In the Matter o£ sidevPalk reconstruction at the following locations:
S99105 - South side Juliet Avenue from South Hamline Avenue to South Syndicate Street
at 1298, 1304 & 1306 Juliet Avenue.
S99106 - Both sides Woodlawn Avenue Prom Ford Parkway to Highland Parkway.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$8.65 per front foot for a
five (5) foot wide walk and $10.38 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Nem construction
(where no walk existed) - 100% of the actual cost estimated to be
approximately 53.87 per square foot.
All cosner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.23 per square foot.
The Council o£ the City of Saint Paul having received the report o£ the Mayor upon
the above improvement, and having considered said report, hereby resolves:
l. That the said report and the same is hereby approved with no alternatives, u�
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 1998 Public Improvement Aid.
2
3.
That a public hearing be had on said improvement on the 28 dav of Julv, 1999
5:30 o`clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPEI2SONS
Yeas Nays
✓ Benanav
� Blakey
✓ Bostrom
Coleman -- ���'�
� Harris
✓ Lantry
, Reiter
�.I�G
JUL 3 1999
�In Favor
/J Against
/ ./�5srnt
Adopted by Council: Date
Certified-�ass
1 Secretary
Mayor
sae�a��s
266�&t187
�
GREEN
+�''�� s �1 yy-���
ET No. �8065_--
JAA7E Nff1ALAATE
__ ❑CffVCWNCLL
_ ❑CrtraaK
_ �O
— a� �s� �6B3fG�1
—_ / _ �G.PALLIOCAT10M6lptllW�T{IRE) � � /t�ppATE
R :^�,!i7�!i�
�� . S
Reconstruct Siderya8c in WaW 3(See at�ed fist)
�-••�' PHiSOpAI SERVICE COp7AACTS W76T JIt�WHt THE FOLLOWNG CI�STIONS:
_Wt861VICECCMOSgON 7. ►YstltiSPe��eVarro�keCwNxaoonbaGfortldsCePerhreM?
YES t10
— 2 Fies tl�is pe�saNfmm everbeen a dly d�qbyee?
— YES ND
_ 8 Doss tl� persm?rtn possess a tlaY not nommly P�etl bY a^Y ewrent ciy' en4�%'ee?
� YES NO
4pWn a6 y�s arorr�rs on parab al�wt antl a�h 10 y�x� �trt
91NTlIfi Pfq91.EM.ISSUF.OPPORTIMfY (MIIIO. MM11�T. MIIEN. MRF17E. Mryfl'k
The Problem �tlefecfive sidewalk' was caused by mumpte problems. tree roots, Poor subgrade materials. freezeRhaw cycles, service
ife 6mits, chemical additives. euheme tempereture variations� etc. These problems oxur on a citywide basis and must be addressed
and corrected annuairy. Left unconected, the sidewalk condition would worsen to a state where it would be unusabie and subject to
M�xeased pedestrian injuries from faus and possible litigatia�s.
The community wili ber�efil irom this project because ft wili provide safe defect free sidewalks fw its citizens. The sidewalk coMracts
are done by private contradors generating private Sectw jobs as a resutt.
Historicaly, the sidewalk reconstnic6pr�s have peated rregative feedbadc because of cor�struction procedures atW assessments.
Property owners ques6on ttie assessmer�ts, despite the fact that up to one-half the assessrneM is City subsidized. Having to assess
for walk recons7uction remains a controversia4 issue.
T� oPb°^ �b a�bw the q�hastnrc[ure of sidewaUc stodc to deteriorate. which in tum, wiH generate rtare personal injury suits,
�esuiting in the expenditure of farger doilaz amounts in repairs and repiacemeM, as well as daim payouts.
Counc� Resea�ch C�nt°�
MAY 2 8 19�9
�
.
_ -, � . _� o�
v� .,a� — 77� �wv
C; Ct6 99 • 50,000
ORIG�NAL
City of St. Paul
�
RESOLUTION APPROVING ASSSSSMENT AND
aq - a4
CDUNCIL
By � a
FIXING TIN� OF HBARING TAEREON File No. 18831
Assessment No. 0651
Voting
Ward In the matter of the assessment of benefits, cost and e�enses for
2 painting the skyway bridges in downtown, Saint Paul.
Preliminary Order: 96-675 approved 3une 12, 1996
Final Order: 96-801 approved Julv 10, 1996
The assessments of benefits, cost and expenses for and in connection
with the above improvement having been submitted to the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on
the 28th day of July, 1999, at the hour of Five thirty o'clock P.M., in the
Council Chamber of the Court House and City Hall Building, in the City of St.
Paul; that the Valuation and Assessment Engineer give notice of said
meetings, as required by the Charter, stating in said notice the time and
place of hearing, the nature of the improvement, and the amount assessed
against the lot or lots of the particular owner to whom the notice is
directed.
the
Ye�s Nays
� " Benanav
� Blakey
�—" Bostrom
Coleman.- 9����T
✓ Harris _/�In Favor
� Lantry
� Reiter � Against
/ �6 SP>rt
_ed/Passed
C� 7�../
U/i?�� 9 /99-�1
Council Secretary
Mayor
PUA[ISHFh
JUL 3 �999
�� �►ntilicHearing Date: 7t28l99 - a
�T.M.SJREAi, ESTA'�'E. DIVISION ��` . Grcen Sheet Nnmber. 63020
- -- nsrwara�nrrn�cros cirrcomvcu, -
� - Person - ae Namber a
- ._ � ' � v �rerm�r carcqaa�c
�
��er �VLite`�� 266-8853 Bimcern�croa FIN. & MGT. SVG DIR. �
��� �
MAYOB(OBASSSGNT) 1 CODNCII.YFCeenCg
nst be on Coancil Agenda by: 06/09/99
AL A OF SIGNATURE pAGES 2 (QdP ALI, IACAT[ONS FOR SIGNAtORE)
AEQUESIEDc
ettiag date of public heariag for the ratification of asaessmeats for the
aa.ntiag of the skyway bridges ia dowatowa Saiat Paui.
= ile Ido. 18831 Assesemea.t No. 0651
ATIONS: APPAOVE (A) OR RE7ECf (R) ERSONAL SERVICE CON7RAG15 MUST ANSWER 1'HE FOLLOWA'G:
. Hu ihe peraont6rm ever worlctd mder a rnntraU tor ttiis deqrtment? - YES NO
rw+nu+cco�.n.�oK A sTNm
Has this pe[soolfirm erer ban a Gtty employee? Y6S NO
�: rnn.soeviceeo�ss�o�c
��� . Does tLis persoo/firm poasess a akill not oormally possessed by any YES NO
current City employee?
cmco�nrree
Ezplaio e1! YES answers on a sepante sheet and attaeh.
� PORTS WffiCH COUNCII. OBdECTIYE?
Neighborhoods
�. CODNCII� WARD(3) Z _ D33fRiCT PI.ANNING COUNCII. 17
�
�b
17NG PROBLEM, ISSUE, OPPOR7'[INITY (Who, What, When Where, Wdy?):
-- roject is completed. Ratification is aecessary ia order to begia collectiag
ssessmeate to help pay for the project.
YANTAGES IF AYPROVED:
�� ame as above.
�
�, ISADVANfAGESIFAPPROVED:
�
�` eaefitted property owaers have assessmeats payable via property taxes.
�
Sn
�; ISADVANTAGFSIFNOTAPPROVED:
o aot assess the beaefits would be inconsistent with City policy.
�
�, ALAMOUNfOF1RANSAGI'[ON: $`j']]„ �'���USSVncET�n(e�ec[,�a�> �s No
p
Assessments onlyl
�re souxcE: Councti Research Gentet
ACfIV1TY 1VOA�ER
,+��.���,TTaN: c�►.,�,, MAY 101999
/
,.;. �:v
CITY OF ST. PAUL CO L F L� ���l _i5
PRELIMINARY ORDER By �
File No. 59 1�& 599106
ORIG�NAL Voting Ward_ 3 �
�
In the Matter o£ sidevPalk reconstruction at the following locations:
S99105 - South side Juliet Avenue from South Hamline Avenue to South Syndicate Street
at 1298, 1304 & 1306 Juliet Avenue.
S99106 - Both sides Woodlawn Avenue Prom Ford Parkway to Highland Parkway.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$8.65 per front foot for a
five (5) foot wide walk and $10.38 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Nem construction
(where no walk existed) - 100% of the actual cost estimated to be
approximately 53.87 per square foot.
All cosner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.23 per square foot.
The Council o£ the City of Saint Paul having received the report o£ the Mayor upon
the above improvement, and having considered said report, hereby resolves:
l. That the said report and the same is hereby approved with no alternatives, u�
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 1998 Public Improvement Aid.
2
3.
That a public hearing be had on said improvement on the 28 dav of Julv, 1999
5:30 o`clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPEI2SONS
Yeas Nays
✓ Benanav
� Blakey
✓ Bostrom
Coleman -- ���'�
� Harris
✓ Lantry
, Reiter
�.I�G
JUL 3 1999
�In Favor
/J Against
/ ./�5srnt
Adopted by Council: Date
Certified-�ass
1 Secretary
Mayor
sae�a��s
266�&t187
�
GREEN
+�''�� s �1 yy-���
ET No. �8065_--
JAA7E Nff1ALAATE
__ ❑CffVCWNCLL
_ ❑CrtraaK
_ �O
— a� �s� �6B3fG�1
—_ / _ �G.PALLIOCAT10M6lptllW�T{IRE) � � /t�ppATE
R :^�,!i7�!i�
�� . S
Reconstruct Siderya8c in WaW 3(See at�ed fist)
�-••�' PHiSOpAI SERVICE COp7AACTS W76T JIt�WHt THE FOLLOWNG CI�STIONS:
_Wt861VICECCMOSgON 7. ►YstltiSPe��eVarro�keCwNxaoonbaGfortldsCePerhreM?
YES t10
— 2 Fies tl�is pe�saNfmm everbeen a dly d�qbyee?
— YES ND
_ 8 Doss tl� persm?rtn possess a tlaY not nommly P�etl bY a^Y ewrent ciy' en4�%'ee?
� YES NO
4pWn a6 y�s arorr�rs on parab al�wt antl a�h 10 y�x� �trt
91NTlIfi Pfq91.EM.ISSUF.OPPORTIMfY (MIIIO. MM11�T. MIIEN. MRF17E. Mryfl'k
The Problem �tlefecfive sidewalk' was caused by mumpte problems. tree roots, Poor subgrade materials. freezeRhaw cycles, service
ife 6mits, chemical additives. euheme tempereture variations� etc. These problems oxur on a citywide basis and must be addressed
and corrected annuairy. Left unconected, the sidewalk condition would worsen to a state where it would be unusabie and subject to
M�xeased pedestrian injuries from faus and possible litigatia�s.
The community wili ber�efil irom this project because ft wili provide safe defect free sidewalks fw its citizens. The sidewalk coMracts
are done by private contradors generating private Sectw jobs as a resutt.
Historicaly, the sidewalk reconstnic6pr�s have peated rregative feedbadc because of cor�struction procedures atW assessments.
Property owners ques6on ttie assessmer�ts, despite the fact that up to one-half the assessrneM is City subsidized. Having to assess
for walk recons7uction remains a controversia4 issue.
T� oPb°^ �b a�bw the q�hastnrc[ure of sidewaUc stodc to deteriorate. which in tum, wiH generate rtare personal injury suits,
�esuiting in the expenditure of farger doilaz amounts in repairs and repiacemeM, as well as daim payouts.
Counc� Resea�ch C�nt°�
MAY 2 8 19�9
�
.
_ -, � . _� o�
v� .,a� — 77� �wv
C; Ct6 99 • 50,000
ORIG�NAL
City of St. Paul
�
RESOLUTION APPROVING ASSSSSMENT AND
aq - a4
CDUNCIL
By � a
FIXING TIN� OF HBARING TAEREON File No. 18831
Assessment No. 0651
Voting
Ward In the matter of the assessment of benefits, cost and e�enses for
2 painting the skyway bridges in downtown, Saint Paul.
Preliminary Order: 96-675 approved 3une 12, 1996
Final Order: 96-801 approved Julv 10, 1996
The assessments of benefits, cost and expenses for and in connection
with the above improvement having been submitted to the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on
the 28th day of July, 1999, at the hour of Five thirty o'clock P.M., in the
Council Chamber of the Court House and City Hall Building, in the City of St.
Paul; that the Valuation and Assessment Engineer give notice of said
meetings, as required by the Charter, stating in said notice the time and
place of hearing, the nature of the improvement, and the amount assessed
against the lot or lots of the particular owner to whom the notice is
directed.
the
Ye�s Nays
� " Benanav
� Blakey
�—" Bostrom
Coleman.- 9����T
✓ Harris _/�In Favor
� Lantry
� Reiter � Against
/ �6 SP>rt
_ed/Passed
C� 7�../
U/i?�� 9 /99-�1
Council Secretary
Mayor
PUA[ISHFh
JUL 3 �999
�� �►ntilicHearing Date: 7t28l99 - a
�T.M.SJREAi, ESTA'�'E. DIVISION ��` . Grcen Sheet Nnmber. 63020
- -- nsrwara�nrrn�cros cirrcomvcu, -
� - Person - ae Namber a
- ._ � ' � v �rerm�r carcqaa�c
�
��er �VLite`�� 266-8853 Bimcern�croa FIN. & MGT. SVG DIR. �
��� �
MAYOB(OBASSSGNT) 1 CODNCII.YFCeenCg
nst be on Coancil Agenda by: 06/09/99
AL A OF SIGNATURE pAGES 2 (QdP ALI, IACAT[ONS FOR SIGNAtORE)
AEQUESIEDc
ettiag date of public heariag for the ratification of asaessmeats for the
aa.ntiag of the skyway bridges ia dowatowa Saiat Paui.
= ile Ido. 18831 Assesemea.t No. 0651
ATIONS: APPAOVE (A) OR RE7ECf (R) ERSONAL SERVICE CON7RAG15 MUST ANSWER 1'HE FOLLOWA'G:
. Hu ihe peraont6rm ever worlctd mder a rnntraU tor ttiis deqrtment? - YES NO
rw+nu+cco�.n.�oK A sTNm
Has this pe[soolfirm erer ban a Gtty employee? Y6S NO
�: rnn.soeviceeo�ss�o�c
��� . Does tLis persoo/firm poasess a akill not oormally possessed by any YES NO
current City employee?
cmco�nrree
Ezplaio e1! YES answers on a sepante sheet and attaeh.
� PORTS WffiCH COUNCII. OBdECTIYE?
Neighborhoods
�. CODNCII� WARD(3) Z _ D33fRiCT PI.ANNING COUNCII. 17
�
�b
17NG PROBLEM, ISSUE, OPPOR7'[INITY (Who, What, When Where, Wdy?):
-- roject is completed. Ratification is aecessary ia order to begia collectiag
ssessmeate to help pay for the project.
YANTAGES IF AYPROVED:
�� ame as above.
�
�, ISADVANfAGESIFAPPROVED:
�
�` eaefitted property owaers have assessmeats payable via property taxes.
�
Sn
�; ISADVANTAGFSIFNOTAPPROVED:
o aot assess the beaefits would be inconsistent with City policy.
�
�, ALAMOUNfOF1RANSAGI'[ON: $`j']]„ �'���USSVncET�n(e�ec[,�a�> �s No
p
Assessments onlyl
�re souxcE: Councti Research Gentet
ACfIV1TY 1VOA�ER
,+��.���,TTaN: c�►.,�,, MAY 101999
/
,.;. �:v
CITY OF ST. PAUL CO L F L� ���l _i5
PRELIMINARY ORDER By �
File No. 59 1�& 599106
ORIG�NAL Voting Ward_ 3 �
�
In the Matter o£ sidevPalk reconstruction at the following locations:
S99105 - South side Juliet Avenue from South Hamline Avenue to South Syndicate Street
at 1298, 1304 & 1306 Juliet Avenue.
S99106 - Both sides Woodlawn Avenue Prom Ford Parkway to Highland Parkway.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$8.65 per front foot for a
five (5) foot wide walk and $10.38 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Nem construction
(where no walk existed) - 100% of the actual cost estimated to be
approximately 53.87 per square foot.
All cosner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.23 per square foot.
The Council o£ the City of Saint Paul having received the report o£ the Mayor upon
the above improvement, and having considered said report, hereby resolves:
l. That the said report and the same is hereby approved with no alternatives, u�
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 1998 Public Improvement Aid.
2
3.
That a public hearing be had on said improvement on the 28 dav of Julv, 1999
5:30 o`clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPEI2SONS
Yeas Nays
✓ Benanav
� Blakey
✓ Bostrom
Coleman -- ���'�
� Harris
✓ Lantry
, Reiter
�.I�G
JUL 3 1999
�In Favor
/J Against
/ ./�5srnt
Adopted by Council: Date
Certified-�ass
1 Secretary
Mayor
sae�a��s
266�&t187
�
GREEN
+�''�� s �1 yy-���
ET No. �8065_--
JAA7E Nff1ALAATE
__ ❑CffVCWNCLL
_ ❑CrtraaK
_ �O
— a� �s� �6B3fG�1
—_ / _ �G.PALLIOCAT10M6lptllW�T{IRE) � � /t�ppATE
R :^�,!i7�!i�
�� . S
Reconstruct Siderya8c in WaW 3(See at�ed fist)
�-••�' PHiSOpAI SERVICE COp7AACTS W76T JIt�WHt THE FOLLOWNG CI�STIONS:
_Wt861VICECCMOSgON 7. ►YstltiSPe��eVarro�keCwNxaoonbaGfortldsCePerhreM?
YES t10
— 2 Fies tl�is pe�saNfmm everbeen a dly d�qbyee?
— YES ND
_ 8 Doss tl� persm?rtn possess a tlaY not nommly P�etl bY a^Y ewrent ciy' en4�%'ee?
� YES NO
4pWn a6 y�s arorr�rs on parab al�wt antl a�h 10 y�x� �trt
91NTlIfi Pfq91.EM.ISSUF.OPPORTIMfY (MIIIO. MM11�T. MIIEN. MRF17E. Mryfl'k
The Problem �tlefecfive sidewalk' was caused by mumpte problems. tree roots, Poor subgrade materials. freezeRhaw cycles, service
ife 6mits, chemical additives. euheme tempereture variations� etc. These problems oxur on a citywide basis and must be addressed
and corrected annuairy. Left unconected, the sidewalk condition would worsen to a state where it would be unusabie and subject to
M�xeased pedestrian injuries from faus and possible litigatia�s.
The community wili ber�efil irom this project because ft wili provide safe defect free sidewalks fw its citizens. The sidewalk coMracts
are done by private contradors generating private Sectw jobs as a resutt.
Historicaly, the sidewalk reconstnic6pr�s have peated rregative feedbadc because of cor�struction procedures atW assessments.
Property owners ques6on ttie assessmer�ts, despite the fact that up to one-half the assessrneM is City subsidized. Having to assess
for walk recons7uction remains a controversia4 issue.
T� oPb°^ �b a�bw the q�hastnrc[ure of sidewaUc stodc to deteriorate. which in tum, wiH generate rtare personal injury suits,
�esuiting in the expenditure of farger doilaz amounts in repairs and repiacemeM, as well as daim payouts.
Counc� Resea�ch C�nt°�
MAY 2 8 19�9
�
.
_ -, � . _� o�
v� .,a� — 77� �wv
C; Ct6 99 • 50,000
ORIG�NAL
City of St. Paul
�
RESOLUTION APPROVING ASSSSSMENT AND
aq - a4
CDUNCIL
By � a
FIXING TIN� OF HBARING TAEREON File No. 18831
Assessment No. 0651
Voting
Ward In the matter of the assessment of benefits, cost and e�enses for
2 painting the skyway bridges in downtown, Saint Paul.
Preliminary Order: 96-675 approved 3une 12, 1996
Final Order: 96-801 approved Julv 10, 1996
The assessments of benefits, cost and expenses for and in connection
with the above improvement having been submitted to the Council having
considered same and found the said assessment satisfactory, therefore, be it
RESOLVED,That the said assessment be and the same is hereby in all
respects approved.
RESOLVED FURTHER, That a public hearing be had on said assessment on
the 28th day of July, 1999, at the hour of Five thirty o'clock P.M., in the
Council Chamber of the Court House and City Hall Building, in the City of St.
Paul; that the Valuation and Assessment Engineer give notice of said
meetings, as required by the Charter, stating in said notice the time and
place of hearing, the nature of the improvement, and the amount assessed
against the lot or lots of the particular owner to whom the notice is
directed.
the
Ye�s Nays
� " Benanav
� Blakey
�—" Bostrom
Coleman.- 9����T
✓ Harris _/�In Favor
� Lantry
� Reiter � Against
/ �6 SP>rt
_ed/Passed
C� 7�../
U/i?�� 9 /99-�1
Council Secretary
Mayor
PUA[ISHFh
JUL 3 �999
�� �►ntilicHearing Date: 7t28l99 - a
�T.M.SJREAi, ESTA'�'E. DIVISION ��` . Grcen Sheet Nnmber. 63020
- -- nsrwara�nrrn�cros cirrcomvcu, -
� - Person - ae Namber a
- ._ � ' � v �rerm�r carcqaa�c
�
��er �VLite`�� 266-8853 Bimcern�croa FIN. & MGT. SVG DIR. �
��� �
MAYOB(OBASSSGNT) 1 CODNCII.YFCeenCg
nst be on Coancil Agenda by: 06/09/99
AL A OF SIGNATURE pAGES 2 (QdP ALI, IACAT[ONS FOR SIGNAtORE)
AEQUESIEDc
ettiag date of public heariag for the ratification of asaessmeats for the
aa.ntiag of the skyway bridges ia dowatowa Saiat Paui.
= ile Ido. 18831 Assesemea.t No. 0651
ATIONS: APPAOVE (A) OR RE7ECf (R) ERSONAL SERVICE CON7RAG15 MUST ANSWER 1'HE FOLLOWA'G:
. Hu ihe peraont6rm ever worlctd mder a rnntraU tor ttiis deqrtment? - YES NO
rw+nu+cco�.n.�oK A sTNm
Has this pe[soolfirm erer ban a Gtty employee? Y6S NO
�: rnn.soeviceeo�ss�o�c
��� . Does tLis persoo/firm poasess a akill not oormally possessed by any YES NO
current City employee?
cmco�nrree
Ezplaio e1! YES answers on a sepante sheet and attaeh.
� PORTS WffiCH COUNCII. OBdECTIYE?
Neighborhoods
�. CODNCII� WARD(3) Z _ D33fRiCT PI.ANNING COUNCII. 17
�
�b
17NG PROBLEM, ISSUE, OPPOR7'[INITY (Who, What, When Where, Wdy?):
-- roject is completed. Ratification is aecessary ia order to begia collectiag
ssessmeate to help pay for the project.
YANTAGES IF AYPROVED:
�� ame as above.
�
�, ISADVANfAGESIFAPPROVED:
�
�` eaefitted property owaers have assessmeats payable via property taxes.
�
Sn
�; ISADVANTAGFSIFNOTAPPROVED:
o aot assess the beaefits would be inconsistent with City policy.
�
�, ALAMOUNfOF1RANSAGI'[ON: $`j']]„ �'���USSVncET�n(e�ec[,�a�> �s No
p
Assessments onlyl
�re souxcE: Councti Research Gentet
ACfIV1TY 1VOA�ER
,+��.���,TTaN: c�►.,�,, MAY 101999