89-2170 � �i
��- � g �
CITY OF ST,PAUL COUN_ E N .! ��f �
FINAL ORDER �/�' � " '
�` ��-'��
F' No. 185�3
Voting In the Matter of iaprotitis�g tb� foll g atrs�ta �rith a bitmeinous pavin;.
Ward °coacrete curb a�d �nttera, c ncrete drivevsya aad oaL�ral. �ad
coaatrnctiag a lantera style street ligbting s�st�:
5
Azaadel �tre�t froa pt A�m� to �e�lael� partv�g
Cabans�y Street fxoa braaka Aveuie� to iih�eloct Parlar�y
Cottsgs Avent�e fr� cknbin Str�et t� �elact PartNay
C�rlsad Strset fro� bzeal�a Avea�a to Arl3ngtoa Av4nus
Galtier Street fr+o� linston Aves�ae to I bloct saut� of Cottage Ars.
�ebraska �v�nne froaa laabiA Stx��t to T�aelott Yartiray
Qestara Mneeaae fros brasta Avesue to Ar2ingion A�enn�
. Hh�elack �ark�ay fr+o: hwsis�� Sireet to Arlington A�enue
ell to be kaowa aa Ehe Arli tem/Wi�stera Area Street Paving aad
Ligbtiag Prc��ct.
.
under Preliminary Order —�7� approved �� � ���
The Council of the City of Saint Paul has con cted a public hearing upon the above improvement, due notice
thereof having been given as prescribed by the City C rter; and
WHEREAS, The Council has heard all persons, obj ctions and recommendations pertaining to said proposed improve-
ment and has fuliy considered the same; now, therefor , be it
RESOLVED, That the Council of the City of Sa nt Paul does hereby order that the above-described improvement
be made, and the proper City officers are hereby direct and authorized to proceed with fhe improvement; and be it
FURTHER RESOLVED, That upon the comple ion of said improvement, the proper City officers shall calculate
all expenses incurred therein and shall report the same to he City Council in accordance with Chapter 14 of the City Charter.
CO Njl,CIL�ERSON Adopted by the Council: Date JAN � ��?v
Yeasvl�a Nays
���s Certified s by Council ecretary
Lo
� yaC���� In Favor By
_�be�l .��-7->�� � �
'�" ��� Against
iillson JAN � 0 1�90 Mayor
1'U6l,fSNEp JA N 2 p 199Q
� JAN 2'fi 1��0
� � . -
sw� ' , � � r . ��
, �� �/
SiJNIIKARY OF fiNG NEERING RECONII�9ENDATIONS
Arlington/Western torm Sewer & Paving Pro�ect
. Pro�ect No. 90 5-8061 (P-8046, V-8046)
Report Prepar d - September 25, 1989
Neighborhood Informati nal Meeting - October , 1989
Public Heari - December 12, 1989
SEH ile No. 89086
PROJECT•
The pro�ect is bounded by N braska, Wheelock Parkway, Mackuben,
and Marion. Construction of a storm sewer, sewer connections and
reconnections, street improv ments and a roadway lighting system.
(See attached vicinity and 1 cation maps) .
INITIATING ACTION:
The project is part of th City of St. Paul Combined Sewer
Separation pro�ect.
ERISTING CONDITIONS:
Many of the streets within t e pro�ect area have an oiled roadway
surface with no curb. The d iving surfaces are fair to poor and
roadway widths vary because f lack of curb.
Some of the streets within t e pro�ect area have curb. However,
attempts made to salvage ld curb when reconstructing road
surfaces have been unsuccess ul in the past; therefore, we are
proposing to remove existin curb and construct new curb and
gutter on oiled streets.
Wheelock Parkway is propose to be reconstructed in the near
future. The construction o storm sewer along the segment of
Wheelock Parkway between C hansey and Western will severely
impact the existing surfac . Total reconstruction of this
segment of Wheelock Parkway n con�unction with the storm sewer
construction should prove mo e economical due to the elimination
of an expensive temporary pat h system.
Many of the streets have exi ting boulevard trees. All efforts
will be made to protect e trees during construction and
boulevard grading.
However, four exiting trees fall within the proposed curb and
gutter and may need to be emoved to facilitate construction.
The tree locations are as fol ows:
(3) N.W. Corner of Galt er & Cottage ( 18", 20", 14" )
( 1 ) N.W. Corner of Cott ge & Arundel ( 14" )
. . . . D
ro ' . �• '. ' . C��j_ ���
PROPOSED IMPROVEMENTS:
Street lighting, improvement are proposed for:
) � /wD WESTE2W "CO VIR(q)M 1 A
✓Ne�.�aska (Mackuben to C hansey) GoH••�,S�`/
Id�e'br'aaka �tage (Macku en to W�ree�oeic)
,�effiansey (Neb�aska to W eelock Parkway)
-Afundel (Hoyt to Wheelo k Parkway)
.:�umberland (Nebraska to Arlington)
-6al�tier (Arlington to C ttage)
Storm sewer construction and restoration in kind is proposed for
following streets:
Arlington (Arundel to M rion
Cottage (Virginia to Ma ilda)
Far�tington (Arlington t railroad)
Street, lighting and storm s er improvements are proposed for:
Nebraska (Cohansey to W stern)
Western (Nebraska to Ar ington)
-��tage (Cohansey to Wh lock Parkway)
W.heelock Parkway (Cohan y to Arlington)
G,a���tier (Cottage to 1 b ck south)
Typical street section for r constructed streets will consist of
a 30 foot wide roadway. City normal standard is 32 feet.
However, since sheets in th area are primarily residential in
use and to protect boulevard rees 30' streets are proposed.
Existing power poles wil be relocated as necessary to
accommodate roadway widths.
Actual style of lighting is t to be determined.
All driveway aprons will be constructed with concrete and a new
outwalk will be constructed or each home. New energy efficient
sodium vapor lighting syste will be installed. Trees will be
planted in the boulevard area as needed to reforest the area.
ALTERNATfiS:
To do nothing would be incons stent with the City's commitment to
improve existing oiled stre ts, and to separate the combined
sewers. Constructing sewers without street improvements has not
been effective in the past, in that the existing oiled streets
are not capable of withs anding the construction activity
necessary to construct the s wers, and merely restore the trench
areas. Improving the ro dways in con�unction with sewer
construction will save time, oney and inconvenience later.
� - = �� � • C��ai7a
POSITIVE BENEFITS:
With the completion of the ity's sewer pro�ect, the chance of
sewer backups into baseme ts and surface flooding will be
. reduced, and after rainleade disconnections, sewer backups into
basements will be eliminated General improvement of the public
right-of-way in conjunction ith street construction and lighting
improvements will enhance a d add quality to the neighborhood.
Street oiling would be elimi ated on new bituminous roadways.
ADVERSE EFFSCTS•
Normal problems associated with construction, such as noise,
dust, and general disruption will be present.
Wheelock Parkway and Arling on Avenue will be closed to through
traffic during construction.
Temporary parking bans and treet closures on remaining streets
will be imposed during v ious stages of the construction.
However, local access will e provided as often as construction
permits. Continuous acce s will be provided to emergency
vehicles.
Four existing boulevard t ees may need to be removed to
facilitate roadway construc ion. Final decision will be made
following inspection by City Forester.
Partial costs of street, 1 ghting and storm sewer improvement
costs will be assessed to ab tting property owners.
TIME SCHEDULE:
This pro�ect has been ident fied on the "reserve" project list
and depending on State and F deral funding may not be constructed
until 1991. In either case he following sequence would apply.
The construction is anticipa ed to begin around June and continue
to October.
- . �� ����
COST ESTIMATES:
S-8061 Arlin ton/Western Sto m Sewer
, Construction & Eng'neering $ 900,000.00
P-8046 Arlin ton/Western Gra in & Pavin
Construction & Eng neering $ 825,000.00
V-8046 Arlin ton/Western Li tin
Construction & Eng neering $ 120,000.00
Total: $1,845,000.00
ESTIMATED FINANCING:
5-8061 Sewer
Federal Grants & L ans $ 150, 100.00
State & Grants & L ans 181,700.00
Sewer Revenue Bond 501,200.00
Assessments 67,000.00
P-8046 Paving
Assessments $ 166,000.00
Sewer Revenue Honds 359,000.00
CIB (1990) 300,000.00
V-8046 Lighting
Assessments $ 50,000.00
CIB ( 1990) 70,000.00
Total: $1,845,000.00
Assessment Rates:
Lighting $4.�Q per ront foot � 3, `�o � �-►� �-�
Paving & Streets $1 .00 per front foot
Storm Sewer $0.03 p r square foot (residential)
$0.075 p r square foot (commercial)
�. . N � . . .
.i . , � � � � / /'r'� -` �P /�O
\/�r.�
SOURCB OF ADDITIONAL INFORMA ION:
For additional information, ntact:
. General: Thomas Kuhfel (298-5317)
Mike Kraemer, hort-Elliott-Hendrickson, Inc.
(484-0272)
Lighting: Mike Kasson (2 2-6293)
RfiCO1�IENDATION•
This segment of the City's c mbined sewer separation will expand
the opportunity to simultaneo sly improve roadway surfaces.
The coordination of these fforts will result in long term
savings through economies of scale while minimizing the
disturbances to which woul be associated with individual
subsequent construction.
The Department of Public Wor s feels that this is a necessary,
timely, and worthwhile pro�ect, and the engineering
recommendation is for approva of the order.
.
� ��� �fi�;';��`��
� `�`'`�,, 1;.� "°°��a?.
��.��:�\��`;���' ��'�.
,�{���`�' C
. � �`,� � ,�`�� �\� �r
• - �'�,�"��� ��`���` �a
• n _ ;F;::�\��,\ � �`.� .
I \\�\ \\,�<��
\�
.I����`I iII
� ��� I I I '' . n
. I�I�I II ±. • �
II���� f i� � �
, i�� �
� �� �� ;
II� , s�
�
_ � / �
. . - �■� � -
s�� , / �� . .
� l � _ .
��y III II .
•► � II � .
• .`�� • :� • .
•
a ��� , .�\ "�,., � °
1 � �• � .
_ � � ') a� ��
. / ��
/` a
II II'I�'I I ��ill -, •
� ���I��!I���i i ,,I
� �� !I�' ' �
��I����;�!i� - ' \���
� � • �,, � �
�� � �' ' � Ill�i�!�,'' �
� . �� ' I�II�IIII��� ��
� ���
� � ..
� n ,�Ill������ �''',!��.
'� --��' 1 `
� . l
■' � (
���i� ,
�• II�,.ir�I �� l
, .■' ��� �II,�'��Iil�ll��l. �I•Ilj�•�� IIII ,
�I,;IIII � ,ii
_ i ,llll�����,�i� ,�Ilil!, �
I V/��1� - ''''r�' :��� �
� ��r,:,
�� �� _,��,,�
____� { _ ._ ,
i— -��_ _``--�,�.�` �,'.
��
��_ //
' ._ . • . . � �
� . .. . . J� �i a�7
ARLINGTON WESTERN CSS
W
} z o 0
m � � �
?
W w � � Q ; o Z
Y Q ° w w z z � W o 0
v = � � v�i � � a � Q o
� U� Q V �? > I�i • � � � �
HOYT u u u u � u u u �
:«:
:,:
.».
15 �~:.
:�: �9
:,.;
��: �
A•
-0i:
:M• �j
:"«� Z L
•»:
. :..•.«:::,: .:>�...:. ::.�:::;:::::.::::;;'-:;: —
NE BR A SK A �?���:�:aii:'e1�iN(t�lww+i�i
16 I �:::;::s::.;::::�:.::
0 19 �g 13
8
:�
. :r: :a.
''',�' I .:�:t� 12 11 II
ARLINGTON un���n.�aun�� ����rr����nu�u��u�n�u�ar�a�au��u�u�nn��uu
::.:
: 13 . ;;;:
21 �..•. ,,._�:"'' I 7
O: �p '
::a�'2
3 23 �4 ' � ::�:
:.::. :::
.... :.;�
.:�. :=" :
_ ,::. ;r:� : ��::
::;�: : :�.
COTTAGE �:�::;:�:;:;:;:::�tii.'....'..:: ::s�� 24 �...•... >:-
!i ..... �u.....�...
:•... .... ;:• :
� :: � �t� � ' �� �
: �o �� � --
��:• 14 • -- M� --
�---" —
�4 --- ---- _-�-�� L.__
WHEELOCK PKWY. '� � ' . —'
�� __
.� � — ��
�' ��
. .
iQ. ��•
Q'�'
0`-� L E G E N D
STORM SEWER ������•••••.....•..
STREE PAVING
• SEWER SHEET NO. 12
PAVING SHEET NO. 18
� �9- a���
k. , . . . . . .. . . �� � ..� .. ' . . _ ._ ._
., i.<. . .�. . : � r��M�iA. ��vaM/� ��� �. . - � . . . . . .
�Gtiu�e�Y F31eNo.�$9-193B�.....gy Jsnir.e`Ae!
.,� ,; ' ` - •.
` �n t3�e Mat�er a#-�m�roviitg tiie ia�l " g qtreets bvit�;s•bitti£�fno�s�iNi��:<;;
concrete:curb abtZ gutters,concrete�drlv s�3►��$��rl�s�and.eci�3st�tctiag���� '
lantern style street lighting�rstem��}-Vo �V,�td 5: °
Anmdel Bt.�fr�n Hayt Ave.to�l�ac�c kwy.', ° , .
Cc�ha'�is�p St.from Nebraska�v�.:�;q. cc�Pkwy. �
� i�ot�ageAve.tro�x►Macktibin.�5t..to: PJswy.
- ,. ., ..
Ck�m�erland St.f�Ne6rasl�a Ave:�o . �igt�n A,�re, • " ,
�Fetltier,St.i�i+a�m Ar on Ave.to l b�loe sQUth bi�Cbt��qe Ave:
�Tebzacka�Lv�e fxqoa��ubin 8t;:t�o �'#�yq,
�e�t.e�n.A�°iro,�r,Neb�ska.Atie.tar ' � Aive.
_ �ack�wY fi�om�'+�qn�py�t.ta Aal aa Ave.. , i
AIl to b� knov��►'�a�.�h� A�rlingt�n<W� "A�ea St�et P�vi�,.ai�;Li�iiuj� ,
Projeit. . . ..� ���.; . .
� 3'ke Couacil of theCitj�of Saint Pai�'�' '�. '-'`. iiect'the�p�orE o#t�t�e M� `
ttpon the,�bove improve�t, and 'h j�'' iaered beid=.
resolves• ��� �
. � , , ., ;: . �:_,.
1:' That Che said �repe�t �aa+� the.: 3s. hereby approv�ed arfth no .
alteanatives,ant�tkat Ehe�stimat , ca�t ihsseoi is�.A00,fit►aaced by
Assesaznerits �16,�pQ; Sewer R�v e 8omds 3859,000.and 1899�apitai.
Improvemeat Sonds;370,000. .,` ;
, 2-. 1'het s pubiic�'�1�rYn�be�l..o� d i�prov'�t�tt o�r the����
�be��19�,at iR00 o'cloei��u3n., the:Co���be�_4 ; e , ,jt .
` � �t CitY;o�:BRa�at Paul. ,
3. That aotice of said public hearing given to the persons �t1`i�\4h�, ;
manner provided by t�e Charte��st ng the tixne and place ai•l�r�,
the nature of the improvement and �#o�al�st thereof as eati�d. :
File'�Io. 18582 ,
. Adopted bq the Council f�Otober 26, 1989 . • �
ApPreved October,3'�. 1'989. " •
` (November:4i0 1889)
. . - .
� �- ,����
. PSEL�i Y OR3lBR .. ,
�Council File No,89-`1�-L�3y��ait�R tmaii— - _
In the�atter of improving the fo11 ing streets with a bitumi�ous�p,aving; .�
c.oncrete curb and gutters,concr�te dri waqs and tsutwaiks and crnistructing a�
lan�ern style stiee4lighting system in tfn¢WaYd 3.
���� .
��^�t�44+��iif,, ,�y�i`��r� `+� " � ry ',-
�� ,`�I�M�+f�i�!. ,�" A�e, �'�
�������� �� ,,����� �� �
��� � �� F.�7i+,r
Westera�tve: from I+Tebraska Ave:to A mgton Ave. – , -
Wheeloek PYwy,from Cohansey St. to lington Ave:. .
All to'bP �nown a§ the Arlington/We ern Area Street�Paving and i,i�ting
Froject. '
The Council of the City of Saint PauY vixig-neceived the repoa�t-of the 3�Ese�#s
uPon the abovg improvement, and h ving considered said repc�rt, hei;eby
resoives: t�� 1 e
L That the said report and .the ssme is hereby .approved;: with nQ
altennatives,and that the es�ima ed cos�_thereof�s a945,000,fittaneed by -
tlssesg�nents $218,000; Sewes ge enue Bonds �359,000 and 19$Q Capital
Improvement$onds�370.000.
2. That a,gublic heariag•t,�had�o said improvement on f.he 2th c�a .• t �
�" e 1959,at 9: 0 o'cloc� , in the Counefl Chambers o e � ty
Hail.aad oui ouse �u ing the City of SainY paul:' '
3. That notice of said public heari � be given to the persons and in the
manner provided by the Gtiarter, stating the time and place af heariiig
the nature of th�e improvement the total cost thereof as estia�ated, �
Etle No. 18382 . _ ' ,
Adopted by the Couttcil October 26,1 89. �
Appmved:October 27, 1989.
(ATOVerntiei l�R 1�89) : ;