D00737•
•
PROJECT: Saint Paul Civic Center
Expansion Project
Saint Paul, Minnesota
CONTRACTOR Edward Kraemer 8� Sons
1020 West Cliff Road
Burnsviile, MN 55337
Original Contract Amount $5,317,785.70
CO No. Deduct Add
C1.1 14,844.30
C 1.2 7,104.85
C1.3 28,810.80
C1.4 9,928.70
C 1.5 24241.68
Subtota� .00 �84.930.33
DATE ISSUED: 15 August 1995
CONTRACT NO.: CP-1
CONTRACT TITLE: Demolition, Excavation 8�
Bridge Construction
CONTRACT DATE: 29 March 1995
Net Amount of Contract
including this Change Order: $5,402,716.03
•
r� S
•
June 30, 1995
Susan Jones
CPMI
f.A. O'Shaughnessy P{aza
143 W. Fourth Street
St. Paul, MN 55102-1299
����
32 s-5�oi.3
K �
EBWARD
KRAEMER
& SONS,
INC.
Re: C.P. 1, St. Pauf Civic Center Demolition, Excavation and Bridge Gonstruction
Concrete Removal in West Bound Kellogg Boulevard
DearSusan:
As a foilow up to our fetter of June 28th, 1995, regarding the reinforced concrete
• pavement encountered on west bound Kellogg Blvd. during Siage 11 removais, we are
submitting our cost for the extra work.
Please review and issue a contract change order for this work. As of this date we stiA
have not received a contraot change order for the concrete pavement removal on
Stage 1 that was submitted on 5119195.
/
If you should have any questions, pfease contact me at (612) 890-2820.
Sincerely,
���
Jerry A. Voiz
Regional Operations Manager
enc.
cc: Mike Moe11er1Ames
CONSTRUCTION D/VISION �
1020WEST CIIfF ROAD BURNSVILLE, MWNESOTA 33337 612-84Q-2820 FAX- 612-8942996
� AnE9wlpppom�myEmPbY�� �....�
�
JUC'.29'95 16:23 FR AMES HURNSVILLE
CJ
_ �
7une 29,1995
612 435 7142 TO KRREMER HVILLE P.01i01
C�-�ae)
AMES CONSTRUCTION, INC. �� l
14420 COUNTY ROAD 5
BI3RNSVII.LE, MLNNFSOTA 55306
(612) 435-'7106 • FAX 435-7742
Eciward Kraemcr & Sons, Inc.
1Q2Q WestCliffRoad
Burnsville, Minnesota 55337
Atteation: Jexry Volz, Regional Mana$et
Subject Concrete Removat in West Bound Kellogg Bouievsrd
Saint Yaul Givic Center �xpansion
Cp-1 Demo, F.xca�ation & Bridge Construction
Dear Jerry:
As per our previaus letters conceming the reinForced concrete in east bound Keilogg Boulevard,
� we azs scefdng additiona! compensation for the concrete paving encouutered during demoliGon
ofthe west bound Kefiogg Baulevard in Phasc II af the referenced project.
As outtined ia previous correspandeace, onr additionai cost for removal of this material is $9.72
P� $9� Y� The total exGa cost is thereforc 2,494 �qaare yards at $9.72 or $24,241.68. T6is
conczete paving was verified in the field by Eriks L.udins. It is our request that a change order be
issued for this amamt
If you have any questians, pleasc give me a ca1L
Sinccrely,
� I�-^� �
M'ichael Moeller
Project Manager.
/
M��n�
OPPiCES 7N: DfiNVp3, CO[ARAT�O • PA08NDC. AWZONiA � 5AL? L�iK6 CS1Y. Vl'AH
** TOTRL PAGE.H01 �*
•
lJ
t
R'S PROPO-S-AL __ __
Contractor Proposaf No.: / ✓ Date:
Project:�ain[ Paui Civic Center Contract No.:.
A change in the scope of the work is requested as indicated befow:
It +s requested the completion date be ( extended, () decreased, !) unchanged by _
calendar days_ The adjusted compietion date wi(i be cu,n..�.� b� � o�...
2. Description of the change: (Refer to drawings, specifications, addenda, if applicable}.
{Reference RFP No.: • CCD No.: • FO No.: 1
Basis ot payment: ICheck one) S�
( y Firm price for performing tfiis change is ....:...............................$ Z55toS
Adequate supporting detaiis and information (Increased educt)
must 6e attached to atlow Owner to evaluate_
() Time and material per contract, but not to exceed $
( 1 Acival cost at compietion of work S
Submitted 6y: �cii.,�a¢,� K-¢'�+aw..�- � S�.- � Date: � � s
Contractor
� A�1��
Corttractor Sig ature
FOR CPMI USE
Action Recommended: lCheck one)
() Change witl not be made. Explain:
2.
CPMt Job No.: 3225
( l Proceed on the following basis:
() As indicated above, change and basis of payment is acceptable.
() Change is acceptabte, basis of payment is not acceptable.
{) Basis of payment shafi be $
(� The follawing modification is recommended:
(� Change in completion date is accepted.
( y Change is acceptable with no. change in price.
() Change is acceptabie with no change in completion date.
Reasonfor Change:
( � Design Change i! Client Request i) F�eld Condition
() Suggested by Contractor () Design Omission or Other (expiain)
3. Is this a part of the originaal contract scope? () YES ( 1 NO
4. Is Contractor's Estimate attached? () YES 1) NO
5. AIE consulted. () YES () fV0
Prepared by: CPMq
Approved by (HGA)
Approved by (Owner!
cc:
Eriks Ludins 3225-
Date:
Date:
3225- Bl
SAINT PAUL CIVIC CENTER EXPANSION
�
•
.
BREAKDOWN SHEET
CONTRACTOR'S PROPOSAL
SAINT PAUL CIVIC CENTER EXPANStON
LABOR, MATERIAL & EQUIPMENT
DIRECT EMPLOYEE LABOR
MATERIALS & EQUIPMENT INCORPORATED
TOTAL LAB & MATERIAL & EQUIPMENT
15% FEE
TOTAL LABOR, MATERIAL, EQUIP., & FEE
�
S
S
SUBCONTRACTORS $
5%FEE Z4 Sy �. � � S
\
SOTALSUBCONTRACTORS & FEE
OTHER COSTS
TRAVEL & SUSSISTENCE
MATERIALS & EQUIPMENT NOT INCORPORATED
RENTALS
TAXES
PERMITS & LICENSE FEES
UTILITIES, FUEL, FAC{LITIES AT SITE
INCIDENTALEXPENSES
BOfVD & INSURANCE PROVISfONS
TOTAL OTHER COSTS
TOTAL OF CHANGE PROPOSAL
S
S
5
S
S
S
S
��3�1
$
S °
s 'zS S b3
$ ZS sb3�
SAINT PAUL CIVIC CENTER EXPANSION