Loading...
99-643City of St. Paul � RESOLUTION APPROVING ASSESSMENT AND FIXING TII+fE OF HEARING THEREON COUNCIL FILE N0. � l `�� BY , File No. 98WALKS2 �' Assessment No. 0493 Voting Ward In the matter of the assessment of benefits, cost and expenses for Sidewalk Reconstruction (Work already done) (See attached) Preliminary Order:98-252, 98-404, 98-429,998-431,approved: April 1, 1998, May 6, 1998 98-433, 98-436, 98-678 May 13, 1998, May 20, 1998, July 22, 1998 Final Order 98-471, 98-500, 98-569, 98-571, approved: May 27, 1998, June 10, 98-573, 98-576, 98-749 1998, June 24, 1998, August 12, 1998 � assessment of benefits, cost and expenses for and in connection with the above improvement having been submitted to the Council, and the Council having considered same and found the said assessment satisfactory, therefore, be it RE50LVED, That the said assessment be and the same is hereby in all respects approved. RESOLVED FURTHER, That a public hearing be had on said assessment on the 25th d� of Auaust, 1999, at the hour of 5:30 P.M., in the Council Chamber of the Court House and City Hall Building, in the City of St. Paul; that the Valuation and Assessment Engineer give notice of said meetings, as required by the Charter, stating in said notice the time and place of hearing, the nature of the improvement, and the amount assessed against the lot or lots of the particular owner to whom the notice is directed. Yeas Nays Benanav �akey i/�ostrom � leman �farris �� try //Reiter Adopted by the Council: Date r l l y Certified Passed by Council Secretary BY� � ��,-�� �In Favor C��/�L1�/ �l�ll�f(6�� �Against `� Mayor / �� PIIAIISNFI9 �IUL 2 4 i999 �� �`�3 598005 S98034 598037 [.Y�:idc3'] S98041 [.Y�:ZI' % ►':1� �.•�..i S98045 598050 ':1.. 598067 ':1�: 598075 Sidewalk Reconstruction on the North Side of EAST T'HIRD STREET from Barclay Street to Hazelwood Street & the West Side HAZELWOOD STREET from East Third Street to Fremont Avenue at 1535 EAST THIRD ST'REET Only. Sidewalk Reconstruction on Both Sides DAYTON AVENCTE from North Syndicate Street to North Griggs Street. Sidewalk Reconstruction on Both Sides BELLOWS STREET from West Page Street to West Baker Street. Sidewalk Reconstruction on the South Side WEST EXCHANGE STREET from St. Peter Street to North Wabasha Street. Sidewalk Reconstruction with integral curb on the South Side MUI,BERRY STREET from Old Kellogg Boulevard to West Kellogg Boulevazd. Sidewalk Reconstruction on the North Side WEST PAGE STREET from Bellows STreet to Bidwell Street. Sidewalk Reconstruction on Both Sides WEST PAGE STREET from Charlton Street to Bellows Street. Sidewalk Reconstruction on Both Sides WEST ST'EVENS STREET from Winslow Avenue to Stryker Avenue. Sidewalk Reconstruction on Both Sides SOUTH VICTORIA STREET from Palace Avenue to James Avenue. Sidewalk Reconstruction on Both Sides EAST ROBIE STREET from Bancroft Avenue to approximaiely 240 feet East of Bancroft Avenue. Sidewalk Reconstruction on Both Sides NORTH DUNLAP STREET from Sherburne Avenue to Charles Avenue & the South Side CHARLES AVENUE from North Griggs Street to North Dunlap Street. Sidewalk Reconstruction on Both Sides SELBY AVENLTE from North Milton Street to North Victoria Street. Sidewalk Reconstruction on Both Sides THOMAS AVENUE from Farrington Street to Marion Street. Sidewalk Reconstruction on Both Sides BUSH AVENLTE from Atlantic Street to Johnson Parkway. �iG-co`k� 598076 Sidewalk Reconstruction on Both Sides NORTH RITI'H STREET from East Minnehaha Avenue to Reaney Avenue. 598077 Sidewalk Reconstruction on Both Sides NORTH WIIITE BEAR AVENUE from Fremont Avenue to Margazet Street. North Side EAST FIFTH STREET from North White Bear Avenue to North Hazel Street & South Side EAST FOURTH STREET from Flandrau Street to North White Bear Avenue. S98094 Sidewalk Reconstruction on Both Sides AURORA AVENUE from Nor[h Grotto Street to North St. Albans Street. S98108 Sidewalk Reconstruction on the West Side NORTH WHITE BEAR AVENLTE from Beech Street to East Minnehaha Avenue. S98125 Sidewalk Reconstruction on Both Sides DALY STREET from Iefferson Avenue to Palace Avenue. V(_ N i ' S Z9 T��` y� , T.M.S./REAL ESTATE DIVISION Date: Jane 10,1999 Green Sheet Number: 63714 ntad Person aod Phone Nam6er: EPARIMENi DIRECIOR C[IY COUNCIt, 1. 6j ` �i ll' L/ Peter White 266-8850 ATiO�Y �� � ry a GnA � IIDGESDIBECfOR FF[CEOFFINANCGV.SVCS t � V/1 att bt on Coontil Agenda by: A � + � YOR (OR ASSLSfAN1) i OiJNCII. Rrccsu�g OTAL # OF SIGNATURE PAG S 1 (CLIP ALL LOCATTONS FOR SIGNATURE) CTION REQUFSTED: ' etting date of public hearing for the ra 'hfication of assessments for sidewalk improvements in various ocations throughout the city. ile No. 98WALKS2 ASSESSMENT NO. 0493 OMMelvnwnOws:werxOVE(w)ORne.l�c7(tq ERSONALSERVICECONTRACfSMUSTANSWERTHEFOLLOWMG: . Has the personlfirm ever worked under a coatraet tor t6is department? YES NO rwrnr�NCrn��ss�on A srwtr . Has Nis persoNfirm ever bceo a City employee? YES NO crva sexvrce commrss�ox . Does t6is persodfirm possess a skill not normally pouessed by any YES NO C'scoMmm'ee eurrent City employee? Ezplain ali YES answers oo a separete sheet and attacA. ; UPPORTS WN[CH WUNCIL OBJECENE? Neighborhoods COUNCIL WARD(S) 1 2 7 DISTRICT PLANNING COUNCIL TTL4TiNG PROBLEM, ISSUE, OPPORT[TNTTY (Who, Wha4 w'heo, W6ere, Why?): t Projects are completed. Ratification is necessary to begin to collect assessments to help pay for the projects. a � +� ' DVANTAGESIFAPPROVED: Same as above. ��N 2 9 � ` ISADVAMAGESIFAPPROVED: Benefitted property owners have assessments payable via property taxes. ' ;� ISADVANTAGESIFNOTAPPROVED: To not assess the benefits would be inconsistent with City policy. r- OTALAi110UNTOFTRANSACCION: $ 148�L62 .Z1 COST/REVENUEBUDGETED{CIRCLEONE) YES NO � 585,618.01 PIA 1998 A�'rvmNUmsex: $62,644.20ASSESSiVIENTS .;� UNDING SOURCE: ANCIAL INFORMATION: (EXPLAIN) z � � �� t���U'��-- City of St. Paul � RESOLUTION APPROVING ASSESSMENT AND FIXING TII+fE OF HEARING THEREON COUNCIL FILE N0. � l `�� BY , File No. 98WALKS2 �' Assessment No. 0493 Voting Ward In the matter of the assessment of benefits, cost and expenses for Sidewalk Reconstruction (Work already done) (See attached) Preliminary Order:98-252, 98-404, 98-429,998-431,approved: April 1, 1998, May 6, 1998 98-433, 98-436, 98-678 May 13, 1998, May 20, 1998, July 22, 1998 Final Order 98-471, 98-500, 98-569, 98-571, approved: May 27, 1998, June 10, 98-573, 98-576, 98-749 1998, June 24, 1998, August 12, 1998 � assessment of benefits, cost and expenses for and in connection with the above improvement having been submitted to the Council, and the Council having considered same and found the said assessment satisfactory, therefore, be it RE50LVED, That the said assessment be and the same is hereby in all respects approved. RESOLVED FURTHER, That a public hearing be had on said assessment on the 25th d� of Auaust, 1999, at the hour of 5:30 P.M., in the Council Chamber of the Court House and City Hall Building, in the City of St. Paul; that the Valuation and Assessment Engineer give notice of said meetings, as required by the Charter, stating in said notice the time and place of hearing, the nature of the improvement, and the amount assessed against the lot or lots of the particular owner to whom the notice is directed. Yeas Nays Benanav �akey i/�ostrom � leman �farris �� try //Reiter Adopted by the Council: Date r l l y Certified Passed by Council Secretary BY� � ��,-�� �In Favor C��/�L1�/ �l�ll�f(6�� �Against `� Mayor / �� PIIAIISNFI9 �IUL 2 4 i999 �� �`�3 598005 S98034 598037 [.Y�:idc3'] S98041 [.Y�:ZI' % ►':1� �.•�..i S98045 598050 ':1.. 598067 ':1�: 598075 Sidewalk Reconstruction on the North Side of EAST T'HIRD STREET from Barclay Street to Hazelwood Street & the West Side HAZELWOOD STREET from East Third Street to Fremont Avenue at 1535 EAST THIRD ST'REET Only. Sidewalk Reconstruction on Both Sides DAYTON AVENCTE from North Syndicate Street to North Griggs Street. Sidewalk Reconstruction on Both Sides BELLOWS STREET from West Page Street to West Baker Street. Sidewalk Reconstruction on the South Side WEST EXCHANGE STREET from St. Peter Street to North Wabasha Street. Sidewalk Reconstruction with integral curb on the South Side MUI,BERRY STREET from Old Kellogg Boulevard to West Kellogg Boulevazd. Sidewalk Reconstruction on the North Side WEST PAGE STREET from Bellows STreet to Bidwell Street. Sidewalk Reconstruction on Both Sides WEST PAGE STREET from Charlton Street to Bellows Street. Sidewalk Reconstruction on Both Sides WEST ST'EVENS STREET from Winslow Avenue to Stryker Avenue. Sidewalk Reconstruction on Both Sides SOUTH VICTORIA STREET from Palace Avenue to James Avenue. Sidewalk Reconstruction on Both Sides EAST ROBIE STREET from Bancroft Avenue to approximaiely 240 feet East of Bancroft Avenue. Sidewalk Reconstruction on Both Sides NORTH DUNLAP STREET from Sherburne Avenue to Charles Avenue & the South Side CHARLES AVENUE from North Griggs Street to North Dunlap Street. Sidewalk Reconstruction on Both Sides SELBY AVENLTE from North Milton Street to North Victoria Street. Sidewalk Reconstruction on Both Sides THOMAS AVENUE from Farrington Street to Marion Street. Sidewalk Reconstruction on Both Sides BUSH AVENLTE from Atlantic Street to Johnson Parkway. �iG-co`k� 598076 Sidewalk Reconstruction on Both Sides NORTH RITI'H STREET from East Minnehaha Avenue to Reaney Avenue. 598077 Sidewalk Reconstruction on Both Sides NORTH WIIITE BEAR AVENUE from Fremont Avenue to Margazet Street. North Side EAST FIFTH STREET from North White Bear Avenue to North Hazel Street & South Side EAST FOURTH STREET from Flandrau Street to North White Bear Avenue. S98094 Sidewalk Reconstruction on Both Sides AURORA AVENUE from Nor[h Grotto Street to North St. Albans Street. S98108 Sidewalk Reconstruction on the West Side NORTH WHITE BEAR AVENLTE from Beech Street to East Minnehaha Avenue. S98125 Sidewalk Reconstruction on Both Sides DALY STREET from Iefferson Avenue to Palace Avenue. V(_ N i ' S Z9 T��` y� , T.M.S./REAL ESTATE DIVISION Date: Jane 10,1999 Green Sheet Number: 63714 ntad Person aod Phone Nam6er: EPARIMENi DIRECIOR C[IY COUNCIt, 1. 6j ` �i ll' L/ Peter White 266-8850 ATiO�Y �� � ry a GnA � IIDGESDIBECfOR FF[CEOFFINANCGV.SVCS t � V/1 att bt on Coontil Agenda by: A � + � YOR (OR ASSLSfAN1) i OiJNCII. Rrccsu�g OTAL # OF SIGNATURE PAG S 1 (CLIP ALL LOCATTONS FOR SIGNATURE) CTION REQUFSTED: ' etting date of public hearing for the ra 'hfication of assessments for sidewalk improvements in various ocations throughout the city. ile No. 98WALKS2 ASSESSMENT NO. 0493 OMMelvnwnOws:werxOVE(w)ORne.l�c7(tq ERSONALSERVICECONTRACfSMUSTANSWERTHEFOLLOWMG: . Has the personlfirm ever worked under a coatraet tor t6is department? YES NO rwrnr�NCrn��ss�on A srwtr . Has Nis persoNfirm ever bceo a City employee? YES NO crva sexvrce commrss�ox . Does t6is persodfirm possess a skill not normally pouessed by any YES NO C'scoMmm'ee eurrent City employee? Ezplain ali YES answers oo a separete sheet and attacA. ; UPPORTS WN[CH WUNCIL OBJECENE? Neighborhoods COUNCIL WARD(S) 1 2 7 DISTRICT PLANNING COUNCIL TTL4TiNG PROBLEM, ISSUE, OPPORT[TNTTY (Who, Wha4 w'heo, W6ere, Why?): t Projects are completed. Ratification is necessary to begin to collect assessments to help pay for the projects. a � +� ' DVANTAGESIFAPPROVED: Same as above. ��N 2 9 � ` ISADVAMAGESIFAPPROVED: Benefitted property owners have assessments payable via property taxes. ' ;� ISADVANTAGESIFNOTAPPROVED: To not assess the benefits would be inconsistent with City policy. r- OTALAi110UNTOFTRANSACCION: $ 148�L62 .Z1 COST/REVENUEBUDGETED{CIRCLEONE) YES NO � 585,618.01 PIA 1998 A�'rvmNUmsex: $62,644.20ASSESSiVIENTS .;� UNDING SOURCE: ANCIAL INFORMATION: (EXPLAIN) z � � �� t���U'��-- City of St. Paul � RESOLUTION APPROVING ASSESSMENT AND FIXING TII+fE OF HEARING THEREON COUNCIL FILE N0. � l `�� BY , File No. 98WALKS2 �' Assessment No. 0493 Voting Ward In the matter of the assessment of benefits, cost and expenses for Sidewalk Reconstruction (Work already done) (See attached) Preliminary Order:98-252, 98-404, 98-429,998-431,approved: April 1, 1998, May 6, 1998 98-433, 98-436, 98-678 May 13, 1998, May 20, 1998, July 22, 1998 Final Order 98-471, 98-500, 98-569, 98-571, approved: May 27, 1998, June 10, 98-573, 98-576, 98-749 1998, June 24, 1998, August 12, 1998 � assessment of benefits, cost and expenses for and in connection with the above improvement having been submitted to the Council, and the Council having considered same and found the said assessment satisfactory, therefore, be it RE50LVED, That the said assessment be and the same is hereby in all respects approved. RESOLVED FURTHER, That a public hearing be had on said assessment on the 25th d� of Auaust, 1999, at the hour of 5:30 P.M., in the Council Chamber of the Court House and City Hall Building, in the City of St. Paul; that the Valuation and Assessment Engineer give notice of said meetings, as required by the Charter, stating in said notice the time and place of hearing, the nature of the improvement, and the amount assessed against the lot or lots of the particular owner to whom the notice is directed. Yeas Nays Benanav �akey i/�ostrom � leman �farris �� try //Reiter Adopted by the Council: Date r l l y Certified Passed by Council Secretary BY� � ��,-�� �In Favor C��/�L1�/ �l�ll�f(6�� �Against `� Mayor / �� PIIAIISNFI9 �IUL 2 4 i999 �� �`�3 598005 S98034 598037 [.Y�:idc3'] S98041 [.Y�:ZI' % ►':1� �.•�..i S98045 598050 ':1.. 598067 ':1�: 598075 Sidewalk Reconstruction on the North Side of EAST T'HIRD STREET from Barclay Street to Hazelwood Street & the West Side HAZELWOOD STREET from East Third Street to Fremont Avenue at 1535 EAST THIRD ST'REET Only. Sidewalk Reconstruction on Both Sides DAYTON AVENCTE from North Syndicate Street to North Griggs Street. Sidewalk Reconstruction on Both Sides BELLOWS STREET from West Page Street to West Baker Street. Sidewalk Reconstruction on the South Side WEST EXCHANGE STREET from St. Peter Street to North Wabasha Street. Sidewalk Reconstruction with integral curb on the South Side MUI,BERRY STREET from Old Kellogg Boulevard to West Kellogg Boulevazd. Sidewalk Reconstruction on the North Side WEST PAGE STREET from Bellows STreet to Bidwell Street. Sidewalk Reconstruction on Both Sides WEST PAGE STREET from Charlton Street to Bellows Street. Sidewalk Reconstruction on Both Sides WEST ST'EVENS STREET from Winslow Avenue to Stryker Avenue. Sidewalk Reconstruction on Both Sides SOUTH VICTORIA STREET from Palace Avenue to James Avenue. Sidewalk Reconstruction on Both Sides EAST ROBIE STREET from Bancroft Avenue to approximaiely 240 feet East of Bancroft Avenue. Sidewalk Reconstruction on Both Sides NORTH DUNLAP STREET from Sherburne Avenue to Charles Avenue & the South Side CHARLES AVENUE from North Griggs Street to North Dunlap Street. Sidewalk Reconstruction on Both Sides SELBY AVENLTE from North Milton Street to North Victoria Street. Sidewalk Reconstruction on Both Sides THOMAS AVENUE from Farrington Street to Marion Street. Sidewalk Reconstruction on Both Sides BUSH AVENLTE from Atlantic Street to Johnson Parkway. �iG-co`k� 598076 Sidewalk Reconstruction on Both Sides NORTH RITI'H STREET from East Minnehaha Avenue to Reaney Avenue. 598077 Sidewalk Reconstruction on Both Sides NORTH WIIITE BEAR AVENUE from Fremont Avenue to Margazet Street. North Side EAST FIFTH STREET from North White Bear Avenue to North Hazel Street & South Side EAST FOURTH STREET from Flandrau Street to North White Bear Avenue. S98094 Sidewalk Reconstruction on Both Sides AURORA AVENUE from Nor[h Grotto Street to North St. Albans Street. S98108 Sidewalk Reconstruction on the West Side NORTH WHITE BEAR AVENLTE from Beech Street to East Minnehaha Avenue. S98125 Sidewalk Reconstruction on Both Sides DALY STREET from Iefferson Avenue to Palace Avenue. V(_ N i ' S Z9 T��` y� , T.M.S./REAL ESTATE DIVISION Date: Jane 10,1999 Green Sheet Number: 63714 ntad Person aod Phone Nam6er: EPARIMENi DIRECIOR C[IY COUNCIt, 1. 6j ` �i ll' L/ Peter White 266-8850 ATiO�Y �� � ry a GnA � IIDGESDIBECfOR FF[CEOFFINANCGV.SVCS t � V/1 att bt on Coontil Agenda by: A � + � YOR (OR ASSLSfAN1) i OiJNCII. Rrccsu�g OTAL # OF SIGNATURE PAG S 1 (CLIP ALL LOCATTONS FOR SIGNATURE) CTION REQUFSTED: ' etting date of public hearing for the ra 'hfication of assessments for sidewalk improvements in various ocations throughout the city. ile No. 98WALKS2 ASSESSMENT NO. 0493 OMMelvnwnOws:werxOVE(w)ORne.l�c7(tq ERSONALSERVICECONTRACfSMUSTANSWERTHEFOLLOWMG: . Has the personlfirm ever worked under a coatraet tor t6is department? YES NO rwrnr�NCrn��ss�on A srwtr . Has Nis persoNfirm ever bceo a City employee? YES NO crva sexvrce commrss�ox . Does t6is persodfirm possess a skill not normally pouessed by any YES NO C'scoMmm'ee eurrent City employee? Ezplain ali YES answers oo a separete sheet and attacA. ; UPPORTS WN[CH WUNCIL OBJECENE? Neighborhoods COUNCIL WARD(S) 1 2 7 DISTRICT PLANNING COUNCIL TTL4TiNG PROBLEM, ISSUE, OPPORT[TNTTY (Who, Wha4 w'heo, W6ere, Why?): t Projects are completed. Ratification is necessary to begin to collect assessments to help pay for the projects. a � +� ' DVANTAGESIFAPPROVED: Same as above. ��N 2 9 � ` ISADVAMAGESIFAPPROVED: Benefitted property owners have assessments payable via property taxes. ' ;� ISADVANTAGESIFNOTAPPROVED: To not assess the benefits would be inconsistent with City policy. r- OTALAi110UNTOFTRANSACCION: $ 148�L62 .Z1 COST/REVENUEBUDGETED{CIRCLEONE) YES NO � 585,618.01 PIA 1998 A�'rvmNUmsex: $62,644.20ASSESSiVIENTS .;� UNDING SOURCE: ANCIAL INFORMATION: (EXPLAIN) z � � �� t���U'��--