WHEREAS, The Commissioner of the Department of Transportation has
prepared a preliminary layout for the improvement of a part of Trunk
Highway 61 and 10 within the corporate limits of the City of St. Paul,
f rom Burns Ave. to the south corporate limits; and seeks the approval
thereof , and
WHEREAS , said preliminary layouts are on file in the Office of the
Department of Transportation , Saint Paul, Minnesota, being marked,
labeled, and identified as Layout No. 1 S.P. 6220-36 (61-10-104) from
Burns Avenue to the south corporate limits of St. Paul , and
WHEREAS , the St. Paul Department of Public Works , Department of
Community Services , District One Community Council and other agencies
and organizations have been involved in the design and development
of thi s pre limin ary p lan , and
WHEREAS, Six public informational meetings have been held to acquaint
local residents with the project, and an opportunity for a public hear-
ing was afforded, and commitments and changes to the project were made
as a direct result of the public involvement,
NOW, THEREFORE, BE IT RESOLVED, that the City Council approve said
preliminary layouts for the improvement of Trunk Highway 61.
RHR:CLT:kaj
COUIVCILMEN Requested by Department of: ��
Yeas Nays
F�etcher Public Works (Traffic-RHR;
ceu� In Favor
Masanz
Nicosia � �������'�/ �.
• scnetbe� __ Against BY �'�
Tedesco
Wilson
Adopted by Council: Date
JUN 9 1983 Form Appro d b ity ttor �
Certified a•s d by Counc' cre BY
By _
t#p v y i4lavor. r UN 1 Q 1983 Ap ov y or ' sion to Council
B 8�+
PUBLISHED �UN 18 19��
.. `NN�r _ _ `�lt�� ��,,�.__._.... . -- -,-_..._._._�
�j�
� �o�' '��o Minnes'ota �
. � Q Dc���rti��c�nt ��f Z'r��i�sE�ortarion JI',;�' '' : � -� ; �
� District 9
;�ti �Q° 3485 1-iaclley AvE�nue North. Box 2050, f '.'�� � - -.; � -;;,
,,_ * TOFTRPa North St. P��ul, MIIIII(,SUI�a �Slo� `
___ _. . �:_�__
(612) 770•2311
December 23, 1981
Mr. Donald Nygaard, Director
Department of Public Works
City of St. Paul
. 25 W. Fourth Street
St. Paul , Minnesota 55102
In reply refer to: 319
S.P. 6220-36 (TH 61 )
I-494 to Near Burns Avenue
Dear Mr. Nygaard: -
The Minnesota Department of Transportation has developed a project for the recon-
struction of TH 61 in St. Paul from the south Ramsey County line to just north
� , of Burns Avenue. The objectives of the project are improvement of traffic safety,
extension of the service life of the existing highway and improvement of the
roadside environment.
The proposed work will consist of the following:
1 . Roadway reconstruction, widening and minor realiqnment to increase
median width. � ,_-
2. Construction of inedian barrier where widening is not feasible.
3. Frontage road construction.
4. Relocation and reconstruction of several intersections.
5. Roadway lighting and traffic signals.
6. Construction of a bicycle trail .
7, Landscaping and signing in accordance with Great River Road objectives .
8. Replacement of the Battle Creek bridge.
The project has been developed with close cooperation and considerable input from
the St. Paul District One Community Council and the City of St. Paul Departments
of Public Works, Parks and Recreation, and Planning.
The project has location and design approval by the Federal Highway Administration.
It has been reviewed by the �4etropolitan Council . The finding was that the project
was consistent with metropolitan planning and policies.
An Equal Opportunily Employer
.... ,,.....�, :.,a........�_. _-. _� ____�_,_._,. _
. � � �8(�4�i�.� - .
Mr. Donald Nygaard
December 23, 1981
Page two
The Minnesota Environmental Quality Board has also reviewed the project, along
with the City of St. Paul Department of Planning, and has indicated that it
complies with the Interim Development Regulations for the Mississippi River
Corridor Critical Area.
In addition, the following agencies and organizations have been involved in the
design and development of this project:
Army Corps of Engineers
U.S. Fish and L+lildlife Service
Minnesota Department of Natural Resources
Minnesota Pollution Control Agency
Metropolitan Transit Commission �
Ramsey-l�lashington Metro Watershed District
Ramsey County Open Space
, St. Paul Port Authority
Six public informational meetings have been held to acquaint local residents with
the project. Included at these meetings were Mn/DOT personnel and representatives
of the City of St. Paul Public Works and Planning, St. Paul District One Community
Council , Metropolitan Transit Commission and others.
Commitments and changes to the project as a direct result of the public involve-
ment are as follows: ---
1 . The location of the major south intersection was changed from the proposed
Bailey Road to Carver Avenue.
2, The continuous section of frontage road from Highwood Avenue to Carver
Avenue was eliminated from the project.
3. A low level of continuous li�hting was requested by residents and will be
incorpora ted into the design.
4. The closure of Highwood Avenue access was given concurrence by the District
One Community Council .
5. The approximate locations of bus stops were sug�ested by the District One
Community Council .
6. The District One Community Council concurred with the bike trail routing.
An opportunity for a public hearing was afforded. The notices were published on
September 10, 1980 and October 1 , 1980 with the deadline for requests October 15,
1980. There were no requests for a public hearing.
The project is located entirely within the City of St. Paul . Preliminary plan
approval from the City is necessary. Mn/DOT hereby requests that the City Council
formally approve the preliminary layout.
_ .. .___.�____,_._...,'-:._ _, ..�.�._ .. �,�.
. ,��{���� ,.
,
Mr. Donald Nygaard
December 23, 1981
..._....- �- Page three
The project is presently unscheduled because of uncertainties in Great River Road
funds and other state and federal funding needed for construction.
Two copies of the geometric layout and one copy of the Location/Design Study
Report are included.
Thank you for your cooperation and assistance with this project.
S' rely,
�
�rpouglas H. Differt, P.E.
District Engineer
• Attachments
�
' Public Works ��pARd"f�1ENT �����
r ,
+ Robert H. Roettger rONTACT
298-4701 PHONE
� 1�g�i.1 2� 19 8 3 OATE re e�, e e
(Routing and Explanation Sheet)
Assi�n Number for Routing Order (Clip Al1 Locations for Dlayoral Siqnature)
Ci ty Attorney R�L'�C�
S 4-2�-83 � O
4 D' nt/Mayor qpR' F
Finance and Management Services Director �+��,Y v�61�
5 City Clerk AT,.
or ��
�lhat Will be Achieved by Takinq Action on the Attached Materials? (Purpose/Rationale)
Mn/DOT feels that they may now have funds to do already studied and approvec�:
projects such as this pro�osed improvement of T.H. 61. With City Council
approval of the preliminary plan , this improvement would be high priority
for 1984 or 1985 construction.
This T.H. 61 project is highly desirable to alleviate congestion and operatior
problems at Burns Ave. and Warner Rd. , Battle Creek Pk. and other access
points. The project would also upgrade �he general operation, condition and
Financial , Budgetary and Personnel Impacts �Anticipated• scenic qualities of entire l�ng
None. Some City staff time for construction plan and detail reviews.
Funding Source and Fund Activity Number Charqed or Credited•
Mn/DOT funds only.
Attachments (List and Number all Attachments) •
. 1. Letter from Mn/DOT to Donald E. Nygaard, requesting approval and
outlina.ng project objectives and history.
DEPARTMENT REVIEW CITY ATTORNEY REVIEW
�_ Yes No Council Resolution Required? Resolution Required? Yes No
Yes �_ No Insurance Required? Insurance Sufficient? Yes No
Yes No Insurance Attached?
Revision of October, 1982
(�Pp RPVPI"tP Sit1v fnr InStrtlCtiOnS)
�`� ���i4��
� �.:.� . .._ .
:� _ , ;,
�°-�� .� � � �I'1�1' (�;F �A=L i'�T'r �r`\U:L
?' �� �:( v;
',: ,��,....,,�����.F � 07i'.FIGT� flF` '1`FLTP CI'.L'Y COI7\CIL �
�� �'� � ;}
�� t � �-` - „; J D d t e , June 1 198 3
s;Y�:�.\-.= j�� '
��;,�- �
" ;°.�,;-: .
C � MMIT`�' � E RE P � RT
TO = 5pinf Paul Cit�+ Cou��i !
. F� � � � COf"l1iTlttt�� Oh pUBLIC WORKS
CHAIR , CHRIS NICOSIA � �
The. Public Works Committee, at its meeting of June 1 , 1983, took the
following action:
Items #2, #4 , #5, #6, # d Resolution approving preliminary layouts
for the improvement of �Trunk HightiJay were recommended for approval.
Item #3 was laid over indefinitely, as was Item #8 . �
�for variance
Item #9 - Resolution/from State for reconstruction of Arlington
Avenue between East Shore Drive and Hazelwood Street was laid over
indefinitely.
Item #9 - Resolution for variance from State for desi.gn of urban
roadways for Sunday parking from 8 : 00 a.m. to 1 : 00 p.m, on tivest side
of Lexington Parkway from Minnehaha Avenue to Blair Avenue - reauest
withdrawn.
CITY HALL SEVF:NTF( FLOO� SA1Nl' YAt1L, �il\`iESO"�':� 55102
..y.
. °�yx9''� .
; .. .. ,
_ ._ _.
_____._ - , .
� . - , � . , , . ����4�� A; _
..;_ _: }Ieai�a.n;; Date- �� _ _ ._ _ ._.: . _._ _._ . ._.... _ _ _ ..... __ .,. . �_�:_.
2. 6 "I 8� -- _.. � VACl1TIOI� :� Petition of City of St. Paul for the vac�tion of
publ.ic int�rest in vacant land on the salit]i s�de oi' .
TSinnehaha Ave. betlaeen Peclerson and ��'intlixop Strer.ts. This :
� parcel ol land iaill be cleec]ed back �to the original oianers ,
� as it ivas gilTen to the City for l�ark purposes only.
. Commullity Services states that t}iei•e xs no intent:i.crn to
, develop this site� fox park purposes in the foreseeable - -
futurc . ' �
3. 6/7/83 � � RE11'IFICATION OF ASSESST7ENTS: For constxucting a sanirary
. � � setvex in AA1CS AVENUE from Ilazell�ood Street to 410 feet
- ti��est of BarcJ.ay St. , and in B/1RCLAY STREET fxom Ames A�-ei�iie
• ' � . to Mec]ianic �lvenue. A1so, constructio�l of sani'tary. se��•e��
� - service connections and a iti�ater main i�i AD9ES �1��E�UE from
150 feet .west of Barclay St�•eet to Haze7.t��ood Si:reet.
- 4. 6/7/83 FIN�1L ORDER: To clecide on the grading F �aving c:t the Easf_-
h'est alley in Block 2, Cole' s Rearrangement of 1;locks 1 F 2,
• and Subdivision and Enlargement of �31ock 3, of his Randolph
. Street and Pleasant Street Addition; Block 2, I3uckhout' s
Rearrangement of �looxe's �lddition; }31ock .2, 1Vatson' s 2nd .
� Addition from Interstate 3b-E to Cl�atsti��orth St:i-eet (botinded
by 35-E, Juno, Chatsi�rorth and Armstrong) . Also, slope can-
stxuction � in the above s�aid al.ley.
S. 6/14/83 � R!1'fIFICATIOI� OF ASSESSAIENTS: Por the grading anci pa��ing �of
SLOAN ST. from fIoyt Avenue �o cul -de-sac. Also , con-ti•uc.tion
of storm zuater drainage facilities in I10Y1' AV1:rUF and also
� the construction o.f se�uer servicc ancl t.�atcr ser>>ice co��nect- �
� � a; �ions. Al.so, construction of a water mai�� in SLOAh S','ItEET �
� from Hoyt Ave. to cul-de-sac. � . -
'"� � � 6. S/31/S3 " `- PII�I�L ORDL-'R: Improvi�ig a11ey in 131ock 9, Tracy' s Outlots
F, Collings Acldition of Outlots by �rading and pa�ring from
� E. Seveni:h Street to Case llvenue. Also , slope construction _
in the above said alley (bowzdect by L'• . •Seventh Street , Case
A��enue , Johnson Par�:�vay and Occan Street:) . Laid over from
� S/18/S3} . .
7. G/7/S3 ��ACATION: (Laicl over Irom 5/�/83) . Petition by the City �
of Saant Paul for the vacation oI publi.c interest in -
, - 69 l�'. Congress Sti•eet to` convey t}iis propexty to llispanas
� . En Dlirinesota (11. E.A7. ) . • "
8. SIDEWALKS: (Laid over from 5/1S/83) . Final Ox�cler far re-
. � � , construction o�� sicleiaalks wllere necess<�r.y at tlie folloi,ring
� � location: North side A7ICliIGl���! STTtiE'I' f��•um Fort Road to
" Richmond Street. � • �
9. VARIIINCE fxom the State for reconstructxon of. ARI.II�GTOl�'
�IVENIIE between East Shore Drive and �-Ic�zel�vood Street ; , � _
VnRIANCE £rom State for design of urban road�aays for
Sunday pa7•king from 8: 00 a .m. to 1 : 00 p.m, on t,est side
� of L�XINGTON P�IRKIV/1Y from Minneliaha Avenue to Blair 11ve. ;
��proval� of °preliniinary layouts for the improvement of _
� 'fRUNK }lI GH�VAY 61 . .
_r � � _