PLAN: Griggs Recreation Center Redesign C98-3K010 CIB - 1997 SPENDING PLAN: Griggs Recreation Center Redesign C98-3K010 Architect Fee Capitalized - Building FINANCING PLAN: CIB Contingency - 1999 C99-OT104 CIB - 1999 SPENDING PLAN: CIB Contingency - 1999 C99-OT104 Transfer to Capital Projects FINANCING PLAN: Rice/Arlington Field Lighting C983F011 CIB - 1995 CIB - 1997 SPENDING PLAN: Rice/Arlington Field Lighling C98-3F011 Architect Fee Capitalized - Land Construction - General 50,000.00 (35,028.30) 14,971.70 50,000.00 (35,028.30) 14.971.70 50,000.00 (35,028.30) 14,971.70 50,00�.00 (35,028.301 14,971.70 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 85,000.00 0.00 85,000.00 0.00 112, 000.00 112,000.00 85, 000.00 112, 000.00 197, 000.00 0.00 112,000.00 112,0��.�� 85,000.00 0.00 85,000.00 85, 000.00 112, 000.00 197, 00 0.00 ORIG�:�,�L Presented By: RESOLUTION CITY OF SAINT PAUL, MINNESOTA Council File # �� � �j Green Sheet# 704304 Referred To: Committee: Date 109 710 iii �iz 113 t14 iis iis �i� iia 719 720 121 i zz 123 124 i2s i zs i z� iza ,zs 730 131 132 733 134 735 136 137 138 739 140 Page 3 of 3 FINAt�iCING PLAtd: Harriet Island Park Reconstruction C99-3R070 Metropolitan Parks Act Contributions & Donations - Outside CIB - 1996 CIB - 1997 CIB - 1999 SPENDING PLAN: Harriet Island Park Reconstruction C99-3R070 Improvements of Land 1,500,000.00 0.00 1,500,000.00 1,500,000.00 0.00 1,500,000.00 0.00 25,000.00 25,000.00 0.00 65,887.14 65,887.14 0.00 159,112.86 159,112.86 3,000,000.00 250,000.00 3,250,000.00 3,000,000.00 250,000.00 3,250,000.00 3,000 000.00 250,000.00 3 250,000.00 i"ie at. �`a+z1 Loaaq • fi��r �'���}�� I�'N�����< ;;. �i� n ,.t (�'O�Sf3.t'CE� T2CE1v2Ci ti1:i� ='�C,LS::$: F,i[i ati?U��o> idefs? � ��- � � � � -- a�d raco�ia��c�r. �� � g � f C � av., t-l`S Zic.C� +PX�y �� � ,. / ('�3r2::ay+...-�...�. —.ac.� Requested by Department of: 0 � gv� -� \ a- i \ ��._ — -�_� � - 1_ - Approved by Mayor: Date �-�'/ � z�0 By: <���%�cL�Gl2 �� Approval Recommended by �SO - Director: B y : (��� '� � — �—�a Form Approved by City Attorney: BY� � dr 4.v�L l ���� Approv� Mayor for Spbm}ssioy� to Council: � saintvamoFSauaeatseaionandvrsaae�.earion Ixsxaowu� .wKq wavea Adopted by Council: Date _ S p Adoption Certified by Council Sec etary: DEPAIt'1'MENLOFFICF/fAUNCII. DATE INITNTED O O � S Pazks&Recrearion 12-02-99 GREEN SHEET NO. 104304 In'Na ! Da Init¢I / Date CAMACCPERSON&PHONE �1 DEPARThtENTDIRECCO 5 Cl'i'YCOUNCQ. John Wirka 266-6411 „n,�,��, � cmrwnow�r .—/ 4� cmrci,�xz M[ISTBEONCAW.C➢,AGEN'DABY(DA'fE) � O2 FN`AiC1AI.SERVICESDIX rylQ FPI.SERVECESOFFACCfG 1 O 4 IdAYOR(ORASSISTAN'n O6 FR'1A1dC4tL5ERV[C�4ACC1'G TOTAL # OF SYGNATURE PAGES (CLIP ALL LOCATiONS FOR SIGNATURE) ACI'10.�'REQUESTED Approval of Council Resolution aznending the spending and fivancing plans of the Rice/Arlington Field Lighting and Harriet Island Pazk Reconstruction. RECOMMENDATIONS: ApO� �/) arRCjca(R) PERSONAL SERVICE CONT'RACTS MUST ANSR'ER THE FOLLOWAG QUESTIONS: rvanvwc cohmttss�o� I. Has iltis person/fum ever worked under a wnuac[ For this depar�ent? _w_cm couuam'ee YES NO _c�vn, seavice co�ssiorv 2. Has this person/fum everheen a city employee? � w_srwt�e YES NO 3. Does this person/fum possess a skil] not nom�ally possessed by any current ciry employee. YES NO 4. Is this person / firm a�eted vendor? YES NO (Explain all yes answers on separate sheet and attach to green sheet.) 1N3'MTINGPROBLEM, ISSUE, OPPORTUNITY (Whq WLa4 �c4 ��, �Y)� For the Rice/Arlington Field Lighting project, esrimates were originally made in 1997 but due to current constructions costs an additional $112,000 will be needed in order that this project can be co leted as designed. For Harriet Island Pazk Reconsh project, it has been recent determined that additional work will have to be completed in order that the electsical system complies with eurrent code standazds. ADVANTAGFSIFAPPROVED: For the Rice/Arlington Field Lighring project, one addihonal field will have lighting installed onto it, the elechical service will be updated so that in the future lighting for the remaining fields can be added onto the system, and the new system will have a 20 yeaz warranty including complete bulb replacement after ten and tvrenty yeus. For Harriet Island Park Reconstruction project, the project will have an electrical system that meets code standazds. DISADVANTAGESiFAPPROVPD. None. ��uh"�� �?�a�� ��1 �EYtf�Y �EC 1 � �999 DISADVANiAGE50FN0]'APPROVED: For the Rice/Arlington Field Lighting project, the current electrical system will not support additional lighring and is not compatible with current lighring systems on the mazket And after loosing field space at MeNfurray and Rice/Arlington to build the Sports Dome, addirional playing time is needed in order to extend the fime available for scheduled games. For Harriet Island Pazk Reconstruction project, the project can not be completed without the mechanicals being properly installed. TOTALAMOIINTOFTIW�`SACf10N � O COST/RCVENUEBU3IGETED(CRiQ.EONE� O NO F�hn���sova� CIB 1996-1999 bonds A�„��EF C96-3T110. C97-3P009. C98-3P030. F��cw wFO�nox cexe� C98-3K010. C99-OT104. C98-3F011. C99-3R070 . $aint Paul OFS Butlget Sec4on antl Pks 8 Reaeation (Hi HILDRARL .WK6 � 12/02/99 OR(G(NAL Presented By: Page 1 of 3 ly Referzed To: �J � Committee: Date , z 3 a 5 6 � a s io » iz 13 ia is �s n �a is zo zi zz 23 za zs zs z� za zs 30 31 32 33 � 35 36 37 38 39 ao ai az aa � as 46 47 as as so si sz � sa WHEREAS, estimates for the Rice/Arlington Field Lighting project were originally made in 1997; and WHEREAS, several bids for the Rice/Arlington Field Lighting project were recently received that reflect current construction costs which are $112,000 over the current appropriation; and WHEREAS, additional work must be completed at Harriet Island Park in order to meet current electrical code requirements; and WHEREAS, the Mayor, pursuant to sec. 10.07.4 of the charter of the City of Saint Paul, recommends transferring $362,000 of unencumbered appropriations to the 1998 Rice/Arlington Field Lighting project and the 1999 Harriet Island Park Reconstruction project; and THEREFORE BE IT RESOLVED, by the Council of the City of Saint Paul, upon recommendation of the Mayor and advice of the Long Range Capital improvement Budget Committee, that the 1996-1999 Capital Improvement Budgets, as heretofore adopted and amended by this Council, be hereby further amended in the following particulars: Current Budget FINANCING PLAN: Como Park Sewer Separation C96-3T110 CIB - 1996 SPENDING PLAN: Como Park Sewer Separation C96-3T110 � Improvements of Land Architect Fee Capitalized - Land FINANCING PLAN: Crosby Farm Path System Resurfacing C97-3P009 CIB - 1997 SPENDING PLAN: Crosby Farm Path System Resurfacing C97-3P009 Improvements of Land Architect Fee Capitalized - Land 196,000.00 196,000.00 147,000.00 49,000.00 196,000.00 200,000.00 200,000.00 177,000.00 23,000.00 200.000.00 Counci�Fi�e # O� � 5 Green Sheet# 104304 Amended Change Budget (25,000.00) 171,000.00 (25,000.00) 171,000.00 �2s,000.00) �zz,000.00 0.00 49,000.00 (25,000.00) 171,000.00 (142,858.84) 57,141.16 (142,558.84) 57,141.16 (130,705.39) 46,294.61 (12,153.45) 10,846.55 (142,858.841 57,141.16 o�;GINAL Presented By: RESOLUTION CITY OF SAINT PAUL, MINNESO7A CouncilFile # 00 - 5 Green Sheet # 1D4304 Referzed To: Committee: Date 55 56 57 � 59 60 si 62 63 64 65 66 67 68 ss �o �i �z 73 �a �s �s n �a �s ao e� sz 83 aa 85 86 87 88 89 so 91 92 93 sa ss 96 s� sa ss iao �o� �oz 103 704 105 106 107 108 Page 2 of 3 FINANCING PLAN: Griggs Recreation Center Redesign C98-3K010 CIB - 1997 SPENDING PLAN: Griggs Recreation Center Redesign C98-3K010 Architect Fee Capitalized - Building FINANCING PLAN: CIB Contingency - 1999 C99-OT104 CIB - 1999 SPENDING PLAN: CIB Contingency - 1999 C99-OT104 Transfer to Capital Projects FINANCING PLAN: Rice/Arlington Field Lighting C983F011 CIB - 1995 CIB - 1997 SPENDING PLAN: Rice/Arlington Field Lighling C98-3F011 Architect Fee Capitalized - Land Construction - General 50,000.00 (35,028.30) 14,971.70 50,000.00 (35,028.30) 14.971.70 50,000.00 (35,028.30) 14,971.70 50,00�.00 (35,028.301 14,971.70 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 85,000.00 0.00 85,000.00 0.00 112, 000.00 112,000.00 85, 000.00 112, 000.00 197, 000.00 0.00 112,000.00 112,0��.�� 85,000.00 0.00 85,000.00 85, 000.00 112, 000.00 197, 00 0.00 ORIG�:�,�L Presented By: RESOLUTION CITY OF SAINT PAUL, MINNESOTA Council File # �� � �j Green Sheet# 704304 Referred To: Committee: Date 109 710 iii �iz 113 t14 iis iis �i� iia 719 720 121 i zz 123 124 i2s i zs i z� iza ,zs 730 131 132 733 134 735 136 137 138 739 140 Page 3 of 3 FINAt�iCING PLAtd: Harriet Island Park Reconstruction C99-3R070 Metropolitan Parks Act Contributions & Donations - Outside CIB - 1996 CIB - 1997 CIB - 1999 SPENDING PLAN: Harriet Island Park Reconstruction C99-3R070 Improvements of Land 1,500,000.00 0.00 1,500,000.00 1,500,000.00 0.00 1,500,000.00 0.00 25,000.00 25,000.00 0.00 65,887.14 65,887.14 0.00 159,112.86 159,112.86 3,000,000.00 250,000.00 3,250,000.00 3,000,000.00 250,000.00 3,250,000.00 3,000 000.00 250,000.00 3 250,000.00 i"ie at. �`a+z1 Loaaq • fi��r �'���}�� I�'N�����< ;;. �i� n ,.t (�'O�Sf3.t'CE� T2CE1v2Ci ti1:i� ='�C,LS::$: F,i[i ati?U��o> idefs? � ��- � � � � -- a�d raco�ia��c�r. �� � g � f C � av., t-l`S Zic.C� +PX�y �� � ,. / ('�3r2::ay+...-�...�. —.ac.� Requested by Department of: 0 � gv� -� \ a- i \ ��._ — -�_� � - 1_ - Approved by Mayor: Date �-�'/ � z�0 By: <���%�cL�Gl2 �� Approval Recommended by �SO - Director: B y : (��� '� � — �—�a Form Approved by City Attorney: BY� � dr 4.v�L l ���� Approv� Mayor for Spbm}ssioy� to Council: � saintvamoFSauaeatseaionandvrsaae�.earion Ixsxaowu� .wKq wavea Adopted by Council: Date _ S p Adoption Certified by Council Sec etary: DEPAIt'1'MENLOFFICF/fAUNCII. DATE INITNTED O O � S Pazks&Recrearion 12-02-99 GREEN SHEET NO. 104304 In'Na ! Da Init¢I / Date CAMACCPERSON&PHONE �1 DEPARThtENTDIRECCO 5 Cl'i'YCOUNCQ. John Wirka 266-6411 „n,�,��, � cmrwnow�r .—/ 4� cmrci,�xz M[ISTBEONCAW.C➢,AGEN'DABY(DA'fE) � O2 FN`AiC1AI.SERVICESDIX rylQ FPI.SERVECESOFFACCfG 1 O 4 IdAYOR(ORASSISTAN'n O6 FR'1A1dC4tL5ERV[C�4ACC1'G TOTAL # OF SYGNATURE PAGES (CLIP ALL LOCATiONS FOR SIGNATURE) ACI'10.�'REQUESTED Approval of Council Resolution aznending the spending and fivancing plans of the Rice/Arlington Field Lighting and Harriet Island Pazk Reconstruction. RECOMMENDATIONS: ApO� �/) arRCjca(R) PERSONAL SERVICE CONT'RACTS MUST ANSR'ER THE FOLLOWAG QUESTIONS: rvanvwc cohmttss�o� I. Has iltis person/fum ever worked under a wnuac[ For this depar�ent? _w_cm couuam'ee YES NO _c�vn, seavice co�ssiorv 2. Has this person/fum everheen a city employee? � w_srwt�e YES NO 3. Does this person/fum possess a skil] not nom�ally possessed by any current ciry employee. YES NO 4. Is this person / firm a�eted vendor? YES NO (Explain all yes answers on separate sheet and attach to green sheet.) 1N3'MTINGPROBLEM, ISSUE, OPPORTUNITY (Whq WLa4 �c4 ��, �Y)� For the Rice/Arlington Field Lighting project, esrimates were originally made in 1997 but due to current constructions costs an additional $112,000 will be needed in order that this project can be co leted as designed. For Harriet Island Pazk Reconsh project, it has been recent determined that additional work will have to be completed in order that the electsical system complies with eurrent code standazds. ADVANTAGFSIFAPPROVED: For the Rice/Arlington Field Lighring project, one addihonal field will have lighting installed onto it, the elechical service will be updated so that in the future lighting for the remaining fields can be added onto the system, and the new system will have a 20 yeaz warranty including complete bulb replacement after ten and tvrenty yeus. For Harriet Island Park Reconstruction project, the project will have an electrical system that meets code standazds. DISADVANTAGESiFAPPROVPD. None. ��uh"�� �?�a�� ��1 �EYtf�Y �EC 1 � �999 DISADVANiAGE50FN0]'APPROVED: For the Rice/Arlington Field Lighting project, the current electrical system will not support additional lighring and is not compatible with current lighring systems on the mazket And after loosing field space at MeNfurray and Rice/Arlington to build the Sports Dome, addirional playing time is needed in order to extend the fime available for scheduled games. For Harriet Island Pazk Reconstruction project, the project can not be completed without the mechanicals being properly installed. TOTALAMOIINTOFTIW�`SACf10N � O COST/RCVENUEBU3IGETED(CRiQ.EONE� O NO F�hn���sova� CIB 1996-1999 bonds A�„��EF C96-3T110. C97-3P009. C98-3P030. F��cw wFO�nox cexe� C98-3K010. C99-OT104. C98-3F011. C99-3R070 . $aint Paul OFS Butlget Sec4on antl Pks 8 Reaeation (Hi HILDRARL .WK6 � 12/02/99 OR(G(NAL Presented By: Page 1 of 3 ly Referzed To: �J � Committee: Date , z 3 a 5 6 � a s io » iz 13 ia is �s n �a is zo zi zz 23 za zs zs z� za zs 30 31 32 33 � 35 36 37 38 39 ao ai az aa � as 46 47 as as so si sz � sa WHEREAS, estimates for the Rice/Arlington Field Lighting project were originally made in 1997; and WHEREAS, several bids for the Rice/Arlington Field Lighting project were recently received that reflect current construction costs which are $112,000 over the current appropriation; and WHEREAS, additional work must be completed at Harriet Island Park in order to meet current electrical code requirements; and WHEREAS, the Mayor, pursuant to sec. 10.07.4 of the charter of the City of Saint Paul, recommends transferring $362,000 of unencumbered appropriations to the 1998 Rice/Arlington Field Lighting project and the 1999 Harriet Island Park Reconstruction project; and THEREFORE BE IT RESOLVED, by the Council of the City of Saint Paul, upon recommendation of the Mayor and advice of the Long Range Capital improvement Budget Committee, that the 1996-1999 Capital Improvement Budgets, as heretofore adopted and amended by this Council, be hereby further amended in the following particulars: Current Budget FINANCING PLAN: Como Park Sewer Separation C96-3T110 CIB - 1996 SPENDING PLAN: Como Park Sewer Separation C96-3T110 � Improvements of Land Architect Fee Capitalized - Land FINANCING PLAN: Crosby Farm Path System Resurfacing C97-3P009 CIB - 1997 SPENDING PLAN: Crosby Farm Path System Resurfacing C97-3P009 Improvements of Land Architect Fee Capitalized - Land 196,000.00 196,000.00 147,000.00 49,000.00 196,000.00 200,000.00 200,000.00 177,000.00 23,000.00 200.000.00 Counci�Fi�e # O� � 5 Green Sheet# 104304 Amended Change Budget (25,000.00) 171,000.00 (25,000.00) 171,000.00 �2s,000.00) �zz,000.00 0.00 49,000.00 (25,000.00) 171,000.00 (142,858.84) 57,141.16 (142,558.84) 57,141.16 (130,705.39) 46,294.61 (12,153.45) 10,846.55 (142,858.841 57,141.16 o�;GINAL Presented By: RESOLUTION CITY OF SAINT PAUL, MINNESO7A CouncilFile # 00 - 5 Green Sheet # 1D4304 Referzed To: Committee: Date 55 56 57 � 59 60 si 62 63 64 65 66 67 68 ss �o �i �z 73 �a �s �s n �a �s ao e� sz 83 aa 85 86 87 88 89 so 91 92 93 sa ss 96 s� sa ss iao �o� �oz 103 704 105 106 107 108 Page 2 of 3 FINANCING PLAN: Griggs Recreation Center Redesign C98-3K010 CIB - 1997 SPENDING PLAN: Griggs Recreation Center Redesign C98-3K010 Architect Fee Capitalized - Building FINANCING PLAN: CIB Contingency - 1999 C99-OT104 CIB - 1999 SPENDING PLAN: CIB Contingency - 1999 C99-OT104 Transfer to Capital Projects FINANCING PLAN: Rice/Arlington Field Lighting C983F011 CIB - 1995 CIB - 1997 SPENDING PLAN: Rice/Arlington Field Lighling C98-3F011 Architect Fee Capitalized - Land Construction - General 50,000.00 (35,028.30) 14,971.70 50,000.00 (35,028.30) 14.971.70 50,000.00 (35,028.30) 14,971.70 50,00�.00 (35,028.301 14,971.70 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 175,680.71 (159,112.86) 16,567.85 85,000.00 0.00 85,000.00 0.00 112, 000.00 112,000.00 85, 000.00 112, 000.00 197, 000.00 0.00 112,000.00 112,0��.�� 85,000.00 0.00 85,000.00 85, 000.00 112, 000.00 197, 00 0.00 ORIG�:�,�L Presented By: RESOLUTION CITY OF SAINT PAUL, MINNESOTA Council File # �� � �j Green Sheet# 704304 Referred To: Committee: Date 109 710 iii �iz 113 t14 iis iis �i� iia 719 720 121 i zz 123 124 i2s i zs i z� iza ,zs 730 131 132 733 134 735 136 137 138 739 140 Page 3 of 3 FINAt�iCING PLAtd: Harriet Island Park Reconstruction C99-3R070 Metropolitan Parks Act Contributions & Donations - Outside CIB - 1996 CIB - 1997 CIB - 1999 SPENDING PLAN: Harriet Island Park Reconstruction C99-3R070 Improvements of Land 1,500,000.00 0.00 1,500,000.00 1,500,000.00 0.00 1,500,000.00 0.00 25,000.00 25,000.00 0.00 65,887.14 65,887.14 0.00 159,112.86 159,112.86 3,000,000.00 250,000.00 3,250,000.00 3,000,000.00 250,000.00 3,250,000.00 3,000 000.00 250,000.00 3 250,000.00 i"ie at. �`a+z1 Loaaq • fi��r �'���}�� I�'N�����< ;;. �i� n ,.t (�'O�Sf3.t'CE� T2CE1v2Ci ti1:i� ='�C,LS::$: F,i[i ati?U��o> idefs? � ��- � � � � -- a�d raco�ia��c�r. �� � g � f C � av., t-l`S Zic.C� +PX�y �� � ,. / ('�3r2::ay+...-�...�. —.ac.� Requested by Department of: 0 � gv� -� \ a- i \ ��._ — -�_� � - 1_ - Approved by Mayor: Date �-�'/ � z�0 By: <���%�cL�Gl2 �� Approval Recommended by �SO - Director: B y : (��� '� � — �—�a Form Approved by City Attorney: BY� � dr 4.v�L l ���� Approv� Mayor for Spbm}ssioy� to Council: � saintvamoFSauaeatseaionandvrsaae�.earion Ixsxaowu� .wKq wavea Adopted by Council: Date _ S p Adoption Certified by Council Sec etary: DEPAIt'1'MENLOFFICF/fAUNCII. DATE INITNTED O O � S Pazks&Recrearion 12-02-99 GREEN SHEET NO. 104304 In'Na ! Da Init¢I / Date CAMACCPERSON&PHONE �1 DEPARThtENTDIRECCO 5 Cl'i'YCOUNCQ. John Wirka 266-6411 „n,�,��, � cmrwnow�r .—/ 4� cmrci,�xz M[ISTBEONCAW.C➢,AGEN'DABY(DA'fE) � O2 FN`AiC1AI.SERVICESDIX rylQ FPI.SERVECESOFFACCfG 1 O 4 IdAYOR(ORASSISTAN'n O6 FR'1A1dC4tL5ERV[C�4ACC1'G TOTAL # OF SYGNATURE PAGES (CLIP ALL LOCATiONS FOR SIGNATURE) ACI'10.�'REQUESTED Approval of Council Resolution aznending the spending and fivancing plans of the Rice/Arlington Field Lighting and Harriet Island Pazk Reconstruction. RECOMMENDATIONS: ApO� �/) arRCjca(R) PERSONAL SERVICE CONT'RACTS MUST ANSR'ER THE FOLLOWAG QUESTIONS: rvanvwc cohmttss�o� I. Has iltis person/fum ever worked under a wnuac[ For this depar�ent? _w_cm couuam'ee YES NO _c�vn, seavice co�ssiorv 2. Has this person/fum everheen a city employee? � w_srwt�e YES NO 3. Does this person/fum possess a skil] not nom�ally possessed by any current ciry employee. YES NO 4. Is this person / firm a�eted vendor? YES NO (Explain all yes answers on separate sheet and attach to green sheet.) 1N3'MTINGPROBLEM, ISSUE, OPPORTUNITY (Whq WLa4 �c4 ��, �Y)� For the Rice/Arlington Field Lighting project, esrimates were originally made in 1997 but due to current constructions costs an additional $112,000 will be needed in order that this project can be co leted as designed. For Harriet Island Pazk Reconsh project, it has been recent determined that additional work will have to be completed in order that the electsical system complies with eurrent code standazds. ADVANTAGFSIFAPPROVED: For the Rice/Arlington Field Lighring project, one addihonal field will have lighting installed onto it, the elechical service will be updated so that in the future lighting for the remaining fields can be added onto the system, and the new system will have a 20 yeaz warranty including complete bulb replacement after ten and tvrenty yeus. For Harriet Island Park Reconstruction project, the project will have an electrical system that meets code standazds. DISADVANTAGESiFAPPROVPD. None. ��uh"�� �?�a�� ��1 �EYtf�Y �EC 1 � �999 DISADVANiAGE50FN0]'APPROVED: For the Rice/Arlington Field Lighting project, the current electrical system will not support additional lighring and is not compatible with current lighring systems on the mazket And after loosing field space at MeNfurray and Rice/Arlington to build the Sports Dome, addirional playing time is needed in order to extend the fime available for scheduled games. For Harriet Island Pazk Reconstruction project, the project can not be completed without the mechanicals being properly installed. TOTALAMOIINTOFTIW�`SACf10N � O COST/RCVENUEBU3IGETED(CRiQ.EONE� O NO F�hn���sova� CIB 1996-1999 bonds A�„��EF C96-3T110. C97-3P009. C98-3P030. F��cw wFO�nox cexe� C98-3K010. C99-OT104. C98-3F011. C99-3R070 . $aint Paul OFS Butlget Sec4on antl Pks 8 Reaeation (Hi HILDRARL .WK6 � 12/02/99