99-643City of St. Paul
�
RESOLUTION APPROVING ASSESSMENT AND
FIXING TII+fE OF HEARING THEREON
COUNCIL FILE N0. � l `��
BY ,
File No. 98WALKS2 �'
Assessment No. 0493
Voting
Ward In the matter of the assessment of benefits, cost and expenses for
Sidewalk Reconstruction (Work already done)
(See attached)
Preliminary Order:98-252, 98-404, 98-429,998-431,approved: April 1, 1998, May 6, 1998
98-433, 98-436, 98-678 May 13, 1998, May 20, 1998, July 22,
1998
Final Order 98-471, 98-500, 98-569, 98-571, approved: May 27, 1998, June 10,
98-573, 98-576, 98-749 1998, June 24, 1998, August 12, 1998
�
assessment of benefits, cost and expenses for and in connection with the above
improvement having been submitted to the Council, and the Council having considered
same and found the said assessment satisfactory, therefore, be it
RE50LVED, That the said assessment be and the same is hereby in all respects
approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on the 25th d�
of Auaust, 1999, at the hour of 5:30 P.M., in the Council Chamber of the Court House
and City Hall Building, in the City of St. Paul; that the Valuation and Assessment
Engineer give notice of said meetings, as required by the Charter, stating in said
notice the time and place of hearing, the nature of the improvement, and the amount
assessed against the lot or lots of the particular owner to whom the notice is
directed.
Yeas Nays
Benanav
�akey
i/�ostrom
� leman
�farris
�� try
//Reiter
Adopted by the Council: Date r l l y
Certified Passed by Council Secretary
BY� � ��,-��
�In Favor C��/�L1�/ �l�ll�f(6��
�Against `� Mayor
/ �� PIIAIISNFI9
�IUL 2 4 i999
�� �`�3
598005
S98034
598037
[.Y�:idc3']
S98041
[.Y�:ZI' %
►':1�
�.•�..i
S98045
598050
':1..
598067
':1�:
598075
Sidewalk Reconstruction on the North Side of EAST T'HIRD STREET from
Barclay Street to Hazelwood Street & the West Side HAZELWOOD STREET
from East Third Street to Fremont Avenue at 1535 EAST THIRD ST'REET Only.
Sidewalk Reconstruction on Both Sides DAYTON AVENCTE from North
Syndicate Street to North Griggs Street.
Sidewalk Reconstruction on Both Sides BELLOWS STREET from West Page
Street to West Baker Street.
Sidewalk Reconstruction on the South Side WEST EXCHANGE STREET from
St. Peter Street to North Wabasha Street.
Sidewalk Reconstruction with integral curb on the South Side MUI,BERRY
STREET from Old Kellogg Boulevard to West Kellogg Boulevazd.
Sidewalk Reconstruction on the North Side WEST PAGE STREET from Bellows
STreet to Bidwell Street.
Sidewalk Reconstruction on Both Sides WEST PAGE STREET from Charlton
Street to Bellows Street.
Sidewalk Reconstruction on Both Sides WEST ST'EVENS STREET from
Winslow Avenue to Stryker Avenue.
Sidewalk Reconstruction on Both Sides SOUTH VICTORIA STREET from
Palace Avenue to James Avenue.
Sidewalk Reconstruction on Both Sides EAST ROBIE STREET from Bancroft
Avenue to approximaiely 240 feet East of Bancroft Avenue.
Sidewalk Reconstruction on Both Sides NORTH DUNLAP STREET from
Sherburne Avenue to Charles Avenue & the South Side CHARLES AVENUE
from North Griggs Street to North Dunlap Street.
Sidewalk Reconstruction on Both Sides SELBY AVENLTE from North Milton
Street to North Victoria Street.
Sidewalk Reconstruction on Both Sides THOMAS AVENUE from Farrington
Street to Marion Street.
Sidewalk Reconstruction on Both Sides BUSH AVENLTE from Atlantic Street to
Johnson Parkway.
�iG-co`k�
598076 Sidewalk Reconstruction on Both Sides NORTH RITI'H STREET from East
Minnehaha Avenue to Reaney Avenue.
598077 Sidewalk Reconstruction on Both Sides NORTH WIIITE BEAR AVENUE from
Fremont Avenue to Margazet Street. North Side EAST FIFTH STREET from
North White Bear Avenue to North Hazel Street & South Side EAST FOURTH
STREET from Flandrau Street to North White Bear Avenue.
S98094 Sidewalk Reconstruction on Both Sides AURORA AVENUE from Nor[h Grotto
Street to North St. Albans Street.
S98108 Sidewalk Reconstruction on the West Side NORTH WHITE BEAR AVENLTE
from Beech Street to East Minnehaha Avenue.
S98125 Sidewalk Reconstruction on Both Sides DALY STREET from Iefferson Avenue
to Palace Avenue.
V(_ N i ' S Z9 T��` y�
,
T.M.S./REAL ESTATE DIVISION Date: Jane 10,1999 Green Sheet Number: 63714
ntad Person aod Phone Nam6er: EPARIMENi DIRECIOR C[IY COUNCIt, 1. 6j ` �i
ll' L/
Peter White 266-8850 ATiO�Y ��
� ry a GnA � IIDGESDIBECfOR FF[CEOFFINANCGV.SVCS
t � V/1
att bt on Coontil Agenda by: A � + � YOR (OR ASSLSfAN1) i OiJNCII. Rrccsu�g
OTAL # OF SIGNATURE PAG S 1 (CLIP ALL LOCATTONS FOR SIGNATURE)
CTION REQUFSTED: '
etting date of public hearing for the ra 'hfication of assessments for sidewalk improvements in various
ocations throughout the city.
ile No. 98WALKS2 ASSESSMENT NO. 0493
OMMelvnwnOws:werxOVE(w)ORne.l�c7(tq ERSONALSERVICECONTRACfSMUSTANSWERTHEFOLLOWMG:
. Has the personlfirm ever worked under a coatraet tor t6is department? YES NO
rwrnr�NCrn��ss�on A srwtr
. Has Nis persoNfirm ever bceo a City employee? YES NO
crva sexvrce commrss�ox
. Does t6is persodfirm possess a skill not normally pouessed by any YES NO
C'scoMmm'ee eurrent City employee?
Ezplain ali YES answers oo a separete sheet and attacA.
; UPPORTS WN[CH WUNCIL OBJECENE? Neighborhoods
COUNCIL WARD(S) 1 2 7 DISTRICT PLANNING COUNCIL
TTL4TiNG PROBLEM, ISSUE, OPPORT[TNTTY (Who, Wha4 w'heo, W6ere, Why?):
t Projects are completed. Ratification is necessary to begin to collect assessments to help pay for
the projects.
a � +�
' DVANTAGESIFAPPROVED:
Same as above. ��N 2 9
�
` ISADVAMAGESIFAPPROVED:
Benefitted property owners have assessments payable via property taxes. '
;� ISADVANTAGESIFNOTAPPROVED:
To not assess the benefits would be inconsistent with City policy.
r- OTALAi110UNTOFTRANSACCION: $ 148�L62 .Z1 COST/REVENUEBUDGETED{CIRCLEONE) YES NO
� 585,618.01 PIA 1998 A�'rvmNUmsex:
$62,644.20ASSESSiVIENTS
.;� UNDING SOURCE:
ANCIAL INFORMATION: (EXPLAIN)
z
� � �� t���U'��--
City of St. Paul
�
RESOLUTION APPROVING ASSESSMENT AND
FIXING TII+fE OF HEARING THEREON
COUNCIL FILE N0. � l `��
BY ,
File No. 98WALKS2 �'
Assessment No. 0493
Voting
Ward In the matter of the assessment of benefits, cost and expenses for
Sidewalk Reconstruction (Work already done)
(See attached)
Preliminary Order:98-252, 98-404, 98-429,998-431,approved: April 1, 1998, May 6, 1998
98-433, 98-436, 98-678 May 13, 1998, May 20, 1998, July 22,
1998
Final Order 98-471, 98-500, 98-569, 98-571, approved: May 27, 1998, June 10,
98-573, 98-576, 98-749 1998, June 24, 1998, August 12, 1998
�
assessment of benefits, cost and expenses for and in connection with the above
improvement having been submitted to the Council, and the Council having considered
same and found the said assessment satisfactory, therefore, be it
RE50LVED, That the said assessment be and the same is hereby in all respects
approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on the 25th d�
of Auaust, 1999, at the hour of 5:30 P.M., in the Council Chamber of the Court House
and City Hall Building, in the City of St. Paul; that the Valuation and Assessment
Engineer give notice of said meetings, as required by the Charter, stating in said
notice the time and place of hearing, the nature of the improvement, and the amount
assessed against the lot or lots of the particular owner to whom the notice is
directed.
Yeas Nays
Benanav
�akey
i/�ostrom
� leman
�farris
�� try
//Reiter
Adopted by the Council: Date r l l y
Certified Passed by Council Secretary
BY� � ��,-��
�In Favor C��/�L1�/ �l�ll�f(6��
�Against `� Mayor
/ �� PIIAIISNFI9
�IUL 2 4 i999
�� �`�3
598005
S98034
598037
[.Y�:idc3']
S98041
[.Y�:ZI' %
►':1�
�.•�..i
S98045
598050
':1..
598067
':1�:
598075
Sidewalk Reconstruction on the North Side of EAST T'HIRD STREET from
Barclay Street to Hazelwood Street & the West Side HAZELWOOD STREET
from East Third Street to Fremont Avenue at 1535 EAST THIRD ST'REET Only.
Sidewalk Reconstruction on Both Sides DAYTON AVENCTE from North
Syndicate Street to North Griggs Street.
Sidewalk Reconstruction on Both Sides BELLOWS STREET from West Page
Street to West Baker Street.
Sidewalk Reconstruction on the South Side WEST EXCHANGE STREET from
St. Peter Street to North Wabasha Street.
Sidewalk Reconstruction with integral curb on the South Side MUI,BERRY
STREET from Old Kellogg Boulevard to West Kellogg Boulevazd.
Sidewalk Reconstruction on the North Side WEST PAGE STREET from Bellows
STreet to Bidwell Street.
Sidewalk Reconstruction on Both Sides WEST PAGE STREET from Charlton
Street to Bellows Street.
Sidewalk Reconstruction on Both Sides WEST ST'EVENS STREET from
Winslow Avenue to Stryker Avenue.
Sidewalk Reconstruction on Both Sides SOUTH VICTORIA STREET from
Palace Avenue to James Avenue.
Sidewalk Reconstruction on Both Sides EAST ROBIE STREET from Bancroft
Avenue to approximaiely 240 feet East of Bancroft Avenue.
Sidewalk Reconstruction on Both Sides NORTH DUNLAP STREET from
Sherburne Avenue to Charles Avenue & the South Side CHARLES AVENUE
from North Griggs Street to North Dunlap Street.
Sidewalk Reconstruction on Both Sides SELBY AVENLTE from North Milton
Street to North Victoria Street.
Sidewalk Reconstruction on Both Sides THOMAS AVENUE from Farrington
Street to Marion Street.
Sidewalk Reconstruction on Both Sides BUSH AVENLTE from Atlantic Street to
Johnson Parkway.
�iG-co`k�
598076 Sidewalk Reconstruction on Both Sides NORTH RITI'H STREET from East
Minnehaha Avenue to Reaney Avenue.
598077 Sidewalk Reconstruction on Both Sides NORTH WIIITE BEAR AVENUE from
Fremont Avenue to Margazet Street. North Side EAST FIFTH STREET from
North White Bear Avenue to North Hazel Street & South Side EAST FOURTH
STREET from Flandrau Street to North White Bear Avenue.
S98094 Sidewalk Reconstruction on Both Sides AURORA AVENUE from Nor[h Grotto
Street to North St. Albans Street.
S98108 Sidewalk Reconstruction on the West Side NORTH WHITE BEAR AVENLTE
from Beech Street to East Minnehaha Avenue.
S98125 Sidewalk Reconstruction on Both Sides DALY STREET from Iefferson Avenue
to Palace Avenue.
V(_ N i ' S Z9 T��` y�
,
T.M.S./REAL ESTATE DIVISION Date: Jane 10,1999 Green Sheet Number: 63714
ntad Person aod Phone Nam6er: EPARIMENi DIRECIOR C[IY COUNCIt, 1. 6j ` �i
ll' L/
Peter White 266-8850 ATiO�Y ��
� ry a GnA � IIDGESDIBECfOR FF[CEOFFINANCGV.SVCS
t � V/1
att bt on Coontil Agenda by: A � + � YOR (OR ASSLSfAN1) i OiJNCII. Rrccsu�g
OTAL # OF SIGNATURE PAG S 1 (CLIP ALL LOCATTONS FOR SIGNATURE)
CTION REQUFSTED: '
etting date of public hearing for the ra 'hfication of assessments for sidewalk improvements in various
ocations throughout the city.
ile No. 98WALKS2 ASSESSMENT NO. 0493
OMMelvnwnOws:werxOVE(w)ORne.l�c7(tq ERSONALSERVICECONTRACfSMUSTANSWERTHEFOLLOWMG:
. Has the personlfirm ever worked under a coatraet tor t6is department? YES NO
rwrnr�NCrn��ss�on A srwtr
. Has Nis persoNfirm ever bceo a City employee? YES NO
crva sexvrce commrss�ox
. Does t6is persodfirm possess a skill not normally pouessed by any YES NO
C'scoMmm'ee eurrent City employee?
Ezplain ali YES answers oo a separete sheet and attacA.
; UPPORTS WN[CH WUNCIL OBJECENE? Neighborhoods
COUNCIL WARD(S) 1 2 7 DISTRICT PLANNING COUNCIL
TTL4TiNG PROBLEM, ISSUE, OPPORT[TNTTY (Who, Wha4 w'heo, W6ere, Why?):
t Projects are completed. Ratification is necessary to begin to collect assessments to help pay for
the projects.
a � +�
' DVANTAGESIFAPPROVED:
Same as above. ��N 2 9
�
` ISADVAMAGESIFAPPROVED:
Benefitted property owners have assessments payable via property taxes. '
;� ISADVANTAGESIFNOTAPPROVED:
To not assess the benefits would be inconsistent with City policy.
r- OTALAi110UNTOFTRANSACCION: $ 148�L62 .Z1 COST/REVENUEBUDGETED{CIRCLEONE) YES NO
� 585,618.01 PIA 1998 A�'rvmNUmsex:
$62,644.20ASSESSiVIENTS
.;� UNDING SOURCE:
ANCIAL INFORMATION: (EXPLAIN)
z
� � �� t���U'��--
City of St. Paul
�
RESOLUTION APPROVING ASSESSMENT AND
FIXING TII+fE OF HEARING THEREON
COUNCIL FILE N0. � l `��
BY ,
File No. 98WALKS2 �'
Assessment No. 0493
Voting
Ward In the matter of the assessment of benefits, cost and expenses for
Sidewalk Reconstruction (Work already done)
(See attached)
Preliminary Order:98-252, 98-404, 98-429,998-431,approved: April 1, 1998, May 6, 1998
98-433, 98-436, 98-678 May 13, 1998, May 20, 1998, July 22,
1998
Final Order 98-471, 98-500, 98-569, 98-571, approved: May 27, 1998, June 10,
98-573, 98-576, 98-749 1998, June 24, 1998, August 12, 1998
�
assessment of benefits, cost and expenses for and in connection with the above
improvement having been submitted to the Council, and the Council having considered
same and found the said assessment satisfactory, therefore, be it
RE50LVED, That the said assessment be and the same is hereby in all respects
approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on the 25th d�
of Auaust, 1999, at the hour of 5:30 P.M., in the Council Chamber of the Court House
and City Hall Building, in the City of St. Paul; that the Valuation and Assessment
Engineer give notice of said meetings, as required by the Charter, stating in said
notice the time and place of hearing, the nature of the improvement, and the amount
assessed against the lot or lots of the particular owner to whom the notice is
directed.
Yeas Nays
Benanav
�akey
i/�ostrom
� leman
�farris
�� try
//Reiter
Adopted by the Council: Date r l l y
Certified Passed by Council Secretary
BY� � ��,-��
�In Favor C��/�L1�/ �l�ll�f(6��
�Against `� Mayor
/ �� PIIAIISNFI9
�IUL 2 4 i999
�� �`�3
598005
S98034
598037
[.Y�:idc3']
S98041
[.Y�:ZI' %
►':1�
�.•�..i
S98045
598050
':1..
598067
':1�:
598075
Sidewalk Reconstruction on the North Side of EAST T'HIRD STREET from
Barclay Street to Hazelwood Street & the West Side HAZELWOOD STREET
from East Third Street to Fremont Avenue at 1535 EAST THIRD ST'REET Only.
Sidewalk Reconstruction on Both Sides DAYTON AVENCTE from North
Syndicate Street to North Griggs Street.
Sidewalk Reconstruction on Both Sides BELLOWS STREET from West Page
Street to West Baker Street.
Sidewalk Reconstruction on the South Side WEST EXCHANGE STREET from
St. Peter Street to North Wabasha Street.
Sidewalk Reconstruction with integral curb on the South Side MUI,BERRY
STREET from Old Kellogg Boulevard to West Kellogg Boulevazd.
Sidewalk Reconstruction on the North Side WEST PAGE STREET from Bellows
STreet to Bidwell Street.
Sidewalk Reconstruction on Both Sides WEST PAGE STREET from Charlton
Street to Bellows Street.
Sidewalk Reconstruction on Both Sides WEST ST'EVENS STREET from
Winslow Avenue to Stryker Avenue.
Sidewalk Reconstruction on Both Sides SOUTH VICTORIA STREET from
Palace Avenue to James Avenue.
Sidewalk Reconstruction on Both Sides EAST ROBIE STREET from Bancroft
Avenue to approximaiely 240 feet East of Bancroft Avenue.
Sidewalk Reconstruction on Both Sides NORTH DUNLAP STREET from
Sherburne Avenue to Charles Avenue & the South Side CHARLES AVENUE
from North Griggs Street to North Dunlap Street.
Sidewalk Reconstruction on Both Sides SELBY AVENLTE from North Milton
Street to North Victoria Street.
Sidewalk Reconstruction on Both Sides THOMAS AVENUE from Farrington
Street to Marion Street.
Sidewalk Reconstruction on Both Sides BUSH AVENLTE from Atlantic Street to
Johnson Parkway.
�iG-co`k�
598076 Sidewalk Reconstruction on Both Sides NORTH RITI'H STREET from East
Minnehaha Avenue to Reaney Avenue.
598077 Sidewalk Reconstruction on Both Sides NORTH WIIITE BEAR AVENUE from
Fremont Avenue to Margazet Street. North Side EAST FIFTH STREET from
North White Bear Avenue to North Hazel Street & South Side EAST FOURTH
STREET from Flandrau Street to North White Bear Avenue.
S98094 Sidewalk Reconstruction on Both Sides AURORA AVENUE from Nor[h Grotto
Street to North St. Albans Street.
S98108 Sidewalk Reconstruction on the West Side NORTH WHITE BEAR AVENLTE
from Beech Street to East Minnehaha Avenue.
S98125 Sidewalk Reconstruction on Both Sides DALY STREET from Iefferson Avenue
to Palace Avenue.
V(_ N i ' S Z9 T��` y�
,
T.M.S./REAL ESTATE DIVISION Date: Jane 10,1999 Green Sheet Number: 63714
ntad Person aod Phone Nam6er: EPARIMENi DIRECIOR C[IY COUNCIt, 1. 6j ` �i
ll' L/
Peter White 266-8850 ATiO�Y ��
� ry a GnA � IIDGESDIBECfOR FF[CEOFFINANCGV.SVCS
t � V/1
att bt on Coontil Agenda by: A � + � YOR (OR ASSLSfAN1) i OiJNCII. Rrccsu�g
OTAL # OF SIGNATURE PAG S 1 (CLIP ALL LOCATTONS FOR SIGNATURE)
CTION REQUFSTED: '
etting date of public hearing for the ra 'hfication of assessments for sidewalk improvements in various
ocations throughout the city.
ile No. 98WALKS2 ASSESSMENT NO. 0493
OMMelvnwnOws:werxOVE(w)ORne.l�c7(tq ERSONALSERVICECONTRACfSMUSTANSWERTHEFOLLOWMG:
. Has the personlfirm ever worked under a coatraet tor t6is department? YES NO
rwrnr�NCrn��ss�on A srwtr
. Has Nis persoNfirm ever bceo a City employee? YES NO
crva sexvrce commrss�ox
. Does t6is persodfirm possess a skill not normally pouessed by any YES NO
C'scoMmm'ee eurrent City employee?
Ezplain ali YES answers oo a separete sheet and attacA.
; UPPORTS WN[CH WUNCIL OBJECENE? Neighborhoods
COUNCIL WARD(S) 1 2 7 DISTRICT PLANNING COUNCIL
TTL4TiNG PROBLEM, ISSUE, OPPORT[TNTTY (Who, Wha4 w'heo, W6ere, Why?):
t Projects are completed. Ratification is necessary to begin to collect assessments to help pay for
the projects.
a � +�
' DVANTAGESIFAPPROVED:
Same as above. ��N 2 9
�
` ISADVAMAGESIFAPPROVED:
Benefitted property owners have assessments payable via property taxes. '
;� ISADVANTAGESIFNOTAPPROVED:
To not assess the benefits would be inconsistent with City policy.
r- OTALAi110UNTOFTRANSACCION: $ 148�L62 .Z1 COST/REVENUEBUDGETED{CIRCLEONE) YES NO
� 585,618.01 PIA 1998 A�'rvmNUmsex:
$62,644.20ASSESSiVIENTS
.;� UNDING SOURCE:
ANCIAL INFORMATION: (EXPLAIN)