99-693/
� City of St. Paul �y[R��1��4 COUNC L FI E NO. �-` `��Z
RESOLIITION APPROVING ASSESSMENT AND - By�"vvl.f ��l v" i/ �--
FI%ING TIME OF HEARING TBEREON File No. 18882
Assessment No. 0664 � 9
Voting
Ward In the matter of the assessment of benefits, cost and expenses for the
3 installation of the following streets with bituminous roadway, construct
concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding,
tree planting, construction of a lantern style lighting system, and doing all other
work necessary to complete said improvement for the PASCAL/JEFFERSON RSVP PAVING AND
LIGHTING PROJECT (#18882):
James Avenue
Palace Avenue
Juliet Avenue
Wellesley Avenue
Stanford Avenue
Berkeley Avenue
Brimhall Street
Brimhall Street
Saratoga Street
Warwick Street
Pascal Street
Albert Street
Jefferson Avenue
-Hamline Avenue to Pascal Street_
-Hamline Avenue to Brimhall Street.
-Aamline Avenue to Pascal Street.
-Hamline Avenue to Pascal Street.
-Hamline Avenue to Snelling Avenue.
-Hamline Avenue to Pascal Street.
-St_Clair Avenue to Jefferson Avenue.
-Palace Avenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-St.Clair zavenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-Hamline Avenue to Snelling Avenue.
Preliminary Order: 98-0972
Final Order : 98-1092
approved:
approved
October 21, 1998
December 9, 1998
The assessment of benefits, cost and e�enses for and in connection with the
above improvement having been submitted to the Council, and the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOLVED, That the said assessment be and the same is hereby in a17, respects
approved.
RESOLVED FVRTHER, That a public hearing be had on said assessment on the 8th
dav of Seotember, 1999 at the hour of 5:30 o'clock P.M., in the Council Chamber of
the Court House and City Hall Building, in the City of St. Paul; that the Valuation
and Assessment Engineer give notice of said meetings, as required by the Charter,
stating in said notice the time and place of hearing, the nature of the improvement,
and the amount assessed against the lot or lots of the particular owner to whom the
notice is directed.
��)ICUCr.
COUNCILPERSON �' q � �
Yeas Nays V � �ggg
B� nanav-_ (J1�
✓Blakey
./�ostrom
V�oleman /'
+/�arris b In Favor
✓�antry _ _
�iter QAgainst
! ��(JSe1�.�
Adopted by the Council: Date �
Certified Passed by Council Secreta
�
n ,� _ �� � Mayor
� �,
3 �
'� Public Heazin : Se tember 8, 19S
T.M.S./REAL ESTATE DIVISION
mYact Paraon aad Phoae N�ber:
Patar [Qhite 266-8850
be on Council Agenda by:
be in Couacil Research O�ce
7121 /1999
7/9 /1999
Date:
•ea�
�
1
09435
[oNREQUESTED: Satt3ng date oP publ3c hearing ot ratiticatioa of assessment ot
iefits, cost an<3 expenses for the installation of naw bitumi.nons surfaced streets
h concrete curb and gutter, concrete drivemay aB=ons aad outmalks, boulevard laadscaped
h sod aud traes, a aew lantera. style lighting system, lead water service raplacements, aad
,iCary sawer rapaira, in the`area called Pascal/Jeffarson RSVP (Area 79) generally bouafled
Snelling Avenue, St,.PClair Avenue, Samliae Aveaue, sad Raadolph Aaenue (yroject 18882).
r'
r '
4.
�A" .. � �. �..
�.
A �,.
PLANNSNG CdYNMISSION
i _
A STAE'F
:R50NAL SERVICE CONTRACTS MOST ANSWER THE FOLLOWIlVG:
FIas t6e persodEUm ever worked under a contzact for Wis depariment? YES NO
Has this persodflrm ever been a City employee?
civlL
Publie Heaith
I��.S��L�7
. Does this persodfirnt passesa a 5tdll not normaLLy possessed Ly any YES NO
current City employee?
cta co�riree v��� sm�.
Eaplain all YFS answers on a separate sheN and attach.
�TING PROBLEM, ISSI7E, OPPORTUNII'P (Who, Whay When, Where, Why?)
TAGESIF APPROVSD:
as above.
� �ES�$i �^.r�l
IF APPROVED;
�DVANTAGESIFNOTAPPROVED: `
not assess these bene�ts would be inconsistent with
2/12/1999 Green Sheet Number:
�BPARTpffii2 DIRHCTOR 2 ITY COLINCZL
xxx arrox�r sxx czaxx
•L
� �
ti��� �
♦
OF TRANSACTION: $ 3.3Z. TOTAL COSTlREVENUE BUAGETED (CIRCLE ONE) YES NO
$1,962,652.00 CIB
$ 495,072.00 MSA
$ 869,878.34 AS5FS5MENTS
sooxcE: ASSESSMENTS, MSA, AND CIB A�''IV�TY
NUMBER:
Z INFORMATION: (EXPLAII�
?ronertv owners will be notified of the nublic hearin2 and charaes.
��
C99-2T553-0784-292A8
/
� City of St. Paul �y[R��1��4 COUNC L FI E NO. �-` `��Z
RESOLIITION APPROVING ASSESSMENT AND - By�"vvl.f ��l v" i/ �--
FI%ING TIME OF HEARING TBEREON File No. 18882
Assessment No. 0664 � 9
Voting
Ward In the matter of the assessment of benefits, cost and expenses for the
3 installation of the following streets with bituminous roadway, construct
concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding,
tree planting, construction of a lantern style lighting system, and doing all other
work necessary to complete said improvement for the PASCAL/JEFFERSON RSVP PAVING AND
LIGHTING PROJECT (#18882):
James Avenue
Palace Avenue
Juliet Avenue
Wellesley Avenue
Stanford Avenue
Berkeley Avenue
Brimhall Street
Brimhall Street
Saratoga Street
Warwick Street
Pascal Street
Albert Street
Jefferson Avenue
-Hamline Avenue to Pascal Street_
-Hamline Avenue to Brimhall Street.
-Aamline Avenue to Pascal Street.
-Hamline Avenue to Pascal Street.
-Hamline Avenue to Snelling Avenue.
-Hamline Avenue to Pascal Street.
-St_Clair Avenue to Jefferson Avenue.
-Palace Avenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-St.Clair zavenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-Hamline Avenue to Snelling Avenue.
Preliminary Order: 98-0972
Final Order : 98-1092
approved:
approved
October 21, 1998
December 9, 1998
The assessment of benefits, cost and e�enses for and in connection with the
above improvement having been submitted to the Council, and the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOLVED, That the said assessment be and the same is hereby in a17, respects
approved.
RESOLVED FVRTHER, That a public hearing be had on said assessment on the 8th
dav of Seotember, 1999 at the hour of 5:30 o'clock P.M., in the Council Chamber of
the Court House and City Hall Building, in the City of St. Paul; that the Valuation
and Assessment Engineer give notice of said meetings, as required by the Charter,
stating in said notice the time and place of hearing, the nature of the improvement,
and the amount assessed against the lot or lots of the particular owner to whom the
notice is directed.
��)ICUCr.
COUNCILPERSON �' q � �
Yeas Nays V � �ggg
B� nanav-_ (J1�
✓Blakey
./�ostrom
V�oleman /'
+/�arris b In Favor
✓�antry _ _
�iter QAgainst
! ��(JSe1�.�
Adopted by the Council: Date �
Certified Passed by Council Secreta
�
n ,� _ �� � Mayor
� �,
3 �
'� Public Heazin : Se tember 8, 19S
T.M.S./REAL ESTATE DIVISION
mYact Paraon aad Phoae N�ber:
Patar [Qhite 266-8850
be on Council Agenda by:
be in Couacil Research O�ce
7121 /1999
7/9 /1999
Date:
•ea�
�
1
09435
[oNREQUESTED: Satt3ng date oP publ3c hearing ot ratiticatioa of assessment ot
iefits, cost an<3 expenses for the installation of naw bitumi.nons surfaced streets
h concrete curb and gutter, concrete drivemay aB=ons aad outmalks, boulevard laadscaped
h sod aud traes, a aew lantera. style lighting system, lead water service raplacements, aad
,iCary sawer rapaira, in the`area called Pascal/Jeffarson RSVP (Area 79) generally bouafled
Snelling Avenue, St,.PClair Avenue, Samliae Aveaue, sad Raadolph Aaenue (yroject 18882).
r'
r '
4.
�A" .. � �. �..
�.
A �,.
PLANNSNG CdYNMISSION
i _
A STAE'F
:R50NAL SERVICE CONTRACTS MOST ANSWER THE FOLLOWIlVG:
FIas t6e persodEUm ever worked under a contzact for Wis depariment? YES NO
Has this persodflrm ever been a City employee?
civlL
Publie Heaith
I��.S��L�7
. Does this persodfirnt passesa a 5tdll not normaLLy possessed Ly any YES NO
current City employee?
cta co�riree v��� sm�.
Eaplain all YFS answers on a separate sheN and attach.
�TING PROBLEM, ISSI7E, OPPORTUNII'P (Who, Whay When, Where, Why?)
TAGESIF APPROVSD:
as above.
� �ES�$i �^.r�l
IF APPROVED;
�DVANTAGESIFNOTAPPROVED: `
not assess these bene�ts would be inconsistent with
2/12/1999 Green Sheet Number:
�BPARTpffii2 DIRHCTOR 2 ITY COLINCZL
xxx arrox�r sxx czaxx
•L
� �
ti��� �
♦
OF TRANSACTION: $ 3.3Z. TOTAL COSTlREVENUE BUAGETED (CIRCLE ONE) YES NO
$1,962,652.00 CIB
$ 495,072.00 MSA
$ 869,878.34 AS5FS5MENTS
sooxcE: ASSESSMENTS, MSA, AND CIB A�''IV�TY
NUMBER:
Z INFORMATION: (EXPLAII�
?ronertv owners will be notified of the nublic hearin2 and charaes.
��
C99-2T553-0784-292A8
/
� City of St. Paul �y[R��1��4 COUNC L FI E NO. �-` `��Z
RESOLIITION APPROVING ASSESSMENT AND - By�"vvl.f ��l v" i/ �--
FI%ING TIME OF HEARING TBEREON File No. 18882
Assessment No. 0664 � 9
Voting
Ward In the matter of the assessment of benefits, cost and expenses for the
3 installation of the following streets with bituminous roadway, construct
concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding,
tree planting, construction of a lantern style lighting system, and doing all other
work necessary to complete said improvement for the PASCAL/JEFFERSON RSVP PAVING AND
LIGHTING PROJECT (#18882):
James Avenue
Palace Avenue
Juliet Avenue
Wellesley Avenue
Stanford Avenue
Berkeley Avenue
Brimhall Street
Brimhall Street
Saratoga Street
Warwick Street
Pascal Street
Albert Street
Jefferson Avenue
-Hamline Avenue to Pascal Street_
-Hamline Avenue to Brimhall Street.
-Aamline Avenue to Pascal Street.
-Hamline Avenue to Pascal Street.
-Hamline Avenue to Snelling Avenue.
-Hamline Avenue to Pascal Street.
-St_Clair Avenue to Jefferson Avenue.
-Palace Avenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-St.Clair zavenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-St.Clair Avenue to Randolph Avenue.
-Hamline Avenue to Snelling Avenue.
Preliminary Order: 98-0972
Final Order : 98-1092
approved:
approved
October 21, 1998
December 9, 1998
The assessment of benefits, cost and e�enses for and in connection with the
above improvement having been submitted to the Council, and the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOLVED, That the said assessment be and the same is hereby in a17, respects
approved.
RESOLVED FVRTHER, That a public hearing be had on said assessment on the 8th
dav of Seotember, 1999 at the hour of 5:30 o'clock P.M., in the Council Chamber of
the Court House and City Hall Building, in the City of St. Paul; that the Valuation
and Assessment Engineer give notice of said meetings, as required by the Charter,
stating in said notice the time and place of hearing, the nature of the improvement,
and the amount assessed against the lot or lots of the particular owner to whom the
notice is directed.
��)ICUCr.
COUNCILPERSON �' q � �
Yeas Nays V � �ggg
B� nanav-_ (J1�
✓Blakey
./�ostrom
V�oleman /'
+/�arris b In Favor
✓�antry _ _
�iter QAgainst
! ��(JSe1�.�
Adopted by the Council: Date �
Certified Passed by Council Secreta
�
n ,� _ �� � Mayor
� �,
3 �
'� Public Heazin : Se tember 8, 19S
T.M.S./REAL ESTATE DIVISION
mYact Paraon aad Phoae N�ber:
Patar [Qhite 266-8850
be on Council Agenda by:
be in Couacil Research O�ce
7121 /1999
7/9 /1999
Date:
•ea�
�
1
09435
[oNREQUESTED: Satt3ng date oP publ3c hearing ot ratiticatioa of assessment ot
iefits, cost an<3 expenses for the installation of naw bitumi.nons surfaced streets
h concrete curb and gutter, concrete drivemay aB=ons aad outmalks, boulevard laadscaped
h sod aud traes, a aew lantera. style lighting system, lead water service raplacements, aad
,iCary sawer rapaira, in the`area called Pascal/Jeffarson RSVP (Area 79) generally bouafled
Snelling Avenue, St,.PClair Avenue, Samliae Aveaue, sad Raadolph Aaenue (yroject 18882).
r'
r '
4.
�A" .. � �. �..
�.
A �,.
PLANNSNG CdYNMISSION
i _
A STAE'F
:R50NAL SERVICE CONTRACTS MOST ANSWER THE FOLLOWIlVG:
FIas t6e persodEUm ever worked under a contzact for Wis depariment? YES NO
Has this persodflrm ever been a City employee?
civlL
Publie Heaith
I��.S��L�7
. Does this persodfirnt passesa a 5tdll not normaLLy possessed Ly any YES NO
current City employee?
cta co�riree v��� sm�.
Eaplain all YFS answers on a separate sheN and attach.
�TING PROBLEM, ISSI7E, OPPORTUNII'P (Who, Whay When, Where, Why?)
TAGESIF APPROVSD:
as above.
� �ES�$i �^.r�l
IF APPROVED;
�DVANTAGESIFNOTAPPROVED: `
not assess these bene�ts would be inconsistent with
2/12/1999 Green Sheet Number:
�BPARTpffii2 DIRHCTOR 2 ITY COLINCZL
xxx arrox�r sxx czaxx
•L
� �
ti��� �
♦
OF TRANSACTION: $ 3.3Z. TOTAL COSTlREVENUE BUAGETED (CIRCLE ONE) YES NO
$1,962,652.00 CIB
$ 495,072.00 MSA
$ 869,878.34 AS5FS5MENTS
sooxcE: ASSESSMENTS, MSA, AND CIB A�''IV�TY
NUMBER:
Z INFORMATION: (EXPLAII�
?ronertv owners will be notified of the nublic hearin2 and charaes.
��
C99-2T553-0784-292A8